Loading...
HomeMy WebLinkAbout1987-07-01-AGREEMENT FOR PROF ENGINEERING SERVICES F AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES for WATER, SYSTEM IMPROVEMENTS on LY'MAN CREEK THIS AGREEMBNT made as of the lst day of � Jul 19 87 , by and between the City of Bozeman , a Municipal.. Corporation, hereinafter called the "owner" , and Sanderson/Stewart,/Gaston Engineering , Inc. , a Montana corporation, hereinafter called the "Engineer" , W I `1' N E S S E T H: WHEREAS , the Owner intends to complete an engineering design , deve- lapment of construction plans, specifications , caontract documents, and engineering services during construction for water system improvements on Lyman Creels supply, and WHEREAS , the Engineer represents that it is qualified to perform such services, is in compliance with the Montana statutes relating to the registration of Processional Engineers and is willing to furnish such services to they Owner; NOW, THEREFORE, the Owner and Engineer , for the consideration hereinafter set forth , agree as follows , I . The engineer agrees as fellows : A. To furnish all labor , inater. ials , equipment, supplies, anal incidentals necessary to conduct and complete the Engineea ` s portion of the project as defined in the sccape of work and to prepare and deliver to the Owner all reports , both written and verbal- , all plans, specifica- €:ions, bid documents, and other_ material as designated herein. B. To ascertain such information as may have a bearing on the work from units of government and private organ izatIons and shall. be authorized to procure information From other authorities besides the Owner , but shall keep the Owner advised as to the extent of these contacts and the results thereof. C. To prepare and present such information as may be pertinent and necessary in order for the Owner to pass critical judgment on the features of the work. The Engineer shall make changes, amendments or revisions in the detail of the work as may be required by the owniyr during the preliminary plan-in- hand review. When alternates are being considered , the owner shall have the right of selection. D. To conform to the requirements of the Montana Cone Annotated Title 18 "Public Contracts" and more particularly Sections 18-2-121 and 18-2-122, and all other codes of the State of Montana applicable to providing professional services including crudes and standards nationally recognized. E. To perform professional services in connection with the project and to serve as the owner ' s representative in those phase;- of the project to which this agreement applies. F. That, where State and Federal funds are involved , the necessary provisions to meet all requirements will be complied with and documents secured and placed in the bidding documents. C. To submit an estimated progress schedule as to time and costs at the beginning of the work and weekly progress reports thereafter unt:i.l complete to Owner ' s Task Directo,. if requested in writing . The reports will include any problems, potential problems, and delays as foreseen by the Engineer. Reports will be submitted in a timely manner to permit prompt resolution of problems. E. That the Owner shall have the right of review and examination of the Engineer ' s work and records pertaining to this project' s accounting at all times. 1 . To name a Task Director who shall he the liaison between the Owner_ and the Engineer. For this; project the Task Director designated is Mr. Gerald M. Gaston, .I.E. T . The Engineer shall_ perform the work covered by Lhis agreement which includes- -2- A. SCOPE OF WORK 1. Lyman Creek Spring ]development: To include the engineering design and preparation of construction documents for the field investi- gation and flow monitoriilg of Lyman Creek Spring, This contract will.. also include surveying, field engineering and construction inspection of work conducted by the Contractor in the performance of his duties. Scope of work shall include design of access road from the end of existing access ,road to the spring, development of construction 4' specifications for excavation at the spring site, flow monitoring requirements, turbidity, and silt containment, site gracing and clean up. After completion of design and construction docu- ments are approved, this project is to be adver- tised, bid award made and the issuance of a Notice to proceed performed separately and independently of other construction contracts awarded under this engineering agreement, and in accordance with City of Bozeman direction. 2. Lyman Creek Reservoir Covering: To include the engineering design and preparation of construction documents to cover the existing reservoir. This contracts will also include field engineering, surveying, Lurid construction inspec- tion of work oonductod by the Contractor in the performance of his duties. Scope of work shall include the design of a floating cover complete with support devices, roof drain system, access hatches, baffling, and operation/maintenance manual. This item is to be bid in combination with or completely separatE! of other project items con- tained herein, in accordance with City of Bozeman staff direction. 