HomeMy WebLinkAbout2007-09-LYMAN CREEK RESERVOIR IMPROVEMENTS Y �M Lyman Creek
t u ra Reservoir
F aF .
Improvements
t September 2007
Y
IA Morrison-
• Maierle,Inc
Lyman Creek Reservoir
Improvements
September 2007
Outline
Project team ,p
Treatment
Building Improvements
Spring Development
Radon, Liner, Distribution
Schedule �gl
Work Load
r�
Morrison-
lilt Maierle,Inc
1
Lyman Creek Reservoir
.Improvements
��� September 2007
Organizational Chart
City of Bozeman
Principal in Charge Quality Assurance
Jack Schunk \ i Carl Anders
James HDR Engineering
Architectural, Nickelson,
Structural Amanda McInnis,P.E.,
P.E. Radon,Liner,
8 Distribution
Mechanical
Construction e.or
Electrical
& Hydraulic ._
Spring
Controls Analysis Flow Water Evaluation 4' m,A�
Control, Mikc +
Process Pi to Treatment
P 9 Kacztnarek,' � Morrison-
&Site Civil Jeff Ashley, P.G. �i Maierle,Inc
P.E.
Lyman Creek Reservoir
Improvements
September 2007
rI�:JSUJ�lJ r
Spring
Monitoring
1) Maintain existing hypo system,.._.
safety & storage concerns ,
2) On-site Hypochlorite Generation:
Salt + H2O + Electricity = NaOCI + H2 e,�
Generates Hypo solution < 1% ,.;:-OA:
Much less hazardous chemical
More stable '� Morrison-
More volume needed i� Maierle,Inc
Typical system consists of...
Add Salt Electrolytic Vent
Cells '
Hydrogen
Dilution
+ - Blower
Potable
Water +
To Application
-. 1
7 Point
-�
Water Brine Brine \
Softener Tank Pump
Chemical
Metering
Pumps
Lyman Creek Reservoir
Improvements
September 2007
Spring
Monitoring
new.-
Morrison-
- •• " iiti�Maierle,Inc
I
i
i
Lyman Creek Reservoir ;
Improvements
September 2007
rf��JSIIJ�II!
Spring
Monitoring
2) On-site Hypo Generation (cont):
O&M requirements
Salt handling
Various methods
Electricity
Relatively inexpensive
Morrison-
idi Maierle,Inc
Lyman Creek Reservoir
Improvements
September 2007
Ti, :J S'11J IJ!
Spring
Monitoring
3) Tablet Chlorinator:
Calcium hypo tablets
Similar to sodium hypo in chemistry
Bulk storage typically not used
Questions about accurate dosing
Morrison-
; a Maierle,Inc
r
t
Lyman Creek Reservoir
Improvements
September 2007
FY „ Spring
Monitoring
.a
a•
06/26/2002 = Morrison-
F, L h. _ _.. ii�Maierle,Inc
Lyman Creek Reservoir
Improvements
September 2007
Spring
Monitoring
Pacing by flow or chlorine dose
Dose pacing important with hypo
Residual chlorine at multiple points
Before reservoir
e•
Outlet control bldg
Chemical injection
i
Mixing -A Morrison-
Maintenance a Maierle,Inc
Safety
Lyman Creek Reservoir I
Improvements
September 2007
Building
Improvements
a•
Access, Heating and Electrical `'•mA�
Hydraulic Analysis - ARV
Piping Changes — 2,680 gpm Morrison-
Metering and Flow Control Valve Maicrl e,Inc
Telemetry and Controls
Lyman Creek Reservoir
Improvements
September 2007
Building
Improvements
I
I
e•
m A:
Access
Temperature Sensor/Alarm Jed�Morrison-
dd Maierle,Inc i
Lyman Creek Reservoir]'
Improvements
September 2007
Building
Improvements
i
1
\+ }�t 'l
s
Vestibules
Vents Morrison-
�� Maiorle,Inc
Pressure Transducer
Lyman Creek Reservoir
fs Improvements
Y1 September 2007
Building
Improvements
tv y
rat: !Jt� T-1
Access Morrison-
Remote Readout .4 aid Maierle,Inc
Telemetry?
Lyman Creek Reservoir
Improvements
September 2007
Spring
Monitoring
rJJr'l�� J,'J5'JUtI i�
Grid Power
Solar Power
Hydro Power ?
Morrison- i
Maierle,Inc
Lyman Creek Reservoir
Improvements
e�aw September 2007
Spring
Monitoring
J fJtJ l
I l ttj rt'l rJ rl�t WO
Hardwire `--
Radio AMON A
Morrison-
Cellular _;Maicrlc,Inc
Satellite
Lyman Creek Reservoir
Improvements
September2007
d - Flow
Measurement
Free Flow Parshali Flume
_Additional Measurement Points
n sar
.F'k
t1 3�
AliMorrison-
Maierle,Inc
Lyman Creek Reservoir
Improvements
September 2007
Spring
Development
�����►' sear
-11
Lyman Spring Development �Morrison-
Ad Maierle,Inc
Lyman Creek Reservoir
ril • Improvements
I September 2007
IKf
A q. pi
Aqfg
Spring
Aqfg Id.
