Notice to Proceed
Date: _________________
Project: Front Street Connector Trail
Owner: City of Bozeman – Parks and Recreation Department Owner's Contract No.:
Contract: New pathway extending from Rouse Avenue to
Wallace Avenue along Birch Street and the future Front
Street including a new bridge over Bozeman Creek.
Engineer's Project No.: 15022.02
Contractor: Highland Construction Services, LLC
Contractor's Address: P.O. Box 207; Belgrade, MT 59714
You are notified that the Contract Times under the above Contract will commence to run
on July 8, 2021. On or before that date, you are to start performing your obligations under the
Contract Documents. In accordance with Article 3 of the Agreement, the number of days to
achieve Substantial Completion is 45 calendar days.
Before you may start any Work at the Site, Paragraph 2.01.B of the General Conditions
provides that you and Owner must each deliver to the other (with copies to Engineer and other
identified additional insureds and loss payees) certificates of insurance which each is required to
purchase and maintain in accordance with the Contract Documents.
City of Bozeman – Parks and Recreation
Department
Owner
Given by:
Authorized Signature
Title
Date
Copy to Engineer
DocuSign Envelope ID: 7EE98D7F-57C1-4EAB-9120-C7A9E8C45B19
7/7/2021
7/7/2021
Director