HomeMy WebLinkAboutResolution 3297 Authorize City Manager to sign Change Order 2 (PEC), 1998 sewer improvement
------..-..-..... -.. -...---.-.
COMMISSION RESOLUTION NO. 3297
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT
WITH PLANNED AND ENGINEERED CONSTRUCTION (PEC), INC., HELENA,
MONT ANA.
WHEREAS, the City Commission did, on the 6th day of July 1998, authorize award
of the bid for 1998 sanitary sewer improvements to Planned and Engineered Construction
(PEC), Inc., Helena, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations or modifications of the specifications and/or plans of the contract be made by
resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make
alterations or modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana, that the proposed modifications and/or alterations to the contract
between the City of Bozeman, a municipal corporation, and Planned and Engineered
Construction (PEC), Inc., as contained in Change Order No.2, attached hereto, be and the
same are hereby approved; and the City Manager is hereby authorized and directed to
execute the contract change orders for and on behalf of the City; and the Clerk of the
Commission is authorized and directed to attest such signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana,
at a regular session thereof held on the 21 st day of June 1999.
ATTEST: ~~~~YO~
()).: J A~~
ROBIN L. SULLIVAN
Clerk of the Commission
APPROVED AS TO FORM:
-------- n_.._ -....--.