Loading...
HomeMy WebLinkAbout08-25-21 DRB Agenda & PacketA.Call meeting to order B.Disclosures C.Changes to the Agenda D.Approval of Minutes D.1 Approval of Meeting Minutes from 07-28-21(Hufstetler) E.Public Comment Please state your name and address in an audible tone of voice for the record. This is the time for THE DESIGN REVIEW BOARD OF BOZEMAN, MONTANA DRB AGENDA Wednesday, August 25, 2021 WebEx Meeting Information Via Webex: https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php? MTID=e312ff9b1070e155788d3de3ea2fad437 Click the Register link, enter the required information, and click submit. Click Join Now to enter the meeting Via Phone: This is for listening only if you cannot watch the stream or channel 190 • Call-in toll number (US/Canada ): 1-650-479-3208 • Access code: 2554 903 9473 Public Comment: If you are interested in commenting in writing on items on the agenda, please send an email to agenda@bozeman.net prior to 4:00pm on Wednesday, August 25th, 2021. You may also comment by visiting the City's public comment page. You can also comment by joining the Webex meeting. If you do join the Webex meeting, we ask you please be patient in helping us work through this online meeting. If you are not able to join the Webex meeting and would like to provide oral comment you may send a request to agenda@bozeman.net with your phone number, the item(s) you wish to comment on, and someone will call you during the meeting to provide an opportunity to comment. You may also send the above information via text to 406-224-3967. As always, the meeting will be streamed through the City's video page (click the Streaming Live in the drop down menu), and available in the City on cable channel 190. 1 individuals to comment on matters falling within the purview of the Committee. There will also be an opportunity in conjunction with each action item for comments pertaining to that item. Please limit your comments to three minutes. F.Action Items F.1 Town & Country Master Site Plan and Phase I Site Plan, Applications 19206 & 19207 (Miller) G.FYI/Discussions H.Adjournment For more information please contact Brian Krueger This board generally meets the 2nd and 4th Wednesday of the month from 5:30 to 7:30 Committee meetings are open to all members of the public. If you have a disability and require assistance, please contact our ADA coordinator, Mike Gray at 582-3232 (TDD 582-2301). 2 Memorandum REPORT TO:Design Review Board FROM:Taylor Chambers - Communuity Development Technician II SUBJECT:Approval of Meeting Minutes from 07-28-21 MEETING DATE:August 25, 2021 AGENDA ITEM TYPE:Minutes RECOMMENDATION:I move to approve the meeting minutes from July 28th, 2021. STRATEGIC PLAN:1.2 Community Engagement: Broaden and deepen engagement of the community in city government, innovating methods for inviting input from the community and stakeholders. BACKGROUND:None UNRESOLVED ISSUES:None ALTERNATIVES:1. Approve meeting minutes with corrections. 2. Do not approve meeting minutes. FISCAL EFFECTS:None Attachments: 07-28-21 DRB Minutes DRAFT.pdf Report compiled on: August 3, 2021 3 Bozeman City Commission Meeting Minutes, 07-28-21 Page 1 of 5 THE DESIGN REVIEW BOARD MEETING OF BOZEMAN, MONTANA MINUTES Wednesday, July 28th, 2021 Due to loss in network, there are four brief periods (average 5 minutes) where audio was lost. A) 00:04:32 Call meeting to order Present: Lotus Grenier, Mark Hufstetler, Allison Bryan, Erin Eisner, Brady Ernst Absent: Troy Scherer, M Ethan Barlow, Paul East B) 00:07:19 Disclosures C) 00:07:31 Changes to the Agenda D) 00:07:37 Approval of Minutes D.1 Approval of Minutes from 06-23-21 06-23-21 DRB Minutes DRAFT.pdf 00:07:56 Motion D) Approval of Minutes Brady Ernst: Motion Allison Bryan: 2nd 00:08:11 Vote on the Motion to approve D) Approval of Minutes. The Motion carried 4 - 0 Approve: Lotus Grenier Allison Bryan Erin Eisner Brady Ernst Disapprove: None 4 Bozeman City Commission Meeting Minutes, 07-28-21 Page 2 of 5 E) 00:08:39 Public Comment F) Action Items F.1 00:10:11 Community First Griffin Place Site Plan; Application No. 21117 Attachment 1 2117 Community First DRB staff rpt 07 22 21.pdf Attachment 2 Applicants Project Narrative.pdf Attachment 4 Departure Narrative_06012021.pdf 30_L001_Schedules_06012021.pdf 62_A4.1_EXTERIOR_ELEVATIONS_06012021.pdf 31_L300_Overall_Landscape_Plan_06012021.pdf 63_A4.2_EXTERIOR_ELEVATIONS_06012021.pdf 32_L301_Landscape_Plan_Enlargement_06012021.pdf 64_A5.0_ARCHITECTURAL_MATERIALS_&_RENDERINGS_06012021.pdf 33_L302_Landscape_Plan_Enlargement_06012021.pdf 34_L303_Landscape_Plan_Enlargement_06012021.pdf 35_L304_Landscape_Plan_Enlargement_06012021.pdf 36_L305_Landscape_Plan_Enlargement_06012021.pdf 37_L306_Landscape_Plan_Enlargement_06012021.pdf 38_L307_Landscape_Plan_Enlargement_06012021.pdf 39_L308_Landscape_Plan_Enlargement_06012021.pdf 40_L500_Landscape_Details_06012021.pdf 41_L501_Landscape_Details_06012021.pdf 42_L600_Irrigation_Plan_06012021.pdf 43_L601_Irrigation_Plan_06012021.pdf 44_L700_Irrigation_Details_06012021.pdf 45_L701_Irrigation_Details_06012021.pdf 46_A100_SITE_PLAN_NORTH_BUILDING_06012021.pdf 47_A101_SITE_DETAILS_06012021.pdf 48_A102_STREET_SECTIONS_06012021.pdf 49_A201_FIRST_FLOOR_PLAN_06012021.pdf 50_A202_SECOND_FLOOR_PLAN_06012021.pdf 01_A.01_COVER_SHEET_06012021.pdf 51_A203_ROOF_PLAN_06012021.pdf 02_A.02_SITE_DIAGRAMS_&_RELATED_INFO_06012021.pdf 52_A300_ELEVATIONS_06012021.pdf 03_A1.1_SITE_PLAN -CFGP_06012021.pdf 53_A301_ELEVATIONS_06012021.pdf 04_T1.0_TITLE_06012021.pdf 54_A305_EXTERIOR_MATERIALS_06012021.pdf 06_EX.01_EXISTING_CONDITIONS_PLAN_03122021.pdf 55_A306_EXTERIOR_PERSPECTIVES_06012021.pdf 07_C0.3_CONSTRUCTION_FACILITIES_PLAN_06012021.pdf 56_A1.2_SITE_PLAN -SOUTH_BUILDING_06012021.pdf 08_C1.0_CIVIL_SITE_PLAN_06012021.pdf 57_A1.3_SITE_DETAILS_06012021.pdf 5 Bozeman City Commission Meeting Minutes, 07-28-21 Page 3 of 5 09_C1.1_ENLARGED_CIVIL_SITE_PLAN_NORTH_06012021.pdf 58_A1.4_SITE_DETAILS_06012021.pdf 10_C1.2_ENLARGED_CIVIL_SITE_PLAN_SOUTH_06012021.pdf 59_A2.1_FLOOR_PLANS -LEVEL_1_06012021.pdf 28_ES1.6_LIGHT_FIXTURES_03122021.pdf 60_A2.2_FLOOR_PLANS -LEVEL_2_06012021.pdf 29_L000_Landscape_Site_Plan_06012021.pdf 61_A2.5_ROOF_PLAN_06012021.pdf 00:10:41 Staff Presentation City of Bozeman Senior Planner Susana Montana introduced the project and provided an overview of the project. Following, she asked for the Design Review Board to provide a recommendation to the Community Development Director, and to address the applicant's request for a Departure on the length of the South Building. 00:26:34 Applicant Presentation Heather Grenier, director of the Human Resource Development Council (HRDC) shared some information on the proposed facility and its benefits to the community. Michael Juliano of Hennebery Eddy Architects presented on behalf of the applicant, focusing on the South building, also called the "Year-Round Emergency Shelter and Resource Hub." Peter Andrews of Intrinsik Architecture provided an overview of the North building which offers food resource services. 00:40:26 Board Member Q&A with staff and applicant. 00:58:30 Public Comment Opportunity 01:03:56 Motion “Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 21117 Community First Griffin Place and move to recommend approval of the site plan application, with the requested departure, subject to recommended conditions and all applicable code provisions.” Brady Ernst: Motion Allison Bryan: 2nd 01:12:38 Vote on the Motion to approve “Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 21117 Community First Griffin Place and move to recommend approval of the site plan application, with the requested departure, subject to recommended conditions and all applicable code provisions.” The Motion carried 5 - 0 Approve: Lotus Grenier Mark Hufstetler 6 Bozeman City Commission Meeting Minutes, 07-28-21 Page 4 of 5 Allison Bryan Erin Eisner Brady Ernst Disapprove: None F.2 01:13:47 UPS Bozeman Parcel Distribution Facility Site Plan, Application 21169 21169_StaffReport_DRB.pdf A1_06092021.pdf _CVRCoverSheet_06092021.pdf C100OverallSite_06092021.pdf A103RoofPlan_04212021.pdf A201ExteriorElevations_06092021.pdf A202ExteriorElevationsColored_06092021.pdf A101FloorPlans04212021.pdf C300OverallUtility_06092021.pdf DepartureRequests_04212021.pdf ES501SitePhotometricPlan_06092021.pdf L100OverallLandscapePlan_06092021.pdf C200OveralGrading_04212021.pdf 01:13:47 Staff Presentation Senior Planner Lynn Hyde presented on behalf of the City of Bozeman and gave an overview of the proposed Site Plan. 01:28:11 Applicant Presentation Will Krahn of Cushing Terrell presented on behalf of the applicant 01:38:04 Board member Q&A with staff and applicant 01:50:43 Public Comment Opportunity 01:58:24 Motion Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 21169 and move to recommend approval of the site plan application with departure subject to conditions and all applicable code provisions. Lotus Grenier: Motion Allison Bryan: 2nd 02:09:01 Vote on the Motion to approve Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 21169 and move to recommend approval of the site plan application with departure subject to conditions and all applicable code provisions. The Motion failed 2 - 3 7 Bozeman City Commission Meeting Minutes, 07-28-21 Page 5 of 5 Approve: Lotus Grenier Allison Bryan Disapprove: Mark Hufstetler Erin Eisner Brady Ernst G) 02:10:02 FYI/Discussions H) 02:10:27 Adjournment For more information please contact Brian Krueger bkrueger@bozeman.net. This board generally meets the 2nd and 4th Wednesday of the month from 5:30 to 7:30 8 Memorandum REPORT TO:Design Review Board FROM:Jacob Miller, Associate Planner Martin Matsen, Director of Community Development SUBJECT:Town & Country Master Site Plan and Phase I Site Plan, Applications 19206 & 19207 MEETING DATE:August 25, 2021 AGENDA ITEM TYPE:Community Development - Quasi-Judicial RECOMMENDATION:Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for applications 19206 & 19207 and move to recommend approval of the site plan application with departure subject to conditions and all applicable code provisions. STRATEGIC PLAN:4.2 High Quality Urban Approach: Continue to support high-quality planning, ranging from building design to neighborhood layouts, while pursuing urban approaches to issues such as multimodal transportation, infill, density, connected trails and parks, and walkable neighborhoods. BACKGROUND:These Master Site Plan and Site Plan applications are to grant entitlements for the layout of a 4.15 acre lot that will contain a 38,378 square foot grocery store and two commercial pad sites located within the B-2, Community Business District. The grocery store, infrastructure, parking lot and all other site improvements will be constructed with phase I. This project will also be providing a 10' pedestrian easement with 10' setbacks through the middle of the site due to block length standards. Pursuant to section 38.340.020, the Design Review Board (DRB) authority, the DRB is required to make advisory comments and a recommendation to the Director on this application. The Design Review Board meeting will occur on August 25, 2021 via WebEx. Public comment ran from July 30 through August 14, 2021. Adequacy for the project was granted on July 29, 2021. Following any recommendations by DRB, Director of Community Development will make the final decision on this application. UNRESOLVED ISSUES:None ALTERNATIVES:NA FISCAL EFFECTS:NA 9 Attachments: 19206 19207 T&C MSP SP SR DRB.pdf C0.1 - Phasing Plan Rev 2 03-18-20.pdf SP103 - OVERALL ROOF PLAN 07-15-2020.pdf C0.2 - Demolition Plan 01-16-20.pdf SP200 - EXTERIOR ELEVATIONS 07-15-2020.pdf C1.0 - Site Plan - Rev 4 12-17-20.pdf SP200a - EXTERIOR ELEVATIONS - COLOR 07-15-2020.pdf C1.1 - Utility Plan - Rev 4 12-17-20.pdf SP201 - EXTERIOR ELEVATIONS 07-15-2020.pdf C1.2 - Grading Plan - Rev 4 12-17-20.pdf SP201a - EXTERIOR ELEVATIONS - COLOR 07-15-2020.pdf C2.0 - Civil Details Rev 1 01-20-20.pdf SP900 - 3D PERSPECTIVES 07-15-2020.pdf C2.1 - Civil Details Rev 1 01-16-20.pdf E001 - ELECTRICAL LEGEND SCHED 06-07-21.pdf E002 - LIGHTING ELEVATIONS 06-07-21.pdf E003 - LIGHTING ELEVATIONS 06-07-21.pdf E100 - SITE LIGHTING PLAN 06-07-21.pdf E101 - SITE POWER PLAN 06-07-21.pdf L0.0 - OVERALL SITE PLAN TOWN & COUNTRY 01-12-2021.pdf L0.1 - OVERALL OPEN SPACE AND PHASING 01-12-2021.pdf L0.2 - OPEN SPACE NOTES AND LEGENDS 01-12-2021.pdf L0.3 - NOTES AND LEGENDS TOWN AND COUNTRY SITE 01- 12-2021.pdf L0.4 - FUTURE PHASE RESEEDING PLAN 01-12-2021.pdf L3.0 - PLANTING PLAN ENLARGEMENT 01-12-2021.pdf L3.1 - PLANTING PLAN ENLARGEMENT 01-12-2021.pdf L3.2 - PLANTING PLAN ENLARGEMENT 01-12-2021.pdf L3.3 - PLANTING PLAN ENLARGEMENT 01-12-2021.pdf L5.0 - LANDSCAPE DETAILS 01-12-2021.pdf L5.1 - LANDSCAPE DETAILS 01-12-2021.pdf L6.0 - IRRIGATION WATER USE PLAN 01-12-2021.pdf L7.0 - IRRIGATION DETAILS 01-12-2021.pdf L7.1 - IRRIGATION DETAILS 01-12-2021.pdf SP000 - SITE PLAN COVER SHEET 05-27-2021.pdf SP000 - SITE PLAN COVER SHEET 07-15-2020.pdf SP001 - GARBAGE ENCLOSURE 07-15-2020.pdf SP002 - GARBAGE ENCLOSURE 07-15-2020.pdf SP101 - OVERALL FIRST FLOOR PLAN 07-15-2020.pdf SP102 - OVERALL SECOND FLOOR PLAN 07-15-2020.pdf Report compiled on: August 17, 2021 10 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 1 of 15 Application No. 19206 & 19207 Type Site Plan & Master Site Plan Project Name Town & Country Foods Summary A Master Site Plan and Site Plan application for the construction of a 38,378 square foot grocery store and one commercial pad sites. Zoning B-2 Growth Policy Community Commercial Mixed Use Parcel Size 4.15 acres Overlay District(s) NA Street Address 4551 Field St., Bozeman, MT 59718 Legal Description Block 5, Ferguson Farms Commercial Subdivision Owner Town & Country Foods, Inc., 1611 S. 11th Ave., Bozeman, MT 59715 Ferguson Farms POA, 101 E. Main St., Bozeman, MT 59715 Applicant Town & Country Foods, Inc., 1611 S. 11th Ave., Bozeman, MT 59715 