Loading...
HomeMy WebLinkAboutA10BuildingElevations_07282021LEVEL 1 100'-0" LEVEL 2 116'-2" B B C C E E LEVEL 3 126'-10" LEVEL 4 137'-6" LEVEL 5 148'-2" LEVEL 6 158'-10" T.O. ROOF 169'-6" F F A A D A B A A C DC109A H K L L K K G G G G G GG G G GK K K KK K K KL L L LL L L LK K K KH H H H 10 7 5 6 44 3 3399 3 EXISTING ONE 11 BUILDING4'-0"10'-8"10'-8"10'-8"10'-8"10'-8"16'-2"LANDSCAPED FRONTAGE 65'-3" LANDSCAPED FRONTAGE PARKING 127'-2 1/8" T 10'-0"4'-0"9'-0"12'-0"9'-0" 17 LEVEL 1 100'-0" LEVEL 2 116'-2" LEVEL 3 126'-10" LEVEL 4 137'-6" LEVEL 5 148'-2" LEVEL 6 158'-10" T.O. ROOF 169'-6" 11 11 10 10 9 9 7 7 6 6 5 5 4 4 3 3 2 2 1 1 8 84.3 6.3 7.7 9.5 10.14.1 10.91.1 A B A B A B A B B A A MC202A R12A R12A R12A R12AR12A R12A R12A R12A R12A R12A R12A R12A R12A R12A H H H H HL L L L LK K K K KK K K K KH H H H HC201B K K K KE E E E E J J J J JK K K K KJ J J J J M M M M M C111BC110A 9 1 3 4 5 1 1 1 1 1 1 1 1 1 1 1 3 3333333399 3 3 3 4NEW GARAGE OPENING EXISTING ONE 11 BUILDING CORRIDOR C110 EW-1 11E L4'-0"10'-8"10'-8"10'-8"10'-8"10'-8"16'-2"GARAGE C10910'-10"10'-10"12'-0"12'-0"12'-0"10'-0"4'-0"1717 HORIZONTAL CEDAR SIDING PREFINISHED CORRUGATED METAL SIDING MODULAR BRICK VENEER 8" CMU -GROUND FACE ARCHITECTURAL FINISH SEALED EXTERIOR ELEVATIONS MATERIAL LEGEND A B C D E GUARDRAIL, WIRE MESH INFILL BIM FILE PATH: SHEET NO.: TITLE: copyright 2018 SMA, P.C. REVISIONS: KEYMAP: HELENA 920 Front Street | Suite 101 Helena | MT | 59601 P| 406/442.4933 www.architects-sma.com ARCHITECT SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: LOGO: CONSULTANT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: PROJECT NUMBER:Plot Date:BOZEMAN 109 East Oak Street | Suite 2E Bozeman | MT | 59715 P| 406/219.2216 www.architects-sma.com C:\Users\JordanC\Documents\2032 - One11-2-R20_jordancL2SGC.rvt 7/26/2021 11:08:20 AMSPR-A10 2032 04/14/2021 BUILDING ELEVATIONS Author Checker ONE 11 2.0 2032 110 W. BEALL ST. BOZEMAN, MT 59715 SITE PLAN REVIEW RC-02 3/32" = 1'-0"SPR-A10 1 SPR-WEST ELEVATION 3/32" = 1'-0"SPR-A10 2 SPR-SOUTH ELEVATION NO. DATE REVISION DESCRIPTION 5 07/28/2021 RC - 02 KEYNOTES - EXTERIOR ELEVATIONS 1 2-1/4" PRECAST CONCRETE SILL - MATCH BRICK 2 ALUMINUM GLASS OVERHEAD DOOR WITH MOTORIZED OPENER 3 PREFINISHED METAL CAP FLASHING 4 STEEL CANOPY - PAINT TO MATCH WINDOWS - SEE DETAILS 5 TRANSFORMER LOCATION - SEE ELEC. 6 LOUVER - PAINT TO MATCH METAL BEYOND - SEE MECH. 7 GAS METER - SEE PLUMBING 8 BUILDING SIGNAGE - SEE DETAIL 9 MECHANICAL EQUIPMENT SCREENING - SEE DETAILS 10 UTILITY GATE - SEE SITE DETAIL 12 MASONRY EXPANSION JOINT - COLOR MATCH SEALANT 13 DEFLECTION JOINT AT METAL PANEL 14 DEFLECTION JOINT AT BRICK VENEER 15 BUILDING ADDRESS LETTERING - SEE SIGNAGE PLANS 16 BOLT-ON ALUMINUM JULIET BALCONY AND GUARD RAIL - SEE SPEC 17 3'x10' METAL WALL MOUNT SCREEN - METAL TO BE PAINTED TO MATCH EXISTING RAILINGS 5 5 5