Loading...
HomeMy WebLinkAboutBID Agenda 08-18-21 and PacketA.Call meeting to order B.Disclosures C.Changes to the Agenda D.Changes to the Agenda E.Public Service Announcements F.Approval of Minutes F.1 Approval of July Minutes (Cope) G.Consent H.Public Comment Please state your name and address in an audible tone of voice for the record. This is the time for individuals to comment on matters falling within the purview of the Committee. There will also be an opportunity in conjunction with each action item for comments pertaining to that item. Please limit your comments to three minutes. I.Special Presentation J.Action Items K.FYI/Discussion K.1 August Finance Report(Cope) K.2 Economic Development Director's Report(Cope) K.3 UDC Edits Discussion(Cope) L.Adjournment M.For more information please contact Emily Cope, emily@downtownbozeman.org This board generally meets the 2nd Wednesday of the month from 12:00 to 1:00 PM Committee meetings are open to all members of the public. If you have a disability and require assistance, please contact our ADA coordinator, Mike Gray at 582-3232 (TDD 582-2301). THE BOZEMAN DOWNTOWN BUSINESS IMPROVEMENT DISTRICT BOARD OF BOZEMAN, MONTANA BDBIDB AGENDA Wednesday, August 18, 2021 1 Memorandum REPORT TO:Bozeman Downtown Business Improvement District Board FROM:Emily Cope, Economic Development Director, Downtown Bozeman Partnership SUBJECT:Approval of July Minutes MEETING DATE:August 18, 2021 AGENDA ITEM TYPE:Minutes RECOMMENDATION:Approve STRATEGIC PLAN:7.3 Best Practices, Creativity & Foresight: Utilize best practices, innovative approaches, and constantly anticipate new directions and changes relevant to the governance of the City. Be also adaptable and flexible with an outward focus on the customer and an external understanding of the issues as others may see them. BACKGROUND:Minutes from the July 2021 Downtown Business Improvement District. UNRESOLVED ISSUES:N/A. ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: BID Minutes 7-21.pdf Report compiled on: August 11, 2021 2 Downtown Business Improvement District Board Meeting Minutes July 21, 2021 Attending: Jolee Barry, Eric Bowman, Emily Cope, Ileana Indreland, Susan Neubauer, I-Ho Pomeroy, Ellie Staley, Eric Sutherland Absent: Mike Basile, Erik Nelson General Public Comments: None Minutes ACTION: Eric Sutherland moved to approve the May meeting minutes as presented. Jolee Barry seconded the motion. All voted in favor. Finance Report June finance report attached below. Economic Development Director’s Report DBP and COB Updates: • The DBP has hired a new Operations Manager (Gaby Krevat) with a start date of 7/19/21. • The appointment to the BID Board for the two expired terms has not yet been assigned to a city commission meeting. To date, Jolee and Ileana are the only two applicants. Downtown Plan Projects Here are some updates regarding other projects proposed in the 2019 Downtown Plan. Transportation & Mobility Analysis—The Phase 1 Transportation plan with the 3-lane concept, bike sharrows and other traffic calming ideas have been completed and submitted to MDT and the City of Bozeman. The MDT report has been completed with concerns about much of what was proposed. We are still waiting for the city to report on the proposed plan due to staff changes. Phase 1 transportation plan, MDT’s report and additional notes from the current term contract team will be include in July’s URD board meeting packet. City of Bozeman comments have been delayed due to Shawn Kohtz’s departure. City response needed to move to Phase 2. Structured Parking Planning—The parking decks were researched by the term team and most have been found to be non-starters due to lack of space, retail wrap on ground-level restrictions and high costs/space ratios. The US Bank building was added as a one-off to the parking structure studies. This initial study as well as the full study of possible parking structure will be included in the URD board meeting packet in July. Baker Tilly has been hired by the URD to do an initial analysis of the bonding capacity of the Downtown URD before sun-setting in 2032. UDC Updates – Rob Pertzborn and Susan Riggs have been contracted by the URD to research and update the URD/BID and downtown stakeholders updated on the City’s UDC Edits, the timeline for changes and how these updates may impact downtown and why we should care. The City’s UDC update process has been moved back a few times but, is slated to move forward in fall of 2021 with a focus on building height and parking requirements. Ellie and Emily are scheduled to meet with Rob and Susan to provide a memo for URD next steps at August board meeting. UDC edits on the fall 2021 revision schedule to include B-3 parking requirements and B-3 height requirements. 