3. Lyman Creek Reservoir Yard Pining , Turbidity Monitoring, Chlorination Facil. ti,�S, Bypass Flow Control System and Associated Building Structure: To include the engineering design and preparation of construction documents to include field engi- neering, surveying and construction insp ction of work conducted by the Contractor in the perfor- mance of his duties. -3-- Scope of work shall include the design of yard piping replacement within the confines of the reservoir area. Piping severely corroded and deteriorated including concrete manholes, valves and boxes , and all miscellaneous items, which are accessible by means of excavation to depth not- to-exceed fifteen feet or not requiring major concrete removal , shall be included if necessary. Chlorination system shall include Lhe use of tort cylinders, and have sufficient capacities to pro- vide required chlorine residual,. Turbidity monitoring and bypass flow control shall, be capable of monitoring incoming turbidity values and automatically bypass raw water from the reservoir. 4. Line Replacement, New Raw Water Piping and Diver- sion Structure : To include the engineering design and preparation of construction, documents including field engi- neering, surveying and construction inspection of work conducted by the Contractor in the per- formance of his duties. v Scope of work shall include the design of line w : +MV replacement of the existing V.C.P. (vitrified �•�"' .1"" clay pipe) located between the existing diversion structure and the newer installed U. T .P . (ductile iron pipe) . Installation of new piping from the existing diversion towards, the Lyman Creek Spring to the location of the new diversion, including the new diversion. Flow control valving , pressure reducing valves and air release structure shall be included. 5. Miscellaneous Any work associated with the operation of existing facilities such as draining reservoirs, operation of valves, or visual inspection of existing facili- ties shall be done in the presence of City person-- . r nel. Actual_ drainage of reservoir or isolating ...fc of pipeline, i.e. : valve operation, flood control gate and head gate operation, shall be performed „a" i� '�,,,• by City personnel.. 4,h' Access to sites under control. by the City shall be made available to the Engineer for the purposes of the preliminary evaluation. -4- B. MLIMINARY DESIGN SERVICES 1. Prepare preliminary drawings of selected elements of the project for review by Owner . 2. Perform the engineering surveys required for design of the project. 3 . perform subsurface soi . investigation and geo- technical engineering required for the design of the project. 4. Research available record , report, plans and studies which relate to the project. 5. Provide City Engineer with preliminary plans :for comments. 6 . Review project with princila,al- property owner; to provide coordination, 7 . Prepare exhibits and legal- descriptions for necessary easements, and necessary right-of- way permits such as highways , railroads , etc. , complete with Engineer and/or Surveyor ' s Certificate and with necessary backup infor- mation (title reports, previous easements , etc. ) . S . Prepare a complete traffic control plan to be used during the construction of the project. The plan will. show the required detours, the required Signing and , if necessary, the required construction phasing and public notification. C. VINAl, DESIGN AND CONTRACTOR SERVICM : 1. From the approved preliminary drawings, prepare and furnish final drawings , specifications and ether_ contract documents for, review if required by reviewing agencies. 2. Prepare contract documents (basic specifica- 'Uion to the "Montana Public Works Standard Specification" ) and review with Owner . 3. Stamp and siren all. plans and specifications with seal of professional Engineer in charge: if re- quired by reviewing agencies. 4. Provide final estimate of design quantities and costs. 5. Based on final elan-in-hand and Owner review, prepare final, plans rioted in C (1) , above, in Sufficient number for bidding and contracts. (Five sets for owner ' s use) . 6. Engineer shall provide bid package to interested parties and may charge a fee for each package which is based oil cost of preparing and administering the package. 7 . Provide and hold a pre-bid conference. 8 . Assist Owner; during laid advertisement and answer Bidders ' questions. 9 . Provide bit] tabulation sheet for at least the two lowest bids by Wednesday noon following Monday bid opening, with the tabulat:iorl sheet also to :show Engineer ' s estimates. 10. Analyse contractors from standpoint of skill anti experience , facilities for performing tine work, financial responsibility, previous satisfactory performance, previous timely performance and any other matters touching on the ability of the Contractor to effectively and efficiently perform the work and make recommendations on awarding of contract. n. CONSTRUCTION SERVICES : 1. Schedule and hold a pr.c-construction meeting. Z. Provide personnel, equipment and supplie.