Representative Madison Engineering, 895 Technology Blvd., Suite 203, Bozeman, MT 5718 Staff Planner Jacob Miller Engineer Griffin Nielsen, Alicia Paz-Solis Noticing Public Comment Period Site Posted Adjacent Owners Mailed Newspaper Legal Ad 7/30/21 to 8/14/21 7/30/21 7/30/21 N/A Advisory Boards Board Date Recommendation Development Review Committee 6/5/19 Adequate Design Review Board 8/25/21 TBD Recommendation Approval with conditions Decision Authority Director of Community Development Date: Full application and file of record: Community Development Department, 20 E. Olive St., Bozeman, MT 59715 Motion: “Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for applications 19206 & 19207 and move to recommend approval of the site plan application subject to conditions and all applicable code provisions.” Project summary: These Master Site Plan and Site Plan applications are to grant entitlements for the layout of a 4.15 acre lot that will contain a 38,378 square foot grocery store and two commercial pad sites located within the B-2, Community Business District. The grocery store, infrastructure, parking lot and all other site improvements will be constructed with phase I. This project will also be providing a 10' pedestrian easement with 10' setbacks through the middle of the site due to block length standards. This project will blend well with the existing uses in the 11 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 2 of 15 Ferguson Farms Subdivision and the other surrounding areas on the west side of Bozeman, which have been developing rapidly. Directly to the north is the Icon Apartments development which contains over 300 apartment units and is flanked by a variety of housing types, all of which will benefit from a grocery store in close proximity. Along the east side of resort drive is a shared use path which will provide an opportunity for multi-modal transportation to and from the Town & Country Foods. To the south of the project are commercial uses, including retail, restaurants, offices, etc. Pursuant to section 38.340.020, the Design Review Board (DRB) authority, the DRB is required to make advisory comments and a recommendation to the Director on this application. The Design Review Board meeting will occur on August 25, 2021 via WebEx. Public comment ran from July 30 through August 14, 2021. Adequacy for the project was granted on July 29, 2021. Following any recommendations by DRB, Director of Community Development will make the final decision on this application. CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. Additional conditions of approval and code corrections are required and will be included with the final report provided to the Director of Community Development Recommended Conditions of Approval: 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 2. Those which may be identified by the DRB as recommended conditions. 12 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 3 of 15 Figure 1: Current Land Use 13 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 4 of 15 Figure 2: Community Plan 2020 Future Land Use Map 14 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 5 of 15 Figure 3: Zoning 15 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 6 of 15 Figure 4: Site Plan 16 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 7 of 15 Figure 5 - 8: Building Elevations 17 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 8 of 15 ANALYSIS AND FINDINGS Analysis and resulting recommendations based on the entirety of the application materials, municipal codes, standards, plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis in this report is a summary of the completed review. Plan Review, Section 38.230.100, BMC In considering applications for plan approval under this title, the Director of Community Development shall consider the following: 1. Conformance to and consistency with the City’s adopted growth policy 38.100.040 B Meets Code? Growth Policy Land Use Community Commercial Mixed Use Yes Zoning B-2 Yes Comments: The uses are allowed within the zoning district. The property is within the City’s municipal service area. Staff finds that the project does contribute to the goals of the growth policy including the following goals and objectives: Goal EE-1: Promote the continued development of Bozeman as an innovative and thriving economic center. This project will provide long term benefits to the community by providing a regional grocery store in a rapidly developing area as well as additional employment opportunities. 5. Conformance with zoning provisions of article 3 38.320.100 Meets Code? Current Violations None Yes Comments: There are no current violations on the subject property 3. Conformance with all other applicable laws, ordinances, and regulations 38.100.080 Meets Code? Conflicts NA NA Condominium ownership NA NA Comments: No specific conflicts identified. 4. Conformance with Plan Review for applicable permit types as specified in article 2 Section 38.230 Meets Code? Site Plan Yes Comments: The site plan criteria are met with this project. The proposal is compatible and sensitive to the immediate environment of the site and the adjacent neighborhoods. Architectural design, building mass, building materials and character are compatible to the immediate environment of the site and neighborhood. 18 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 9 of 15 5. Conformance with zoning provisions of article 3 38.320.100 Meets Code? Permitted uses 38.310 Shop/offices with accessory apartments Yes Form and intensity standards 38.320 Yes Zoning B-2 Setbacks (feet) Structures Parking / Loading Yes Front 10’ 10’ Rear 5’ 10’ Side 5’ 8’ Alley NA - Comments: The proposed uses are a principle use in B-2 and this project conforms to all standards set forth in 38.320.100. Relationship to adjacent properties standards 38.520.030 (light and air access and privacy) and angled setback plane 38.360.030 NA Applicable zone specific or overlay standards 38.330-340 NA Building Height Requirements 38.320.010-.060 Yes Lot coverage Lot 1: 22.4% Lot 2: 36.6% Lot 3: 36.3% Allowed 100% Height 35’ Allowed 50’ Yes Comments: Project conforms to all of the form and intensity standards for the B-2 district. General land use standards and requirements 38.350 NA Comments: No Setback encroachments are proposed. No other general land use criteria are applicable. Applicable supplemental use criteria 38.360 NA Supplemental uses/type NA NA Comments: No supplemental use criteria are applicable. Wireless facilities 38.370 NA Affordable Housing 38.380.010 NA NA Affordable housing plan NA Comments: NA, no wireless facilities or residential uses proposed. 6a(1). Conformance with the community design provisions of article 4: Transportation facilities and access 38.400 Meets Code? Street vision Yes Yes Secondary access Yes Traffic Impact Study / LOS NA Transportation grid adequate to serve site Yes Yes Comments: A traffic study was conducted with the subdivision and reviewed by Engineering. Street dedication NA Yes 19 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 10 of 15 Drive access locations and widths Yes Number of drive accesses 2 from Fallon St., 2 from Field St. Yes Street easements NA Special Improvement Districts Yes Yes Comments: There are two vehicular access for customers, one from Field St. and one from Fallon St. There are also two truck loading and unloading accesses, one from each street. Parking requirements of 38.540 Required parking nonresidential 164 Yes Required parking residential NA Reductions nonresidential None Reductions residential None Provided parking off street 199 On street parking None Comments: Parking requirements are met through a surface parking lot. 6a(2). Conformance with the community design provisions of article 4: Pedestrian and vehicular ingress and egress 38.400 Meets Code? Design of the pedestrian and vehicular circulation systems to assure that pedestrians and vehicles can move safely and easily both within the site and between properties and activities within the neighborhood area Yes Vehicle accesses to site 4 Yes Pedestrian access location(s) Yes Site vision triangles Yes Fire lanes, curbs, signage and striping Yes Non-automotive transportation and circulation systems, design features to enhance convenience and safety across parking lots and streets, including, but not limited to paving patterns, grade differences, landscaping and lighting Yes Crosswalks Yes Curb ramps Yes Pedestrian lighting Yes Comments: Project meets all requirements of article 4. Adequate connection and integration of the pedestrian and vehicular transportation systems to the systems in adjacent development and the general community Yes Access easements Yes Yes Dedication of right-of-way or easements necessary for pedestrian, shared use pathway and similar transportation facilities NA Comments: This project site has pedestrian and vehicular access from Field St. and Fallon St. 6a(3) Loading and Unloading areas Meets Code? 20 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 11 of 15 Loading and unloading area requirements 38.540.080 Yes Loading and unloading Yes Yes First Berth (min. 70 feet length, 12 feet in width and 14 feet in height) Yes Yes Additional Berths (min. 45 feet length) NA NA Comments: Off-street loading berth conforms to requirements. 6b Community design and element provisions 38.410 Meets Code? Lot and block standards 38.410.040 Yes Rights of way for pedestrians alternative block delineation Yes Comments: This project meets lot and block standards. A 10’ pedestrian access easement with 10’ setbacks is provided as an alternative block delineation. Provisions for utilities including efficient public services and utilities 38.410.050-060 Yes Municipal infrastructure requirements Yes Easements (City and public utility rights-of-way etc.) Yes Water, sewer, and stormwater Yes Other utilities (electric, natural gas, communications) Yes CIL of water Yes Comments: All utilities proposed are adequate to serve this project. CILWR has been paid for this lot. Easements for utilities have been provided. Site Surface Drainage and stormwater control 38.410.080 Yes Location, design and capacity Yes Landscaping per 38.410.080.H Yes Comments: An infrastructure design report was included with this project and was reviewed by engineering and determined to be adequate. Grading 38.410.080 Yes Maximum 1:4 slope requirements met NA Comments: Reviewed and approved by Engineering Division. 6c. Park and recreation requirements 38.420 Meets Code? Enhancement of natural environment NA Wildlife habitat or feeding area preservation NA Maintenance of public park or public open space access NA Park/Recreational area design NA Parkland Cash-in-lieu for maximum known density not to exceed 12 units/acre (ac.). NA __ ac. X __ units/ac. X 0.03 ac.= __ 21 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 12 of 15 Cash donation in-lieu(CIL) NA NA Improvements in-lieu NA NA Comments: No parkland dedication is required with this project. 7a-c. Conformance with the project design provisions of Article 5, Compatibility, Design and Arrangement Meets Code? Compatibility with, and sensitivity to, the immediate environment of the site and the adjacent neighborhoods and other approved development relative to architectural design, building mass, neighborhood identity, landscaping, historical character, orientation of buildings on the site and visual integration Yes Block Frontage Standards 38.510 Yes Building Design 38.530 Yes Location and design of service areas and mechanical equipment 38.520.070 Yes Comments: This project adheres to all requirements from Article 5. The block frontage designations on the adjacent streets are mixed and the applicant has elected to adhere to the landscaped block frontage standards. The applicant has chosen the southern façade as the primary façade, which includes a pedestrian entrance with weather protection, a courtyard with landscaping and seating and a high level of glazing. The utility meters and trash enclosure are adequately screened with landscaping and an architectural screen. The roof-mounted mechanical equipment is screened with an architectural screen. Design and arrangement of the elements of the plan (e.g., buildings, circulation, open space and landscaping, etc.) so that activities are integrated with the organizational scheme of the community, neighborhood, and other approved development and produce an efficient, functionally organized and cohesive development Yes Relationship to adjacent properties 38.520.030 Yes Non-motorized circulation and design 38.520.040 Yes Vehicular circulation and parking 38.520.050 Yes Comments: This project provides pathways connecting to the sidewalks on Field St. and Fallon St. and provides crosswalks through the site. Design and arrangement of elements of the plan (e.g., buildings circulation, open space and landscaping, etc.) in harmony with the existing natural topography, natural water bodies and water courses, existing vegetation, and to contribute to the overall aesthetic quality of the site configuration Yes Site Planning and Design Elements 38.520 Yes Comments: Project conforms to requirements. 