3 North Rouse Lighting Project – This project was originally scheduled to be completed in Summer 2021 but has been delayed due to contractor interest/availability. The bid was revised to have work completed in fall 2021, one local contractor bid the project in the amount of $128,518.00 (10% increase from original estimate of $115,000) and has been awarded to Montana Lines Inc. who is set to begin work by late August. There were assembly line concerns with the large light pole order so, light poles have been ordered in advance with confirmation they can be stored by City Streets Department for the contractor to access when needed. Parking Policy Updates – Two Parking Commission subcommittees; Policy and Capacity have been formed to develop a more focused work plan for city staff and the Parking Commission. Each subcommittee has met for initial discussions. DBP staff is staying engaged in discussions. Ellie and Emily participated in the July 14 Capacity Subcommittee meeting to discuss garage capacity, shared use agreement opportunities, and additional seasonal bike parking. Many great ideas were discussed including the possibility of the URD to help fund the “Run DMC” shuttle and future work with property owners on shared use agreements. Outreach Bozeman The Outreach Bozeman pilot program has been funded for summer of 2021. HRDC has hired an individual to oversee the business outreach aspects of the program. An existing HRDC employee has also begun to work with Marek (Bozeman Police Department) to shadow and assist in developing strategies for the program. A De-escalating training was sent to engaged parties with additional trainings being held in the future for additional property and business owners. The DBP will oversee all marketing and business outreach over the next several months and will continue to work with HRDC, the city and the police department to assist in getting information out to downtown property owners, business owners and patrons. Maintenance Program Update Currently we have one part-time general maintenance employee (Mike), one weekend general maintenance employee and one part-time garage maintenance employee (Trish), and two seasonal part-time flower waterers (Porter and Kodie). Below are the maintenance statistics comparing the year-to-date figures from this year (FY21) to the corresponding stats from last year (FY20). FY2020 Y-T-D FY2021 Y-T-D Total Avg/mnth Total Avg/mnth Difference Trash Emptied 1868 187 3190 266 +1322 Recycling Emptied 459 46 736 61 +277 Graffiti Removed 390 40 441 37 +51 Building Projects • Merin Condos (North Bozeman) 28 units of owner-occupied housing. Under construction. • Village Downtown 30 new residential condo units and 9 single-family lots are under review by the City. • AC Hotel (5 East Mendenhall) 6 story 140 room full-service hotel. Under construction. • East End Flats (240 East Mendenhall) 6-story mixed use project. Development review completed and final site plan approved. • Carin Townhomes (northwest corner of W Beall & N Grand)—5 townhome condos currently under construction. • North Central (20 North Tracy)—Mountain View & Medical Arts buildings, phased master site 4 plan development proposing a total of 9 new mixed-use buildings, associated parking, open space and infrastructure. Application submitted. New Businesses • Stretch Lab, 23 South Willson - OPEN • Main Street Market/Brigade/Happy Box, 233 East Main - OPEN • Cool Beans (next door to Main Street Over Easy), 9 East Main - OPEN • Vienne (French bakery), 101 South Wallace - OPEN • Tanoshii, 113 East Main - OPEN • Sotheby’s International Realty, 424 E Main – OPEN • Engel & Volkers Real Estate, 106 E Babcock – OPEN • Sweet Peaks, 411 East Main – OPENING SOON • Alara (by appt only space), 424 East Main – OPEN • Residence Inn, 815 East Main Street - OPEN • Sun Dial (Lark food truck), 122 West Main – OPENING SOON • Last Call (modern