- for construction layout and control , including line and grade control staking and blue+ topping. 3. Review the construction operations and the traf- fic controls for, construction, prior, to the start of work. Ascertain that the Contractor has all needed permits to accomplish his work during construction. 4. Perf'orrn appropriate testing of materials intended for incorporation into the project and required documentation of this pre-qualification. 5. Provide general review of olonstruction to check the Contractor ' s work for compliance with the drawings and specificatio475, quality control and monitoring of safety measures. Review of work -6- shall. be made on a full-time basis while any major item of work is in progress. Major items of work shall be pipe laying, backfil.l.ing pipe- line testing, Base laying, concrete pouring, paving and reservoir roof installation. The Engineer shall provide a minimum of 48 hours' notice for Owner personnel when specific inspec- tions or testing required their presence on the project. Each daily review shall include the Contractor ' s activities, progress and weather conditions and shall be documented in permanent reproducible form and kept in consecutive order with the project file. Copies of the daily review reports shall be furnished the Owner as requested. Engineer will, notify the Owner, of contract problems or deviations from approved plans. 6. Make prompt d( cisions on request from Contractor for clarification or interpretation of tf)e drawings and specifications. 7 . Prepare written weekly activ_?_ty and progress reports and submit to the City' s Task Director . S. Provide the services of a qualified materials engineering technician who will observe construc- tion and provide representative tests. 9 . Reference and preserve all existing survey monu- ments and benchmarks. All intersection monu- ments required within the project shall be punched, located and elevations shown on as- builts. 10. Act as the Owner ' s authorized representative in inspecting and coordinatirzg the excavation work of private contractors and utility companies within the public right--of-way of this project. The Engineer shall make necessary test: to ensure compliance with project specifications or City Codes where faulty excavation or ba,ckfill work may, result in damage to improvements. The Eagineer shall record the location of all. underground utilities installed under streets and on the sui face within the public right-of- way and show these facilities, together with a representation of the general_ corridors in which other underground utilities are located, on the as-built drawings. -7- 11. Check :chop drawings, samples, equipment and other data submitted by the Contractor for compliance with drawings and specifications. 12. Prepare change orders which do not require addi- tional engineering design or inspection. 13 . Prepare monthly progress estimates and final, pay estimates for construction and make reconrmen- dations for payment. Prepare contract admini- stration forms on a monthly basis. These will be submitted in owner approved formats. 14. Copy all correspondence to Contractor to Owner ' s "Task Director simultaneously. 15. issue notice to the Contractor to suspend work in whole or in part; when , in the opinion of the Bngineer , work is not boing or cannot be per- formed in aQcordance with the Contract Documents. 16. Prepare plan and specification chances when required clue to any initial design and engi- neering deficiencies in order to complete the project in its original concept, and, after: approval by the Owner , prepare change orders therefor•" . FINAL SERVICES 1. prepare as-built drawing; and furnish the Owner one ,yet of reproducible mylar within 60 days of submittal. of Contractor ' s final payment and before final. payment to the Engineer: . 2. Make final inspection with the owner and certify to the Owner all construction items were constr.rtrctr-.rl according to plans and specifications and are acceptable to the Fngineer . 3 . Schedule and make an inspection with the Owner prior to expiration of the construction warranty period and provide a cer-tification of final acceptance. It any problems are found , send a list of deficiencies to the Owner and Contractor and continue monitoring project: until. acceptable. 4 . ror a period of one, year after the final. inspec- tion as outlined in Paragraph (2) , respond to requests for information concerning engineering -8- aspects of the project, and provide engineering design and plans, if necessary, to correct any design deficiencies. 5. Pre�a,re a final design report complete with design calculation,, assumptions and data base. F. EXTRA SERVICES of the Engineer will be paid only with w ten pr ar authorization by the Owner . 1 . Reset monuments Lost or destroyed by construction of this project when restoration of such monu- ments is not the liability of the Contractor . 2. Provide construction review service in excess of the basic review specified in scope of work under constTuction services. 