HomeMy WebLinkAboutSite Plan Narrative 05-12-2021
Fallon Condos – Site Plan
Fallon Condos
Site Plan Application
Page 2 of 23
Table of Contents
NARRATIVE
I. Project Overview
II. Response to DRC Comments
APPENDICES
Appendix A: Vicinity Map
Appendix B: Zoning Map
Appendix C: Traffic Impact Memo
Appendix D: Norton Ranch Phase 4 TIS
Appendix E: Site Plan Checklist
Appendix F: Concurrent Construction Request Letter
Appendix G: Norton East Ranch Subdivision Phase 4 Plat
Appendix H: Unit Mix Diagram
PLANS:
ARCHITECTURAL
Sawtooth (Rowhouse) Units
A1.1 – Main Floor Plan
A1.2 – Upper Floor Plan
A2.1 – Elevations
A.3.1 – Section, Roof Plan, and Details
A3.2 – 2-Hour Wall Details
Highland Units
A0.1 – Cover Sheet
A1.1 – Floor Plans
A1.2 – Roof Plans
A2.1 – RCP
A3.1 – Exterior Elevations
Fallon Condos
Site Plan Application
Page 3 of 23
A3.2 – Exterior Elevations
A4.1 – Building Sections
A5.1 – Schedules
A5.2 – Quantity Schedule
A6.1 – Interior Elevations
A7.1 – Exterior Details
A8.1 – Exterior Elevations
Calderwood Units
A0.1 – Cover Sheet
A1.1 – Floor Plans
A1.2 – Roof Plan
A2.1 – Reflected Ceiling Plans
A3.1 – Exterior Elevations
A4.1 – Building Sections
A5.1 – Schedules
A5.2 – Quantity Schedule
A6.1 – Interior Elevations
A7.1 – Exterior Details
A8.1 – Exterior Elevations
Truss Drawings
Truss Layout
Boulder Units
A0.1 – Cover Sheet
A1.1 – Floor Plans
A1.2 – Roof Plan
A2.1 – RCP Plans
A3.1 – Exterior Elevations
A3.2 – Exterior Elevations
A4.1 – Building Sections
Fallon Condos
Site Plan Application
Page 4 of 23
A5.1 – Door and Window Schedules
A6.1 – Interior Elevations
A6.3 – Floor and Wall Details
A8.1 – Exterior Elevations
Greenhorn Units
A0.1 – Cover Sheet
A1.1 – Floor Plans
A1.2 – Roof Plan
A2.1 – RCP Plans
A3.1 – Exterior Elevations
A4.1 – Building Sections
A5.1 – Door and Window Schedules
A5.2 – Quantity Schedules
A6.1 – Interior Elevations
A7.1 – Interior Details
A8.1 – Exterior Elevations
CIVIL
C1.0 – Cover Sheet & Overall Site Plan
C2.0 – Overall Site Layout
C2.1 – Site Utility Plan
C2.2 – Site Grading & Drainage Plan
C3.0 – Details
C3.1 – Details
Stormwater Design Report
LANDSCAPE
L101 – Landscape Plan
L102 – Plant Schedule & Notes
L201 – Landscape Details
Fallon Condos
Site Plan Application
Page 5 of 23
I. PROJECT HISTORY
Executive Summary
This Site Plan application is for the construction of eighteen (18) residential buildings – two
(2) three-household rowhouses and sixteen (16) detached single-household condominiums
– for a total of 24 residential units.
Narrative
The Fallon Condominium Site Plan is a proposed residential condominium complex located
on Lots 1 and 2 of Block 14 in Phase 4 of the Norton East Ranch Subdivision, land annexed
into the City of Bozeman in 2007. The property is designated on the Future Land Use Map as
Community Commercial Mixed Use (CCMU) and is zoned Residential Emphasis Mixed Use
(REMU). The project includes open space areas, pedestrian connections, and
parking/stormwater facilities necessary to serve the proposed buildings. The narrative
below contains an overall project description and responses to the City’s comments, while
the plans show conformance with the UDC standards. Please see Appendix E for a complete
analysis of how this project meets the relevant Site Plan review criteria.
The parcel is currently a vacant field and was historically used as farmland. The parcel is
generally flat with a gradual slope to the north. The parcel is in the northwest portion of the
City of Bozeman and is bordered by Water Lily Drive, Pond Lily Drive, and Fallon Street on its
north, east, west and north sides, respectively. All surrounding roads were installed to City
of Bozeman standards during the Norton East Ranch Subdivision, Phase 4 and Phase 1
infrastructure improvements. The project site is located approximately 1,000 feet from a
6.8-acre public park installed with Phase 1 of the Norton Ranch Subdivision.