Mexican restaurant), 19 S Willson, – OPENING SOON • Pakeezah – 14 N Church- formerly 14 North- Moving/re-opening soon • 27 East Main (formerly Crossroads) - to be redeveloped as a steak house • TBD - 137 East Babcock—formerly Gallatin Laundry • TBD - 544 East Main—formerly Heeb’s – building improvements underway • TBD - 402 E Main St Suite 3— formerly The Montana Scene • TBD – 34 N Bozeman- formerly Pakeezah Upcoming DBA Events: more info at www.downtownbozeman.org • Art Walks – 2nd Fridays: August 13, Sept. 10, 4-8pm • Music on Main – 4 Thursdays: July 22- August 12, 6-9pm • “Cruisin’ on Main” Car Show – Saturday, August 14 from 3-5pm (packet pick-up) & Sunday, August 15 from 6am-4pm Discussion and Decision Items Maintenance Mule Emily presented the estimated costs for a 2021 Kawasaki Mule 4010 4x4 and the needed add- ons. Emily shared that after completing research to other utility vehicles, the Kawasaki Mule is the ideal and desired maintenance vehicle for downtown. DBP staff is in conversation with the Billings Kawasaki dealer and hope to have their rep find a vehicle. If not, staff will locate a mule from out of state and have it transported to Bozeman. The current mule is a 2012 and not running optimally. ACTION: Eric Bowman moved to purchasing a new maintenance mule vehicle, not to exceed $16,000 in total expenses. Ileana Indreland seconded the motion. All voted in favor. Meeting was adjourned at 12:45pm 5 June 2021 BID Finance Report APPROVED Y-T-D FY2021 FY2021Income BID Assessment 175,000$ 173,758.64$ BID Assessment--residual Contract Income 17,000$ 16,999.92$ Interest Income 100$ 12.83$ Mobile Vending Fees 2,000$ 1,750.00$ Flower Sponsorships 8,000$ 10,700.94$ Christmas Light Sponsorships 4,000$ 2,850.00$ Streetlamp Banners 9,000$ 10,100.00$ Total Income 215,100$ 216,172.33$ Expenses Management Fee Partnership Administration 35,000$ 35,000.00$ District Manager 21,000$ 21,000.00$ Total Expenses 56,000$ 56,000.00$ Payroll Expenses Maintenance Staff 37,500$ 40,210.75$ Taxes 3,300$ 3,693.14$ Work Comp 2,250$ 1,391.69$ Maintenance Staff--Garage 10,000$ 15,609.25$ Taxes 750$ 771.92$ Work Comp 750$ 358.88$ Total Payroll Expenses 54,550$ 62,035.63$ Programs ot Sidewalk Cleaning / Alley Snow Remo 20,000$ 12,000.00$ Invoi ntown Bozeman Association (DBA) Su 25,000$ 25,000.00$ Christmas Lights 2,000$ 1,810.13$ Christmas Light Spider Repair 1,500$ 723.00$ Christmas Lights Storage 1,000$ 1,233.00$ New Banners 3,000$ 3,015.00$ Flower Expenses 24,000$ 23,480.27$ Flower Water 200$ 213.17$ Tree Purchases 2,000$ - Marketing 2,500$ 2,500.00$ Maintenance Supplies $ 3,000 $ 3,628.12 Garbage Bags $ 2,625 $ 1,816.87 Miscellaneous Services Graffiti Supplies 1,125$ 746.50$ Graffiti Contracted Removal 4,500$ 2,386.00$ Mule Service & Fuel 1,500$ 1,342.02$ Truck Service & Fuel 2,100$ 1,961.09$ Truck-Mule Insurance 3,250$ 3,255.48$ Program Contingency 1,000$ 800.96$ Total Program Expenses 100,300$ 85,911.61$ Other Expenses Total BID Expenses 210,850$ 203,947.24$ NET ASSESSMENT INCOME 4,250$ 12,225.09$ Checking Account Balance 102,230.91$ Certificate of Deposit Balance -$ 31,802.31$ Total Cash On Hand Total 134,033.22$ 6 Memorandum REPORT TO:Bozeman Downtown Business Improvement District Board FROM:Emily Cope, Economic Development Director, Downtown Bozeman Partnership SUBJECT:August Finance Report MEETING DATE:August 18, 2021 AGENDA ITEM TYPE:Finance RECOMMENDATION:Discussion STRATEGIC PLAN:7.3 Best Practices, Creativity & Foresight: Utilize best practices, innovative approaches, and constantly anticipate new directions and changes relevant to the governance of the City. Be also adaptable and flexible with an outward focus on the customer and an external understanding of the issues as others may see them. BACKGROUND:The Economic Development Director will provide an update on year-to-date expenses. UNRESOLVED ISSUES:None. ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: BID Finance Report 8-21.pdf Report compiled on: August 11, 2021 7 Downtown BID August 2021 Finance Report APPROVED Y-T-D FY2022 FY2022 Income BID Assessment 185,000$ 92,500.00$ BID Assessment--residual Contract Income 17,500$ 4,375.00$ Interest Income 100$ 0.54$ Mobile Vending Fees 2,000$ Flower Sponsorships 8,500$ 600.00$ Christmas Light Sponsorships 3,500$ Streetlamp Banners 10,000$ 2,200.00$ Total Income 226,600$ 99,675.54$ Expenses Management Fee 58,750$ 14,687.50$ Total Expenses 58,750$ 14,687.50$ Payroll Expenses Maintenance Staff 45,000$ 4,682.75$ Taxes 3,950$ 507.75$ Work Comp 2,700$ 232.28$ Maintenance Staff--Garage 13,000$ 1,664.00$ Taxes 975$ Work Comp 975$ Total Payroll Expenses 66,600$ 7,086.78$ Programs New Program 15,000$ wntown Bozeman Association (DBA) Sup 26,150$ 13,075.00$ Christmas Lights 2,000$ 16.25$ Christmas Light Spider Repair 1,500$ Christmas Lights Storage 1,400$ New Banners 3,000$ Flower Expenses 25,000$ 22,096.42$ Flower Water 250$ 27.39$ Tree Purchases 2,000$ Marketing 2,500$ Maintenance Supplies $ 3,500 $ 700.10 Garbage Bags $ 2,625 $ 55.98 Graffiti Supplies 1,125$ 106.25$ Graffiti Contracted Removal 4,500$ 282.00$ Mule Service & Fuel 1,500$ 81.33$ Truck Service & Fuel 2,200$ 374.77$ Truck-Mule Insurance 3,850$ Program Contingency 1,000$ Total Program Expenses 99,100$ 36,815.49$ Other Expenses Total BID Expenses 224,450$ 58,589.77$ NET ASSESSMENT INCOME 2,150$ 41,085.77$ Checking Account Balance 142,335.94$ Certificate of Deposit Balance -$ 31,802.31$ Total Cash On Hand Total 174,138.25$ 8 Memorandum REPORT TO:Bozeman Downtown Business Improvement District Board FROM:Emily Cope, Economic Development Director, Downtown Bozeman Partnership SUBJECT:Economic Development Director's Report MEETING DATE:August 18, 2021 AGENDA ITEM TYPE:Policy Discussion RECOMMENDATION:Discussion STRATEGIC PLAN:7.3 Best Practices, Creativity & Foresight: Utilize best practices, innovative approaches, and constantly anticipate new directions and changes relevant to the governance of the City. Be also adaptable and flexible with an outward focus on the customer and an external understanding of the issues as others may see them. BACKGROUND:The Economic Development Director will provide an update to the Business Improvement District Board. UNRESOLVED ISSUES:None. ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: BID EDD Report 8-21.pdf Report compiled on: August 12, 2021 9 Economic Development Director’s Report Business Improvement District Board August 2021 COB Updates: • The appointment to the BID Board for the two expired terms has not yet been assigned to a city commission meeting. To date, Jolee and Ileana are the only two applicants. • City Board Consolidation Updates: At the August 10th City Commission meeting, Ordinance 2085 was passed to consolidate the City’s advisory boards to create the Transportation Board, Sustainability Board, The Urban Parks and Forestry Board, the Economic Vitality Board, and the Community Development Board. The current advisory boards will be dissolved at the end of 2021. Board members will go through a process to re-apply as the new boards are assembled. Please note, there will not be any changes to the Downtown BID or URD boards. Downtown Plan Projects Here are some updates regarding other projects proposed in the 2019 Downtown Plan. Transportation & Mobility Analysis—The Phase 1 Transportation plan with the 3-lane concept, bike sharrows and other traffic calming ideas have been completed and submitted to MDT and the City of Bozeman. The MDT report has been completed with concerns about much of what was proposed. We are still waiting for the city to report on the proposed plan due to staff changes. Phase 1 transportation plan, MDT’s report and additional notes from the current term contract team will be include in July’s URD board meeting packet. City of Bozeman comments have been delayed due to Shawn Kohtz’s departure. City response needed to move to Phase 2. Structured Parking Planning—The parking decks were researched by the term team and most have been found to be non-starters due to lack of space, retail wrap on ground-level restrictions and high costs/space ratios. The US Bank building was added as a one-off to the parking structure studies. This initial study as well as the full study of possible parking structure will be included in the URD board meeting packet in July. Baker Tilly has been hired by the URD to do an initial analysis of the bonding capacity of the Downtown URD before sun-setting in 2032. UDC Updates – Rob Pertzborn and Susan Riggs have been contracted by the URD to research and update the URD/BID and downtown stakeholders updated on the City’s UDC Edits, the timeline for changes and how these updates may impact downtown and why we should care. The City’s UDC update process has been moved back a few times but, is slated to move forward in fall of 2021 with a focus on building height and parking requirements. Ellie and Emily are scheduled to meet with Rob and Susan to provide a memo for URD next steps at August board meeting. UDC edits on the fall 2021 revision schedule to include B-3 parking requirements and spring 2021 revision schedule to include height requirements and transitional heights. **See memo attached for discussion at today’s meeting.