3. Provide coazstructi.on review of major it�2ms of work after expiration of one year after contract, construction contract completical, time. 4 . Prreprare change orders which do require addi- tional engineering design or inspection under Scope of Work, Construction Services (Section II (D) herein) . III . The Owner agrees to provide the Engineer with all availa- ble information pertinent to the project and to perform the following services: A. Give thorough consideration to all reports, estima- tes, drawings, specifications, proposals, change orders , payment claims, and other documents presented by the Engineer and shall inform the Engineer of all. decisions within ten (1.0) working days. B . Furnish the Engineer with a copy of any design and constuotion standards the Engineer shall be required to follow in the preparation of Contract Documents. C. Le responsible for choosing a contractor on Engineer ' s recommendations. D. Name a Task Director who shall be the liaison between the Engineer and the Owner . For this project the Task Director designated i, Phill Forbes. IV. The Owner ' s payments to the Engineer . A. Payment for services of the Engineer . -9- The Owner shall pay the Engineer for services per- formed under Articles II .A through II .0 and II .E of this agreement a total lump sum fee as defined below. 1. Lyman Creek spring development Preliminary and final. design services: h Two thousand two hundred fifty dollars ($2 , 250 . 00) . V Contractor services: One hundred fifty dollars ($150. 00) . 2. Lyman Creek reservoir covering: ,3I10l��' Tc:n thousand nine hundred eighty dollars ($10 ,980 . 00) . 3 . Lyman Creek reservoir yard piping : g63•�� H� Ten thousand thirteen dollars ($10 , 013 . 00) . 3 4 = Z, r 4. Raw water line & diversion pond replacement:1 � Twenty-seven thousand nine hundred seventy dollars ($27 ,970. 00) . B . The Owner sfiall pay the Engineer for services per-- , formed under Articles II . D of this agreement a total lump sum fee as defined below. n 1. Lyman Creek spring development (II .A. 1) : One thousand one hundred fifty dollars ($1 , 150 . 00) . 2. Lyman Creek reservoir covering (II .A. 2) : od Four thousand twenty dollars ($4 , 020. 00) . � e SqZ. - � 3 . Lyman Creel: reservoir piping (II .A. 3) : Eight thousand five 1•iundred fifty-two dollars ($0 ,552. 00) . 9 4. Raw water line and diversion pond replacement �Crac� (II .A. 4) : 'Thirty-•two thousand twenty dollars IUUA ($32, 020. 00) w` C. Method of Pawment f` 1. For services rendered under Article II .A through II .0 and .II .E of this agreement , payment shall be due the Engineer within 30 days following comple- tion of cLe design work and receipt of the Engineer ' s invoice. 2. For services rendered under Article II .D of this agreement, payment shall be due the Engineer within 30 days following receipt of Engineer ' s invoice. Billing of lump sum amount shall he in accordance with percentage completion of contruc- tion (i . e. : at 35% complete construction billing for engineering fee shall. be 35% of lump sum fee) . -10- 3 . No deduction shall be made the Engineer ' s coml;,)en-- sati.on on account of penalty, liquidated damages or tither amounts withheld from payment of Coxit,rac,- tor. D. Payments for extra services when authorized by the Owner. 1 . Construction review in excess of basic services as defined in this agreement shall be paid for an hourly basis at the applicable fee in Table A. 2 . Preparation of change orders which do require additional engineering design or, construction review shall be paid for on an hourly basis and the applciabl.e fee in Table A. TABLE A HOLI-rly is ec 1chedule Professional, Engineer $48. 00 Project Engineer $42. 00 Engineering Technician $28. 00 2-Man Survey Party $50. 00 3-Man Survey $58. 00 Inspector $32. 00 Draftsman $20. 00 Clerical $M 00 Thc, aforementioned itemized schedule includes direct labor_ costs, normal payroll and overhead costs f transportation, furnishing equipment and materials normally required for performance of the work and reasonable profit. Direct project casts not itemized herein shall be paid i_'or at actual cost. V'I. The Owner and Engineer further agree to the following conditions ; .11_ A. EMPLOYMENT: The Engineer warrants that he has not employed or retained any company or persons, other than a bona- fide employee, working solely :for the Engineer , to solicit or secure this Contract, and that he has not paid or agreed to pay any company or person, other than, bonafide employees working solely for the Engineer , any commission , percentage, brokerage fee, gifts or any other considerations contingent upon or resulting from the award or: making of this Contract. For breach or violation of this warranty, the Owner shall have the right: to annul. this Contract without liability, or at its discretion to deduct from the consultants ' fee , or otherwise recover the full amount of such commission, percentage, brokerage :fee, gift, or contingent fee. Any and all employees of the Engineer or other: per- sons while engaged in the performance of any con- sidered employees of the Lngineez