The project intends to utilize five (5) building types as described below. Please see Appendix
H for locations of each proposed unit type and unit plans for additional building details.
Additional information on the location of the on-street parking provided for this project is
shown on Civil Sheet C1.0.
1. Boulder Units (Eastern Units)
a. Dwelling Type – Two-bedroom
b. Building Frontage – Water Lily Drive
c. Building Footprint – 1,018 sq. ft.
d. Building Height – 26’-9”
Fallon Condos
Site Plan Application
Page 6 of 23
e. Number of Buildings – 5
f. Parking –
i. Required – 10 spaces (two spaces per unit)
ii. Provided – 10 spaces (two spaces within each garage per unit)
2. Greenhorn Units (Southern Units)
a. Dwelling Type – Two-bedroom
b. Building Frontage – Internal pedestrian pathway
c. Building Footprint – 946 sq. ft.
d. Building Height – 24’-5”
e. Number of Buildings – 3
f. Parking –
i. Required – 6 spaces (two spaces per unit)
ii. Provided – 6 spaces (one space within each carport and one on-street
space per unit)
3. Highland Units (Western Units)
a. Dwelling Type – Three-bedroom
b. Building Frontage – Pond Lily Drive
c. Building Footprint – 1,239 sq. ft.
d. Building Height – 27-’8”
e. Number of Buildings – 5
f. Parking –
i. Required – 15 spaces (three spaces per unit)
ii. Provided – 15 spaces (two spaces within each garage and one on-street
space per unit)
4. Calderwood Units (Northern Units)
a. Dwelling Type – Two-bedroom
b. Building Frontage – Fallon Street
c. Building Footprint – 946 sq. ft.
d. Building Height – 24’-7”
e. Number of Buildings – 3
f. Parking –
i. Required – 6 spaces (two spaces per unit)
ii. Provided – 6 spaces (one space within the carport and one stacked
driveway space per unit)
5. Sawtooth Units (Rowhouse Units)
a. Dwelling Type – Three-unit Rowhouse (2 x Three-bedroom units and 1 x Two-
bedroom unit)
Fallon Condos
Site Plan Application
Page 7 of 23
b. Building Footprint – 5,044 sq. ft.
c. Building Height – 22’-2 1/16”
d. Number of Buildings – 2
e. Parking –
i. Required – 16 spaces (Eight spaces per building)
ii. Provided – 16 spaces (two spaces within each garage and one on-street
space as necessary to serve the three-bedroom units)
Utilities surrounding the subject parcel were installed with both Phase 1 and Phase 4 of
Norton East Ranch. Water and sanitary sewer services will be provided via water and sewer
main extensions from Fallon Street that will loop through the onsite central drive aisle. The
existing water and sewer service stubs are discussed in the responses included below the
previous City Comments. Dry utilities to serve the proposed project, including gas and
electricity from Northwestern Energy and communications from various providers, will be
extended in utility easements from existing connections installed with Phase 4 of Norton
East Ranch as shown the Site Utility Plan (Civil Sheet C2.1).
An access drive through the property is proposed to create a separation from the
surrounding local and collector streets as shown on the Overall Site Layout (Civil Sheet
C2.0). These pathways will connect sidewalks from all streets to internal site circulation
pathways, providing public access throughout the project site. See Civil plans for additional
information on the public access easements and their proposed locations. The proposed site
design also includes two drive approaches that will serve as access to the proposed
development. Two drive aisles through the property will connect to Fallon Street.
As these apartment units are to be rental units and not market-rate units, this project is not
subject to the AHO. Therefore, an affordable housing plan has not been included with this
application. CIL of parkland and water rights are discussed below in the response the City
comments. The CIL of parkland is summarized on the Site Plan (Civil Sheet C1.0). The project
is to be developed in phases, and a phasing plan for the site and utilities are shown on Civil
Sheets C1.0 and C2.1. Concurrent construction is requested for this project as discussed in
Appendix F.
It should also be noted that the two lots will be aggregated as part of this Site Plan. SE File
No. 21-174 has been submitted and is currently under review by the City of Bozeman.
Fallon Condos
Site Plan Application
Page 8 of 23
If there remain unanswered questions or additional minor code corrections following
review of this submittal, the applicant requests that those items be included as conditions
of Site Plan approval to be addressed concurrent Building Permit application and/or
through the utilization of a Modification application following Site Plan approval.