** North Rouse Lighting Project – The groundwork for this project began during the week of August 9th and is scheduled to take a few weeks to complete. The streetlamps (20) have been ordered and are scheduled to arrive end of September, installation of the poles will take place end of September or early October. Parking Policy Updates – At the August 12th Park Commission meeting, Resolution #2021-05 was passed with an amendment to include the entire B-3 District instead of the downtown core. This resolution is a recommendation to the City Commission and Planning and Zoning Commissions to adopt the introduced parking requirement changes to the Unified Development Code this October/November. 10 Outreach Bozeman The Outreach Bozeman pilot program has been funded for summer of 2021. HRDC hosted a De-escalation and Crisis Training offered to businesses and property owners that Emily Cope attended on July 30th. The training offered knowledge and tips of how to interact with individuals who may be disruptive in a business. Additional trainings will be offered, with the next one tentatively in October. Emily and Ellie met with Jenna Huey and Crystal Baker on August 11th to discuss next steps for Outreach Bozeman and also went into several businesses downtown to make introductions. Crystal Baker is HRDC’s outreach specialist who will be making rounds Tuesday and Thursday to individuals in the community who may be experiencing homelessness and provide information on resources available. Brooke, one of HRDC’s housing navigators will be making rounds with Crystal. Jenna Huey will be the main contact for businesses who have any questions on training, situations and resources. Jenna will be making rounds with Marek every other Wednesday. We have received great input so far from businesses and community members who are asking how they can be a part of Outreach Bozeman and volunteer opportunities. HRDC state that outreach kits is a priority need and would be an ideal volunteer opportunity for those who want to be involved. We are working to come up with a timeline with HRDC report data quarterly and scheduling times to do outreach alongside with them to make introductions to businesses. Maintenance Program Update Currently we have one part-time general maintenance employee (Mike), one weekend general maintenance employee and one part-time garage maintenance employee (Trish), and two seasonal part-time flower waterers (Porter and Kodie). Below are the maintenance statistics comparing the year-to-date figures from this year (FY22) to the corresponding stats from last year (FY22). We are in contact with the Billings Kawasaki dealer to secure a new mule, timeline of arrival to be determined. FY2021 Y-T-D FY2022 Y-T-D Total Avg/mnth Total Avg/mnth Difference Trash Emptied 398 398 499 499 +101 Recycling Emptied 82 82 129 129 +47 Graffiti Removed 57 57 13 13 -44 Building Projects • Merin Condos (North Bozeman) 28 units of owner-occupied housing. Under construction. • Village Downtown 30 new residential condo units and 9 single-family lots are under review by the City. • AC Hotel (5 East Mendenhall) 6 story 140 room full-service hotel. Under construction. • East End Flats (240 East Mendenhall) 6-story mixed use project. Development review completed and final site plan approved. • Carin Townhomes (northwest corner of W Beall & N Grand)—5 townhome condos currently under construction. • North Central (20 North Tracy)—Mountain View & Medical Arts buildings, phased master site plan development proposing a total of 9 new mixed-use buildings, associated parking, open space and infrastructure. Application submitted. New Businesses • Sweet Peaks, 411 East Main – OPENING SOON • Residence Inn, 815 East Main Street - OPEN 11 • Sun Dial (Lark food truck), 122 West Main – OPEN • Last Call (modern Mexican restaurant), 19 S Willson, – OPEN • Pakeezah – 14 N Church- formerly 14 North- OPEN • 27 East Main (formerly Crossroads) - to be redeveloped as a steak house • TBD - 137 East Babcock—formerly Gallatin Laundry • TBD - 544 East Main—formerly Heeb’s – building improvements underway • TBD - 402 E Main St Suite 3— formerly The Montana Scene • TBD – 34 N Bozeman- formerly Pakeezah • TBD—121 W Main – formerly Union Hall—TBD • TBD—127 E Main—formerly A Banks Gallery—TBD 12 Memorandum REPORT TO:Bozeman Downtown Business Improvement District Board FROM:Emily Cope, Economic Development Director, Downtown Bozeman Partnership SUBJECT:UDC Edits Discussion MEETING DATE:August 18, 2021 AGENDA ITEM TYPE:Policy Discussion RECOMMENDATION:Discussion STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant Downtown, Midtown, and other commercial districts and neighborhood centers – including higher densities and intensification of use in these key areas. BACKGROUND:The Unified Development Code (commonly called the "UDC") is a set of regulations aimed to protect the public health, safety and general welfare. These regulations recognize and balance the various rights and responsibilities relating to land ownership, use and development. Updates to the B-3 parking requirements are on the fall 2021 UDC revision schedule. At the August 12th Parking Commission meeting, Resolution 2021- 05 was passed with an amendment to include the entire B-3 District instead of the downtown core. This resolution is a recommendation to the City Commission and Planning and Zoning Commissions to adopt the introduced parking requirement changes to the Unified Development Code this fall. Resolution and pages from 2019 DBIP pages regarding parking requirements attached. B-3 height & zone edge transition updates to the UDC are on the revision schedule for spring 2022. This amendment will go through a community engagement process and therefore will not go before City Commission for adoption until the spring 2022 amendments package. Currently, the only language provided on the City of Bozeman’s UDC website is “Update the height requirements for the B-3 district and the zone edge transition requirements for all effected districts to reflect changing circumstances in Bozeman and recent height requirement updates.” Pages from the 2019 Downtown Bozeman Improvement Plan are attached that reference building heights. 13 Today we will hold a discussion regarding these topics, Susan Riggs and/or Rob Pertzborn will be on the meeting to answer any technical questions and provide further industry knowledge. The board has the opportunity to provide recommendations to the City Commission if they choose to write a letter with suggested actions. UNRESOLVED ISSUES:None. ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: Parking Commission Resolution 2021-05.pdf Parking Requirement Pages from Downtown Plan.pdf Building Height Pages from Downtown Plan.pdf Report compiled on: August 12, 2021 14 Resolution 2021-05 Parking Requirements in the Unified Development Code Page 1 of 3 BOZEMAN PARKING COMMISSION RESOLUTION 2021-05 A RESOLUTION OF THE PARKING COMMISSION OF THE CITY OF BOZEMAN, MONTANA, ABOUT PARKING REQUIREMENTS IN THE UNIFIED DEVELOPMENT CODE. WHEREAS, the City of Bozeman has granted the Parking Commission authority to manage parking in the downtown area and any other parking permit areas (MCA7-14-4634); and, WHEREAS, the Bozeman Parking Commission authorized the creation of subcommittees in Resolution 2021-03 and the Policy Subcommittee has identified parking minimum reductions as top priority for their work: and, WHEREAS, the City of Bozeman Strategic Plan identifies a Well Planned City (Goal 4) as a key priority for the City and also identifies a vibrant downtown, districts and centers (4.4) and a high quality urban approach (4.2) as sub goals: and, WHEREAS, the 2016 Downtown Parking Strategic Management Plan Strategy 7 is for the Parking Commission and Parking Services to evaluate code-based parking minimums; and, WHEREAS, the 2019 Downtown Bozeman Strategic Plan’s Goal 3, The Heart of a Thriving City, calls for simplified parking requirements for the downtown core; and, WHEREAS, the Parking Commission has the ability to submit comments to the Zoning and Planning Board as well as the