only and not of the Owner , and any and all claims that may a�itie under the Workman' s Compensation Act on behalf" of said employees or other persons while so engaged and any and all claims made by a third party as a consequence of any act or omission on the part of the Engineer ' s employees or other persons while so engaged shall be the sole obligation and respon- sibility of the Engineer . The E°ngiTieer shall be subject to and comply with Title VI of the Civil.. Rights Act of 1964 ; Section 140, Title 23 , United States Code, and all regola- tioals promulgated thereunder . The Engineer shall comply with all provisions of Equal Emp,loyrnent Opportunity (EEO) and Disadvantage Business Act (DBA--Minority and Hlomen ' s Business Enterprises) . B. DECLARATION OF' FINANCIAL INTEREST: The Engineer horeby declares that: the Engineer ' s partners, principal shareholders, officers , and pro- fessional engineers assigned to or otherwise working on the projects or in any way associated with the Engineer does not own any equitable or legal rights to property Within the project, whether public. or private, or have any interest either directly or indirectly in tho project except for the remunera- tion provided herein. -1 ?- C. TERMINATION: (1.) The Owner shall have the right to terminate this agreement for default should the Owner determine that. the Engineer is failing to pro- secute the work in a manner which assures timely completion or that the Engineer is not performing any of tho provisions of this agreement. If the Engineer shall default: in or fail to perform any of its obligations under this agreement, and such default or ,failure shall continue for a period of den (10) days after written notice specifying the default is deposited in the United State malls addressed to the Engineer at 61.8 West Griffin, Bozeman, Montana, 59715, or such ether address as Engineer shall provide to Owner from time to time , then the Owner shall not be Liable for any further payment to the Engineer whatsoever and the Engineer shall be liable for any casts to the Owner resulting from the termination. The Owner ' s rights herein are in addition to any other remedies it may have under the law. (2) The Owner shall also have the aright to ter- minate this agreement for its convenience upon seven (7) days ' written notice . If the Owner termiantes for its convenience, the Engineer shall waive any claims for damages including lass of anticipated ,praf its p and as the sole right and remedy of Engineer , Owner shall, pay the Engineer for the work performed pursuant to the payment schedule in this agreement: plus any reasonable coasts incidental to the termination of the work. D. LIABILITY: The rngineer agrees to indemnify and save harml.eess the Owner , its officers, agents and eirployees against and from any and all actions, Suits, claims, demands, expenses (including a reasonable attorney' s fee) or liability of any character whatsoever brought: or asserted for injuries to the death of any person o>: persons, or damages to property arising out of, resulting from or in connection �aitjh the performance of the work herein specified. The Owner agree, to indemnify and save harmless the Engineer for any claims, damages, or liabilities arising from any negligent: act, action, neglect, omission or default by the Owner , its contractor , and their agents or employees, -13- E. INSURANCE : Without limiting any of Engineer ' s obligations hereunder , Engineer shall secure and maintain, until the work is completed and accepted by the Owner , insurance coverage naming the Owner a, additional Assured (with the exception of Workers ' Compensa- tion) with minimum insurance coverage as follows: Type oL Coveray Limits Workers ' Compensation: In accordance with the brow of the State of Montana Statutory R�m�a,l.oyers ' Liability: $ 100 ,000 per accident General Liabi_lity:l Bodil,y Ira jury 51 , 000 , 000 each occurrence Property Davwa2 including $ 100, 000___ -4300 000 coverage for damage caused by Each tOccurrence aggregate blasting , collapse or structur- al injury and/or damage to underground facilities --or- Vodi,;ly Injury & Property Oamay-, Single abet caa�nhined g mil , OOrI , 0O0. OU Automobile: Bodil _ 1.n7ur covering all $ .5..00000. 0._0_ $1 , 000•r( go. 00 automobiles, truck , tractors , Each xh 'sQn Each occurrence traitors or other automotive equipment whether awned or rented by Engineer or owned by employees of Engineer- Property Mac covering all, $ S00&00. 00 Bach occurrence Glutomobiles, trucks, tractors, �� � trailers or :ether automotive equipment whether awned or rented by Engineer or owned by employees of Engineer. -or- Bodily 1QUEJ & Proem Pamage Single and combined 500 '000. 