Fallon Condos
Site Plan Application
Page 9 of 23
II. RESPONSE TO CITY COMMENTS
The following responses are provided City DRC Comments provided December 16, 2020 (File
No. 20-369):
No. Conditions of Approval Review Entity Response/Comments
1 Process – A Site Plan Application is required
for entitlement. A Subdivision Exemption
Application is required to aggregate the two
lots. Given the preliminary nature of this
submittal, a second concept review
application is required prior to the submittal
of the formal site plan application. Any
requested departures must be submitted
with the applicable review fees for each
departure with the Site Plan. Per Section
38.230.100 include the following in your
submittal.
a. Show all existing and proposed utility
easements in the correct location on the
plans with the formal submittal.
b. Show the 10-foot drain tile
maintenance easement in the correct
location on the plans with the formal
submittal. All buildings along Fallon are
encroaching into this easement. A total of
20-feet of easements exists along Fallon.
c. A draft mutual access and utility
easement must be included in the formal
submittal.
d. A color exterior material palette
keyed to the building elevations (also see
building materials below).
e. Show utility meters, electrical
conduits, and other service utility apparatus
on the building elevations.
Planning –
Overall
Comments
Following discussions
with City Planning
Staff, the applicant was
advised that a second
Concept plan was not
required. A Subdivision
Exemption (File # 21-
174) has been
submitted to
aggregate the two lots.
No departures are
requested with this
submittal.
a. The existing
and proposed
utility
easements
have been
shown in the
correct
location.
b. The required
10-foot drain
tile
maintenance
easement and
the total 20-
foot easement
along Fallon
Street.
c. The draft
mutual access
and utility
easement have
been included
Fallon Condos
Site Plan Application
Page 10 of 23
on the Civil
plan sheets.
d. A color exterior
material
palette has
been included
with the
Architectural
plans.
e. All utility
meters,
electrical
conduits, and
all other utility
meters are
shown on the
building
elevations.
2 Zoning Designation – A Zone Map
Amendment is currently in review with our
office under application #20288. The new
Bozeman Community Plan future land use
map designation underlying the current R-O
zoning is now Community Commercial
Mixed Use which would preclude the
establishment of a primarily residential
development as proposed with this
application per Section 38.310.030. If the
proposed zoning of REMU for these lots is
approved by the City Commission the
proposed uses will be permitted per Section
38.310.040. Staff will review this application
under the proposed REMU zoning
designation, since it is not permitted with
the current R-O zoning designation as
explained above.
Planning –
Overall
Comments
Understood, the
application has been
prepared in
accordance with REMU
zoning.
3 Form and Intensity Standards – Section
38.320.040 – Front setbacks in REMU are 10-
15 feet, however there are easements along
Fallon Street totaling 20-feet that will need
to be accounted for.
Planning –
Overall
Comments
Understood. The Civil
Plan demonstrates the
easements and
setbacks have been
accounted for in this
submittal.
Fallon Condos
Site Plan Application
Page 11 of 23
4 Townhouse and Rowhouse Standards –
Section 38.360.240 – Rowhouse standards
apply to the two 3-household condominium
units fronting on Fallon Street. Usable open
space is measured (10% of the building living
space) and configured differently per this
standard. Front setbacks may be used to
meet this standard, provided they are
defined with a fence. With the formal
submittal provide details in the narrative
and drawings demonstrating compliance
with all applicable rowhouse standards
including open space and building design.
Planning –
Overall
Comments
Understood. The
rowhouse open space
is shown on the Civil
Cover sheet, and
details on the size of
each open is also found
on this plan sheet.
5 Single, two, three, and four-household
dwellings – Section 38.360.210 – A clear and
obvious pedestrian connection between the
sidewalk and the building entry that faces
the street is required for new dwellings. All
units fronting on a street need this
connection including the rowhouses. All new
dwellings must provide a covered pedestrian
entry with a minimum weather protection of
3’ x 3’. The rowhouse designs currently show
sliding glass doors and no weather
protection for the front entries. The
detached condo designs vary.
Planning –
Overall
Comments
Pedestrian pathways
connecting to
sidewalks and weather
protection have been
shown on the Civil
plans.
6 Non-motorized circulation and design –
Section 38.520.040.C.2 - Sites with
residential units. Provide direct pedestrian
access between all ground related unit
entries and a public street or to a clearly
marked pathway network or open space
that has direct access to a public street.