7d. Conformance with the project design provisions of Article 5, Landscaping including the enhancement of buildings, appearance of vehicular use, open space and pedestrian area and the preservation of replacement of natural vegetation Meets Code? Submittal requirements for landscape plans 38.220.100 Yes Mandatory landscaping 38.550.050 Yes Yard Yes 22 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 13 of 15 Additional screening Yes Parking lot screening Yes Interior parking lot landscape Yes Off-street loading spaces screening Yes Street frontage Yes Street median island NA Acceptable landscape materials Yes Protection of landscape areas Yes Irrigation: plan, water source, system type Yes (underground) Trees for residential adjacency NA City rights-of-way and parks Yes Tree plantings for boulevard ROW, drought- resistant seed Yes Public ROW boulevard strips Yes Irrigation and maintenance provisions for ROW Yes State ROW landscaping NA Additional NA NA Fencing and walls NA NA Comments: Additional screening will be provided for the screening of the trash enclosure and the utility meters. Boulevard trees will be planted with this project. Additional screening is provided as a departure for the parking lot width > 50%. Site planning and design required 38.520 Yes Pedestrian area landscaping, including pathways and internal circulation 38.520.040 Yes Internal roadway landscaping 38.520.050 NA Open space landscaping 38.520.060 Yes Service area and mechanical equipment landscaping and screening 38.520.070 Yes Comments: Project meets requirements. 7e. Conformance with the project design provisions of Article 5, Open Space Meets Code? Open Space Section 38.520.060 NA Total required 3,019 NA Total provided 3,432 NA Comments: Open space is required for the Phase I portion only because it is over 1 acre.d site 7f. Conformance with the project design provisions of Article 5, Lighting 38.570 Meets Code? Building-mounted lighting (cutoff and temperature) Yes Site lighting (supports, cutoff and temperature) Yes Minimum light trespass at property line Yes 23 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 14 of 15 7g. Conformance with the project design provisions of Article 5, Signage 38.560 Meets Code? Allowed (sq. ft)/building NA NA Proposed (sq. ft) NA Comments: No signage is currently proposed. 8a-c. Conformance with environmental and open space objectives in articles 4-6 Meets Code? Enhancement of natural environment: Integrated stormwater, LID, removal of inappropriate fill NA Grading Yes On-site retention/detention Yes Comments: Project meets requirements. Drainage design Yes Stormwater maintenance plan 38.410.030.A Yes Stormwater feature: landscaping amenity, native species, curvilinear, 75% live vegetation Yes Comments: This project utilizes two retention ponds for lot 1 and will construct underground stormwater facilities on lots 2 and 3 with future phases. A stormwater maintenance plan was submitted and reviewed by engineering and determined to be adequate. Watercourse and wetland protections and associated wildlife habitats NA If the development is adjacent to an existing or approved public park or public open space area, have provisions been made in the plan to avoid interfering with public access to and use of that area NA Comments: NA 9. Conformance with the natural resource protection provisions of articles 4-6 Meets Code? Watercourse setback 38.410.100 NA Watercourse setback planting plan NA Floodplain regulations 38.600 NA Wetland regulations 38.610 NA Comments: NA 10. Other related matters, including relevant comment from affected parties 38.220 Meets Code? Public Comment No No Comments: This project was noticed accordingly and given adequate time for public comment. 11. If the development includes multiple lots that are interdependent for circulation or other means of addressing requirement of this title, Meets Code? Comments: The proposed building mounted lighting and site lighting meets standards. 24 Staff Report Town & Country Foods MSP & SP Review Application 19206 & 19207 August 17, 2021 Page 15 of 15 whether the lots are either: Configured so that the sale of individual lots will not alter the approved configuration or use of the property or cause the development to become nonconforming OR Are the subject of reciprocal and perpetual easements or other agreements to which the City is a party so that the sale of individual lots will not cause one or more elements of the development to become nonconforming. 38.410.060 Subdivision exemption Yes Yes Required Easements Yes Yes Reciprocal access and shared parking easement Yes Yes Mutual access easement and agreement Yes Yes Comments: All necessary easements are provided with this project. A subdivision exemption is nearly finalized to aggregate lots. 12. Phasing of development 38.230.020.B including buildings and infrastructure Meets Code? Phasing No # of phases 2 Yes Comments: This project will be constructed in two phases. 25 26 1 BCEFG 3 4 5 2 9 KL J D 7 8 M AHI 6 10 SP200a 1 SP200a2 SP201a 2 SP201a 1 1" / 12"1" / 12"1" / 12"1" / 12"1" / 12"1" / 12" 2" / 12"2" / 12"67' - 0" LINE OF BUILDING FOOTPRINT BELOW LINE OF BUILDING FOOTPRINT BELOW LINE OF BUILDING FOOTPRINT BELOW LINE OF BUILDING FOOTPRINT BELOW RM-3 RM-4 RM-4 RM-4 RM-3 1/4" / 12" ROOF ACCESS HATCH CANOPY BELOW CANOPY BELOW CANOPY BELOW CANOPY BELOW CANOPY BELOW 2" / 12" 2" / 12"2" / 12"COVERED TRASH ENCLOSURE BELOW 1/4" / 12"1/4" / 12"RAMP BELOW ELEVATOR PENTHOUSE SKYLIGHT SNOW GUARD SNOW GUARD SNOW GUARD SNOW GUARD SNOW GUARD SNOW GUARD SNOW GUARD SKYLIGHT RTU SCREEN SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT RM-4 RM-4 RM-4 RM-4 RM-4 HARDSCAPE, WALKSURFACE BELOW 1" / 12"1/4" / 12"2'0'20'10'40' RTU SCREEN RTU SCREEN RTU SCREEN LOADING DOCK SCREEN 1 1 1 1 SP0023 ROOF PLAN GENERAL NOTES ?XX-X INDICATES BUILDING COMPONENT, SEE EXTERIOR ELEVATIONS FOR COMPONENT SCHEDULE NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:39:11 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP103 OVERALL ROOF PLAN SITE PLAN APRIL 21, 2020 SCALE:3/32" = 1'-0"1 ROOF PLAN REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 27 28 T.O. FOUNDATION 100' -0" BCEFG MIN. ALLOWABLE:1,194.6 SF GLAZING PROVIDED: 1,200 SF MAX BUILDING HT B2 138' -0" KL J DM AHI T.O. FOOTING 96' -0" T.O. WALL 123' -9" T.O. MEZANIN SUBFLOOR 118' -0"7' - 6"2' - 6"10' - 0"FACADE BETWEEN 30"-10' ABOVE SIDEWALK: 1991 SF BLOCK FRONTAGE: NONE WALL AREA: 1,991 SF GLAZING AREA: 1,200 SF PERCENT OF GLAZING TO WALL AREA: 60% PERCENT WEATHER PROTECTED FACADE: 82% EXTENDING 5+ FEET 1" 12" 1/4" 12" 1/4" 12" 1" 12"35' - 10 3/4"31' - 5 3/4"MASTER SIGNAGE PLAN TO BE DEFFERED, SEE ATTACHED NARRATIVE MASTER SIGNAGE PLAN TO BE DEFFERED, SEE ATTACHED NARRATIVE MASTER SIGNAGE PLAN TO BE DEFFERED, SEE ATTACHED NARRATIVE CANOPY ACROSS STOREFRONT CANOPY ACROSS STOREFRONT RTU SCREEN RTU SCREEN COVERED BIKE RACKS T.O. FOUNDATION 100' -0" 13452 FACADE BETWEEN 4'-8' ABOVE SIDEWALK:624 SF MIN ALLOWABLE:159 SF GLAZING PROVIDED:167 SF 9 MAX BUILDING HT B2 138' -0" 78 BLANK WALL LANDSCAPING TO BE PROVIDED PER SEC.38.530.070.C.2, SEE LANDSCAPE DRAWINGS 6 T.O. FOOTING 96' -0" 10 T.O. WALL 123' -9" T.O. MEZANIN SUBFLOOR 118' -0" SERVICE DRIVE ELECTRICAL METER PANEL, STRUCTURE & LANDSCAPE SCREENING TO BE PROVIDED PER SEC.38.530.070.C.24' - 0"4' - 0"BLOCK FRONTAGE:FALLON ST. MIXED USE -LANDSCAPED WALL AREA: 636 SF GLAZING AREA: 167 SF PERCENT OF GLAZING TO WALL AREA PROVIDED: 25% LANDSCAPED BLANK WALL SURFACES PROVIDED MASTER SIGNAGE PLAN TO BE DEFFERED, SEE ATTACHED NARRATIVE GAS METER PANEL, VFY FINAL LOCATION. LANDSCAPE SCREENING TO BE PROVIDED PER SEC.38.530.070.C.237' - 10 1/2"BIKE RACK, SEE LANDSCAPE DRAWINGS FOR DETAILS 39' - 9"1" 12" 1" 12" BUILDING FRONTAGE 156' - 0" RTU SCREEN 2 NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:39:34 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP200 EXTERIOR ELEVATIONS SITE PLAN APRIL 21, 2020 SCALE:3/32" = 1'-0"2 EAST SITE PLAN STUDY SCALE:3/32" = 1'-0"1 NORTH SITE PLAN STUDY REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 2 SPRC 6.29.20 29 30 WD-1 SMF-1 WD-3 MWP-1 CWP-1 MTL-1 WD-1 SMF-1 WD-4 TRASH ENCLOSURE, SEE PLAN SERVICE DRIVE ELECTRICAL METER PANEL SCREENING SMF-1 WD-1 WD-3 CWP-1 MWP-1 2 18X36 SMOOTH CONCRETE WALL PANEL VERTICAL WOODTONE RUSTIC SERIES LAP SIDING 6" PLANK, SUMMER WHEAT HORIZONTAL METAL BOX RIB SIDING, FOREST GREEN TIMBER KNEE BRACE & TRIM, STAINED EXTERIOR FINISH MATERIAL LEGEND CWP-1 WD-1 MWP-1 WD-2 WD-4 MTL-1 PRE-FINISH BREAK METAL TRIM, DK CHARCOAL NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:39:52 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP200a EXTERIOR ELEVATIONS - COLOR SITE PLAN APRIL 21, 2020 SCALE:3/32" = 1'-0"1 EAST SITE PLAN STUDY Copy 1 SCALE:3/32" = 1'-0"2 NORTH SITE PLAN STUDY Copy 1 EXTERIOR COMPONENT SCHEDULE SYMBOL MATERIAL MANUFACTURER TYPE, COLOR COMMENTS ASF-1 ALUMINUM STOREFRONT FRAME, CLEAR ANODIZED V.I.F. CIP-1 CAST IN PLACE CONCRETE POST BASE CIP-2 CAST-IN-PLACE FOUNDATION EXPOSED CONCRETE FOUNDATION W/ DRYSACKED FINISH CWP-1 COMPOSITE WALL PANEL - CONCRETE FINISH NICHIHA INDUSTRIAL BLOCK PANEL EQ-3 DOCK LEVELER TBD T.O. DOCK LEVELER,COORDINATE W/ SUPPLIER EQ-4 DOCK SEALS TBD DOCK DOOR SEALS COORDINATE W/ SUPPLIER KB-1 KNOX BOX KNOX BOX V.I.F. LOCATION WITH FIRE DEPARTMENT MSP-2 METAL SOFFIT PANEL, 6" WOOD LOOK T&G LONGBOARD COLOR: TBD MTL-4 STEEL TUBE OR PIPE DECORATIVE TRELLIS POWDER COATED FINISH DK CHARCOAL MWP-1 BOX RIB METAL PANEL BRIDGER STEEL 24GA. HORIZONTAL, COLOR: FOREST GREEN MWP-3 FLAT METAL PANEL BRIDGER STEEL RA-1 'K'-STYLE GUTTER COLOR TO MATCH FASCIA BOARD RA-2 ROOF ACCESS HATCH BILCO RA-3 DOWNSPOUT SHT. MTL. DOWNSPOUT DRAIN TO LANDSCAPING, PROVIDE SPLASH BLOCK RA-4 SCUPPER & DOWNSPOUT OPEN FACE DOWNSPOUT CONNECT TO PERIMETER DRAIN TO DRY WELL RD-2 ROOF DRAIN SEE PLUMBING, VERIFY FINAL LAYOUT RM-3 EPDM ROOFING EPDM MEMBRANE RM-4 STANDING SEAM ROOFING BRIDGER STEEL COLOR: TBD RTU-1 ROOF TOP MECHANICAL UNIT SEE MECH., VERIFY FINAL LAYOUT S-1 BUILDING SIGN BY SIGN COMPANY, PROVIDE BLOCKING PROVIDE POWERED JUCTION BOX SB-1 SNOW BARRIER LAUPON PIRISTEEL OY SFG-1 STOREFRONT GLASS V.I.F. SMF-1 SHT. MTL. FASCIA ROLLEX PRE-FINISHED BUILT UP PROFILE COLOR MATCH WOOD SIDING SMF-2 SHT. MTL. FASCIA ROLLEX PRE-FINISHED BUILT UP PROFILE COLOR: MATCH METAL SIDING SEE DETAIL SMF-3 SHT. MTL. FLASHING TRIM BRIDGER STEEL 'J' METAL WINDOW TRIM TO MATCH METAL SIDING SMF-4 SHT. MTL. TRIM BRIDGER STEEL 6" VERT. DIVIDER TRIM, COLOR TO MATCH SIDING SEE DETAIL WD-1 VERTICAL FIBERCEMENT PLANK SIDING WOODTONE RUSTIC SERIES 6" REVEAL, COLOR: SUMMER WHEAT WD-2 TIMBER SUPPORTS STAIN & SEAL WD-3 WOOD TRIM 1X6 FIBER CEMENT TRIM, MATCH SIDING WD-6 WOOD BELLY BAND 1X10 FIBERCEMENT TRIM, MATCH SIDING REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 2 SPRC 6.29.20 31 32 T.O. FOUNDATION 100' -0" T.O.SUBFLOOR LEVEL 2 113' -0" B C E F G MAX BUILDING HT B2 138' -0" K LJD MAHI T.O. FOOTING 96' -0" T.O. MEZANIN SUBFLOOR 118' -0" TRASH ENCLOSURE FIELD ST. SCREENING ELEMENTGUARD RAIL, SEE CIVIL DRAWINGS BLOCK FRONTAGE:ADJACENT PROPERTY NO BLOCK FRONTAGE REQUIRED WALL AREA: 984 SF GLAZING AREA: 171 SF PERCENT OF GLAZING TO WALL AREA: 17% LANDSCAPED BLANK WALL SURFACES BLANK WALL DECORATIVE TRELLIS TO BE PROVIDED PER SEC.38.530.070.C.2 BLANK WALL DECORATIVE TRELLIS TO BE PROVIDED PER SEC.38.530.070.C.2 1/4" 12" 2" 12"2" 12" BUILDING FRONTAGE 246' - 0"39' - 7"30' - 6 3/4"MASTER SIGNAGE PLAN TO BE DEFFERED, SEE ATTACHED NARRATIVE RTU SCREEN 16' - 9"20' - 0"20' - 0"20' - 0"20' - 0"17' - 6 3/4"10' - 6 1/4" SP002 5 ELECTRICAL METER PANEL, STRUCTURE & LANDSCAPE SCREENING TO BE PROVIDED PER SEC.38.530.070.C.2 2 T.O. FOUNDATION 100' -0" T.O.SUBFLOOR LEVEL 2 113' -0" 1 3 4 52 FACADE BETWEEN 4'-8' ABOVE SIDEWALK: 640 SF MIN. ALLOWABLE:160 SF GLAZING PROVIDED: 174 SF 9 MAX BUILDING HT B2 138' -0" 7 86 T.O. FOOTING 96' -0" 10 BLOCK FRONTAGE:FIELD ST. MIXED USE -LANDSCAPED WALL AREA: 640 SF GLAZING AREA: 174 SF PERCENT OF GLAZING TO WALL AREA: 27% LANDSCAPED BLANK WALL SURFACES LOADING ZONE, SOUTH DELIVERY DOOR BEYOND SERVICE DRIVE 4' - 0"4' - 0"LANDSCAPE SCREENING TO BE PROVIDED PER SEC.38.530.070.C, SEE LANDSCAPE DRAWINGS 37' - 10 1/2"34' - 9"BUILDING FRONTAGE 156' - 0" 1" 12" 1" 12" BIKE RACK, SEE LANDSCAPE DRAWINGS FOR DETAILS CANOPY ACROSS STOREFRONT SP002 4 T.O. FOUNDATION 100' -0" 1 2 MAX BUILDING HT B2 138' -0" T.O. FOOTING 96' -0" 116-A 116-B GUARDRAIL, SEE CIVIL DRAWINGS NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:40:08 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP201 EXTERIOR ELEVATIONS SITE PLAN APRIL 21, 2020 SCALE:3/32" = 1'-0"3 WEST SITE PLAN STUDY SCALE:3/32" = 1'-0"1 SOUTH SITE PLAN STUDY SCALE:3/32" = 1'-0"2 SOUTH (DELIVERY DOOR) SITE PLAN STUDY REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 2 SPRC 6.29.20 33 34 WD-1 SMF-1 WD-4 MTL-4 CWP-1 CIP-1 MWP-1 SMF-2 EXTERIOR RAILING, SEE CIVIL DRAWINGS LOADING DOCK SCREEN ELECTRICAL METER PANEL SCREENING 2 SERVICE DRIVE BIKE RACK, SEE LANDSCAPE DRAWINGS SMF-1 WD-1 MWP-1 SMF-1 WD-4 WD-1 MTL-3 CWP-1 18X36 SMOOTH CONCRETE WALL PANEL VERTICAL WOODTONE RUSTIC SERIES LAP SIDING 6" PLANK, SUMMER WHEAT HORIZONTAL METAL BOX RIB SIDING, FOREST GREEN TIMBER KNEE BRACE & TRIM, STAINED EXTERIOR FINISH MATERIAL LEGEND CWP-1 WD-1 MWP-1 WD-2 WD-4 MTL-1 PRE-FINISH BREAK METAL TRIM, DK CHARCOAL NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:40:25 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP201a EXTERIOR ELEVATIONS - COLOR SITE PLAN APRIL 21, 2020 SCALE:3/32" = 1'-0"1 WEST SITE PLAN STUDY Copy 1 SCALE:3/32" = 1'-0"2 SOUTH SITE PLAN STUDY Copy 1 EXTERIOR COMPONENT SCHEDULE SYMBOL MATERIAL MANUFACTURER TYPE, COLOR COMMENTS ASF-1 ALUMINUM STOREFRONT FRAME, CLEAR ANODIZED V.I.F. CIP-1 CAST IN PLACE CONCRETE POST BASE CIP-2 CAST-IN-PLACE FOUNDATION EXPOSED CONCRETE FOUNDATION W/ DRYSACKED FINISH CWP-1 COMPOSITE WALL PANEL - CONCRETE FINISH NICHIHA INDUSTRIAL BLOCK PANEL EQ-3 DOCK LEVELER TBD T.O. DOCK LEVELER,COORDINATE W/ SUPPLIER EQ-4 DOCK SEALS TBD DOCK DOOR SEALS COORDINATE W/ SUPPLIER KB-1 KNOX BOX KNOX BOX V.I.F. LOCATION WITH FIRE DEPARTMENT MSP-2 METAL SOFFIT PANEL, 6" WOOD LOOK T&G LONGBOARD COLOR: TBD MTL-4 STEEL TUBE OR PIPE DECORATIVE TRELLIS POWDER COATED FINISH DK CHARCOAL MWP-1 BOX RIB METAL PANEL BRIDGER STEEL 24GA. HORIZONTAL, COLOR: FOREST GREEN MWP-3 FLAT METAL PANEL BRIDGER STEEL RA-1 'K'-STYLE GUTTER COLOR TO MATCH FASCIA BOARD RA-2 ROOF ACCESS HATCH BILCO RA-3 DOWNSPOUT SHT. MTL. DOWNSPOUT DRAIN TO LANDSCAPING, PROVIDE SPLASH BLOCK RA-4 SCUPPER & DOWNSPOUT OPEN FACE DOWNSPOUT CONNECT TO PERIMETER DRAIN TO DRY WELL RD-2 ROOF DRAIN SEE PLUMBING, VERIFY FINAL LAYOUT RM-3 EPDM ROOFING EPDM