Loading...
HomeMy WebLinkAboutResolution 3297 Authorize City Manager to sign Change Order 2 (PEC), 1998 sewer improvement ------..-..-..... -.. -...---.-. COMMISSION RESOLUTION NO. 3297 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION/MODIFICATION OF CONTRACT WITH PLANNED AND ENGINEERED CONSTRUCTION (PEC), INC., HELENA, MONT ANA. WHEREAS, the City Commission did, on the 6th day of July 1998, authorize award of the bid for 1998 sanitary sewer improvements to Planned and Engineered Construction (PEC), Inc., Helena, Montana; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Planned and Engineered Construction (PEC), Inc., as contained in Change Order No.2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change orders for and on behalf of the City; and the Clerk of the Commission is authorized and directed to attest such signature. PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 21 st day of June 1999. ATTEST: ~~~~YO~ ()).: J A~~ ROBIN L. SULLIVAN Clerk of the Commission APPROVED AS TO FORM: -------- n_.._ -....--.