Loading...
HomeMy WebLinkAboutA2ConstructionSiteManagementPlan_012820211. THE STREET VISION TRIANGLES MAY NOT BE IMPEDED DURING CONSTRUCTI ON, ACCORDING TO THE LOCATION INDICATED IN THE CIVIL DRAWINGS. 2. CONSTRUCTION AND ROAD CLOSURES MUST BE COORDINATED WITH STREAMLI NE BUS SERVICES SO AS NOT TO DISRUPT ESSENTIAL SERVICES. 3. THE PERIMETER OF THE SITE WILL BE BARRICADED FROM THE PUBLIC WIT H A 6' TALL CONSTRUCTION FENCE. ACCESS WILL BE THROUGH GATES. CONSTRUCTION W ILL BE STAGED ON WEST BEALL STREET. 4. CONSTRUCTION TRAFFIC WILL USE HWY 191/MAIN STREET AS THE PRIMARY ROUTE THROUGH THE CITY TO ACCESS THE PROJECT SITE. FROM MAIN STREET DR IVERS SHALL TURN ONTO NORTH GRAND AVENUE AND THEN EAST ONTO WEST BEALL STREE T DUE TO THE AVAILABILITY OF A TRAFFIC SIGNAL AT HWY 191/MAIN STREET AND THE SUBSEQUENT RIGHT -HAND TURNS ONTO WEST BEALL STREET AND NORTH WIL LSON AVENUE. DELIVERY TRUCKS WILL UTILIZE WEST BEALL STREET ALONG THE PROJECT SITE TO TEMPORARILY PARK AND OFF -LOAD MATERIALS AND EQUIPMENT. AFTER MAKING DELIVERIES OR PICK -UPS, VEHICLES WILL CONTINUE EAST ON WEST BEAL L STREET, TURNING SOUTH AT NORTH WILLSON AVENUE AND UTILIZING THE TRAFFIC SIGNAL AT HWY 191/MAIN STREET. SHEET NOTES -SITE MANAGEMENT SITE MANAGEMENT PLAN -NO SCALE CONSTRUCTION ROUTE MAP -NO SCALE BIM FILE PATH: SHEET NO.: TITLE: copyright 2018 SMA, P.C. REVISIONS: KEYMAP: HELENA 920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER: Plo t D a t e : BOZEMAN 109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com C:\Users\JordanC\Documents\2032 - One11-2-R20_jordancL2SGC.rvt 1/2 7 / 2 0 2 1 4 : 4 4 : 5 4 P M SPR-A2 2032 01/28/2021 CONSTRUCTION SITE MANAGEMENT PLAN Author Checker ONE 11 -2.0 2032 LOT A, BLOCK B, OF TRACYS NORTH THIRD ADDITION, PLAT C -18 -E | BOZEMAN, MONTANA 59715 SITE PLAN REVIEW N N NO. DATE REVISION DESCRIPTION