MEMBRANE RM-4 STANDING SEAM ROOFING BRIDGER STEEL COLOR: TBD RTU-1 ROOF TOP MECHANICAL UNIT SEE MECH., VERIFY FINAL LAYOUT S-1 BUILDING SIGN BY SIGN COMPANY, PROVIDE BLOCKING PROVIDE POWERED JUCTION BOX SB-1 SNOW BARRIER LAUPON PIRISTEEL OY SFG-1 STOREFRONT GLASS V.I.F. SMF-1 SHT. MTL. FASCIA ROLLEX PRE-FINISHED BUILT UP PROFILE COLOR MATCH WOOD SIDING SMF-2 SHT. MTL. FASCIA ROLLEX PRE-FINISHED BUILT UP PROFILE COLOR: MATCH METAL SIDING SEE DETAIL SMF-3 SHT. MTL. FLASHING TRIM BRIDGER STEEL 'J' METAL WINDOW TRIM TO MATCH METAL SIDING SMF-4 SHT. MTL. TRIM BRIDGER STEEL 6" VERT. DIVIDER TRIM, COLOR TO MATCH SIDING SEE DETAIL WD-1 VERTICAL FIBERCEMENT PLANK SIDING WOODTONE RUSTIC SERIES 6" REVEAL, COLOR: SUMMER WHEAT WD-2 TIMBER SUPPORTS STAIN & SEAL WD-3 WOOD TRIM 1X6 FIBER CEMENT TRIM, MATCH SIDING WD-6 WOOD BELLY BAND 1X10 FIBERCEMENT TRIM, MATCH SIDING REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 2 SPRC 6.29.20 35 36 NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:41:02 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP900 3D PERSPECTIVES SITE PLAN APRIL 21, 2020 SCALE:1 3D View 5 SITE PLAN SCALE:2 3D View 8 SITE PLAN SCALE:3 3D View 9 SITE PLAN SCALE:4 3D View 10 SITE PLAN REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 37 38 39 40 41 42 43 UP UPRAMP 4826.04824.04825.04824.04826.04826.54825.04824.04825.04824.04824.04828.04826.04833.04832.04831.54831.04830.04832.04831.04829.04830.04831.04829.04831.0523'-9"309'-9"116'-9"493'-6"135'-9"696'-3"RUSRUSRUSRUSRUSSIOSIOSIOSIOSIOSIOLANLANLANRUSRUSRUSRUSRUSRUSSPRSPRSPRSPRSPRSPRSPRSPRSPRSPR31'-5"159'299111110141488813333716167716101017181919202222111714182122222212222159231166666121244444415544EXISTINGSIDEWALKEXISTINGROUNDABOUT10' UTILITY EASEMENTALONG EXTERIOR BOUNDARYUNLESS NOTEDEXISTINGSIDEWALKEXISTING CURBAND GUTTERPROPERTY LINEPROPERTY LINEFALLON STREETFIELD STREET 60' ROWPROPOSED TOWN ANDCOUNTRY BUILDINGFUTURE LOTFUTURE PARKINGFFE 4827.8PROJECT DATA-TOWN AND COUNTRYPROJECT OWNERTOWN AND COUNTRY FOODS1611 SOUTH 11TH AVE.Bozeman, MT 59715(406) 587 - 5541ENGINEERMADISON ENGINEERING895 Technology BLVDBozeman, MT 59718(406) 586 - 0262ARCHITECTBECHTLE ARCHITECTS4515 Valley Commons DriveBozeman, MT 59718(406) 585 - 4161LANDSCAPE ARCHITECTDESIGN 5, LLCTroy Scherer37 East Main Street, Suite 10Bozeman, MT 59715(406) 585 - 416115 TOTAL LANDSCAPEPOINTS PROVIDEDLANDSCAPE POINTS - TOWN AND COUNTRY AT FERGUSON FARM (B-2 ZONING)55 POINTS ARE AWARDED FOR THE INSTALLATION OF DROUGHT TOLERANTSPECIES FOR GREATER THAN 50% AND LESS THAN 75% OF THE NUMBER OFTREES AND SHRUBS10 POINTS ARE AWARDED WHEN ALL SURFACE PARKING LOTS ARE LANDSCAPED INACCORDANCE WITH SUBSECTION D IN ADDITION TO THAT LANDSCAPING REQUIRED INSECTION 38.26.050. A. THE PARKING LOT MUST CONTAIN ONE OF THE PLANT GROUPSFROM SUBSECTION B.2 AT AN AVERAGE DENSITY OF ONE GROUP, PLUS ANADDITIONAL ONE LARGE CANOPY TREE WITHIN 20 FEET OF THE PARKING LOT, FOREACH REQUIRED 16 PARKING SPACES. AND NO REQUIRED SPACE MAY BE LOCATEDMORE THAN 70 FEET FROM THE TRUNK OF A LARGE CANOPY TREE.10182 TOTAL PARKING SPACES: 182 / 16 = 11REQUIRED LANDSCAPING: 5 TREES, 12 ORNAMENTAL TREES + 66 SHRUBS 11 ADDITIONAL CANOPY TREESPROVIDED LANDSCAPING: 16 TREES, 12 ORNAMENTAL TREES AND 86SHRUBSPARKING LOT LANDSCAPING175 TOTAL PARKING SPOTS WITH 3 ACCESSIBLE PARKING SPOTSREQUIRED: 1 LARGE CANOPY TREE FOR EVERY 9 PARKING SPACES PROVIDED (20 TREES);ALL PARKING SPACES MUST BE WITHIN 90 FEET OF THE TRUNK OF A TREE.PROVIDED: 20 LARGE CANOPY TREES AND ALL PARKING SPACES ARE WITHIN 90 FEET OF THE TRUNK OF A TREEREQUIRED: ANY PARKING LOT PROVIDING 15 OR MORE PARKING SPACES SHALL HAVE:A MINIMUM OF 20 SQUARE FEET OF LANDSCAPE AREA WITHIN THE PARKING LOT PER EACH OFFSTREET PARKING SPACE IN THE LOT (3,500 SF REQUIRED)PROVIDED: 11,950 SF OF LANDSCAPE AREA WITHIN THE PARKING LOT PROVIDEDSTREET FRONTAGE LANDSCAPINGREQUIRED: 1 LARGE CANOPY TREE FOR EVERY 50 FEET OF STREET FRONTAGERESORT DRIVE (313' - 8") 6 TREES REQUIRED AND TO BE PROVIDED FOR MASTER PLANFALLON STREET (709') 14 TREES REQUIRED - 14 PROVIDEDFIELD STREET (696') 14 TREES REQUIRED - 14 PROVIDEDLANDSCAPE FRONTAGES RESORT DRIVE - MIXED BLOCK FRONTAGE (LANDSCAPE) FALLON ST - MIXED BLOCK FRONTAGE (LANDSCAPE) FIELD ST - MIXED BLOCK FRONTAGE (LANDSCAPE)SHEET INDEXL0.0-OVERALL SITE PLANL0.1- OVERALL OPEN SPACE AND PHASINGL0.2- OPEN SPACE NOTES AND LEGENDSL0.3- NOTES AND LEGENDS TOWN ANDCOUNTRYL0.4- FUTURE PHASE RESEEDING PLANL3.0- PLANTING PLAN ENLARGEMENTL3.1- PLANTING PLAN ENLARGEMENTL3.2- PLANTING PLAN ENLARGEMENTL3.3- PLANTING PLAN ENLARGEMENTL5.0- LANDSCAPE DETAILSL5.1-LANDSCAPE DETAILSL6.0- IRRIGATION WATER USEL7.0- IRRIGATION DETAILSL7.1-IRRIGATION DETAILSKEYNOTESCONCRETE SIDEWALK, SEE CIVILSNOW STORAGEREQUIRED PARKING LOT TREES AND LANDSCAPINGTREE GRATES, SEE AMENITY SCHEDULE DETAIL 3/L5.1BIKE RACKS, SEE DETAILS 5/L5.1 & 7/L5.1 AND SITE AMENITY SCHEDULE.VISION TRIANGLES, SEE CIVILPROPERTY DIMENSIONSBLUEGRASS MIX SEED, SEE SHEET L0.3OPEN SPACE SEATING AND AMENITIES, SEE SHEET L0.1. SEE NOTE 21 BELOW.MANDATORY SCREENING WITH VEGETATION.NATURAL STEEL EDGING, TYP. SEE DETAIL 3/L5.1BLUEGRASS SOD OR SEED MIX (OWNER DIRECTED)OPEN SPACE LOTS, SEE SHEETS L0.1 & L0.2.PROPERTY LINEENHANCED PARKING LOT LANDSCAPINGPARKING LOT LIGHTINGLANDSCAPE FRONTAGE LANDSCAPINGBLANK WALL SCREENINGOPEN SPACE DIMENSION AND BOUNDARY. OPEN SPACE = 4,166 SF(3,233 SF REQUIRED). PLAZA SPACE = 1,877 SF/60 = 31 SEATSREQUIRED. 32 SEATS PROVIDED.WOOD FENCE SCREENING, SEE DETAIL 8/L5.1RETENTION POND FENCE, SEE CIVIL.NOT USEDARCHITECTURAL SCREENING, SEE ARCH.1234567891011121314151617181920212223SITE DATA:FERGUSON FARM SUBDIVISION, S10, TO2 S, RO5 EBLOCK 5, LOTS 1-4ADDRESS: 4567 FIELD ST, BOZEMAN, MT 59718LANDSCAPE INSTALL NOTES1.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT.2.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERYSTOCK.3.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.4.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPEARCHITECT. ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE.406-587-4873 OR TROY@DESIGN5LA.COM.5.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINEDINTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.6.ALL SOD AREAS TO HAVE 6" MINIMUM TOPSOIL WITH 1" COMPOST TILLED IN PRIOR TO SODINSTALLATION.7.SEED AREAS SHALL HAVE A MINIMUM OF 3" TOPSOIL WITH 1" COMPOST TILLED IN PRIOR TOHYDROSEEDING WITH *FLEXTERRA TACKIFIER*.8.ALL NATIVE SOIL IN PLANTING BEDS SHALL BE TILLED TO A DEPTH OF AT LEAST 12" AND GRADEDSMOOTHLY.9.PLANTING BEDS SHALL HAVE A MINIMUM OF 12" TOPSOIL ADDED. TILL 1" COMPOST INTO TOPSOILPRIOR TO PLANTING IN ORDER TO PROMOTE PLANT GROWTH.10.ALL PLANTING BEDS SHALL HAVE A WEED BARRIER INSTALLED BETWEEN THE SOIL AND COVERINGLAYER OF ROCK OR MULCH PER PLAN. DRIP IRRIGATION SHALL BE PLACED ABOVE WEED FABRIC,BUT UNDER MULCH AND PINNED IN PLACE.11.ALL TREES SHALL BE STAKED FOR A MINIMUM OF 2 YEARS. REMOVE STAKES AFTER 2 YEARS.12.ALL TREES AND OTHER SIGNIFICANT LANDSCAPING FEATURES MUST BE PLANTED A MINIMUM OF 10'OF SEPARATION FROM WATER AND SEWER SERVICES.13.ALL EDGING SHALL BE 316"x 4" NATURAL STEEL ON STRAIGHT RUNS AND 18" X 4" NATURAL STEEL FORCURVED RUNS (OR AS OTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN AMINIMUM OF 18" DEEP.14.AREAS OF BLUEGRASS ARE TO BE EITHER A BLUEGRASS SEED MIX OR BLUEGRASS TURF AND IS TOBE DECIDED BY OWNER. AREAS THAT ARE RECOMMENDED AS TURF ARE NOTED ON THE PLAN.15.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLANARE TO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFYDISTURBANCE AREA IN FIELD.16.PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPEINSTALLATION. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODESAND ORDINANCES.17.ALL TREES PLANTED IN BLUEGRASS SOD AREAS ARE TO HAVE 3' DIAMETER MULCHED RINGSSURROUNDING THE TRUNK. MULCH IS TO BE SHREDDED CEDAR. THIS INCLUDES BLVD AREAS ANDSOD AREAS WITHIN PARKING LOT.***SEE LANDSCAPE ENLARGEMENTS FOR DETAILED DEPARTURE TREATMENTSFOR LANDSCAPE BLOCK FRONTAGE REQUIREMENTS. PARKING LOT VISIBILITY ISMITIGATED BY A COMBINATION OF BERMING, 4' TALL WOOD LANDSCAPE FENCESAND EXTENSIVE PLANTINGS THAT INCORPORATE A SIGNIFICANT NUMBER OFEVERGREEN TREES AT DIFFERING HEIGHTS.3015060N1L0.01"=30'-0"Overall Site PlanL0.0OVERALLSITE PLANTOWN &COUNTRYAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/202044 UP UPRAMP 4826.04824.04825.04824.04826.04826.54825.04824.04825.04824.04824.04828.04826.04833.04832.04831.54831.04830.04832.04831.04829.04830.04831.04829.04831.0SHEET L0.2aSHEET L0.2bPHASE LINESIOSIOSIOSIOSIOSIOSIOLANLANLANLANLANLANLANEXISTINGSIDEWALKEXISTINGROUNDABOUT10' UTILITY EASEMENTALONG EXTERIOR BOUNDARYUNLESS NOTEDEXISTINGSIDEWALKEXISTING CURBAND GUTTERALL LANDSCAPE IRRIGATIONTO RECEIVE A PERMANENT,WATER EFFICIENTIRRIGATION SYSTEM. TO BESOURCED FROM EXISTINGIRRIGATION WELLS ANDCOORDINATED WITHIRRIGATION CONTRACTOREXISTINGSTORMWATERDETENTIONEXISTINGSTORMWATERDETENTIONPROPERTY LINEPROPERTY LINEFALLON STREETFIELD STREET 60' ROWPROPOSED TOWN ANDCOUNTRY BUILDINGPROPOSEDSTORMWATERRETENTIONRESORT DRIVE 60' ROW FFE 4827.8FFE 4828.7PROPERTY LINEFALLON STREETFIELD STREET 60' ROWRESORT DRIVE 60' ROW PROPOSED TOWN ANDCOUNTRY BUILDINGFUTURE LOTFFE 4827.8SEE TOWN ANDCOUNTRY SP1 FORCHECKLIST ITEMSPROPERTY LINEPROPOSEDSTORMWATERRETENTIONPHASE 1523'-10"309'-9"116'-9"290'-8"68'-2"709'-3"WFUTUREPARKING LOTPROPOSEDUNDERGROUNDDETENTION. ALLSEEDING OVERRETENTION AREATO BE DONE IN AFUTURE PHASETEMPORARYNATIVE SEEDMIX, SEESHEET L0.3FUTUREPHASEEXISTINGSTORMWATERDETENTION3015060N1L0.11"=30'-0"Overall Open Space and PhasingAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/19/2019SP101/16/2020RC12/16/2020L0.1OVERALLOPEN SPACEAND PHASING45 SIO40'-60'30'-40'TREESSYMB.BOTANICAL NAMESIZETYPESPACING#COMMON NAMEOPEN SPACE PLANTINGPOPULUS SONGARICASONGARICA POPLAR2" CALB & BPER PLAN7POPULUS ACUMINATALANCELEAF POPLAR2" CALB & BPER PLAN7MATUREHEIGHT50'-75'MATURESPREAD20'-40'B & BPER PLAN76'-12'6'-8'SALIX GEYERIANA GEYER WILLOWB & BPER PLAN915'8'PRUNUS VIRGINIANA NATIVE CHOKECHERRYSHRUBS5 GAL5 GALLAN50'-60'25'-40'ULMUS 'MORTON' ACCOLADE***ACCOLADE ELM2" CALB & BPER PLAN2GLEDITSIA TRIACANTHOS ***SKYLINE HONEYLOCUST30'-60'30'-40'2" CALB & BPER PLAN3ACER X 'FREEMANII' ***FREEMAN MAPLE40'-60'30'-40'2" CALB & BPER PLAN3ULMUS AMERICANA 'LEWIS AND CLARK' ***PRAIRIE EXPEDITION ELM50'-60'30'-40'2" CALB & BPER PLAN6***DROUGHT TOLERANTSYMBOLSEED/SOD MIXESLBS/ACREQUANTITYCOMMON NAME (BOTANICALNAME)RECOMMENDED NATIVE/UPLAND SEED BLENDSLENDER WHEATGRASS (AGROPYRON TRACHYCAULUM)"SODAR" STREAMBANK WHEATGRASS (AGROPYRON RIPARIUM)CANADA WILDRYE (ELYMUS CANADENSIS)SHEEP FESCUE (FESTUCA OVINA)WESTERN WHEATGRASS (AGROPYRON SMITHII)4.05.04.01.04.013,120 SFLAWN AND BOULEVARD SEED MIX - FUTUREPHASE ***SOD, SEED AND GROUDCOVER MATERIAL SCHEDULE : COMMON OPEN SPACERETENTION POND SEED MIXSLENDER WHEATGRASS (AGROPYRON TRACHYCAULUM)"SODAR" STREAMBANK WHEATGRASS (AGROPYRON RIPARIUM)GLYCERIA STRIATA (FOWL MANNAGRASS)DESCHAMPSIA CAESPITOSA (TUFTED HAIRGRASS)POA PALUSTRIS (FOWL BLUEGRASS)JUNCUS TENUIS (SLENDER RUSH)6.55.00.53.50.250.067,700 SFCOMMON KENTUCKY BLUEGRASS26%NEWPORT KENTUCKY BLUEGRASS27%PARK KENTUCKY BLUEGRASS27%PERENNIAL RYEGRASS12%CREEPING RED FESCUE8%APPLY AT 4LBS./ 1000SFBOULEVARD BLUEGRASS SOD2,500 SF***LAWN AND BOULEVARD SEED MIX - FUTURE PHASE NOT TO BE INSTALLED WITH THIS PROJECTSIOSIOSIOSIOSIOSIOSIOLANLANLANLANLANLANLAN68'-2"4824.0116'-9"290'-8"IRRIGATIONTYPEIRRIGATION SCHEDULE :OPEN SPACE & STORMWATER DETENTIONTOTALAREA / QTYANNUALET RATETOTALANNUAL H2O2,500 SF29 IN / SF45,005 GALH.E. BLVDSPRAYIRRIG. SOD28 TREES462 GAL /WEEK8,316 GAL13 SHRUBS98 GAL /WEEK1,755 GALTOTAL ANNUAL H2O REQUIRED: 132,901 GALTOTAL ACRE FEET PER YEAR: .41 ACRE FEETH.E. TREEBUBBLERH.E. SHRUBDRIP IRRIG.0 SF29 IN / SF0 GALH.E. SPRAYIRRIG. LAWNSEED MIX20,820 SF29 IN / SF76,825 GALH.E. SPRAYIRRIG. SEEDL0.2OPEN SPACENOTES ANDLEGENDS1L0.2a1"=20'-0"Open Space West Lot1L0.2b1"=20'-0"Open Space & Future LotNNAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/19/2019SP101/16/2020RC12/16/202046 TREESBOTANICAL NAMESIZETYPESPACING#COMMON NAMEULMUS AMERICANA 'LEWIS AND CLARK' ***PRAIRIE EXPEDITION ELMMATUREHEIGHT50'-60'MATURESPREAD30'-40'PER PLANB & B92" CALCRATAEGUS AMBIGUA ***SNOWBIRD HAWTHORN - MULTI STEM15'-20'8'-12'1.5" CALB & B11PER PLAN50'-60'20'-25'2" CALB & B23PER PLAN50'-60'30'-40'2" CALB & B4PER PLANULMUS AMERICANA***ACCOLADE ELMTILIA AMERICANA 'BOULEVARD' ***BOULEVARD LINDENPINUS SYLVESTRIS ***SCOTCH PINE30'-60'20'-40'6'8'B & B5PER PLAN*** INDICATES DROUGHT TOLERANT SPECIESACER PLATANOIDES 'EMERAL LUSTRE' ***EMERALD LUSTRE NORWAY MAPLEPOPULUS TREMULOIDES 'DANCING FLAME'DANCING FLAME ASPENB & B9PER PLAN1.5" CAL50'-60'40'-45'2" CALB & B16PER PLANAMELANCHIER X ALNIFOLIAAUTUMN BRILLIANCE SERVICEBERRYB & B5PER PLAN6'40'6'-10'815'-20'10' - 12RUSPRUNUS MACKII ***MULTI STEM AMUR CHERRYB & B11PER PLAN6'20'-30'18'-25'ACER X 'FREEMANII' ***FREEMAN MAPLEB & B8PER PLAN2" CAL40'-60'20'-30'ACER GINNALA 'FLAME'***MULTI STEM AMUR MAPLEB & B1PER PLAN6'15'-20'12'-20'TOWN AND COUNTRY: TREESSYMB.MALUS 'SPRING SNOW'***SPRING SNOW CRABAPPLEB & B10PER PLAN2" CAL20'-25'15'-20'GLEDITSIA TRIACANTHOS ***SKYLINE HONEYLOCUST30'-60'30'-40'2" CALB & BPER PLAN2SPRSYRINGA RETICULATA 'PALIBIN' ***PALIBIN LILACCARAGANA PYGMAEA ***PYGMY CARAGANARHUS AROMATICA 'GRO-LOW' ***GRO LOW SUMACSPIREA BETULIFOLIA 'TOR' TOR SPIREAPINUS MUGO 'TANNENBAUM'*** MUGO PINEARONIA MELANOCARPA 'AUTUMN MAGIC'*** AUTUMN MAGIC CHOKEBERRYJUNIPERUS SABINA 'BUFFALO'*** BUFFALO JUNIPERSYMB.BOTANICAL NAMESIZETYPESPACING#COMMON NAMEMATUREHEIGHT4'-5'MATURESPREAD5'-7'PER PLANPOT205 GAL*** INDICATES DROUGHT TOLERANT SPECIES4'4'162'-3'3'-4'713'-4'3'-4'208'-12'6'-8'173'-6'4'-6'246"-12"6'-8'635 GAL5'-6'5'-6'725 GAL5 GAL5 GAL5 GAL5 GAL5 GALPOTPOTPOTPOTPOTPOTPOTTOWN AND COUNTRY: SHRUBSPER PLANPER PLANPER PLANPER PLANPER PLANPER PLANPER PLANEUONYMOUS ALATUS 'COMPACTUS'*** DWARF BURNING BUSHSYMBOLHARDSCAPE AND GROUDCOVER MATERIALS TOWN AND COUNTRY SITE1-1/2" CONCRETE ROCK-OR APPROVED EQUALMINI NUGGET