Loading...
HomeMy WebLinkAboutResolution 5322 Declaring Emergency Exemption from Advertisements for Bids for Pear Street Booster Station Water Main RepairVersion April 2020 RESOLUTION 5322 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, DECLARING AN EMERGENCY TO EXEMPT THE 2021 PEAR STREET BOOSTER STATION WATER MAIN REPAIR PROJECT FROM ADVERTISEMENT FOR BIDS PURSUANT TO SEC. 7-5-4303 MCA AND AUTHORIZING THE CITY MANAGER TO SIGN A NOTICE OF AWARD WITH DUNEMAN CONSTRUCTION, INC. TO COMPLETE THE 2021 PEAR STREET BOOSTER STATION WATER MAIN REPAIR PROJECT AT A COST OF $96,910.00 AS WELL AS CONTRACT DOCUMENTS ONCE RECEIVED WHEREAS, the City Commission is authorized pursuant to Sec. 7-5-4303 MCA, to exempt certain construction contracts from bidding and advertising requirements upon the happening of an emergency caused by fire, flood, explosion, storm, earthquake, riot, insurrection, or other similar emergency; and WHEREAS, the City Commission may proceed in any manner which, in the judgment of three-fourths of the members of the City Commission present at a meeting, duly recorded in the minutes of the proceedings of the meeting by aye and nay vote, will best meet the emergency and serve the public interest; WHEREAS, sudden failure of an existing 18” cast iron water main fitting immediately adjacent to the Pear Street Booster Station has rendered the station inoperable, causing the happening of an “other similar emergency” under Sec. 7-5-4303 MCA due to the inability to move water produced from the Lyman water supply system into the remainder of the City’s water distribution system, which is an imperative operating function should the Sourdough Water Treatment Plant supply become reduced or otherwise not available; and WHEREAS, by passage and adoption of Resolution 5315 on July 13, 2021, the City Commission declared a Stage Two drought and further authorized the City Manager, through administrative order, to issue subsequent drought stage declarations in order to preserve the City’s available water supply for those purposes essential to public health, safety, and welfare; and DocuSign Envelope ID: BEE9779E-C616-4328-8733-AE8EEB571DA6 Version April 2020 WHEREAS, the 2021 Pear Street Booster Station Water Main Repair Project addresses the emergency by returning the station to service immediately and without delay through proactively replacing existing fittings of similar age and condition to that which experienced sudden failure; and WHEREAS, the City Engineering Staff prepared a limited solicitation to obtain bids from four local contractors that have performed similar such work for the City in the past and received two bids for the 2021 Pear Street Booster Station Water Main Repair Project; and WHEREAS, Duneman Construction, Inc. submitted the low bid at a bid price of $123,310.00. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, that: Section 1 The Bozeman City Commission hereby declares an emergency due to the City’s inability to operate the Pear Street Booster Station during a drought declaration, by recognizing the critical function the station performs to provide emergency water supply to City residents in the event the water supply from the Sourdough Water Treatment Plant is reduced or otherwise not available. The City Commission determines this emergency requires immediate action to ensure sufficient availability of water supply and any additional delay is not in the public interest. Section 2 The Bozeman City Commission, by motion and affirmative vote of three-fourths of the members present at the July 20, 2021 City Commission meeting, duly recorded in the minutes of the proceedings of the City Commission, concur with the actions taken by City Engineering Staff to prepare construction plans and specifications for the 2021 Pear Street Booster Station Water Main Repair Project in order to prepare a limited solicitation to obtain bids from four local contractors without public advertisement of bids. Section 3 The Bozeman City Commission hereby authorizes the City Manager to sign a Notice of Award with Duneman Construction, Inc. for the 2021 Pear Street Booster Station Water Main Repair Project in the amount of $96,910.00 as well as Contract Documents once received. DocuSign Envelope ID: BEE9779E-C616-4328-8733-AE8EEB571DA6 Version April 2020 PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 20th day of July, 2021, by unanimous vote of its members present. ___________________________________ CYNTHIA L. ANDRUS Mayor ATTEST: ___________________________________ MIKE MAAS City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney DocuSign Envelope ID: BEE9779E-C616-4328-8733-AE8EEB571DA6