Residential developments must provide a
pedestrian circulation network that connects
all main entrances on the site to other areas
of the site. Sidewalks are required to be 5-
feet in width.
Planning –
Overall
Comments
Understood.
Pedestrian circulation
connections have been
shown on the Civil
plans.
7 Non-motorized circulation and design –
Section 38.520.040.C.3 – Crosswalks are
required when a pedestrian path crosses the
drive aisle and must contain contrasting
Planning –
Overall
Comments
Understood. The Civil
plans include
information on
Fallon Condos
Site Plan Application
Page 12 of 23
material (such as concrete) and/or patterns
(such as stamped asphalt), excluding painted
surfaces. Detail location and materials
proposed in the formal submittal.
crosswalk location and
design.
8 Location and design of service areas and
mechanical equipment - BMC 38.520.070.D
–
Utility meters, electrical conduit, and other
service utility apparatus must be located
and/or designed to minimize their visibility
to the public. Project designers are strongly
encouraged to coordinate with applicable
service providers early in the design process
to determine the best approach in meeting
these standards. If such elements are
mounted in a location visible from the
street, pedestrian pathway, shared open
space, or shared auto courtyards, they must
be screened with vegetation and/or
integrated into the building's architecture.
Planning –
Overall
Comments
Understood. The utility
meters have been
screened using a
variety of landscaping
and architectural
methods. Additional
details are included on
the Architectural and
Landscaping plans.
9 Building materials – Section 38.530.060 – In
the submittal provide details demonstrating
compliance for all exterior cladding
materials listed in this section.
Planning –
Overall
Comments
Understood. Building
materials are
described within the
Architectural plans for
each building type.
10 Stall, aisle and driveway design – Section
38.540.020 – None of the internal garage
parking stalls meet the minimum
dimensional standards to be considered
parking spaces as detailed in this section.
None of the driveways for each detached
condo meet the dimensional requirements
for stacked parking, if stacked parking is to
be used. Provide a set number of bedrooms
per unit so that staff can evaluate the
parking calculation, many of the floor plans
were labeled with text boxes indicating the
number of bedrooms has not yet been
determined. On-street parking may not be
available on Fallon Street, reference the as-
built drawings for the road to determine if
on-street parking is allowed. If on-street
Planning –
Overall
Comments
Understood. A Parking
Exhibit has been
included as Appendix I.
Fallon Condos
Site Plan Application
Page 13 of 23
parking is to be utilized dimension and show
the spaces on the site plan drawing outside
of vision triangles.
11 Detail not sufficient for comment on the
following sections, demonstrate compliance
with the formal submittal or the next
concept review:
a. Lighting – Section 38.570.040
b. Grading and drainage – Section
38.410.080
c. Landscaping – Section 38.550
Planning –
Overall
Comments
Landscaping and
Grading and Drainage
details have been
included in this
submittal. No site
lighting is proposed
with this submittal.
1 Water main stubbed to property line from
Stonefly Dr must be abandoned at main in
Fallon St if not utilized by the project.
Engineering -
Water
The water main
stubbed into the
property form Fallon
will be utilized and
therefore not required
to be abandoned.
2 The water mains must be extended to the
southern property boundary for future
connections to the adjacent property to the
south.
Engineering -
Water
This comment no
longer applies since
the water main
configuration has
revised since the
concept submittal.
3 DSSP Section V.6.a - A line serving more than
one building, or intended to serve more than
one building or facility is designated a water
main. The existing 4” fire line extensions may
not be utilized to service multiple buildings.
Engineering -
Water
Understood. The
existing 4" fire service
stubs will be
abandoned at the main
as shown on civil sheet
C2.1
4 DSSP Section V.6.f - All service connections
shall be uniform size from the service line tap
to the building structure or structures unless
otherwise approved or required by the Water
Superintendent.
Engineering -
Water
Understood.
5 Existing fire line and water service stubs in
Pond Lily Drive and Water Lily Drive not
utilized by the project must be abandoned at
the main if not utilized by the project.
Engineering -
Water
Understood. The
existing 4" fire service
and 2" water service
stubs will be
abandoned at the
main, where needed,
Fallon Condos
Site Plan Application
Page 14 of 23
as shown on civil sheet
C2.1
6 DSSP Section V.A.5 - All main extensions shall
be looped, where possible. All dead end 8"
mains shall end with a fire hydrant or 2" blow
off. Larger diameter dead end mains shall end
with a fire hydrant. Permanent dead-end
mains shall not exceed 500-feet long.
