Loading...
HomeMy WebLinkAboutA0.1 Cover Sheet 07-06-2021GSPublisherVersion 87.0.7.100 SHEET TITLE Designed by: SHEET 1 OF 11 A0.1 Built by: Ph: 541.550.9389 Em. openroaddesignco@gmail.com Web. myopenroaddesign.com PROJECT NO: DATE: DRAWN BY: COPYRIGHT: Jeff Warwick 05.05.2021 202022-F Open Road DesignNorton Ranch Homes:Cover SheetTHE BOULDERArea Calculations: FIRST FLOOR - 546 SF SECOND FLOOR - 684 SF TOTAL HEATED = 1230 SF GARAGE - 473 SF Phone: 541-728-0378www.Nortonranchhomes.com Sheet Index A0.1 A1.1 A1.3 A2.1 A3.1 A3.2 A4.1 A5.1 A6.1 A6.3 Cover Sheet Floor Plans Roof Plan/Heel Diagrams RCP / Power Plans Exterior Elevetions Exterior Elevetions Building Sections Door & Window Schedules Interior Elevations Floor and Wall Details General Notes: 1. Contractor to verify and comply with all applicable local and state building codes 2. All siting, setbacks, and property locations TBD 3. All utilities to be verified in field, connecting to existing: -Electrical -Water Supply -Sewer -Gas -Storm Drain (as required by local jurisdictions) 4. All structural designs to be verified by structural engineer 5. All soil bearing to be determined by civil engineer if required by local jurisdiction 6. All wood in contact with concrete to be pressure treated 7. All wood exposed to weather to be primed all sides and ends before installation 8. Return all end grain to wall/roof 9. Do not scale from plans, use dimensions on documents for reference 10. If not printed on 24x36, drawings are not to scale 11. It is the responsibility of the contractor to coordinate all structural, architectural, and mechanical/electrical/plumbing documentation Abbreviations: A.F.F. Above Finish Floor A.B. Anchor Bolt A.C. Air Conditioning B.O. Bottom Of BD Board BLDG. Building BLKG. Blocking BLW. Below BM. Beam BTWN Between C.O. Clean Out CAB. Cabinet CL Center Line CLG. Ceiling CL Closet CLR Clear CMU Concrete Masonry Unit COL. Column CON. Concrete CW Cold Water DH Double Hung DIA. Diameter DR Door D.S. Down Spout DTL Detail DW Dishwasher DWG Drawing EA Each EL Elevation EQ Equal EXP Exposed EXT Exterior FG Finished Grade FOC Face of Concrete FOF Face of Finish FOS Face of Stud FD Floor Drain FDN Foundation FIN Finish FLR Floor FTG Footing GALV Galvanized GWB Gypsum Wall Board GA Gauge GL Glass HW Hot Water HB Hose Bib HDR Header HOR Horizontal HT Height INT Interior JB Junction Box JST Joist KD Kiln Dried LH Left Handed LAV Lavatory MAX Maximum MFR Manufacturer MIN Minimum MIR Mirror MTD Mounted MT Metal NTS Not to Scale PT Pressure Treated PLWD Plywood PNL Panel PTD Painted R Riser RH Right Handed RO Rough Opening RM Room SS Stainless Steel SHWR Shower SIM Similar STL Steel T&G Tongue and Groove T Tread T.O. Top of T.O.C. Top of Concrete T.O.P. Top of Plate T.O.S. Top of Steel T.O.W. Top of Wall THK Thickness TYP Typical U.N.O. Unless Noted Otherwise V.I.F. Verify in Field WP Waterproof WRB Weather Resistant Barrier W/ With WC Water Closet WD Wood WDW Window WH Water heater Area Calculations: 1st Floor 546 2nd Floor 684 Total Conditioned 1,230 sq. ft. Garage 473 Building Size: Building Width (eave to eave) 23'-0" Building Depth (eave to eave) 52'-6" Building Height (first flr to ridge) 26'-9"