HomeMy WebLinkAboutA2ConstructionSiteManagementPlan_012820211. THE STREET VISION TRIANGLES MAY NOT BE IMPEDED DURING CONSTRUCTI ON,
ACCORDING TO THE LOCATION INDICATED IN THE CIVIL DRAWINGS.
2. CONSTRUCTION AND ROAD CLOSURES MUST BE COORDINATED WITH STREAMLI NE BUS
SERVICES SO AS NOT TO DISRUPT ESSENTIAL SERVICES.
3. THE PERIMETER OF THE SITE WILL BE BARRICADED FROM THE PUBLIC WIT H A 6' TALL
CONSTRUCTION FENCE. ACCESS WILL BE THROUGH GATES. CONSTRUCTION W ILL BE
STAGED ON WEST BEALL STREET.
4. CONSTRUCTION TRAFFIC WILL USE HWY 191/MAIN STREET AS THE PRIMARY ROUTE
THROUGH THE CITY TO ACCESS THE PROJECT SITE. FROM MAIN STREET DR IVERS SHALL
TURN ONTO NORTH GRAND AVENUE AND THEN EAST ONTO WEST BEALL STREE T DUE TO
THE AVAILABILITY OF A TRAFFIC SIGNAL AT HWY 191/MAIN STREET AND THE
SUBSEQUENT RIGHT -HAND TURNS ONTO WEST BEALL STREET AND NORTH WIL LSON
AVENUE. DELIVERY TRUCKS WILL UTILIZE WEST BEALL STREET ALONG THE PROJECT SITE
TO TEMPORARILY PARK AND OFF -LOAD MATERIALS AND EQUIPMENT. AFTER MAKING
DELIVERIES OR PICK -UPS, VEHICLES WILL CONTINUE EAST ON WEST BEAL L STREET,
TURNING SOUTH AT NORTH WILLSON AVENUE AND UTILIZING THE TRAFFIC SIGNAL AT
HWY 191/MAIN STREET.
SHEET NOTES -SITE MANAGEMENT
SITE MANAGEMENT PLAN -NO SCALE CONSTRUCTION ROUTE MAP -NO SCALE
BIM FILE PATH:
SHEET NO.:
TITLE:
copyright 2018 SMA, P.C.
REVISIONS:
KEYMAP:
HELENA
920 Front Street | Suite 101
Helena | MT | 59601
P| 406/442.4933
www.architects-sma.com
ARCHITECT SEAL:
PROJECT:
PROJECT LOCATION:
PREPARED FOR:
LOGO:
CONSULTANT:
PROJECT NUMBER:
DRAWN BY:
CHECKED BY:
TEAM:
PHASE:
DATE:
PROJECT NUMBER:
Plo
t
D
a
t
e
:
BOZEMAN
109 East Oak Street | Suite 2E
Bozeman | MT | 59715
P| 406/219.2216
www.architects-sma.com
C:\Users\JordanC\Documents\2032 - One11-2-R20_jordancL2SGC.rvt
1/2
7
/
2
0
2
1
4
:
4
4
:
5
4
P
M
SPR-A2
2032
01/28/2021
CONSTRUCTION SITE
MANAGEMENT PLAN
Author
Checker
ONE 11 -2.0
2032
LOT A, BLOCK B, OF TRACYS NORTH THIRD
ADDITION, PLAT C -18 -E | BOZEMAN,
MONTANA 59715
SITE PLAN REVIEW
N N
NO. DATE REVISION DESCRIPTION