Temporary dead-end mains scheduled for
future extension may end with a blow-off in
lieu of a fire hydrant.
Engineering -
Water
No dead-end water
mains are proposed.
7 DSSP Section V.D.5.b - At no time will the
utility line in question be less than nine (9)
feet from the edge of the easement or less
than ten (10) feet from a parallel utility line.
Utility easements will also be required for all
meter pits and fire hydrants maintained by
the City of Bozeman. The water main must be
greater than 9 feet from the easement line
and no permanent structures will be allowed
within the easement.
Engineering -
Water
The proposed water
main is greater than 9
feet from the
easement line as
shown on civil sheet
C2.1.
1 The sewer mains must be extended to the
southern property boundary for future
connections to the adjacent property to the
south.
Engineering -
Wastewater
This comment no
longer applies since
the sewer main
configuration has
revised since the
concept submittal.
2 DSSP Section V.B.11 - Each building shall
have a separate service line from the building
to the sewer main.
Engineering -
Wastewater
Understood. Each
building is shown to
have one service to the
main.
3 DSSP Section V.D.5.b - At no time will the
utility line in question be less than nine (9)
feet from the edge of the easement or less
than ten (10) feet from a parallel utility line.
Utility easements will also be required for all
meter pits and fire hydrants maintained by
the City of Bozeman. The 4” line serving
multiple structures would have to meet the
requirements of a sewer main and be greater
Engineering -
Wastewater
The proposed sewer
main is greater than 9
feet from the
easement line as
shown on civil sheet
C2.1.
Fallon Condos
Site Plan Application
Page 15 of 23
than 9 feet from the easement line and no
permanent structures will be allowed within
the easement.
4 Existing sanitary sewer service stubs in Pond
Lily Drive and Water Lily Drive must be
abandoned at the main if not utilized by the
project.
Engineering -
Wastewater
The sewer services
stubbed into the
property from Pond
Lily Drive and Water
Lily Drive will be
utilized and therefore
not required to be
abandoned.
1 The southern portion of the internal
roadways running north and south must be
widened to a minimum width of 24 feet to
accommodate two way traffic.
Engineering -
Transportation
Each drive aisle shown
is 24 feet wide.
1 BMC 38.410.060 (C.1) Easements - The
applicant must provide a thirty (30) foot
public utility easement to accommodate both
water and sewer. An additional ten feet of
width is required for each additional main
that occupies the easement.
Engineering
Advisory
Comments -
Easements
A 30-foot foot public
utility easement is
shown for the
proposed water and
sewer mains.
2 BMC 38.410.060 (B.2) Easements - The
applicant must provide a ten foot utility
easement (power, gas, communication, etc.)
along the developments property frontage
prior to Site Plan approval. The applicant may
contact the Engineering Department to
receive a copy of a utility easement template.
Engineering
Advisory
Comments -
Easements
This 10-foot utility
easement is shown on
the Civil Plans. It is
understood that this
easement must be
recorded prior to final
site plan approval.
1 Bozeman Municipal Code (BMC) 38.410.130 -
The applicant must contact Brian Heaston
with the City Engineering Department to
obtain a determination of cash-in-lieu of
water rights (CILWR). CILWR must be paid
prior to site plan approval.
Engineering
Advisory
Comments –
Water Rights
The CIL of water rights
has been coordinated
with Brian Heaston.
Any outstanding
CILWR requirements
or payments will be
addressed concurrent
with Building Permit.
1 1. BMC Section 38.270.030 – If the
applicant wishes to construct the proposed
structures concurrently with public
infrastructure the applicant must provide the
following to request concurrent construction
Engineering
Advisory
Comments –
Concurrent
Construction
A Concurrent
Construction Request
Letter has been
included as Appendix
F.
Fallon Condos
Site Plan Application
Page 16 of 23
for the public infrastructure associated with
the project (water and sewer mains) Prior to
Site Plan Approval:
a. Formal memo requesting concurrent
construction.
b. Plan and specification approval from
the City and State prior to issuance of
building permit(s).
c. Submittal of an executed original
conditional irrevocable offer of dedication,
please contact the Engineering Department
to receive a copy of this document.
d. Written approval from the fire
department for concurrent construction.
