HomeMy WebLinkAboutA0.1 COVER SHEET 07-06-20211SHEET TITLE
Designed by:
SHEET 1 OF 12
A0.1
Built by:
Ph: 541.550.9389
Em. openroaddesignco@gmail.com
Web. myopenroaddesign.com
PROJECT NO:
DATE:
DRAWN BY:
COPYRIGHT:
Jeff Warwick
05.03.2021
202022-HL
Open Road Design
BIMcloud: openroaddesign - BIMcloud as a Service/Fallon Plans/Highland/HighlandNorton Ranch Homes:COVER SHEETHighland PlanPhone: 541-728-0378www.Nortonranchhomes.comArea Calculations:
1st Floor 700
2nd Floor 930
Total Conditioned 1,630 sq. ft.
Garage 485
Front Porch 50
Dining Rm Patio 20
SHEET INDEX
A0.1
A1.1
A1.2
A2.1
A3.1
A3.2
A4.1
A5.1
A5.2
A6.1
A7.1
A8.1
COVER SHEET
FLOOR PLANS
ROOF PLAN
RCP
EXTERIOR ELEVATIONS
EXTERIOR ELEVATIONS
BUILDING SECTIONS
SCHEDULES
QUANTITY SCHEDULES
INTERIOR ELEVATIONS
EXTERIOR DETAILS
EXTERIOR ELEVATIONS
General Notes:
1. Contractor to verify and comply with all applicable local and state building codes
2. All siting, setbacks, and property locations TBD
3. All utilities to be verified in field, connecting to existing:
-Electrical
-Water Supply
-Sewer
-Gas
-Storm Drain (as required by local jurisdictions)
4. All structural designs to be verified by structural engineer
5. All soil bearing to be determined by civil engineer if required by local jurisdiction
6. All wood in contact with concrete to be pressure treated
7. All wood exposed to weather to be primed all sides and ends before installation
8. Return all end grain to wall/roof
9. Do not scale from plans, use dimensions on documents for reference
10. If not printed on 24x36, drawings are not to scale
11. It is the responsibility of the contractor to coordinate all structural, architectural,
and mechanical/electrical/plumbing documentation
Abbreviations:
A.F.F. Above Finish Floor
A.B. Anchor Bolt
A.C. Air Conditioning
B.O. Bottom Of
BD Board
BLDG. Building
BLKG. Blocking
BLW. Below
BM. Beam
BTWN Between
C.O. Clean Out
CAB. Cabinet
CL Center Line
CLG. Ceiling
CL Closet
CLR Clear
CMU Concrete Masonry Unit
COL. Column
CON. Concrete
CW Cold Water
DH Double Hung
DIA. Diameter
DR Door
D.S. Down Spout
DTL Detail
DW Dishwasher
DWG Drawing
EA Each
EL Elevation
EQ Equal
EXP Exposed
EXT Exterior
FG Finished Grade
FOC Face of Concrete
FOF Face of Finish
FOS Face of Stud
FD Floor Drain
FDN Foundation
FIN Finish
FLR Floor
FTG Footing
GALV Galvanized
GWB Gypsum Wall Board
GA Gauge
GL Glass
HW Hot Water
HB Hose Bib
HDR Header
HOR Horizontal
HT Height
INT Interior
JB Junction Box
JST Joist
KD Kiln Dried
LH Left Handed
LAV Lavatory
MAX Maximum
MFR Manufacturer
MIN Minimum
MIR Mirror
MTD Mounted
MT Metal
NTS Not to Scale
PT Pressure Treated
PLWD Plywood
PNL Panel
PTD Painted
R Riser
RH Right Handed
RO Rough Opening
RM Room
SS Stainless Steel
SHWR Shower
SIM Similar
STL Steel
T&G Tongue and Groove
T Tread
T.O. Top of
T.O.C. Top of Concrete
T.O.P. Top of Plate
T.O.S. Top of Steel
T.O.W. Top of Wall
THK Thickness
TYP Typical
U.N.O. Unless Noted Otherwise
V.I.F. Verify in Field
WP Waterproof
WRB Weather Resistant Barrier
W/ With
WC Water Closet
WD Wood
WDW Window
WH Water heater
Building Size:
Building Width (eave to eave)
25'-0"
Building Depth (eave to eave)
63'-0"
Building Height (first flr to ridge)
27'-8"