MULCH-OR APPROVED EQUALLAWN AND BOULEVARD SEED MIX OR SOD (TO BEDETERMINE BY OWNERCOMMON KENTUCKY BLUEGRASS26%NEWPORT KENTUCKY BLUEGRASS27%PARK KENTUCKY BLUEGRASS27%PERENNIAL RYEGRASS12%CREEPING RED FESCUE8%TYPE#20,156 SF1,636 SF11,105 SFBOULEVARD SOD (SEED OR SOD, TO BEDETERMINED BY OWNER)5,541 SF3" DEPTH3" DEPTHNOTES***SEE OPEN SPACE TABLE FOROPEN SPACE MATERIALQUANTITIESTRASHCONTAINERSYMB.DESCRIPTIONCONTACTPRODUCTSITE AMENITY SCHEDULEQTY.BENCH3MLB870-PCCHIGH DENSITY PAPER COMPOSITEBENCH IN CHARCOALBIKE RACKSBIKE RACK.COM520-322-962610BIKE RIB 2.0 - THE ORIGINAL INVERTED UBIKE RACKBLACK POWDER COAT -90% GLOSSSEE DETAIL 12/L5.15MLPT1100-M SERIES CLUSTERSEATING IN BLACK POWDERCOATNEENAH FOUNDRY AVENUE COLLECTIONSQUARE 48" X 48"R-8710 NATURAL FINISHPICNIC TABLECLUSTERSEATINGMAGLIN SITE FURNISHINGSMAGLIN CORPORATION999 18TH ST, SUITE 3000DENVER, CO 80202(800) 716-5506SALES@MAGLIN.COM12MLPT1100-M-WCAIN BLACK POWDERCOATWHEELCHAIR ACCESSIBLEMAGLIN SITE FURNISHINGSDENVER, CO 80202(800) 716-5506SALES@MAGLIN.COMMAGLIN SITE FURNISHINGSDENVER, CO 80202(800) 716-5506SALES@MAGLIN.COM***ALL SITE AMENITIES ARE SUBJECT TO APPROVED SUBSTITUTION5TREE GRATEMLWR1400-32-PCC-FBTRASH CONTAINER IN CHARCOALNEENAH FOUNDRY2121 BROOKS AVE.NEENAH, WI 54956920-725-70007 BIKE RACK9BELSON OUTDOOR TRITON 7 BIKES111 NORTH RIVER ROADNORTH AURORA, IL 60542(800)897-0573NEPETA X FAASSENII 'SELECT BLUE'***CATMINT 'SELECT BLUE'ECHINACEA PURPUREA 'WHITE SWAN' ***ECHINACEA 'WHITE SWAN'LIATRIS SPICATA 'KOBOLD'***COMMON GAYFEATHERACHILLEA X 'CORONATION GOLD'***CORONATION GOLD YARROWHELETOTRICHON SEMPRIVIVENS ***BLUE OAT GRASSSYMB.BOTANICAL NAMESIZETYPESPACING#COMMON NAMEMATUREHEIGHT2'-3'MATURESPREAD3'-4PER PLANPOT111 GAL*** INDICATES DROUGHT TOLERANT SPECIES2'1'-2'372'-3'2'-3'3'-4'2'-3'1'-3'1'-2'2'-3'1'-1.5'1 GAL1 GAL1 GAL1 GAL1 GALPOTPOTPOTPOTPOTTOWN AND COUNTRY: PERENNIALS AND ORNAMENTAL GRASSESPER PLANPER PLANPER PLANPER PLANPER PLAN46101319TIARELLA 'BRANDYWINE' ***BRANDYWINE TIARELLA6"-12"1.5'-2'1 GALPOTPER PLAN19DESCHAMPSIA CESPITOSATUFTED HAIRGRASS2'-3'2'-3'1 GALPOTPER PLAN18MOLINIA CAERULEA 'MOORFLAMME' ***MOORGRASS 'MOORFLAMME'L0.3NOTES ANDLEGENDSTOWN ANDCOUNTRYSITEAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/202047 4824.0116'-9"290'-8"FUTURE PHASE SEEDING PLAN#NOTESRECOMMENDED NATIVE/UPLAND SEED BLEND SLENDER WHEATGRASS (AGROPYRON TRACHYCAULUM)"SODAR" STREAMBANK WHEATGRASS (AGROPYRON RIPARIUM)CANADA WILDRYE (ELYMUS CANADENSIS)SHEEP FESCUE (FESTUCA OVINA)WESTERN WHEATGRASS (AGROPYRON SMITHII)4.05.04.01.04.023,570 SFWEEDING PLAN FOR NATIVE SEED1.CONTROL NOXIOUS WEEDS WITH SPOT TREATMENT, EITHER MECHANICALLY OR USING APPROPRIATE HERBICIDES. NEVER SPRAY THE NATIVE SEEDING WITH HERBICIDE, SPOT TREATMENT ONLY.2.NATIVE GRASSES TO BE MOWED DOWN TO 6" BEFORE THEY REACH 16" IN HEIGHT. WEEDS MUST BEMOWED BEFORE THEY GO TO SEED. MOWING WILL COMPLETED FOR THE PURPOSE OF CONTROLLINGANNUAL AND BIENNIAL WEEDS IN THE FIRST TWO YEARS AFTER WEEDING. MOWING SHOULD BECOMPLETED THREE TIMES IN THE FIRST YEAR AFTER SEEDING.3.COOL SEASON GRASSES ARE BEST SEEDED/PLANTED IN EITHER EARLY SPRING OR LATE SUMMER TOMID-FALLL0.4FUTUREPHASERESEEDINGPLAN1L0.41"=20'-0"Future Phase Re-seeding PlanNAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/19/2019SP101/16/2020RC12/16/2020201004048 UP UPRAMP 4826.04824.04825.04824.04826.04826.54825.04824.04825.04824.04824.04828.04826.04833.04832.04831.54831.04830.04832.04831.04829.04830.04831.04829.04831.0523'-9"309'-9"493'-6"RUSRUSRUSRUSRUSSIOSIOSIOSIOSIOSIOLANLANLANRUSRUSRUSRUSRUSRUSSPRSPRSPRSPRSPRSPRSPRSPRSPRSPR31'-5"159'1-1/2" LANDSCAPEROCK (TYP)1-1/2" LANDSCAPEROCK (TYP)1-1/2"LANDSCAPEROCK(TYP)NATURALSTEEL EDGING1-1/2" LANDSCAPEROCK1-1/2" LANDSCAPEROCK (TYP)SCREENING BERMSSCREENINGBERMSSCREENING BERMSSCREENING BERMSSCREENING FENCEADDITIONAL SCREENINGPLANTINGADDITIONALSCREENINGPLANTINGSCREENING FENCEBLUEGRASS SODRECOMMENDED HEREDUE TO BERMINGTURF ORBLUEGRASS SEEDMIXBLUEGRASS SODRECOMMENDED HEREDUE TO FOOT TRAFFICFIELD STREETPROPOSED TOWN ANDCOUNTRY BUILDINGFFE 4827.8L3.0PlantingPlanEnlargementAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/20202010040N1L3.01"=20'-0"Planting Plan Enlargement49 UP 4829.04830.04831.04829.04831.031'-5"148'-10"7'-11"MINI NUGGETMULCH (TYP)1-1/2"LANDSCAPEROCK (TYP)REQUIRED OPENSPACE SEATING,SEE AMENITYSCHEDULE,SHEET L0.3 ANDDETAIL 2/L3.1REQUIRED 3' LANDSCAPE STRIPBETWEEN ALL WALKWAYS ANDBUILDINGBIKE RACKS,SEE DETAIL5/L5.1TREE GRATES,SEE DETAIL3/L5.1NATURALSTEEL EDGINGBENCH,SEE DETAIL6/L5.14,166 SF OFCOMMERCIALOPEN SPACESYMB.BOTANICAL NAMECOMMON NAMESYRINGA RETICULATA 'PALIBIN' ***PALIBIN LILACCARAGANA PYGMAEA ***PYGMY CARAGANASHRUBSRHUS AROMATICA 'GRO-LOW' ***GRO LOW SUMACPERENNIALSSPIREA BETULIFOLIA 'TOR' TOR SPIREAPINUS MUGO 'TANNENBAUM'*** MUGO PINEARONIA MELANOCARPA 'AUTUMN MAGIC' AUTUMN MAGIC CHOKEBERRYJUNIPERUS SABINA 'BUFFALO'*** BUFFALO JUNIPERTOWN AND COUNTRY AT FERGUSON FARM:SHRUBS AND PERENNIALSDROUGHT TOLERANT ***MOLINIA CAERULEA 'MOORFLAMME' ***MOORGRASS 'MOORFLAMME'NEPETA X FAASSENII 'SELECT BLUE'***CATMINT 'SELECT BLUE'ECHINACEA PURPUREA 'WHITE SWAN' ***ECHINACEA 'WHITE SWAN'LIATRIS SPICATA 'KOBOLD'***COMMON GAYFEATHERACHILLEA X 'MOONSHINE'***YARROW 'MOOONSHINE'HELETOTRICHON SEMPRIVIVENS ***BLUE OAT GRASSTIARELLA 'BRANDYWINE' ***BRANDYWINE TIARELLADESCHAMPSIA CESPITOSATUFTED HAIRGRASSEUONYMOUS ALATUS 'COMPACTUS'*** DWARF BURNING BUSH929-213www.maglin.comMAGLIN SITE FURNITURE INC.27 BYSHAM PARK DR.WOODSTOCK, ON N4T 1P1TOLL FREE: 1-800-716-5506PHONE: (519) 539-6776FAX: (877) 260-9393CADdetails.comPROTECTED BY COPYRIGHT ©2013 CADDETAILS.COM LTD.MLPT1104MREVISION DATE 10/24/2013CLUSTER SEATINGTOP VIEWSELECT DESIRED POWDER COATED COLORSILVERGRAPHITEPEARL SILVERNICKELBRONZESAGEAUTUMNEVER GREENBLACKSIDE ELEVATIONSELECT DESIRED OPTIONSWHEEL CHAIR ACCESSIBILITYNOTES:1. MANUFACTURED USING IPE SLATS. FRAME IS H.S. STEEL TUBE.2. ALL STEEL COMPONENTS ARE PROTECTED WITH E-COAT RUST PROOFING.3. DELIVERED PRE-ASSEMBLED.4. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.5. DO NOT SCALE DRAWING.6. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALSFOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION.7. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BYTHE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE.8. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTERREFERENCE NUMBER 929-213.xTREESBOTANICAL NAMECOMMON NAMEULMUS AMERICANA 'LEWIS AND CLARK' ***PRAIRIE EXPEDITION ELMULMUS AMERICANA***ACCOLADE ELMTILIA AMERICANA 'BOULEVARD' ***BOULEVARD LINDENACER PLATANOIDES 'EMERAL LUSTRE' ***EMERALD LUSTRE NORWAY MAPLETOWN AND COUNTRY: TREESSYMB.DROUGHT TOLERANT ***GLEDITSIA TRIACANTHOS ***SKYLINE HONEYLOCUSTCRATAEGUS AMBIGUA ***SNOWBIRD HAWTHORN - MULTI STEMPINUS SYLVESTRIS ***SCOTCH PINEPOPULUS TREMULOIDES 'DANCING FLAME'DANCING FLAME ASPENAMELANCHIER X ALNIFOLIAAUTUMN BRILLIANCE SERVICEBERRYRUSPRUNUS MACKII ***MULTI STEM AMUR CHERRYACER X 'FREEMANII' ***FREEMAN MAPLEACER GINNALA 'FLAME'***MULTI STEM AMUR MAPLEDROUGHT TOLERANT ***BOTANICAL NAMECOMMON NAMETOWN AND COUNTRY: TREESSYMB.1L3.11"=10'-0"Planting Plan EnlargementL3.1PLANTINGPLANENLARGMENTAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/20202L3.1NTSCluster Seating105020N50 4833.04832.04831.54831.04830.04832.04831.0RUSRUSSPRSPRSPRSPRSPRTURF OR BLUEGRASSSEED MIXNATURALSTEEL EDGING1-1/2"LANDSCAPEROCK (TYP)24' WOOD SCREENING FENCE,SEE DETAIL 8/L5.124' WOODSCREENING FENCE,SEE DETAIL 8/L5.1SYMB.BOTANICAL NAMECOMMON NAMESYRINGA RETICULATA 'PALIBIN' ***PALIBIN LILACCARAGANA PYGMAEA ***PYGMY CARAGANASHRUBSRHUS AROMATICA 'GRO-LOW' ***GRO LOW SUMACPERENNIALSSPIREA BETULIFOLIA 'TOR' TOR SPIREAPINUS MUGO 'TANNENBAUM'*** MUGO PINEARONIA MELANOCARPA 'AUTUMN MAGIC' AUTUMN MAGIC CHOKEBERRYJUNIPERUS SABINA 'BUFFALO'*** BUFFALO JUNIPERTOWN AND COUNTRY AT FERGUSON FARM:SHRUBS AND PERENNIALSDROUGHT TOLERANT ***MOLINIA CAERULEA 'MOORFLAMME' ***MOORGRASS 'MOORFLAMME'NEPETA X FAASSENII 'SELECT BLUE'***CATMINT 'SELECT BLUE'ECHINACEA PURPUREA 'WHITE SWAN' ***ECHINACEA 'WHITE SWAN'LIATRIS SPICATA 'KOBOLD'***COMMON GAYFEATHERACHILLEA X 'MOONSHINE'***YARROW 'MOOONSHINE'HELETOTRICHON SEMPRIVIVENS ***BLUE OAT GRASSTIARELLA 'BRANDYWINE' ***BRANDYWINE TIARELLADESCHAMPSIA CESPITOSATUFTED HAIRGRASSEUONYMOUS ALATUS 'COMPACTUS'*** DWARF BURNING BUSHTREESBOTANICAL NAMECOMMON NAMEULMUS AMERICANA 'LEWIS AND CLARK' ***PRAIRIE EXPEDITION ELMULMUS AMERICANA***ACCOLADE ELMTILIA AMERICANA 'BOULEVARD' ***BOULEVARD LINDENACER PLATANOIDES 'EMERAL LUSTRE' ***EMERALD LUSTRE NORWAY MAPLETOWN AND COUNTRY: TREESSYMB.DROUGHT TOLERANT ***GLEDITSIA TRIACANTHOS ***SKYLINE HONEYLOCUSTCRATAEGUS AMBIGUA ***SNOWBIRD HAWTHORN - MULTI STEMPINUS SYLVESTRIS ***SCOTCH PINEPOPULUS TREMULOIDES 'DANCING FLAME'DANCING FLAME ASPENAMELANCHIER X ALNIFOLIAAUTUMN BRILLIANCE SERVICEBERRYRUSPRUNUS MACKII ***MULTI STEM AMUR CHERRYACER X 'FREEMANII' ***FREEMAN MAPLEACER GINNALA 'FLAME'***MULTI STEM AMUR MAPLEDROUGHT TOLERANT ***BOTANICAL NAMECOMMON NAMETOWN AND COUNTRY: TREESSYMB.1L3.11"=10'-0"Planting Plan EnlargementL3.2PLANTINGPLANENLARGMENTAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/2020105020N51 4826.04824.04825.04824.04826.04826.54825.04824.04825.04824.04824.04828.04826.0523'-9"RUSRUSRUSRUSRUSRUSSPRSPRSPRSPRSPRTURF OR BLUEGRASSSEED MIX29'-7"5'-10"14'-8"NATURALSTEEL EDGING1-1/2"LANDSCAPEROCK24' WOOD SCREENINGFENCE, SEE DETAIL 8/L5.1SYMB.BOTANICAL NAMECOMMON NAMESYRINGA RETICULATA 'PALIBIN' ***PALIBIN LILACCARAGANA PYGMAEA ***PYGMY CARAGANASHRUBSRHUS AROMATICA 'GRO-LOW' ***GRO LOW SUMACPERENNIALSSPIREA BETULIFOLIA 'TOR' TOR SPIREAPINUS MUGO 'TANNENBAUM'*** MUGO PINEARONIA MELANOCARPA 'AUTUMN MAGIC' AUTUMN MAGIC CHOKEBERRYJUNIPERUS SABINA 'BUFFALO'*** BUFFALO JUNIPERTOWN AND COUNTRY AT FERGUSON FARM:SHRUBS AND PERENNIALSDROUGHT TOLERANT ***MOLINIA CAERULEA 'MOORFLAMME' ***MOORGRASS 'MOORFLAMME'NEPETA X FAASSENII 'SELECT BLUE'***CATMINT 'SELECT BLUE'ECHINACEA PURPUREA 'WHITE SWAN' ***ECHINACEA 'WHITE SWAN'LIATRIS SPICATA 'KOBOLD'***COMMON GAYFEATHERACHILLEA X 'MOONSHINE'***YARROW 'MOOONSHINE'HELETOTRICHON SEMPRIVIVENS ***BLUE OAT GRASSTIARELLA 'BRANDYWINE' ***BRANDYWINE TIARELLADESCHAMPSIA CESPITOSATUFTED HAIRGRASSEUONYMOUS ALATUS 'COMPACTUS'*** DWARF BURNING BUSHTREESBOTANICAL NAMECOMMON NAMEULMUS AMERICANA 'LEWIS AND CLARK' ***PRAIRIE EXPEDITION ELMULMUS AMERICANA***ACCOLADE ELMTILIA AMERICANA 'BOULEVARD' ***BOULEVARD LINDENACER PLATANOIDES 'EMERAL LUSTRE' ***EMERALD LUSTRE NORWAY MAPLETOWN AND COUNTRY: TREESSYMB.DROUGHT TOLERANT ***GLEDITSIA TRIACANTHOS ***SKYLINE HONEYLOCUSTCRATAEGUS AMBIGUA ***SNOWBIRD HAWTHORN - MULTI STEMPINUS SYLVESTRIS ***SCOTCH PINEPOPULUS TREMULOIDES 'DANCING FLAME'DANCING FLAME ASPENAMELANCHIER X ALNIFOLIAAUTUMN BRILLIANCE SERVICEBERRYRUSPRUNUS MACKII ***MULTI STEM AMUR CHERRYACER X 'FREEMANII' ***FREEMAN MAPLEACER GINNALA 'FLAME'***MULTI STEM AMUR MAPLEDROUGHT TOLERANT ***BOTANICAL NAMECOMMON NAMETOWN AND COUNTRY: TREESSYMB.1L3.11"=10'-0"Planting Plan EnlargementL3.3PLANTINGPLANENLARGMENTAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/2020105020N52 PRUNE TREE TO REMOVEDEAD OR DAMAGED LIMBS ANDBRANCHESTREE STAKES AND TIESAS SHOWN. STAKES SHALLBE DRIVEN INTO EXISTING,UNDISTURBED SOIL ANDSHALL NOT PENETRATE THEROOT BALL. STAKES TO BEREMOVED AFTER TWO YEARSFINISHED ELEVATION OF TREECROWN TO BE MIN 3" ANDMAX 6" ABOVE FINISHED GRADECIRCULAR SWALE TO RING TREE,3' DIAMETER WITH 3" HIGHMOUNDED RING OF SOILBURLAP TO BE REMOVEDFROM TOP 13 OF ROOT BALL.REMOVE WIRE CAGE FOLLOWINGPLANTING13 NATIVE SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOILEXCAVATE HOLE2X DIAMETER OF ROOT BALL1L5.03/8" = 1'-0"Coniferous Ball and Burlap PlantingPRUNE TREE TO REMOVEDEAD OR DAMAGED LIMBS ANDBRANCHESTREE STAKES AND TIESAS SHOWN. STAKES SHALLBE DRIVEN INTO EXISTING,UNDISTURBED SOIL ANDSHALL NOT PENETRATE THEROOT BALL. STAKES TO BEREMOVED AFTER TWO YEARSFINISHED ELEVATION OF TREECROWN TO BE MIN 3" ANDMAX 6" ABOVE FINISHED GRADECIRCULAR SWALE TO RING TREE,4' DIAMETER WITH 3" HIGHMOUNDED RING OF SOILBURLAP TO BE REMOVEDFROM TOP 13 OF ROOT BALL.REMOVE WIRE CAGE FOLLOWINGPLANTING13 NATIVE SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOILEXCAVATE HOLE2X DIAMETER OF ROOT BALL2L5.03/8" = 1'-0"Ball and Burlap Deciduous Tree Planting DetailPRUNE SHRUB TO REMOVEDEAD OR DAMAGED LEAVESAND BRANCHESELEVATION OF SHRUBCROWN TO BE 3" ABOVEFINISHED GRADE ELEVATIONCIRCULAR SWALE TO RINGSHRUB, 2' DIAMETER WITH 3"HIGH MOUNDED RING OF SOILALL CONTAINMENT MATERIALSAROUND ROOTS TO BE REMOVEDPRIOR TO INSTALLATION13 NATIVE SOIL WITH 13 SANDYLOAM AND 13 DEBRIS FREETOPSOILEXCAVATE HOLE2X DIAMETER OF ROOT BALL3L5.03/4" = 1'-0"Shrub Planting DetailTRIANGULAR SPACINGX XXYTILL NATIVE SOIL TO 12" DEPTH, ADDINGORGANIC SOIL AMENDMENT SO AS TOACHIEVE MIN. 15% ORGANIC CONTENT INSOILBED EDGING ANDMULCH AS SPECIFIEDX = PLANT SPACING. REFER TO PLANT LEGEND FOR SPACINGY = SPACING BETWEEN ROWS. 86% OF X = PLANT LOCATION6L5.01/2" = 1'-0"Ornamental Grass Planting DetailEXCAVATE HOLE2X DIAMETER OF ROOT BALLPRUNE TREE TO REMOVEDEAD OR DAMAGED LIMBS ANDBRANCHESTREE STAKES AND TIESAS SHOWN. STAKES SHALLBE DRIVEN INTO EXISTING,UNDISTURBED SOIL ANDSHALL NOT PENETRATE THEROOT BALL. STAKES TO BEREMOVED AFTER TWO YEARS.FINISHED ELEVATION OF TREECROWN TO BE MIN 3" ANDMAX 6" ABOVE FINISHED GRADECIRCULAR SWALE TO RING TREE,3' DIAMETER WITH 3" HIGHMOUNDED RING OF SOILBURLAP TO BE REMOVEDFROM TOP 13 OF ROOT BALL.REMOVE WIRE CAGE FOLLOWINGPLANTING.13 NATIVE SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOIL.AMENDED SOIL,MOUND TOELEVATION OFCROWNORIGINALGRADE5L5.03/8" = 1'-0"Ball and Burlap Deciduous Tree Planting Detail - On SlopeEXCAVATE HOLE2X DIAMETER OF ROOT BALLPRUNE TREE TO REMOVEDEAD OR DAMAGED LIMBS ANDBRANCHESTREE STAKES AND TIESAS SHOWN. STAKES SHALLBE DRIVEN INTO EXISTING,UNDISTURBED SOIL ANDSHALL NOT PENETRATE THEROOT BALL. STAKES TO BEREMOVED AFTER TWO YEARS.FINISHED ELEVATION OF TREECROWN TO BE MIN 3" ANDMAX 6" ABOVE FINISHED GRADECIRCULAR SWALE TO RING TREE,3' DIAMETER WITH 3" HIGHMOUNDED RING OF