Development
•. KMj
172
•Faf
MI Mq�
57
•.
Qpg
Kmi
10
a•a
ram:
., r Morrison-
ComplleAFromMBMG ���Maierle,Inc
Source of Water
Lyman Creek Reservoir
Improvements
September 2007
Spring
�� Development
OBJECTIVE
Have more water when
she project is complete!
If you are going to divert „�'
r4_ .
more water, you must put , ��4_ ° �
a diversion where the '--
groundwater is available.
Morrison-
. .J
i
Lyman Creek Reservoir
Improvements
September 2007 i
"'� The water flowing from s rin
r�� this drain(?) pipe either Deveopment '
>,� � by-passes the upper
r � � collector and its sheet
r.
^M`` �,� piling or comes in down-
- �� '-X�`�. stream from the sheet
piling.
�:�,,
` `� Is the flow from this pipe
enough to make up the `°°`°`�.
difference needed to
increase flow to equal '°
t the existing water right?
Morrison-
Probably not. �Maierle,Inc
•�: ��_
Lyman Creek Reservoir
Improvements
September 2007
��F� � '� - .,�:,�
i I � I Spring
How much groundwater Development
enters the stream between
'� this drain pipe?
•►:
and
�: f
I m�.
'� the old diversion point?
�. Morrison-
���Maierle,Inc
Where?
Lyman Creek Reservoir
Improvements
September 2007
Spring
Y Why does the groundwater Development
flow in from the side of the
:a> valley instead of day-lighting`
in the bottom of the valley?
n r
't Morrison-
we
' ''Cr,�"-t r ��Maierle,Inc
Lyman Creek Reservoir
ImprovementsIV
j
i
Does this hillside conceal a buried channel September 2007
on the south side of the valley? Spring
Development
i��Morrison-
Maierle,Inc
i
1
Lyman Creek Reservoi
Improvements
PROBLEM September2007
Spring
Where can we intercept more groundwater Development
before it becomes surface water?
If more water enters surface water down-
stream from collector boxes, it indicates
more groundwater flow is available:
However, that groundwater must be inter-
cepted as groundwater flow before it
surfaces and comes under surface water -
treatment rules.
Morrison-
r "� Maierle,Inc
I
1
I
Lyman Creek Reservoir
Improvements
y �•" September 2007
Subsurface Investigation Spring
Seismic refraction Development
Ground penetrating radar
.Verify with boreholes
Objectives:
Profile the bedrock surface t
Profile the water surface
A Look for preferred flow paths °
.Check groundwater elevations _
above and below upper spring
box sheet piling.
Find pipes, if possible, including�., p p p 9 .,; Morrisun-
drain(?) pipe. Maierle,Inc
t �< F ,;
Lyman Creek Reservoir
Improvements
September 2007
HDR
Engineering
Philip Brandhuber
s
EPA Regulations + Morrison-
Salvage Value Addli Maierle,Inc
Treatment Process Changes
Lyman Creek Reservoir
Improvements
September 2007
HDR
Engineering
Dick Sprague
ITT
t
Wsear
lIl I:
Repairs-Cost Benefit Analysis
Additional Sealing Morrison-
Maierle,Inc
Discharge Permit Requirements
Lyman Creek Reservoir '
Improvements
September 2007
r..
-r; HDR
Engineering
John Manion j
J StLJ!l rl JIJ / !.IIJ.
I
Efficient Water Use
Modeling
•� Minor Adjustments
~ Upgrade Pressure Reducing Valve - -
-Mandeville Farm Location?
-Baxter/1 1 th?
Morrison-
_ `Maierle,Inc
Lyman Creek Reservoir
_ Improvements
September 2007
i
Construction
i'.
'N
'y
JIJ rr!JC rJ JIJ, 4• m�'
Delivery Methods
Construction Observation Morrison-
�� Maierle,Inc
Contract Administration
Lyman Creek Reservoir
Improvements
2007 2008 2009 September 2007
SEP NOV JAN MAR MAY JUL MAY
Selection&Contract ®.■�■���... ■ Schedule
Pre-design Report ®:��■■■■.■■_■'
Preliminary Design ®®���®�■■■■ '■ir
Final Design&
Bidding Documents
Bidding ®®�®®®���■ ■
Construction -1
The timing of the Construction schedule is also
dependent on the desired operation of the facility
and scheduling plant shutdowns at appropriate times
to meet overall water operation objectives
MORRISON'
Ad MAIERLE.1,1.
Lyman Creek Reservoir
Improvements
September 2007
Staff
Workload
Team members are
committed to your
project and are available
as needed. 0.
I1 Y4_
m p'
" Morrison-
, Maierle,Inc
Lyman Creek Reservoir
Improvements
September 2007
Questions Questions
r
c'
y�.
Morrison-
.. _ Miierle,Inc