Department of Community Development during the October 2021 Unified Development Code rewrite: and, WHEREAS, parking space can range from $3,000 for surface lot spaces to more than $60,000 for underground structure parking and are a main driver of costs for new development; and, WHEREAS, unnecessary parking requirements drives up the cost of both residential and commercial construction which burdens residents and business owners; and, WHEREAS, reducing parking minimums is an identified strategy for the City of Bozeman to meet the goals laid out in the 2020 Climate Action Plan: and, NOW THEREFORE, BE IT RESOLVED that the Bozeman Parking Commission recommends the Bozeman City Commission and Planning and Zoning Commissions adopt the below parking 15 Resolution 2021-05 Parking Requirements in the Unified Development Code Page 2 of 3 requirements in the Unified Development Code for residential, commercial, and mixed use developments: 1. A minimum of one parking space per 1000 SF of conditioned space 2. A maximum of three surface parking spaces per 1000 SF of conditioned space 3. Required parking shall be rounded to the nearest whole parking space (e.g. 1400 SF = 1 parking space; 1600 SF = 2 parking spaces), to the nearest square foot and with halves rounded up 4. For mixed use developments, requirements for commercial and residential uses shall be calculated separately, with a reduction of up to 50% of the lesser of the two requirements allowed 5. Affordable housing developments, developments within one half mile of high frequency transit stops, and redevelopments of less than 5000 SF are exempted from required minimums 6. No additional credits or reductionsare given or allowed except for a residential allowance of one parking space per 24 linear feet of parkable curb frontage (or alternative parking arrangement approved by the City) 7. Exceptions to these requirements, for qualifying developments, are available through a Planned Unit Development, subject to City Commission review and approval Further, the Bozeman Parking Commission recommends the Planning and Community Development Department and the City Commission use the below definitions for conditioned space, affordable housing, and High Frequency Transit” 1. Conditioned space: insulated, heated or cooled space, to include livable and leasable space, exclusive of garages, storage areas, and other spaces not intended for habitation or commercial use 2. Affordable housing: as defined in Bozeman Municipal Code Sec. 38.700.020. 3. High frequency transit: transit service meeting currently defined standards of “transit availability” and having headways of 20 minutes or less (acknowledging that Bozeman currently does not currently have any service that would meet this standard) Passed and adopted by the Parking Commission of the City of Bozeman, Montana, at a session held on the 12th day of August 2021. ______________________________________ Jim Ness, Chair Bozeman Parking Commission 16 Resolution 2021-05 Parking Requirements in the Unified Development Code Page 3 of 3 ATTEST: ___________________________ Mike Veselik, Interim Parking Manager City of Bozeman 17 Code Requirements Currently, the base zoning code requires 1 parking stall per 250 net square feet of office space. While several parking reductions are offered Downtown, this exceeds the demand of 1 stall per 370 square feet for office buildings that was assessed in the 2016 Bozeman Midtown Parking Demand for nearby North 7th Avenue. By requiring more parking than is demanded by office users, it makes locating Downtown challenging for new employers. It is also difficult to achieve this parking ratio in an urban setting with the building types and design standards that are required. Another challenge to high parking ratios is that parking is expensive to build. Providing structured parking on site to meet a code requirement that exceeds demand is a significant cost that is precluding new downtown office development. Parking Strategies Throughout the planning process, parking consistently ranked as a top community concern. Issues of parking management, costs, location, type and amount all rose to the top. The recent 2016 Strategic Parking Management Plan also identified these topics as key factors TRACY A V E $30,000- 42,000 PER STRUCTURED PARKING SPACE $15,000 PER TUCK-UNDER