SOILBURLAP TO BE REMOVEDFROM TOP 13 OF ROOT BALL.REMOVE WIRE CAGEFOLLOWING PLANTING.13 NATIVE SOIL WITH 13 SANDYLOAM AND 13 DEBRIS FREETOPSOIL.AMENDED SOIL,MOUND TOELEVATION OFCROWNORIGINALGRADE4L5.03/8" = 1'-0"Coniferous Ball and Burlap Planting - On SlopeL5.0LANDSCAPEDETAILSAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/202053 12"REVEALUNDISTURBED NATIVESOILPREPARED SUBGRADE. REMOVEALL STONES OR OTHER DEBRISGREATER THAN 1" DIA. AND TILLEXISTING SOIL MIN. 4" BEFOREADDING TOPSOIL ORAMENDMENTS.FINISH GRADE3" MIN. TOPSOIL. SEE NOTENOTE:1.CONTRACTOR SHALL PROVIDE A 3" MINIMUM DEPTH OF TOPSOIL ONALL LAWN AREAS. TOPSOIL SHALL BE DRUM ROLLED ORTRACK-PACKED AND GRADED SMOOTHLY AND EVENLY.NATIVE SEED PER PLAN316" X 4" NATURAL STEELEDGING TAC WELDED TO #4 REBARDRIVEN MIN. 18"SOD/ARTIFICIAL SURFACING PERPLAN1L5.11" = 1'-0"Steel Edging along Natural and Turf PlantingsPAVEMENT EDGE - SEE PLANSAND PAVING DETAILS FORADDITIONAL INFORMATION. SEEALSO EDGING DETAILS ASAPPLICABLE.UNCOMPACTED SUBGRADE;REMOVE ALL STONES OR OTHERDEBRIS GREATER THAN 1" DIAM.AND TILL EXISTING SOIL MIN. 4"BEFORE ADDING TOPSOIL ORAMENDMENTS1"REVEAL - SEE NOTE 2NOTE:1.SLOPE PLANTED AREAS AWAY FROM PAVED AREAS.2.FINISH GRADES AT PAVEMENT EDGES MUST BE AT A LEVEL SUCH THAT THEESTABLISHED TURF SURFACE WILL BE ONE (1) INCH BELOW TOP OFPAVEMENT FOR A MINIMUM DISTANCE OF SIX (6) FEET FROM THE EDGE.3.CONTRACTOR SHALL PROVIDE A 3" MINIMUM DEPTH OF COMPACTEDTOPSOIL ON ALL LAWN AREAS. TOPSOIL SHALL BE DRUM ROLLED ORTRACK-PACKED AND GRADED SMOOTHLY AND EVENLY.4.BASE MATERIAL AND COMPACTED SUBGRADE TO BE EXTENDED 2X THEDEPTH OF THE BASE MATERIAL (12") BEYOND THE EDGE OF THE PAVEMENTSYSTEM. TAPER BASE MATERIAL TOWARD THE COMPACTED SUBGRADE AT A45° ANGLE.SLOPE3" MIN. TOPSOIL. SEE NOTE 36" DEPTH OF 34" MINUSWASHED AGGREGATEBASE MATERIAL90% - 95%COMPACTEDSUBGRADE45°12"SEE NOTE 42L5.13/4" = 1'-0"Planting Bed at Pavement Edge316" x 4" NATURAL STEEL EDGINGMULCH MATERIAL PER PLANMIN 3" DEEP.FINAL ELEVATION MIN 1" BELOWTOP OF STEEL EDGING1" FACE REVEAL#4 REBAR, 24" OC, MIN. 18" DEPTH SPOT WELD ON SITETO STEEL EDGINGWEED FABRIC PER PLAN4" STAPLES, 18" OCPREPARED SUBGRADE. REMOVEALL STONES OR OTHER DEBRISGREATER THAN 1" DIA. AND TILLEXISTING SOIL MIN. 4" BEFOREADDING TOPSOIL OR AMENDMENTS.3" MIN. TOPSOIL. SEE NOTENOTE:1.CONTRACTOR SHALL PROVIDE A 3" MINIMUM DEPTH OF TOPSOIL ONALL LAWN AREAS. TOPSOIL SHALL BE DRUM ROLLED ORTRACK-PACKED AND GRADED SMOOTHLY AND EVENLY.SOD PER PLAN4L5.11" = 1'-0"Edging Detail1'-8"2'-10"2'-6"2'BIKE RIB 2.0 BY BIKERACK.COM ORAPPROVED EQ. COLOR TO BE BLACKPOWDERCOAT. INSTALL PERMANUFACTURER'S SPECIFICATIONSFINISH GRADERACKS ARE TO BE PLACED AMIN. 30" ON CENTER.24"MIN.TO NEAREST OBJECT30" MIN TO NEAREST OBJECT5L5.11/2" = 1'-0"Bike Rack 2.0 Bikerack.com6L5.1NTSLandscape BenchNOTES:1.NEENAH FOUNDRY Co. 800-558-5075 MODEL # R-8708/ RAW STEEL FINISH.2.6" CONCRETE BAND TO BE FORMED ALONG RADIUS OF CURBING IFNECESSARY TO MAINTAIN DIMENSIONING PER PLAN.TREE GRATETREE GRATE FRAME. INSTALL PERMANUFACTURER'S SPECIFICATIONS.RAW FINISH6" WIDE CONCRETE BAND. CASTFRAME INTO CONCRETE BAND.3L5.11/2" = 1'-0"Tree Grate1 X 4 STAINED CLEAR CEDAR(EACH SIDE) GAP 1/2" -ALTERNATE JOINTS AND FASTENTO POSTS WITH (2) #8SS FLUSH HEAD SCREWS18" DIA X 48" DEEPCONCRETE FOOTONGSGRADE2 X 10 STAINED CLEARCEDAR CENTERED ONPOSTS1 X 4 X 5 1/2" STAINEDCLEAR CEDAR, GAP 1/2"AT POST FACE, EACHEND8'-08'-08'-04'-03'-6"24'-7"4'8L5.13/8" = 1'-0"24' Screen Wall - Elevation7L5.1NTS7 Bike RackL5.1LANDSCAPEDETAILSAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/202054 RUSRUSRUSRUSRUSSIOSIOSIOSIOSIOSIOSIOLANLANLANLANLANLANLANRUSRUSRUSRUSRUSRUSSPRSPRSPRSPRSPRSPRSPRSPRSPRSPRUP UPRAMP 4826.04824.04825.04824.04826.04826.54825.04824.04825.04824.04824.04828.04826.04833.04832.04831.54831.04830.04832.04831.04829.04830.04831.04829.04831.0BACKFLOWPREVENTORPROPOSEDCONNECTION POINTPROPOSED IRRIGTIONWELL (TO BE VERIFIED)OPEN SPACE IRRIGATIONTO BE SOURCED FROMEXISTING SUBDIVISIONWELLS. MUST BECOORDINATED.IRRIGATION SLEEVE, TYP.BFCWCPROPOSED IRRIGTION CONTROLLER - ALLIRRIGATION COMPONENTS TO BE VERIFIEDAND COORDINATED WITH MECHANICAL/ELECTRICAL AND LANDSCAPE CONTRACTOR.IRRIGATIONTYPEIRRIGATION SCHEDULETOTALAREA / QTYANNUALET RATETOTALANNUAL H2O5,541 SF29 IN / SF100,109 GALH.E. BLVDSPRAYIRRIG. SOD11,125 SF29 IN / SF200,995 GAL99 TREES1,634 GAL /WEEK29,403 GAL270 SHRUBS2,025 GAL /WEEK36,450 GAL132PERENNIALS1,016 GAL /WEEK18,288 GALTOTAL ANNUAL H2O REQUIRED: 371,710 GALTOTAL ACRE FEET PER YEAR: 1.14 ACRE FEETH.E. SPRAYIRRIG. SODH.E. TREEBUBBLERH.E. SHRUBDRIP IRRIG.H.E.PERENN.DRIP IRRIG.SYMBOLDESCRIPTIONIRRIGATION LEGENDBACKFLOW PREVENTERBFIRRIGATION CONTROLLERCCONNECTION POINTCPIRRIGATION SLEEVE, 4" MIN. SCH 40 PVC***LAYOUT TO BE DETERMINED IN FIELD BYIRRIGATION CONTRACTORWPROPOSED IRRIGATION WELLYC NOTESIRRIGATION NOTES AND SPECIFICATIONS1.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER.2.IRRIGATION MAIN LINE TO BE 1.5" SCH 40 PVC PIPE OR 150 PSI POLY PIPE.3.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS. BUBBLERS TO BE EVENLY DISTRIBUTEDAROUND BASE OF TREE WITH FOUR (4) EVENLY SPACED 1 GPH BUBBLER EMITTERS.4.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION. DRIP IRRIGATION TOBE ADJUSTED PER REQUIREMENTS OF EACH INDIVIDUAL PLANT.5.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS. BUBBLERS TO BEEVENLY DISTRIBUTED AROUND BASE OF SHRUB WITH TWO (2) EVENLY SPACED 1 GPH BUBBLER EMITTERS.6.BUBBLERS TO TREES MAY BE OMITTED WHERE OVERHEAD IRRIGATION WILL PROVIDE ADEQUATE WATER.7.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING. DRIPEMITTERS TO BE ADJUSTED PER REQUIREMENTS OF EACH INDIVIDUAL PLANT.8.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATEDON PLAN.9.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE FOR SOD AREAS.10.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.11.BACKFLOW ASSEMBLY AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN MECHANICAL ROOM ORAPPROVED EXTERNAL GRADEBOX. IT IS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TOCOORDINATE INSTALATION PER LOCAL CODES AND ORDINACES AS WELL AS WITH ARCHITECTURE AND ALLOTHER TRADES.12.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEER,ELECTRICAL CONTRACTOR AND LANDSCAPE CONTRACTOR.13.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.14.ALL INFORMATION TO BE FIELD-VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.15.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALLTIMES.16.SYSTEM DESIGNED TO FALL WITHIN OPERATING PRESSURE OF 50 PSI AND 12 GPM. IF NOT WITHIN LIMITS,CONTRACTOR MUST CONTACT LANDSCAPE ARCHITECT.SHEET L6.0 HAS IMPORTANT INFORMATION DISPLAYEDIN COLOR. IF THIS BOX DOES NOT APPEAR RED, PLEASEREQUEST FULL COLOR PRINT OR PDF.4020080N1L6.01"=40'-0"Irrigation Water UseL6.0IRRIGATIONWATERUSE PLANAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/202055 NOTE:MOUNT CONTROLLER LCD SCREEN AT EYE LEVEL,CONTROLLER SHALL BE HARD-WIRED TOGROUNDED 110 VAC POWER SOURCELEGEND:IRRIGATION CONTROLLER (12C-800-PL) PER PLANIRRIGATION CONTROL WIRE IN CONDUITSIZE AND TYPE PER LOCAL CODESELECTRICAL SUPPLY CONDUITCONNECT TO POWER SOURCE, J-BOX INSIDECONTROLLERADJACENT SURFACE TO MOUNT CONTROLLER PER PLAN13"5"12341L7.0NTSIrrigation Controller Detail- Hunter ICC2 or Equivalent123442L7.0NTSBackflow Preventer(1)FINISHED GRADENOTES1.1 12" BACKFLOW ASSEMBLY, PER LOCAL CODES AND ORDINANCES2.PRESSURE VACUUM BREAKERS MUST BE INSTALLED AT LEAST 12" ABOVEDOWNSTREAM PIPING3.ALL NIPPLES AND VALVES TO BE COPPER OR BRASSMANUAL BRASS SHUTOFFBALL VALVEMANUAL BRASS SHUTOFFBALL VALVEWINTERIZATION ASSEMBLY TO BEINSTALLED AS CLOSE TO BACKFLOW PREVENTER AS POSSIBLE.1"x4" CEDAR PANEL BACKFLOWENCLOSUREADJACENT SURFACE TO MOUNT CONTROLLER PER PLANNOTE:FOR MOST ACCURATE TEMPERATURESENSING, ROTATE THE MWS SO THAT THETHERMOSTAT PORTION POINTS SOUTH.THE MWS IS DESIGNED TO MOUNT ON APOST OF 2" PIPE, ANY COMBINATION OFPIPE AND FITTINGS MAY BE USED.2" PIPEMOUNT TO POST OR WALLWITH CONDUIT CLAMPSMODEL MWS-FR OR SIMILAROPTIMUM MOUNTINGHEIGHT 6' ABOVE GRADERUN LEAD WIRESTO CONTROLLER3L7.0NTSMini Weather Station - Hunter or Equivalent4L7.0NTSQuick CouplerNOTE:FINISH GRADES AT VALVE BOXES MUST BE AT A LEVEL SUCH THATTHE ESTABLISHED TURF OR MULCH SURFACE WILL FLUSH WITH THETOP OF THE BOX.QUICK COUPLING VALVE:RAINBIRD HQ44-RC OR EQUIVALENT6" ROUND VALVE BOX WITHLOCKING LID3 INCH MINIMUM DEPTH OF34" WASHED GRAVELBRICK (1 OF 2)PVC SCH. 80 NIPPLEPVC 1X1 TXT COUPLING LASCOG132212 SWING JOINTPVC OR POLY MAINLINE PIPEPER PLAN36" #4 REBAR WITH STAINLESSSTEEL GEAR CLAMPSFINISH GRADE.T CHRISTY ID. TAGREMOTE CONTROL VALVESCH 80 PVC SOLVENT WELDED UNIONSSCH 40 PVC OR POLY PIPE LATERAL LINE9L7.0NTSIrrigation Control Valve - TURFSTANDARD VALVE BOX WITH LOCKING LIDFINISH GRADE - SEE NOTEWATERPROOF DBR/DBY CONNECTIONS (2)18-24" COILED WIRESCH. 80 TOE NIPPLESCH. 40 FITTINGSBRICK SUPPORTS (4)34" MINUS WASHED GRAVELNOTE:FINISH GRADES AT VALVE BOXES MUST BE AT A LEVEL SUCH THATTHE ESTABLISHED TURF OR MULCH SURFACE WILL FLUSH WITH THETOP OF THE BOX.18"12"18"12"18"18"5L7.0NTSTrenching DetailsFINISH GRADELATERALLATERALMAIN LINEBEDDINGLOW VOLTAGE WIRELOW VOLTAGE WIRESECTIONSPLANSSNAKE ALLLATERAL PIPEIN TRENCHTAPE AND BUNDLE ALL WIRING AT 10'INTERVALS. USE 6" WIDE MARKING TAPE 6"ABOVE ALL DIRECT BURIAL WIRING. ALLSPLICES SHALL BE MADE IN VALVE BOXESAND LOCATED ON AS-BUILT PLANS.ALL 120V. WIRING SHALL BE IN CONDUIT WITHMARKER TAPE AS ABOVE. ALL WIRING UNDERPAVEMENT AND THROUGH SLEEVES SHALL BEIN CONDUIT.TIE A LOOSE 20" LOOP IN WIRING AT ALLCHANGES IN DIRECTION GREATER THAN 30DEGREES. UNTIE ALL LOOPS AFTER MAKINGCONNECTIONSFINISH GRADEMARKING TAPETIESLOOPDIRECT BURYSECTIONCONDUITSECTIONDIRECT BURY PLANCONDUIT PLANPAVEMENT AND THROUGH SLEEVES SHALL BEFINISH GRADESCH. 40 PVC SLEEVE - 4" MIN. OR 2X THE O.D.OF THE IRRIGATION PIPINGWRAP 12 GAUGE WIRE AROUND EACH ENDOF THE SLEEVE AND EXTEND TO THESURFACEWASHED AND GRADED MORTARSAND BACKFILL IN ROCKY SOIL.PAVEMENT EDGE6L7.0NTSIrrigation SleeveNOTE:1.CAP SLEEVES UNTIL USE.2.4" MIN. HORIZONTAL SEPARATION REQUIRED BETWEEN SLEEVESIN THE SAME TRENCH.3.IRRIGATION PIPE AND CONTROL WIRES SHALL BE SLEEVEDSEPARATELY.4.SOIL AROUND SLEEVE BACKFILLED AND COMPACTED TO THESAME DENSITY AS THE SURROUNDING SOIL.DEPTH PER TRENCHING DETAILEQ.EQ.7L7.0NTSValve Box LayoutIRRIGATION CONTROLVALVE BOXPROVIDE EQUAL SPACINGBETWEEN BOXESEDGE OF PAVEMENTALIGN BOXES PARALLELTO THE EDGE OFPAVEMENTPLACE BOXES A MINIMUMOF ONE (1) FOOT FROMEDGE OF PAVEMENTNOTE:GROUP SIMILAR BOX TYPES AND SIZES TOGETHER, I.E. PLACERECTANGULAR OR ROUND BOXES TOGETHER.1' MIN.NIBCO T-113 BRONZE GATE VALVEOR EQUIVALENTSCH 40 MALE ADAPTORFINISH GRADE10" VALVE BOX W/LOCKING LIDSCH 40 PVC MAIN LINE8L7.0NTSIsolation ValveNOTE:FINISH GRADES AT VALVE BOXES MUST BE AT A LEVEL SUCH THATTHE ESTABLISHED TURF OR MULCH SURFACE WILL FLUSH WITH THETOP OF THE BOX.IrrigationDetailsL7.0Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/202056 STANDARD 10" ROUND VALVE BOXFINISH GRADE -SEE NOTE18-24" COILED WIREDBR/DBY CONNECTORS (2)BRICK SUPPORTS (3)SCH 80 T.O.E. NIPPLEMAIN LINE PIPE & FITTINGS3/4" MINUS WASHED GRAVELDRIP ZONE KITLATERAL PIPE AND FITTINGSPVC SLIP UNIONS1L7.1NTSIrrigation Control Valve - DRIP Single ValveNOTE:FINISH GRADES AT VALVE BOXES MUST BE AT A LEVEL SUCH THATTHE ESTABLISHED TURF OR MULCH SURFACE WILL FLUSH WITHTHE TOP OF THE BOX. DRIP VALVE REGULATED @ 25-40 PSI2L7.1NTSIrrigation Valve Bank Layout, typ. NOTES:- STANDARD BOX TO ACCOMMODATE 4 VALVES- VALVE BANKS TO BE CONSTRUCTED TO LOCAL CODES AND STANDARDS.- LATERALS MAY BE PE PIPE WITH SCH. 80 FITTINGS FIRMLY SECURED WITH OETIKER CLAMPS- IF PE PIPE IS USED FOR LATERAL LINES 2 OETIKER CLAMPS TO BE USEDAT EACH VALVE OUTLET CLAMPED AT MIRRORED ANGLES TO INSURE SECURE GRIP, SEE OETIKER CONNECTION DETAILS X S X T SCH. 40 TEETO MAINLINE BELOWSTANDARD VALVE BOXSCH 80 THREADED NIPPLEWITH TEFLON TAPES X T COUPLER WITH TEFLONTAPE AND PVC SOLVENTLATERAL LINE3L7.1NTSPolyethylene Lateral Line at Valve Connection (Oetiker connections) SCH. 80 THREAD TO BARB ADAPTERTHREADED END TO BE TEFLON WRAPPEDOETIKERS (2) CLAMPED ON OPPOSING SIDESPOLY PIPE LATERAL IRRIGATION LINE(1" TYP.)OETIKERS (2) CLAMPED ON OPPOSING SIDESMODEL PROS-04 OR EQUIVALENTLATERAL PIPEFINISH GRADELATERAL TEE OR ELLSWING JOINT:RAINBIRD SA125050 OR EQUIVALENT4L7.1NTSHunter Pro Spray or EquivalentNOTE:FINISH GRADES AT VALVE BOXES MUST BE AT ALEVEL SUCH THAT THE ESTABLISHED TURF ORMULCH SURFACE WILL FLUSH WITH THE TOP OF THEBOX.RAINBIRD SJ127575 PRE-FAB SWINGJOINT OR EQUIVALENTLATERAL PIPELATERAL TEE OR ELLFINISH GRADEMODEL I20-04 ROTOR HEAD OREQUIVALENT8L7.1NTSRotor DetailNOTE:FINISH GRADES AT VALVE BOXES MUST BE AT ALEVEL SUCH THAT THE ESTABLISHED TURF ORMULCH SURFACE WILL FLUSH WITH THE TOP OFTHE BOX.2345TREE BUBBLER1TREE LOCATIONSWING PIPELATERAL TEELATERAL PIPE78910TREE ROOT ZONE6HUNTER PCB-50 BUBBLERFINISH GRADESWING JOINT:HUNTER 'PRO-FLEX' TUBING 24" - 36",HSBE-050 ELBOWS (2), & MARLEXSTREET ELBOW (1)LATERAL TEE OR ELL5L7.1NTSTree and Shrub BubblerSECTIONPLAN12336455109876L7.1NTSDrip for Trees and Large ShrubsGALVANIZED TIEDOWN STAKE:PRESSURECOMPENSATINGEMITTER MODULE14" VINYLDISTRIBUTION TUBINGDIFFUSER BUG CAPTREEXERI-TUBE 700COMPRESSIONADAPTERPVC FITTING AND RISERPVC LATERAL PIPECOMPRESSION FLUSHTREE PLANDIFFUSER BUG CAP:14" TUBING STAKE:MULCH AS SPECIFIEDWEED CONTROL FABRIC14" VINYL DISTRIBUTIONTUBINGXERI-TUBE 700SINGLE-OUTLET EMITTERTREE SECTIONNOTE:1.DIRECT TWO (2) 1GPH EMITTERS PER SHRUB AND FOUR (4)1GPH EMITTERS PER TREE2.EMITTERS SHOULD BE PLACED INSIDE TREE WELL, HALFWAYBETWEEN THE BASE OF THE TREE AND EDGE OF ITSCANOPY.3.RUN XERI-TUBE 700 DISTRIBUTION TUBING NO MORE THAN250' LENGTH4.RUN 14" VINYL DISTRIBUTION TUBING NO MORE THAN 5'LENGTH7L7.1NTSEmitter on Stake14" TUBING DRIP EMITTERTUBING STAKEAMENDED SOIL 17MM BLANK PLD TUBING14" BARBED CONNECTORIrrigationDetailsL7.1Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2018 Bechtle Architects JOB:4515 Valley Commons Drive #201 Bozeman, MT 59718 406.585.4161 ph 406.585.6919 fax BECHTLE ARCHITECTS