1 DSSP Section (A) (4) Water Quality - The
applicant must include a drainage plan with
post- construction storm water management
controls that are designed to infiltrate,
evapotranspire, and/or capture for reuse the
post-construction runoff generated from the
first 0.5 inches of rainfall from a 24-hour
storm preceded by 48 hours of no
measurable precipitation. For projects that
cannot meet 100% of the runoff reduction
requirement, the remainder of the runoff
from the first 0.5 inches of rainfall must be
either: a. Treated onsite using post-
construction storm water management
control(s) expected to remove 80 percent
total suspended solids (TSS); b. Managed
offsite within the same sub-watershed using
post-construction storm water management
control(s) that are designed to infiltrate,
evapotranspire, and/or capture for reuse; or
c. Treated offsite within the same
subwatershed using post-construction storm
water management control(s) expected to
remove 80 percent TSS.
Engineering
Advisory
Comments -
Stormwater
The stormwater design
report is included
herein and addresses
these requirements.
2 DSSP Section (C) Water Quantity - The
applicant must provide on-site detention
with release rates limited to predevelopment
Engineering
Advisory
Comments -
Stormwater
The stormwater design
report is included
herein and addressed
these requirements.
Fallon Condos
Site Plan Application
Page 17 of 23
runoff rates. Retention ponds must be sized
based on a 10- year, 2-hour storm intensity.
3 The seasonal high groundwater elevation
must be determined and the engineer
responsible for the design drainage must
certify that the proposed infrastructure can
meet or exceed the City’s drainage
requirements during the seasonal high.
Engineering
Advisory
Comments -
Stormwater
The stormwater design
report is included
herein and addressed
these requirements.
1 DSSP Section (V) (A) Main Size - A water
design report must be prepared by a
professional engineer for the proposed
project. The water distribution system must
be designed to meet the maximum day
demand plus fire flow and the peak hour
demand. A water design report was not
provided with the Master Site Plan submittal.
Engineering
Advisory
Comments -
Water
The water design
report will be prepared
and submitted as part
of the subsequent
infrastructure
submittal.
1 BMC 38.410.070.A - As presented,
wastewater generated from the subject
property will flow into the existing Norton
Ranch Lift Station. The applicant will need to
verify that this lot has originally allocated
capacity at the lift station and that the
subject property can be adequately served by
the Norton Ranch Lift Station prior to Site
Plan approval.
a. Norton Ranch Lift Station - The
applicant is advised that the Norton Ranch
Lift Station has been designed to be
reconfigured to allow for phased
development of the Norton Ranch
Subdivision. The exact configuration is
dependent on the phase and number of
dwelling units to be served. Currently, there
are three pumps at the lift station with a
single principal pump that can operate under
different hydraulic conditions that the station
experiences, specifically column separation
after pumping cycles.
Engineering
Advisory
Comments –
Wastewater
It is understood that
upgrades to the
Norton Ranch Lift
Station are currently in
the design phase,
which is being
prepared by HDR and
expected to be
submitted to the City
this Spring. The
proposed upgrades to
the lift station would
significantly increase
the capacity of the lift
station to allow for this
development. It is
understood that
approval of the future
infrastructure plans
cannot be issued until
the lift station updates
are complete. We
respectfully request
that site plan review is
Fallon Condos
Site Plan Application
Page 18 of 23
DEQ Circular 2 requires that multiple pumps
must be provided and of the same size. Units
must have capacity such that, with any unit
out of service, the remaining units will have
capacity to handle the design peak hour flow.
The station does not satisfy DEQ firm capacity
requirements. The lift station must be
upgraded prior to site plan approval.
allowed to proceed on
the assumption the
that lift station
upgrades will be
completed this Spring.
2 DSSP Section (V) (B) Sanitary Sewer System
Design Criteria - The applicant must provide
an estimate of the peak-hour sanitary sewer
demand for the different phases certified by
a professional engineer for the proposed
project prior to Phase 1 site plan approval.
This
information is used to verify downstream
sewer capacity as well as keep the City’s
wastewater hydraulic model updated.
Engineering
Advisory
Comments –
Wastewater
The sewer design
report will be prepared
and submitted as part
of the subsequent
infrastructure
submittal.
1 A mutual access easement for shared drive
accesses utilized by multiple lots will need to
be executed and filed with the Gallatin
County Clerk and Recorder. Subsequently, a
copy of the filed easement must be
submitted to the City prior to approval of the
Site Plan. This will be required for the
proposed access to the south.
Engineering
Advisory
Comments –
Transportation
The two lots will be
aggregated as
depicted on the
submitted Subdivision
Exemption application
has been submitted
(File #21-174). As a
result, the mutual
access easement is not
required.
