HomeMy WebLinkAboutResolution 3314 Change Order 3 modification for PCE, sewer improvement
COMMISSION RESOLUTION NO. 3314
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONT ANA, APPROVING AL TERA TION/MODIFICA TION OF CONTRACT
WITH PLANNED AND ENGINEERED CONSTRUCTION (PEC), INC., HELENA,
MONTANA.
WHEREAS, the City Commission did, on the 6th day of July 1998, authorize award
of the bid for 1998 sanitary sewer improvements to Planned and Engineered Construction
(PEC), Inc., Helena, Montana; and
WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such
alterations or modifications of the specifications and/or plans of the contract be made by
resolution; and
WHEREAS, it has become necessary in the prosecution of the work to make
alterations or modifications to the specifications and/or plans of the contract.
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana, that the proposed modifications and/or alterations to the contract
between the City of Bozeman, a municipal corporation, and Planned and Engineered
Construction (PEC), Inc., as contained in Change Order No.3, attached hereto, be and the
same are hereby approved; and the City Manager is hereby authorized and directed to
execute the contract change orders for and on behalf of the City; and the Clerk of the
Commission is authorized and directed to attest such signature.
PASSED AND ADOPTED by the City Commission of the City of Bozeman, Montana,
at a regular session thereof held on the 16th day of August 1999.
~~
MARCIA B. YO GMAN, Mayor
ATTEST:
9d~ 01 ~
ROBIN L. SULLIVAN
Clerk of the Commission
APPROVED AS TO FORM:
CHANGE ORDER
ORDER NO. 3
DATE 7/7/99
AGREEMENT DATE: AUli!ust 18. 1998
NAME OF PROJECT 1998 Sanitary Sewer Improvements
OWNER City of Bozeman
CONTRACTOR P.E.C.. Inc.
The following changes are hereby made to the CONTRACT DOCUMENTS:
The addition of two (2) external service connections to the lined six inch line on South 6th
Avenue.
Justification: Due to the poor condition and small size of the host pipe, internal reinstatement of the
services were not possible.
Attachments: None.
Original CONTRACT PRICE:
$ 111.647.40
Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $ 166.106.94
The CONTRACT PRICE due to this CHANGE ORDER will be (increased) by:
$ 2.400.00
The new CONTRACT PRICE including this CHANGE ORDER will be $ 168.506.94
CHANGE of CONTRACT TIME: N/ A
The CONTRACT TIME will be (increased)(decreased) by N/ A calendar days.
The date for comple.?on of all ~ill be ;Changed fr':::;:nal .
Recommended by: ~~ L d2- -; e:#<;:
Ordered by: -~T I. ~I f/roJ. fZ1(jI IE c.
Accepted by: ..\ -
5_ d\Jobs\B96-24\OffcDocs\Chageor3.doc