TOWN AND COUNTRY FOODS BOZEMAN, MONTANA12/18/2019SP102/14/2020RC06/30/2020RC12/16/202057 LIST OF ABBREVIATIONS AP ACCESS PANEL ACT ACOUSTIC CEILING TILE ALT ALTERNATE AB ANCHOR BOLT ∠ANGLE APPD APPROVED APPR APPROXIMATE ARCH ARCHITECTURAL ASPH ASPHALT @ AT AVE AVERAGE BM BEAM BRG BEARING BM BENCH MARK BLKG BLOCKING BD BOARD BS BOTH SIDES BOT BOTTOM BRK BRICK DS DOWN SPOUT D DRYER EA EACH E EAST ELEC ELECTRIC EL ELEVATION EQ EQUAL EQUIP EQUIPMENT EXIST EXISTING EXT EXTERIOR FT FEET FIN FINISH FF FINISHED FLOOR FE FIRE EXTINGUISHER FIX FIXTURE FL FLOOR FD FLOOR DRAIN FT FOOT FTG FOOTING MATL MATERIAL MAX MAXIMUM MTL METAL MIN MINIMUM MISC MISCELLANEOUS MOD MODULAR MECH MECHANICAL NOM NOMINAL N NORTH NTS NOT TO SCALE NO NUMBER OC ON CENTER OPNG OPENING OPP OPPOSITE OVHD OVERHEAD PTD PAINTED PNL PANEL PTN PARTITION PERM PERMANENT SERV SERVICE SHT SHEET SHTHG SHEATHING SIM SIMILAR S SOUTH SPEC SPECIFICATION SQ SQUARE STD STANDARD STL STEEL STG STORAGE STRUCT STRUCTURAL SYS SYSTEM THRU THROUGH T&G TONGUE AND GROOVE TR TREAD TYP TYPICAL UNO UNLESS NOTED OTHERWISE VIF VERIFY IN FIELD VP VENT PIPE BLDG BUILDING CAB CABINET CLG CEILING CL CENTER LINE CC CENTER TO CENTER CER CERAMIC CIR CIRCLE CLR CLEAR COL COLUMN CONC CONCRETE CMU CONCRETE MASONRY UNIT CONST CONSTRUCTION CONT CONTINUE CT CERAMIC TILE DP DAMP ROOFING DIA DIAMETER DIM DIMENSION DW DISHWASHER DN DOWN FND FOUNDATION GALV GALVANIZE GA GAGE GL GRADELINE GWB GYPSUM WALL BOARD HDWD HARDWOOD HT HEIGHT HOR HORIZONTAL HB HOSE BIB IN INCH INSUL INSULATION INT INTERIOR JT JOINT JST JOIST LAM LAMINATE LAV LAVATORY LG LENGTH LT LIGHT MFG MANUFACTURING PERP PERPENDICULAR PL PLATE PLMB PLUMBING PT POINT LB POUND PSI POUNDS PER SQUARE INCH PREFAB PREFABRICATED QTY QUANTITY R RADIUS REF REFRIGERATOR REG REGISTER REINF REINFORCE REQD REQUIRED REV REVISION R RISER RFG ROOFING RM ROOM SCHED SCHEDULE SECT SECTION VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD WTP WATERPROOFING WP WEATHERPROOF WH WEEPHOLE WT WEIGHT W WEST W WIDTH WDW WINDOW WG WIRE GLASS W/O WITH OUT WD WOOD WM WASHING MACHINE PROJECT SITE: FERGUSON FARM SUB, S10, T02 S, R05 E, BLOCK 5, LOTS 1-4 4567 FIELD STREET, BOZEMAN, MT 59718 CODE INFORMATION: APPLICABLE CODES: (STATE OF MONTANA) -INTERNATIONAL BUILDING CODE, 2018 EDITION -UNIFORM PLUMBING CODE, 2012 EDITION -INTERNATIONAL MECHANICAL CODE, 2012 EDITION -INTERNATIONAL FUEL GAS CODE, 2012 EDITION -NATIONAL ELECTRICAL CODE, 2014 EDITION -INTERNATIONAL ENERGY CONSERVATION CODE, 2012 EDITION -NFPA 70, 2014 EDITION -BOZEMAN MUNICIPAL CODE OF ORDINANCES, CHAPTER 38 UNIFIED DEVELOPMENT CODE ZONING: B-2 FIRE SPRINKLERS: NFPA-13 ALLOWABLE BUILDING HEIGHT: 38 FEET ACTUAL BUILDING HEIGHT: 35 FEET BUILDING AREA: MAIN FLOOR:33,843 SF SECOND FLOOR: 4,535 SF TOTAL:38,378 SF PROJECT INFORMATION OWNER: TOWN AND COUNTRY FOODS 1611 SOUTH 11TH AVE BOZEMAN, MT 59715 CONTACT: TRAVIS FRANDSEN ARCHITECT: BECHTLE ARCHITECTS 4515 VALLEY COMMONS DRIVE #201 BOZEMAN, MT 59718 (406) 585-4161 CONTACT: SCOTT BECHTLE GENERAL CONTRACTOR: LANGLAS & ASSOCIATES 1910 E. MAIN ST. #101 BOZEMAN, MT 59715 (406) 585-3420 CONTACT: ROGER DAVIS CIVIL ENGINEER: MADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 CONTACT: CHRIS BUDESKI STRUCTURAL ENGINEER: AE DYNAMICS 1800 W KOCH ST, SUITE 5 BOZEMAN, MT 59715 (406) 763-6375 CONTACT: CHRIS HIGINBOTHAM ELECTRICAL ENGINEER: BEARTOOTH LIGHTING & DESIGN 2784 CATALYST ST, B BOZEMAN, MT 59718 (406) 551-3669 CONTACT: ANDREW MOORE MECHANICAL ENGINEER: SE ENGINEERS PO BOX 10776 BOZEMAN, MT 59719 (406) 600-8796 CONTACT: BILL EDDEN LANDSCAPE ARCHITECT: DESIGN 5 37 E MAIN ST BOZEMAN, MT 59715 (406) 587-4873 CONTACT: TROY SCHERER FIRE SUPPRESSION COFFMAN ENGINEERS 751 OSTERMAN DR. #104 BOZEMAN, MT 59715 (406) 582-1936 CONTACT: ROBERT BLAKEMAN PROJECT DIRECTORY 1. AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION APPLIES TO THIS PROJECT AND SHALL BE INCORPORATED IN THE SERVICES PROVIDED BY THE GENERAL CONTRACTOR. 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB SITE CONDITIONS BEFORE COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT. 3. USE WRITTEN DIMENSIONS. DO NOT SCALE DRAWINGS. WHERE NO DIMENSION IS PROVIDED, CONSULT THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 4. THE DESIGN, ADEQUACY, AND SAFETY OF ERECTING, BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND HAS NOT BEEN CONSIDERED BY AN ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE PRIOR TO THE COMPLETION OF WALLS, CEILING, AND FINISH MATERIALS. 5. GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, AND PLUMBING. 6. ALL MATERIALS AND FINISHES ARE TO BE AS SPECIFIED, OR PRE-APPROVED EQUAL, PRIOR TO BIDDING. 7. SUBSTITUTIONS SHALL BE BY APPROVAL PRIOR TO THE BID, OR INDICATED AS A LINE ITEM ON THE BID AS AN ALTERNATE TO THE BASE BID. SEE SPECIFICATIONS IF AND WHEN APPLICABLE. 8. CONTRACTOR IS TO USE WATER-RESISTANT GYPSUM WALL BOARD IN ALL WET SPACES (RESTROOMS, JANITORIAL AREAS, MECHANICAL/PLUMBING ROOMS, FOOD SERVICE ROOMS, ETC.) 9. CONTRACTOR SHALL PROVIDE REDLINED AS-BUILT DRAWINGS, SHOWING ANY CHANGES TO PLANS, ELEVATIONS, SYSTEMS, DIMENSIONING, ETC. PRIOR TO FINAL PAYMENT. AND HAVE A SET ONSITE, UPDATED MONTHLY GENERAL PROJECT NOTES PROPOSED LOT 1 MIN. REQUIRED OPEN SPACE: 2% OF DEVELOPMENT ENVELOPE DEVELOPMENT ENVELOPE: 150,964 SF (3.46 ACRES) USABLE COMMERCIAL OPEN SPACE: 3,432 SF PERCENT OPEN SPACE PROVIDED: 2.3% PROPOSED LOT 2 MIN. REQUIRED OPEN SPACE: 2% OF DEVELOPMENT ENVELOPE DEVELOPMENT ENVELOPE: 16,040 SF (.37 ACRES) USABLE COMMERCIAL OPEN SPACE: 795 SF PERCENT OPEN SPACE PROVIDED: 4.9% PROPOSED LOT 3 MIN. REQUIRED OPEN SPACE: 2% OF DEVELOPMENT ENVELOPE DEVELOPMENT ENVELOPE: 16,193 SF (.37 ACRES) USABLE COMMERCIAL OPEN SPACE: 805 SF PERCENT OPEN SPACE PROVIDED: 4.9% COMMERCIAL OPEN SPACE NON-RESIDENTIAL SITE WITH TOTAL SITE AREA GREATER THAN ONE ACRE MUCH PROVIDE OPEN SPACE EQUAL TO AT LEAST TWO PERCENT OF THE DEVELOPMENT ENVELOPE. PER SEC.38.520.060.C This acknowledges that the following project was designed by Bechtle Architects with full knowledge that the City of Bozeman Building Division will not review for compliance with, nor is responsible for enforement of the Federal Americans with Disabilities Act of 1990, the Rehabilitation Act of 1973, the Fair Housing Act of 1988, Title 49 Chapter 2, commonly known as the Montana Human Rights Act or similar federal, state, or local laws that mandate accessibility to commercial construction or multi-family housing. ADA CERTIFICATION PROPOSED LOT 1 = 150,964 SF FLOOR AREA TOWN & COUNTRY FOODS = 33,843 33,843 / 150,964 = 0.224 PROPOSED LOT 2 = 16,040 SF FUTURE PAD FLOOR AREA = 5,880 SF 5,880 / 16,040 = 0.366 PROPOSED LOT 3 = 16,193 SF FUTURE PAD FLOOR AREA = 5,880 SF 5,880 / 16,193 = 0.363 FAR PARKING CALCULATIONS RETAIL STORE AND SERVICE ESTABLISHMENTS: 1 SPACE PER 300 SQUARE FEET OF FLOOR AREA OFFICES: 1 SPACE PER 250 SQUARE FEET OF FLOOR AREA RESTAURANTS, CAFES, BARS AND SIMILAR USES: 1 SPACE PER 60 SQUARE FEET OF INDOOR SERVING AREA; PLUS 1 SPACE PER 120 SQUARE FEET OF OUTDOOR (PATIO) AREA WAREHOUSING, STORAGE OR HANDLING OF BULK GOODS: 1 SPACE PER 1,000 SQUARE FEET OF FOOR AREA STORE RETAIL STORE AREA: 28,584 SF X 85% = 24,296 / 300 81 SPACES OFFICE AREA: 2,712 SF X 85% = 2,305 / 250 = 9 SPACES DELI SEATING AREA INDOOR: 1,214 SF X 85%= 1,032 / 50 =21 SPACES DELI SEATING AREA OUTDOOR: 1,450 X 85%= 1,233 / 100 = 12 SPACES WAREHOUSING AREAS: 6,092 SF X 85% = 5,178 / 1000 = 5 SPACES TOTAL REQUIRED PARKING SPACES T&C = 128 PARKING SPACES PAD SITES RETAIL: 10,800 SF X 85% = 9,180 / 250 = 36 SPACES TOTAL REQUIRED PARKING SPACES PAD SITES = 36 PARKING SPACES TOTAL MINIMUM PARKING FOR THE DEVELOPMENT = 164 SPACES UDO SECTION 38.540.050.A.2.B: MAXIMUM PARKING. PROVISION OF PARKING SPACES IN EXCESS OF 125 PERCENT OF THE MINIMUM NUMBER OF SPACES REQUIRED FOR THE NET FLOOR AREA IN THIS SUBSECTION 2 IS NOT PERMITTED. TOTAL MAXIMUM ALLOWED PARKING FOR DEVELOPMENT = (164 X 125%) = 205 SPACES TOTAL PARKING PROVIDED FOR DEVELOPMENT = 199 + 24 EXTRA BIKE PARKING BICYCLE PARKING: MINIMUM 10% OF PARKING STALLS: 12.8 =13 BIKE PARKING SPACES FOR ENTIRE DEVELOPMENT; 10 PROVIDED AT RETAIL STORE 2 COVERED BIKE PARKING = 1 CAR STALL WHEN LOCKERS & SHOWER PROVIDED PROJECT SITE VICINITY MAP CONSTRUCTION ROUTE PROPOSED LOT 1 = 150,964 SF PROPOSED BUILDING AREA = 33,843 / 150,964 = 0.224 = 22.4% DRIVEWAY CIRCULATION & PARKING = 81,071 / 150,964 = 0.527 = 52.7% LANDSCAPED AREAS = 37,590 / 150,964 = 0.249 = 24.9% PRIVATE OPEN SPACE = 0 CITY PARKS = 0 OTHER PUBLIC LANDS = 0 PROPOSED LOT 2 = 16,040 SF FUTURE PAD FLOOR AREA = 5,880 / 16,040 = 0.366 = 36.6% DRIVEWAY CIRCULATION & PARKING = 1,886 / 16,040 = 0.118 = 11.8% LANDSCAPED AREAS = 8,276 / 16,040 = 0.516 = 51.6% PRIVATE OPEN SPACE = 0 CITY PARKS = 0 OTHER PUBLIC LANDS = 0 PROPOSED LOT 3 = 16,193 SF FUTURE PAD FLOOR AREA = 5,880 / 16,193 = 0.363 = 36.3% DRIVEWAY CIRCULATION & PARKING = 1,886 / 16,193 = 0.116 = 11.6% LANDSCAPED AREAS = 8,436 / 16,193 = 0.521 = 52.1% PRIVATE OPEN SPACE = 0 CITY PARKS = 0 OTHER PUBLIC LANDS = 0 PARCEL PERCENTAGES NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS6/8/2021 11:36:42 AMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP000 MASTER SITE PLAN COVER SHEET MASTER SITE PLAN APRIL 21, 2020 BOZEMAN, MONTANA TOWN AND COUNTRY FOODS LANDSCAPE L0.0 OVERALL SITE PLAN TOWN & COUNTRY 12/16/2020 L0.1 OVERALL OPEN SPACE AND PHASING 12/16/2020 L0.2 OPEN SPACE NOTES AND LEGENDS 12/16/2020 L0.3 NOTES AND LEGENDS TOWN AND COUNTRY SITE 12/16/2020 L0.4 FUTURE PHASE RESEEDING PLAN 12/16/2020 L3.0 PLANTING PLAN ENLARGEMENT 12/16/2020 L3.1 PLANTING PLAN ENLARGEMENT 12/16/2020 L3.2 PLANTING PLAN ENLARGEMENT 12/16/2020 L3.3 PLANTING PLAN ENLARGEMENT 12/16/2020 L5.0 LANDSCAPE DETAILS 12/16/2020 L5.1 LANDSCAPE DETAILS 12/16/2020 L6.0 IRRIGATION WATER USE PLAN 12/16/2020 L7.0 IRRIGATION DETAILS 12/16/2020 L7.1 IRRIGATION DETAILS 12/16/2020 CIVIL C0.1 PHASE PLAN 03/18/2020 C0.2 EX SITE/DEMO 03/02/2020 C1.0 SITE PLAN 12/17/2020 C1.1 UTILITY PLAN 12/17/2020 C1.2 GRADING PLAN 12/17/2020 C2.0 CIVIL DETAILS 01/20/2020 C2.1 CIVIL DETAILS 01/20/2020 ARCHITECTURAL - SPR SP000 MASTER SITE PLAN COVER SHEET 7/1/2020 SP001 GARBAGE ENCLOSURE 04/21/20 SP002 GARBAGE ENCLOSURE 04/21/20 SP101 OVERALL FIRST FLOOR PLAN 7/1/2020 SP102 OVERALL SECOND FLOOR PLAN 01/20/2020 SP103 OVERALL ROOF PLAN 01/20/2020 SP200 EXTERIOR ELEVATIONS 7/1/2020 SP200a EXTERIOR ELEVATIONS - COLOR 7/1/2020 SP201 EXTERIOR ELEVATIONS 7/1/2020 SP201a EXTERIOR ELEVATIONS - COLOR 7/1/2020 SP900 3D PERSPECTIVES 7/1/2020 ELECTRICAL MSP / SP E001 ELECTRICAL LEGEND SCHED 06/07/2021 E002 LIGHTING ELEVATIONS 06/07/2021 E003 LIGHTING ELEVATIONS 06/07/2021 E101 SITE LIGHTING PLAN 06/07/2021 E102 SITE POWER PLAN 06/07/2021 REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 58 LIST OF ABBREVIATIONS AP ACCESS PANEL ACT ACOUSTIC CEILING TILE ALT ALTERNATE AB ANCHOR BOLT ∠ANGLE APPD APPROVED APPR APPROXIMATE ARCH ARCHITECTURAL ASPH ASPHALT @ AT AVE AVERAGE BM BEAM BRG BEARING BM BENCH MARK BLKG BLOCKING BD BOARD BS BOTH SIDES BOT BOTTOM BRK BRICK DS DOWN SPOUT D DRYER EA EACH E EAST ELEC ELECTRIC EL ELEVATION EQ EQUAL EQUIP EQUIPMENT EXIST EXISTING EXT EXTERIOR FT FEET FIN FINISH FF FINISHED FLOOR FE FIRE EXTINGUISHER FIX FIXTURE FL FLOOR FD FLOOR DRAIN FT FOOT FTG FOOTING MATL MATERIAL MAX MAXIMUM MTL METAL MIN MINIMUM MISC MISCELLANEOUS MOD MODULAR MECH MECHANICAL NOM NOMINAL N NORTH NTS NOT TO SCALE NO NUMBER OC ON CENTER OPNG OPENING OPP OPPOSITE OVHD OVERHEAD PTD PAINTED PNL PANEL PTN PARTITION PERM PERMANENT SERV SERVICE SHT SHEET SHTHG SHEATHING SIM SIMILAR S SOUTH SPEC SPECIFICATION SQ SQUARE STD STANDARD STL STEEL STG STORAGE STRUCT STRUCTURAL SYS SYSTEM THRU THROUGH T&G TONGUE AND GROOVE TR TREAD TYP TYPICAL UNO UNLESS NOTED OTHERWISE VIF VERIFY IN FIELD VP VENT PIPE BLDG BUILDING CAB CABINET CLG CEILING CL CENTER LINE CC CENTER TO CENTER CER CERAMIC CIR CIRCLE CLR CLEAR COL COLUMN CONC CONCRETE CMU CONCRETE MASONRY UNIT CONST CONSTRUCTION CONT CONTINUE CT CERAMIC TILE DP DAMP ROOFING DIA DIAMETER DIM DIMENSION DW DISHWASHER DN DOWN FND FOUNDATION GALV GALVANIZE GA GAGE GL GRADELINE GWB GYPSUM WALL BOARD HDWD HARDWOOD HT HEIGHT HOR HORIZONTAL HB HOSE BIB IN INCH INSUL INSULATION INT INTERIOR JT JOINT JST JOIST LAM LAMINATE LAV LAVATORY LG LENGTH LT LIGHT MFG MANUFACTURING PERP PERPENDICULAR PL PLATE PLMB PLUMBING PT POINT LB POUND PSI POUNDS PER SQUARE INCH PREFAB PREFABRICATED QTY QUANTITY R RADIUS REF REFRIGERATOR REG REGISTER REINF REINFORCE REQD REQUIRED REV REVISION R RISER RFG ROOFING RM ROOM SCHED SCHEDULE SECT SECTION VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD WTP WATERPROOFING WP WEATHERPROOF WH WEEPHOLE WT WEIGHT W WEST W WIDTH WDW WINDOW WG WIRE GLASS W/O WITH OUT WD WOOD WM WASHING MACHINE PROJECT SITE: FERGUSON FARM SUB, S10, T02 S, R05 E, BLOCK 5, LOTS 1-4 4567 FIELD STREET, BOZEMAN, MT 59718 CODE INFORMATION: APPLICABLE CODES: (STATE OF MONTANA) -INTERNATIONAL BUILDING CODE, 2018 EDITION -UNIFORM PLUMBING CODE, 2012 EDITION -INTERNATIONAL MECHANICAL CODE, 2012 EDITION -INTERNATIONAL FUEL GAS CODE, 2012 EDITION -NATIONAL ELECTRICAL CODE, 2014 EDITION -INTERNATIONAL ENERGY CONSERVATION CODE, 2012 EDITION -NFPA 70, 2014 EDITION -BOZEMAN MUNICIPAL CODE OF ORDINANCES, CHAPTER 38 UNIFIED DEVELOPMENT CODE ZONING: B-2 FIRE SPRINKLERS: NFPA-13 ALLOWABLE BUILDING HEIGHT: 38 FEET ACTUAL BUILDING HEIGHT: 35 FEET BUILDING AREA: MAIN FLOOR:33,843 SF SECOND FLOOR: 4,535 SF TOTAL:38,378 SF PROJECT INFORMATION OWNER: TOWN AND COUNTRY FOODS 1611 SOUTH 11TH AVE BOZEMAN, MT 59715 CONTACT: TRAVIS FRANDSEN ARCHITECT: BECHTLE ARCHITECTS 4515 VALLEY COMMONS DRIVE #201 BOZEMAN, MT 59718 (406) 585-4161 CONTACT: SCOTT BECHTLE GENERAL CONTRACTOR: LANGLAS & ASSOCIATES 1910 E. MAIN ST. #101 BOZEMAN, MT 59715 (406) 585-3420 CONTACT: ROGER DAVIS CIVIL ENGINEER: MADISON ENGINEERING 895 TECHNOLOGY BLVD, SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 CONTACT: CHRIS BUDESKI STRUCTURAL ENGINEER: AE DYNAMICS 1800 W KOCH ST, SUITE 5 BOZEMAN, MT 59715 (406) 763-6375 CONTACT: CHRIS HIGINBOTHAM ELECTRICAL ENGINEER: BEARTOOTH LIGHTING & DESIGN 2784 CATALYST ST, B BOZEMAN, MT 59718 (406) 551-3669 CONTACT: ANDREW MOORE MECHANICAL ENGINEER: SE ENGINEERS PO BOX 10776 BOZEMAN, MT 59719 (406) 600-8796 CONTACT: BILL EDDEN LANDSCAPE ARCHITECT: DESIGN 5 37 E MAIN ST BOZEMAN, MT 59715 (406) 587-4873 CONTACT: TROY SCHERER FIRE SUPPRESSION COFFMAN ENGINEERS 751 OSTERMAN DR. #104 BOZEMAN, MT 59715 (406) 582-1936 CONTACT: ROBERT BLAKEMAN PROJECT DIRECTORY 1. AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION APPLIES TO THIS PROJECT AND SHALL BE INCORPORATED IN THE SERVICES PROVIDED BY THE GENERAL CONTRACTOR. 