00 Professional Errors & Omissions: $ 500�QQn OO per claim and aggregate -14- Engineer will, before commencing work on this agreement, deliver certification of such insurance to the Owner. lGener'al liability may be obtained by the Construction Contractor naming owner , Engineer and their officers , agents and employee, as additional. insureds. F. OWNERSHIP OF DRAWINGS : All drawings, specifications and information relating to the projects and prepared under the terms of this agreement, including schedules, ,reports , data, recommendations , exhibits , analy- ses and plans shall become the property of t:he Owner and will , at its request, be delivered to the Owner , but Engineer may retain and use copies thereof in furtherance of its know-how. The Engineer ' s drawings and specifications are not intended for use on other pzojec:ts nor doer Engineer represent that they are suitable for use by the Owner on any project other than the one for which they were prepared. Any reuse by the Owner without the writtenronsent of the Engineer will be at the owner ' s sole risk. G. PROPRIETARY RIGHTS : If patentable discoveries or inventions should result from work required herein, all rights accruing from such discoveries or inventions shall be the property of the Owner . N. TIC : The Engineer shall commence work upon the execu- tion of this agreement and shall complete all work necessary in a prompt manner , Provided , however , that if the completion of this agreement is dLllayed as a result of causes not .reasonable fort seeable which are beyond Engineer ' s reason- able control and without its fault or negligence such as acts of the Owner , strikes or acts of God , then and in such evens the time of comple- tion of this agreement shall be extended for such additional time within which to complete the per- formance of the contract as is required by such delay, and the Engineer shall give the Owner written notice setting forth the reasons and justification for such additional time claimed undr�r this paragraph. Failure on the part of the Engineer to give the Owner such notice shall. constitute a waiver of Lhi..s paragraph by the Engineer . I. WARRANTY Engineer warrants that it will provide its ser- vices in accordance with the standards of care, skill and diligence normally exercised by a pro- fessional engineer in the performance of such engineering services. If any such service should be discovered to be not in conformance with this standard, the Engineer shall, at tile Owner ' s request, reperform the service at its own cost, J. CHANGES IN WORK: The Engineer shall make such revisions in the report, plans and specifications which have been completed, approved, and accepted by the Owner as are necessary to correct the Engineer ' s error, or omissions when required to do so by the Owner , without additional compensation therefore. K. INnEpENDENT CONTRACTOR: It is agreed that the relation established by this agreement between the Engineer and the Owner is not that of agent and principal , nor servant and master , nor Employee and Employer , but that:, on the contrary, the relation between the Engineer and the Owner is purely contractual in the performance of the work herein specified, the Engineer being an independent contractor, respon- sible to the Owner only as to the results to be obtained in the work herein specifies] and to the extent that the work shall.. be done in accord xnce with any design , construction standards or other terms furnished by the Owner . L. EXAMINATION OF RECO�;ba : The Owner or its representatives shall have thc� right to examine any books, records or other documents of Engineer directly pertaining to cost, or hours worked wrtaen such Fasts or hours are the basis of compensation to Engineer hereunder. M. COMPLETE AGREEMENT: This document , together with 311 attachments ,referenced herein, constitutes the cnii1pl.eto agreement: between the parties and supersedes all. prior negotiations, represen .atiorns or agree- ments, written or oral. The agreement may be amended only by written instrument signed by Owner and Engineer. -IC- N. NO ASSIGNMENT: It is expressly agreed that this agreement shall. not be assigned in whole or in part by either party hereto without the previous consent of the other party in writing. 0. LEGAL, RELATIONS : The Engineer shall. comply with all Federal , State and Local, laws and ordinances applicable to the work to be done. P . ENDORSEMENTS : The Engineer shall furnish professional stamps , statements, or other suitable means to signify responsible endorsements of work , on all drawings and reports furnished by him. Q. PUBLIC INFORMATION: The Engineer shall not issue any statements , releases , or information for public dissemination without prior approval of Owner . R. LITIGATION LOCATION: In the event litigation is pursued under this Coi:tract, it will. be in the District Court of Gallatin County. S . GOVERNING LAW: This agreement shall be gove:ened in all respects by the laws of the State of Montana. T. STJCCESSURS AND ASSIGNS : This agreement shall inure to the benefit of and be binding upon the parties hereto and tis part- ners , successors , assigns and legal representa- tive,. IN WITNESS WHEREOF the parties hereto have made and executed this Agreement the day and year first above writ- ten. OWNER: ENGINEER: THE CITY OF BOZEMAN SANDERON/STEWART/GASTON ETIGINEERING, INC. By Tj City Manager I "s ice Pres ' nt ATTE : --17 Clerk of the Commission City