1 Need to show 10-foot utility easement along
the outer perimeter of the development
along Water Lily Drive, Fallon Street, Pond
Lily Drive and the south portion of the
development along Lots 3 & 4. This would
allow for the installation of all dry utilities to
provide the needed services to all the units.
Transformers and other electric utility
equipment will be installed within the 10-ft
utility easement along with gas and other dry
utilities.
NWE Plans have been
updated to show the
10-foot utility
easement.
Fallon Condos
Site Plan Application
Page 19 of 23
2 There is three phase underground electric
primary and a 2” gas main installed along the
north property line of Lot 1 up to the lot line
of Lot 1 & Lot 2.
NWE Understood.
3 Buildings will share transformers where
possible and secondary cans will be used to
reduce the number of transformers in some
locations. Secondary junction cans will be
used in place of transformers if the service
runs are short enough and the limit of sweeps
or bends does not exceed four. Submitting an
application to NWE will get the NWE project
engineer involved and can help with this
process.
NWE Understood.
4 Transformer location to buildings &
landscape. For oil filled transformers a 2-foot
clearance is required to non-combustible
walls and surfaces that do not have any
openings such as doors, windows, air intake,
and fire escapes routes. For transformers
750kVA & larger a 3- foot 6-inch clearance is
required. For any combustible surface a
minimum of a 10-foot clearance is required.
Minimum Working Space for a Pad-Mounted
Transformer is 4-feet on the sides and back
portion of the concrete pad and 10-feet of
clearance on the front side of the pad where
the transformer doors are located. Note, all
distances are referenced to the edge of the
pad. The NWE engineer will help to
determine the appropriate location.
NWE Understood.
5 NWE will need to review building site plans
and elevation plans for the proposed
buildings for new meter locations and site
grading plans for all electric primary &
equipment and gas main extension locations.
NWE Understood.
6 Meter locations will need to be approved by
NWE. All meters are to be located outdoors
on the corner of the building or approved are
closest to the transformer serving the
property. NWE policy is to maintain a
minimum 30-inches wide by 3-foot clear zone
NWE Understood. All
meters have been
proposed to meet this
standard.
Fallon Condos
Site Plan Application
Page 20 of 23
between the front of the meter and
landscape screening and allow easy access to
the meters for operation and maintenance.
This can be determined through the design
process after an application is submitted
through NWE and the area engineer will work
through allowable shrubs and plants for
screening and to determine adequate
clearances for access to NWE meters.
7 The following applies to all buildings in
regards to the gas regulator. The gas
regulator cannot be placed under a window
or within 3’ of the operable portion of the
window. It can be placed under a
window/deck on the second story, provided
the “open/operable” portion has at least 6’ of
clearance from the regulator. Ensure that
there is 10’ of separation from any mechanical
air intake, including air conditioning units.
The regulator will need to be 3’ from the
closest corner of any portion of the electric
meter base. Submitting an application to
NWE will get the NWE engineer involved and
can help with this process.
NWE Understood.
8 NWE will need to review landscape plans for
proposed landscaping within the proposed
development with location to utility
easements and utility equipment.
NWE Understood.
9 For landscaping. No large deep rooted trees
or bushes will be allowed within the 10-foot
utility easement. No large trees reaching
heights of 15-feet or taller will be allowed
under any overhead distribution lines.
NWE Understood.
10 Submit an application online to have the
NWE project engineer work with the
applicant. Go to
www.northwesternenergy.com/construction
to apply online Montana Construction
Application, and access Montana New
Service Guide to provide information on
electric and gas service requirements.
NWE Understood.
Fallon Condos
Site Plan Application
Page 21 of 23
1 With the use of individual residential totes
SWD is ok with the plan.
Solid Waste Understood. Trash is to
be handled individually
by each unit occupant.
1 503.1 Where required. Fire apparatus
access roads shall be provided and
maintained in accordance with Sections
503.1.1 through 503.1.3.
Fire
Department
Understood. All
internal roadways
have been designed to
meet this standard.
2 503.1.1 Buildings and facilities.
Approved fire apparatus access roads shall be
provided for every facility, building or portion
of a building hereafter constructed or moved
into or within the jurisdiction. The fire
apparatus access road shall comply with the
requirements of this section and shall extend
to within 150 feet (45 720 mm) of all portions
of the facility and all portions of the exterior
walls of the first story of the building as
measured by an approved route around the
exterior of the building or facility.
Fire
Department
All internal roadways
have been designed to
meet this standard.
