HomeMy WebLinkAboutA201 - ELEVATIONS_East 05-14-2021LEVEL 1
100'-0"
LEVEL 2
109'-6"
LEVEL 3
119'-0"
1" / 12"
9'-
6
"
ABC
W1 W1
W1 W3 W1
W1
090
1
3 3
4
5
ROOF BRG.
127'-6"
33
'
-
1
0
"
6
FS1
FP1 FP1
S1
FP2
9
LEVEL 1
100'-0"
LEVEL 2
109'-6"
LEVEL 3
119'-0"
9'
-
6
"
123. 4567
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
W1 W1 W1 W1 W1 W1 W1 W1 W1 W1
W1 W1
W1 W1
W1 W1
104A
205A
305A 304A
102A
203A
303A 302A
22
2 2
2
2
2
2
2
2
2
2
2
2
2
2
2
3
3 3 3
ROOF BRG.
127'-6"
777777FP1 FS1 FS1 FP1 FS1 FP1 FS1 FP1 FS1 FP1 FS1 FP1
S1 S1 S1 S1
2
9 9 9
LEVEL 1
100'-0"
LEVEL 2
109'-6"
LEVEL 3
119'-0"
1" / 12"
9'-
6
"
A B C
W1 W3
W1 W1
W1
W1
3 3
4
5
ROOF BRG.
127'-6" FP2
FP1 FP1
S1
6
8
9
9
FS1
LEVEL 1
100'-0"
LEVEL 2
109'-6"
LEVEL 3
119'-0"
9'
-
6
"
1 2 3. 4 5 6 7
W1
W1
W2 W2
W2 W2
W1 W2 W2 W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1 W2 W2
W2 W2
W2 W2
W2 W2
W2 W2
W2 W2
300B 301B
200B 201B
101B
302B 303B
202B 203B
102B 103B
304B 305B
204B 205B
104B
3 3 3 3 3
3
3
5
4 4
5 5
4 4
5
4
5
4
5
5
4
ROOF BRG.
127'-6"
FP1
S1
FS1
FS2
FS1
S1 S1 S1 S1
S1
FP1
FS1
FS2
STANDING SEAM METAL
ROOF - TAYLOR METALS
SRI-22
10 10
10 10
10 10
10 10
10 10
10 10
10 10
10 10
10 10
FIBER CEMENT SIDING
FIBER CEMENT PANELS
FS1
FP1
FP2
FIBER CEMENT PANELS
FIBER CEMENT SIDING
FS2
HARDIEPLANK - AGED PEWTER
HARDIEPLANK - BOOTHBAY BLUE
HARDIE REVEAL - PEARL GRAY
HARDIE REVEAL - BOOTHBAY BLUE
S1
STONE VENEER
ELDORADO STONE - DARK RUNDLE
COPYRIGHT 2020
STEELE ASSOCIATES
ARCHITECTS
All rights reserved. Reproduction or use in any
form or by any means- graphic, electronic,
mechanical, etc.- without written permission of
STEELE ASSOCIATES ARCHITECTS is
unlawful and subject to criminal prosecution.
AS
S
O
C
I
A
T
E
S
A
R
C
H
I
T
E
C
T
S
L
L
C
68
6
N
W
Y
O
R
K
D
R
I
V
E
S
U
I
T
E
1
5
0
B
E
N
D
,
O
R
9
7
7
0
3
54
1
.
3
8
2
.
9
8
6
7
F
A
X
5
4
1
.
3
8
5
.
8
8
1
6
i
n
f
o
@
s
t
e
e
l
e
-
a
r
c
h
.
c
o
m
JOB NO.
DATE
DRAWN BY CHECKED BY
SHEET NO.
5/
1
3
/
2
0
2
1
1
1
:
4
0
:
0
4
A
M
A201
AS/STS BC
20114.01
PE
R
M
I
T
S
E
T
-
0
9
.
1
1
.
2
0
2
0
EL
E
V
A
T
I
O
N
S
ELEVATIONS
09.29.2020
FA
L
L
O
N
S
T
R
E
E
T
BO
Z
E
M
A
N
,
M
T
5
9
7
1
8
FA
L
L
O
N
A
P
A
R
T
M
E
N
T
S
1/8" = 1'-0" 2 SOUTH ELEVATION
1/8" = 1'-0" 3 EAST ELEVATION
1/8" = 1'-0" 1 NORTH ELEVATION
1/8" = 1'-0" 4 WEST ELEVATION
GENERAL NOTES AND LEGEND:
KEYED NOTES:
• SEE SHEET A001 FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS.
• SEE TITLE SHEET FOR DRAWING INDEX.
• DO NOT SCALE DRAWINGS.
• CONTRACTOR / SUBCONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
CONDITIONS BEFORE BEGINNING WORK, AND SHALL REPORT TO THE
ARCHITECT ANY ERRORS, INCONSISTENCIES OR OMISSIONS BEFORE
BEGINNING WORK. SEE GENERAL NOTES AND SPECIFICATIONS.
• SEE ELEVATIONS FOR EXTERIOR MATERIAL HEIGHT/LOCATIONS.
1 KNOX BOX, COORDINATE LOCATION WITH FIRE MARSHAL
2 DRYER EXHAUST, COORDINATE LOCATION WITH INTERIOR SOFFIT AND PROVIDE
3' CLEAR TO OPERABLE PORTION OF WINDOWS
3 CAST STONE SILL.
4 PREFINISHED METAL GUTTER.
5 PREFINISHED METAL DOWNSPOUT.
6 ELECTRICAL EQUIPMENT, SEE ELECTRICAL DRAWINGS.
7 EXTERIOR LIGHTING, SEE ELECTRICAL DRAWINGS.
8 MECHANICAL SCREEN
9 3' COVERED ENTRY
10 PTAC SCREEN, PAINTED TO MATCH ADJACENT SIDING
MATERIAL LEGEND:
TOTAL FACADE TRANSPARENCY: 720 SF
TOTAL FACADE AREA: 4,465 SF
16.1%
TOTAL FACADE TRANSPARENCY: 198 SF
TOTAL FACADE AREA: 1,175 SF
16.8%
TOTAL FACADE TRANSPARENCY: 864 SF
TOTAL FACADE AREA: 3,390 SF
25.4%
TOTAL FACADE TRANSPARENCY: 198 SF
TOTAL FACADE AREA: 1,175 SF
16.8%
REV. DATE DESCRIPTION