HomeMy WebLinkAboutA9BuildingElevations_07282021LEVEL 1
100'-0"
LEVEL 2
116'-2"
BCE
LEVEL 3
126'-10"
LEVEL 4
137'-6"
LEVEL 5
148'-2"
LEVEL 6
158'-10"
T.O. ROOF
169'-6"
F AD
BBAB
A
R12A L S R12A
GKKLKLLH
C112A
A A A A
C
C104B
3
2
993 333 3
44 4 4'-0"10'-8"10'-8"10'-8"10'-8"10'-8"16'-2"STOREFRONT FRONTAGE (EXISTING)
127'-2 3/8"
STOREFRONT FRONTAGE
65'-2 3/4"
A
GK
K G
GK
KLKL
H L L K L K
KLLKLH
H L L K L K
HORIZONTAL CEDAR SIDING
PREFINISHED CORRUGATED METAL SIDING
MODULAR BRICK VENEER
8" CMU -GROUND FACE ARCHITECTURAL FINISH SEALED
EXTERIOR ELEVATIONS MATERIAL LEGEND
A
B
C
D
E GUARDRAIL, WIRE MESH INFILL
LEVEL 1
100'-0"
LEVEL 2
116'-2"
LEVEL 3
126'-10"
LEVEL 4
137'-6"
LEVEL 5
148'-2"
LEVEL 6
158'-10"
T.O. ROOF
169'-6"
11 10 9 7 6 5 4 3 2 184.36.37.79.510.1 4.110.9 1.1
A
BB
C
BBBB
?
BBAB
B
C
C
C
D
H K K L
H K K L
R12A
G H
G H N G
GN H
H L
L K M
K M
R12A
R12A
R12A
R12A
MGNK
K N G M K L
LK G
G E
E K L
K L KK
K K
R12A
K L
K L K K M
M
G
GKK
GHF
R1BC107A
DD
FR1A
LFHGGR1AFG
B
C106A
CCB
C100A
A
1
3
4
8 9
C108A
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
3333
3
333
44444
8 999
416'-2"10'-8"10'-8"10'-8"10'-8"10'-8"4'-0"CANOPY HEIGHT9'-10 1/2"STOREFRONT FRONTAGE
89'-0"
LANDSCAPED FRONTAGE
164'-7"
A A
N
N
N G
G
G H
H
H L
L
L K M
MK
K M
R12A
K
K
K N
N
N G
G
G M
M
M K
K
K L
L
LM
M
M
M
M K
K
K
K
KH
H
HG
G
G
K
K
K
KM
M
M
M
H
H
K
K
K K
K
K L
L
L G E
EG
G E K
K
K L
L
L
K
K K
K
K
K
K L
L
L K
K
K K
K
K M
M
M G
G
G
BIM FILE PATH:
SHEET NO.:
TITLE:
copyright 2018 SMA, P.C.
REVISIONS:
KEYMAP:
HELENA
920 Front Street | Suite 101
Helena | MT | 59601
P| 406/442.4933
www.architects-sma.com
ARCHITECT SEAL:
PROJECT:
PROJECT LOCATION:
PREPARED FOR:
LOGO:
CONSULTANT:
PROJECT NUMBER:
DRAWN BY:
CHECKED BY:
TEAM:
PHASE:
DATE:
PROJECT NUMBER:Plot Date:BOZEMAN
109 East Oak Street | Suite 2E
Bozeman | MT | 59715
P| 406/219.2216
www.architects-sma.com
C:\Users\JordanC\Documents\2032 - One11-2-R20_jordancL2SGC.rvt
7/26/2021 11:07:28 AMSPR-A9
2032
04/14/2021
BUILDING ELEVATIONS
Author
Checker
ONE 11 2.0
2032
110 W. BEALL ST.
BOZEMAN, MT 59715
SITE PLAN REVIEW RC-02
3/32" = 1'-0"SPR-A9
1 SPR-EAST ELEVATION
3/32" = 1'-0"SPR-A9
2 SPR-NORTH ELEVATION
KEYNOTES - EXTERIOR ELEVATIONS
1 2-1/4" PRECAST CONCRETE SILL - MATCH BRICK
2 ALUMINUM GLASS OVERHEAD DOOR WITH MOTORIZED OPENER
3 PREFINISHED METAL CAP FLASHING
4 STEEL CANOPY - PAINT TO MATCH WINDOWS - SEE DETAILS
5 TRANSFORMER LOCATION - SEE ELEC.
6 LOUVER - PAINT TO MATCH METAL BEYOND - SEE MECH.
7 GAS METER - SEE PLUMBING
8 BUILDING SIGNAGE - SEE DETAIL
9 MECHANICAL EQUIPMENT SCREENING - SEE DETAILS
10 UTILITY GATE - SEE SITE DETAIL
12 MASONRY EXPANSION JOINT - COLOR MATCH SEALANT
13 DEFLECTION JOINT AT METAL PANEL
14 DEFLECTION JOINT AT BRICK VENEER
15 BUILDING ADDRESS LETTERING - SEE SIGNAGE PLANS
16 BOLT-ON ALUMINUM JULIET BALCONY AND GUARD RAIL - SEE SPEC
17 3'x10' METAL WALL MOUNT SCREEN - METAL TO BE PAINTED TO MATCH EXISTING
RAILINGS
NO. DATE REVISION DESCRIPTION
1 04/14/2021 RC - 01
5 07/28/2021 RC - 02
5
5
5
5
5