3 503.2 Specifications. Fire apparatus access
roads shall be installed and arranged in
accordance with Sections 503.2.1 through
503.2.8.
Fire
Department
Understood. All
internal roadways
have been designed to
meet this standard.
4 503.2.1 Dimensions. Fire apparatus
access roads shall have an unobstructed
width of not less than 20 feet (6096 mm),
exclusive of shoulders, except for approved
security gates in accordance with Section
503.6, and an unobstructed vertical
clearance of not less than 13 feet 6 inches
(4115 mm).
Fire
Department
All internal roadways
have been designed to
meet this standard.
5 503.2.2 Authority. The fire code
official shall have the authority to require or
permit modifications to the required access
widths where they are inadequate for fire or
rescue operations or where necessary to
meet the public safety objectives of the
jurisdiction.
Fire
Department
Understood.
6 503.2.3 Surface. Fire apparatus access
roads shall be designed and maintained to
support the imposed loads of fire apparatus
Fire
Department
All internal roadways
have been designed to
meet this standard.
Fallon Condos
Site Plan Application
Page 22 of 23
and shall be surfaced so as to provide all-
weather driving capabilities.
7 503.2.4 Turning radius. The required
turning radius of a fire apparatus access road
shall be determined by the fire code official.
Fire
Department
Understood.
8 D103.6 Signs. Where required by the fire
code official, fire apparatus access roads shall
be marked with permanent NO PARKING—
FIRE LANE signs complying with Figure
D103.6. Signs shall have a minimum
dimension of 12 inches (305 mm) wide by 18
inches (457 mm) high and have red letters on
a white reflective background. Signs shall be
posted on one or both sides of the fire
apparatus road as required by Section
D103.6.1 or D103.6.2.
Fire
Department
Shown on Civil Plan
Sheet 2.1.
9 D103.6.1 Roads 20 to 26 feet in width. Fire
lane signs as specified in Section D103.6 shall
be posted on both sides of fire apparatus
access roads that are 20 to 26 feet wide (6096
to 7925 mm).
Fire
Department
Shown on Civil Plan
Sheet 2.1.
10 D103.6.2 Roads more than 26 feet in width.
Fire lane signs as specified in Section D103.6
shall be posted on one side of fire apparatus
access roads more than 26 feet wide (7925
mm) and less than 32 feet wide (9754 mm).
Fire
Department
Shown on Civil Plan
Sheet 2.1.
1 BMC Section 38.420 Unless it can be shown
by the applicants that parkland was
previously provided for the existing units,
the parkland requirement for the estimated
addition of 24 new residential units on a 2.1-
acre parcel is estimated to be 0.72 acres.
Please work with the subdivision developer
to provide an estimate of park land provided
in all phases of Norton Ranch and the
equivalent parkland for Improvements-in-
lieu already installed. Staff recommends
Cash-in-lieu of Parkland if a balance is
owed.
Parks &
Recreation
Phase 4 of the Norton
Ranch East Subdivision
provided the required
land dedication for this
project (for 8 du/acre).
The net residential
density of this project
10.48. Therefore the
Sec. 38.420.020.A.1.b
balance of required
cash donation in-lieu is
to be met as follows:
2.10 acres x 2.48
du/acre x 0.03
Fallon Condos
Site Plan Application
Page 23 of 23
units/acre = 0.15 acres
x 43560 sf/acre x
$1.72/sf = $11,238.48
CIL to be paid
concurrent with
Building Permit
submittal.
See the Civil Cover
Sheet for additional
details.
2 BMC Section 38.420. If cash-in-lieu of
parkland will be proposed for some or all of
the land dedication, please submit a
request addressing the criteria of
Resolution 4784 with the Site Plan
application. Current appraisal value for
Cash-in-lieu is $1.72 per square foot but will
be determined at the time of Site Plan
completeness. New appraisal value is
expected in Spring 2021.
Parks &
Recreation
The CIL proposed for
this project is to meet
UDC Sec. 38.420 for
Park Area
requirements as
described above.
3 BMC CIL amount must be printed on the
final Site Plan. Applicants may contact the
Park Planner prior to formal application
with proposed number of units and net lot
area to get an estimated CIL of Parkland
Amount.
Parks &
Recreation
See Civil Cover Sheet.
The CIL amount was
determined in
consultation with Addi
Jadin.
4 All cash-in-lieu requests are reviewed by the
Recreation and Parks Advisory Board
Subdivision Review Committee. A meeting
will be scheduled upon submittal of a formal
application.
Parks &
Recreation
Understood.