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB SITE CONDITIONS BEFORE COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT. 3. USE WRITTEN DIMENSIONS. DO NOT SCALE DRAWINGS. WHERE NO DIMENSION IS PROVIDED, CONSULT THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 4. THE DESIGN, ADEQUACY, AND SAFETY OF ERECTING, BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND HAS NOT BEEN CONSIDERED BY AN ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE PRIOR TO THE COMPLETION OF WALLS, CEILING, AND FINISH MATERIALS. 5. GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, AND PLUMBING. 6. ALL MATERIALS AND FINISHES ARE TO BE AS SPECIFIED, OR PRE-APPROVED EQUAL, PRIOR TO BIDDING. 7. SUBSTITUTIONS SHALL BE BY APPROVAL PRIOR TO THE BID, OR INDICATED AS A LINE ITEM ON THE BID AS AN ALTERNATE TO THE BASE BID. SEE SPECIFICATIONS IF AND WHEN APPLICABLE. 8. CONTRACTOR IS TO USE WATER-RESISTANT GYPSUM WALL BOARD IN ALL WET SPACES (RESTROOMS, JANITORIAL AREAS, MECHANICAL/PLUMBING ROOMS, FOOD SERVICE ROOMS, ETC.) 9. CONTRACTOR SHALL PROVIDE REDLINED AS-BUILT DRAWINGS, SHOWING ANY CHANGES TO PLANS, ELEVATIONS, SYSTEMS, DIMENSIONING, ETC. PRIOR TO FINAL PAYMENT. AND HAVE A SET ONSITE, UPDATED MONTHLY GENERAL PROJECT NOTES PROPOSED LOT 1 MIN. REQUIRED OPEN SPACE: 2% OF DEVELOPMENT ENVELOPE DEVELOPMENT ENVELOPE: 150,964 SF (3.46 ACRES) USABLE COMMERCIAL OPEN SPACE: 3,432 SF PERCENT OPEN SPACE PROVIDED: 2.3% PROPOSED LOT 2 MIN. REQUIRED OPEN SPACE: 2% OF DEVELOPMENT ENVELOPE DEVELOPMENT ENVELOPE: 16,040 SF (.37 ACRES) USABLE COMMERCIAL OPEN SPACE: 795 SF PERCENT OPEN SPACE PROVIDED: 4.9% PROPOSED LOT 3 MIN. REQUIRED OPEN SPACE: 2% OF DEVELOPMENT ENVELOPE DEVELOPMENT ENVELOPE: 16,193 SF (.37 ACRES) USABLE COMMERCIAL OPEN SPACE: 805 SF PERCENT OPEN SPACE PROVIDED: 4.9% COMMERCIAL OPEN SPACE NON-RESIDENTIAL SITE WITH TOTAL SITE AREA GREATER THAN ONE ACRE MUCH PROVIDE OPEN SPACE EQUAL TO AT LEAST TWO PERCENT OF THE DEVELOPMENT ENVELOPE. PER SEC.38.520.060.C This acknowledges that the following project was designed by Bechtle Architects with full knowledge that the City of Bozeman Building Division will not review for compliance with, nor is responsible for enforement of the Federal Americans with Disabilities Act of 1990, the Rehabilitation Act of 1973, the Fair Housing Act of 1988, Title 49 Chapter 2, commonly known as the Montana Human Rights Act or similar federal, state, or local laws that mandate accessibility to commercial construction or multi-family housing. ADA CERTIFICATION PROPOSED LOT 1 = 150,964 SF FLOOR AREA TOWN & COUNTRY FOODS = 33,843 33,843 / 150,964 = 0.224 PROPOSED LOT 2 = 16,040 SF FUTURE PAD FLOOR AREA = 5,880 SF 5,880 / 16,040 = 0.366 PROPOSED LOT 3 = 16,193 SF FUTURE PAD FLOOR AREA = 5,880 SF 5,880 / 16,193 = 0.363 FAR PARKING CALCULATIONS RETAIL STORE AND SERVICE ESTABLISHMENTS: 1 SPACE PER 300 SQUARE FEET OF FLOOR AREA OFFICES: 1 SPACE PER 250 SQUARE FEET OF FLOOR AREA RESTAURANTS, CAFES, BARS AND SIMILAR USES: 1 SPACE PER 60 SQUARE FEET OF INDOOR SERVING AREA; PLUS 1 SPACE PER 120 SQUARE FEET OF OUTDOOR (PATIO) AREA WAREHOUSING, STORAGE OR HANDLING OF BULK GOODS: 1 SPACE PER 1,000 SQUARE FEET OF FOOR AREA STORE RETAIL STORE AREA: 28,584 SF X 85% = 24,296 / 300 81 SPACES OFFICE AREA: 2,712 SF X 85% = 2,305 / 250 = 9 SPACES DELI SEATING AREA INDOOR: 1,214 SF X 85%= 1,032 / 50 =21 SPACES DELI SEATING AREA OUTDOOR: 1,450 X 85%= 1,233 / 100 = 12 SPACES WAREHOUSING AREAS: 6,092 SF X 85% = 5,178 / 1000 = 5 SPACES TOTAL REQUIRED PARKING SPACES T&C = 128 PARKING SPACES PAD SITES RETAIL: 10,800 SF X 85% = 9,180 / 250 = 36 SPACES TOTAL REQUIRED PARKING SPACES PAD SITES = 36 PARKING SPACES TOTAL MINIMUM PARKING FOR THE DEVELOPMENT = 164 SPACES UDO SECTION 38.540.050.A.2.B: MAXIMUM PARKING. PROVISION OF PARKING SPACES IN EXCESS OF 125 PERCENT OF THE MINIMUM NUMBER OF SPACES REQUIRED FOR THE NET FLOOR AREA IN THIS SUBSECTION 2 IS NOT PERMITTED. TOTAL MAXIMUM ALLOWED PARKING FOR DEVELOPMENT = (164 X 125%) = 205 SPACES TOTAL PARKING PROVIDED FOR DEVELOPMENT = 199 + 24 EXTRA BIKE PARKING BICYCLE PARKING: MINIMUM 10% OF PARKING STALLS: 12.8 =13 BIKE PARKING SPACES FOR ENTIRE DEVELOPMENT; 10 PROVIDED AT RETAIL STORE 2 COVERED BIKE PARKING = 1 CAR STALL WHEN LOCKERS & SHOWER PROVIDED PROJECT SITE VICINITY MAP CONSTRUCTION ROUTE PROPOSED LOT 1 = 150,964 SF PROPOSED BUILDING AREA = 33,843 / 150,964 = 0.224 = 22.4% DRIVEWAY CIRCULATION & PARKING = 81,071 / 150,964 = 0.527 = 52.7% LANDSCAPED AREAS = 37,590 / 150,964 = 0.249 = 24.9% PRIVATE OPEN SPACE = 0 CITY PARKS = 0 OTHER PUBLIC LANDS = 0 PROPOSED LOT 2 = 16,040 SF FUTURE PAD FLOOR AREA = 5,880 / 16,040 = 0.366 = 36.6% DRIVEWAY CIRCULATION & PARKING = 1,886 / 16,040 = 0.118 = 11.8% LANDSCAPED AREAS = 8,276 / 16,040 = 0.516 = 51.6% PRIVATE OPEN SPACE = 0 CITY PARKS = 0 OTHER PUBLIC LANDS = 0 PROPOSED LOT 3 = 16,193 SF FUTURE PAD FLOOR AREA = 5,880 / 16,193 = 0.363 = 36.3% DRIVEWAY CIRCULATION & PARKING = 1,886 / 16,193 = 0.116 = 11.6% LANDSCAPED AREAS = 8,436 / 16,193 = 0.521 = 52.1% PRIVATE OPEN SPACE = 0 CITY PARKS = 0 OTHER PUBLIC LANDS = 0 PARCEL PERCENTAGES NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/17/2020 9:27:09 AMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP000 SITE PLAN COVER SHEET SITE PLAN APRIL 21, 2020 BOZEMAN, MONTANA TOWN AND COUNTRY FOODS LANDSCAPE L0.0 OVERALL SITE PLAN TOWN & COUNTRY 06/30/2020 L0.1 OVERALL OPEN SPACE AND PHASING 06/30/2020 L0.2 OPEN SPACE NOTES AND LEGENDS 06/30/2020 L0.3 NOTES AND LEGENDS TOWN AND COUNTRY SITE 06/30/2020 L3.0 PLANTING PLAN ENLARGEMENT 06/30/2020 L3.1 PLANTING PLAN ENLARGEMENT 06/30/2020 L3.2 PLANTING PLAN ENLARGEMENT 06/30/2020 L3.3 PLANTING PLAN ENLARGEMENT 06/30/2020 L5.0 LANDSCAPE DETAILS 06/30/2020 L5.1 LANDSCAPE DETAILS 06/30/2020 L6.0 IRRIGATION WATER USE PLAN 06/30/2020 L7.0 IRRIGATION DETAILS 06/30/2020 L7.1 IRRIGATION DETAILS 06/30/2020 CIVIL C0.1 PHASE PLAN 04/30/2020 C0.2 EX SITE/DEMO 01/20/2020 C1.0 SITE PLAN 7/1/2020 C1.1 UTILITY PLAN 7/1/2020 C1.2 GRADING PLAN 7/1/2020 C2.0 CIVIL DETAILS 01/20/2020 C2.1 CIVIL DETAILS 01/20/2020 ARCHITECTURAL - SPR SP000 SITE PLAN COVER SHEET 7/1/2020 SP001 GARBAGE ENCLOSURE 04/21/20 SP002 GARBAGE ENCLOSURE 04/21/20 SP101 OVERALL FIRST FLOOR PLAN 7/1/2020 SP102 OVERALL SECOND FLOOR PLAN 01/20/2020 SP103 OVERALL ROOF PLAN 01/20/2020 SP200 EXTERIOR ELEVATIONS 7/1/2020 SP200a EXTERIOR ELEVATIONS - COLOR 7/1/2020 SP201 EXTERIOR ELEVATIONS 7/1/2020 SP201a EXTERIOR ELEVATIONS - COLOR 7/1/2020 SP900 3D PERSPECTIVES 7/1/2020 ELECTRICAL MSP / SP E001 ELECTRICAL LEGEND SCHED 01/20/2020 E002 LIGHTING ELEVATIONS 01/20/2020 E003 LIGHTING ELEVATIONS 01/20/2020 E101 SITE LIGHTING PLAN 01/20/2020 E102 SITE POWER PLAN 01/20/2020 REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 59 4X4X1/4 HSS POST, SET IN 12" DIA. SONOTUBE, 4'-0" DEEP (TYP.) STEEL FRAME DOORS W/ (3) HEAVY DUTY HINGES OPEN 180 DEGREES, W/ CORRUGATED MTL. SIDING, MATCH BUILDING COLOR METAL SIDING TO MATCH BUILDING (TYP) 6" DIA. STEEL X 4'-0" H BOLLARDS,FILLED W/ CONC. & SET IN 12" DIA. SONOTUBE 4'-0"DEEP (TYP OF 2) BARREL PIN & LATCH METAL EDGING METAL EDGING 'J' METAL CORNER TRIM, MATCH BUILDING COLOR (TYP) LINE OF FND BELOW (TYP) DBL. P.T. 2X6 TOP, & BTM FRMG W/ P.T. 2X4 INTERMEDIATES @ 24" O.C. ATTACHED W/ C.S. FASTNERS INTO HHS POST - 2 (MIN) PER POST (TYP)EQEQEQEQ8' - 0" 7' - 0"CLEAR10' - 0"3' - 0" 4X4X1/4 HSS POST, WELDED TO SEAT MCNICHOLS PERFORATED METAL PANEL -1/2" ROUND ON 11/16" STAGGERED CENTERS 2X6 HSS FRAME 2X2 HSS SUPPORT 2X2 HSS SUPPORT, TYP.EQEQEQEQEQEQ EQ FILL PIPE W/ CONC. PIPE BOLLARD SEE PLAN DBL. P.T. 2X6 TOP, & BTM FRMG W/ P.T. 2X4 INTERMEDIATES @ 24" O.C. ATTACHED W/ C.S. FASTNERS INTO HHS POST - 2 (MIN) PER POST (TYP) HSS POST PER PLAN (TYP) P.T. 2X4 TOP RAIL WRAP W/ BREAK METAL -COLOR TO METAL SIDING CONC. PAD, SEE CIVIL SITE SECTION SEE CIVIL CONC. FDN (TYP) DASHED LINE SHOWING DEPTH OF POSTS (TYP) METAL SIDING WALL PANEL TO MATCH BLDG (TYP) 2X6 HSS FRAME, BOLTED TO POSTS MCNICHOLS PERFORATED METAL 1/2" ROUND ON 11/16" STAGGERED CENTERS 2X2 HSS FRAME, WELDED EQ EQ EQ EQ EQ 4' - 0"6"5' - 6"3' - 0"6"(TYP.)3' - 0"FILL PIPE W/ CONC. PIPE BOLLARD SEE PLAN HSS POST PER PLAN CONC. PAD, SEE CIVIL SITE SECTION SEE CIVIL CONC. FDN (TYP) DASHED LINE SHOWING DEPTH OF POSTS (TYP) GATE W/ METAL SIDING TO MATCH BLDG (TYP) METAL SIDING WALL PANEL TO MATCH BLDG (TYP) DBL. P.T. 2X6 TOP, & BTM FRMG W/ P.T. 2X4 INTERMEDIATES @ 24" O.C. ATTACHED W/ C.S. FASTNERS INTO HHS POST - 2 (MIN) PER POST (TYP) SLOPED PRE-FINISHED SHT. MTL. COPING 2X6 HSS FRAME, BOLTED TO POSTS MCNICHOLS PERFORATED METAL 1/2" ROUND ON 11/16" STAGGERED CENTERS 2X2 HSS FRAME, WELDED EQ EQ 6"3' - 6"6"5' - 6"3' - 0"3' - 0"4' - 10 1/2"1' - 0"NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:38:53 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP001 GARBAGE ENCLOSURE SITE PLAN APRIL 21, 2020 SCALE:1/2" = 1'-0"1 GARBAGE ENCLOSURE @ PARKING LOT FLOOR PLAN -SITE PLAN SCALE:1/2" = 1'-0"2 GARBAGE ENCLOSURE @ PARKING LOT ROOF PLAN -SITE PLAN SCALE:1/2" = 1'-0"3 GARBAGE ENCLOSURE @ PARKING LOT SECTION -SITE PLAN SCALE:1/2" = 1'-0"4 GARBAGE ENCLOSURE @ PARKING LOT CROSS SECTION -SITE PLAN REVISION SCHEDULE No. Description Date 60 1 2 KL SP0023 10' - 0"10' - 0"14' - 9"22' - 0"1 CANOPY ROOF, SEE G120 FOR ASSEMBLY 8' - 1 1/2"7' - 5 3/4"DOUBLE STEEL GATE EXTERIOR FIN WALL, SEE G120 FOR ASSEMBLY 111112 10' - 0"10' - 0"3 3/4" SP002 2 Sim 1 2 SEE EXT. ELEVATIONS FOR SCREENING 22' - 0"7' - 1 1/2"4' - 0"HSS COLLUMN, SEE STRUCT. HEAVY DUTY HINGE MOUNTED TO COLLUMN DOUBLE STEEL GATE, SEE COMPONENET SCHEDULE L SEE EXT. ELEVATIONS FOR SCREENING 14' - 9"4' - 0"11' - 3 1/4"NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:38:56 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP002 GARBAGE ENCLOSURE SITE PLAN APRIL 21, 2020 SCALE:1/4" = 1'-0"1 GARBAGE ENCLOSURE @ BUILDING -SITE PLAN SCALE:1/2" = 1'-0"3 TRASH ENCLOSURE ENLARGED ELEVATION-SITE PLAN SCALE:1/2" = 1'-0"4 SOUTH SITE PLAN STUDY -Callout 1 SCALE:1 1/2" = 1'-0"2 HINGE @ GARBAGE ENCLOSURE COLLUMN -SITE PLAN SCALE:1/2" = 1'-0"5 WEST SITE PLAN STUDY -Callout 1 REVISION SCHEDULE No. Description Date 61 UP 1 1 BCEFG 3 3 4 4 5 5 2 2 SP2001 SP201 1 SP200 2 SP201 3 9 9 KL J D 7 7 8 8 M AHI 6 6 10 10 COUNT OFFICE 121 18' - 0"18' - 0"19' - 0"25' - 0"23' - 6"17' - 9"18' - 9"6' - 6"9' - 6"GROCERY TO GO 120 FREEZER 118 COOLER 119 BACK ROOM 116 BACK STAIR 114 MEAT COOLER 109 DELI/BAKERY COOLER 107 DELI/BAKERY FREEZER 106 ENTRY 101 EXIT 123 MEN'S 102 WOMEN'S 103 BAKERY/ DELI COUNTER 112 DELI COUNTER 111 MEAT WORK AREA 110 DELI WORK AREA 108 BAKERY WORK AREA 105 WATER ENTRANCE 113 JAN 104 265' - 0"16' - 0"5' - 6"43' - 0"146' - 6"ELEVATOR ROOM 115 GROCERY 122 9' - 6"6' - 6"20' - 2 1/2"14' - 8 1/4"3' - 1 1/4"41' - 6"12' - 5"11' - 0"5' - 1 1/4"59' - 0"15' - 6 1/2"37' - 0"8' - 1"9' - 4 1/2" 1' - 2 1/2"17' - 0"20' - 10"14' - 9 1/2"7' - 10 3/4"7' - 11 1/4"74' - 4"4' - 1 3/4"37' - 3 1/4" 8' - 6"4' - 6"58' - 6"43' - 6"PRODUCE PREP 127 FLOOR SINK LOADING DOCK RAMP DOWN 154 CARTS JAN 129 38' - 0"41' - 6"28' - 6"59' - 0"70' - 0"28' - 0" VESTIBULE 125 SOUTH CHECKOUT 130 3' - 8 1/2" 7' - 0"7' - 0"7' - 3 3/4"12' - 0 1/2"12' - 0 1/2"7' - 11 1/4"9' - 5 1/2"11' - 1 3/4"8' - 11 1/4"9' - 8 3/4"8' - 10 1/4"8' - 0"15' - 0"9' - 0"8' - 5 1/4"8' - 0"7' - 0" 11' - 5" 9' - 5" 10' - 2"12' - 1 1/2"4' - 11 1/4"4' - 3"8' - 11 1/4"9' - 0 1/4"11' - 3"9' - 2"3' - 11 3/4"36' - 1 1/4"48' - 11 3/4"103' - 0"43' - 6"85' - 0"22' - 0"10' - 0" 9' - 5 1/4" 8' - 3 1/4" 89' - 6"10' - 6"144' - 0"11' - 0"1' - 6"128' - 6"SP201 2 50' - 0" SP200a 1 SP200a2 SP201a 2 SP201a 1 1 265' - 0" ELECTRICAL METER LOCATION GAS METER LOCATION 2'0'20'10'40' FIRE DEPARTMENT CONNECTION 10' - 0 1/2" LINE OF CANOPY ABOVE LINE OF CANOPY ABOVE LINE OF CANOPY ABOVE LINE OF CANOPY ABOVE LINE OF CANOPY ABOVE GARBAGE RECYCLE LOADING DOCK SCREEN BIKE PARKING OUTDOOR SERVING AREA PATIO:1,450 SF BIKE PARKING BIKE PARKING SP002 1 SP0023 10' - 0"3' - 0"6' - 8 1/2"3' - 0"10' - 0"CEDAR SLAT SCREEN WALL, SEE ELEVATIONS7' - 1" 2 NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:39:04 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP101 OVERALL FIRST FLOOR PLAN SITE PLAN APRIL 21, 2020 SCALE:3/32" = 1'-0"1 MAIN FLOOR PLAN REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 2 SPRC 6.29.20 62 UP SBSBF FFFFF F FF 1 BCEFG 3 3 4 5 2 9 KL J D 7 8 M AHI 6 10 BACK STAIR 201 JAN/LAUND 211 STORAGE 215 SEATING 214 MECH/DATA 212 SECURITY 213 BREAK ROOM 203 OFFICE 204 OFFICE 205 OFFICE 206 SHOWER 210 ELECTRICAL RM 202 14' - 6"11' - 6"16' - 6"20' - 3"22' - 2 1/2"14' - 10 5/8" 18' - 8"18' - 2 1/2"24' - 7 1/4" PROTOCOL AREA 216 OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW WOMEN'S 208MEN'S 207 ELECTRICAL 217 207 208 209206 210 211 205 204 213 203 202 212 217 217A 9' - 7"SP201 2 SP200a2 SP201a 2 SP201a 1 2'0'20'10'40'1/4" / 12"1/4" / 12"1/4" / 12"INDOOR SERVING AREA FIRST FLOOR: 120 SF SECOND FLOOR:1,094 SF TOTAL:1,214 SF 1 1 SP0023 NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2019 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS7/16/2020 2:39:09 PMTOWN AND COUNTRYFOODSBOZEMAN, MONTANA1871 SP102 OVERALL SECOND FLOOR PLAN SITE PLAN APRIL 21, 2020 SCALE:3/32" = 1'-0"1 SECOND LEVEL FLOOR PLAN REVISION SCHEDULE No. Description Date 1 SPRV 1/16/20 63