PARKING SPACE $3,000 PER SURFACE PARKING SPACE Typical costs for building parking stalls (not including land costs) to make parking work better for Downtown. Their top recommendation was to incorporate a parking system management into the City’s development policy that considered data management, pricing, signage, and expansion of multi-modal facilities. Given the emphasis on management and the need to make the most of existing spaces, there are three steps to improve and expand downtown parking: 1. “Unlock” existing spaces, 2. Create more choices beyond driving, and 3. Expand parking capacity. Step 1: Unlock Existing Spaces Simplify Parking Code Requirements: A healthy downtown mix of uses needs alignment of parking demand with code requirements. Today, office parking code requirements exceed demand and incentives that allow reductions add complexity and uncertainty. The current code should be simplified to better align with demand, while parking management strategies are enhanced. In Midtown parking code requirements were recently reduced to zero spaces in certain areas to reduce barriers and allow the market to guide supply. Downtown, the recommendation is to remove parking requirements in the historic core area and refine the requirements in the rest of Downtown. Outside the core, commercial requirements should be revised to 1 space per 1,000 gross square feet, except for hotel requirements which should be revised to 0.6 spaces per hotel room. More information on residential parking can be found in Chapter 4. Encourage Shared Parking: In addition to reducing office parking code requirements, current parking can also be “unlocked” to be broadly available by making it easier for users to share parking and for new development to lease existing underutilized surface parking lots. Code barriers that preclude the ability to lease underutilized private stalls, such as extended lease timelines or expensive physical improvements to existing lots, should be lifted or loosened to achieve the desired outcome of better use and access to the full parking supply. Step 2: Create More Choices Urban lifestyles bring with them many advantages for living and working Downtown – walkability, a vibrant street life, and access to unique businesses, arts and culture all help to attract more residents, employees, and visitors. However, the downside of these benefits is the concern that the vibrant environment that some people love is creating more congestion. How can we continue to foster a vibrant and safe Downtown, while also combating congestion brought on by more activity? High office parking ratios require office uses to “hold” excess parking, driving down the average utilization even while visitors feel that parking is not available to them. 48 - 2019 Downtown Bozeman Improvement Plan 49 - 2019 Downtown Bozeman Improvement Plan 18 Across the country, downtowns are focused on expanding access to multi-modal transportation options. From bike storage to micro-mobility options, better, safer options for downtown commuters and visitors benefit everyone by reducing traffic, parking demand and the cost burden of car ownership. See Chapter 3 Walkable and Accessible for more details on recommendations to enhance Downtown Bozeman’s transportation options. Step 3: Expand Parking At its core, parking is an economic development issue. Step 1 attempts to unlock privately owned parking that is unused during extended times of the day or evening, making it more available to existing and future development. Still, meeting current needs and planning for future growth will require a proactive approach to adding parking in the Downtown core. Several initiatives should work together to expand Downtown parking: Add on-street parking where possible: Downtown’s streets already provide low-cost, front-door parking for visitors. But, more can be done to make the most of these assets. Introducing diagonal, back-in parking on Main Street could bring over 100 more street spaces. See Chapter 3 Walkable and Accessible for more details on proposals for Main Street. It is also important to manage on-street parking stalls to retain them for retail customers and locate long-term employee parking off Main Street in nearby parking lots or a park-and- ride lot connected by transit. If utilization data shows ample availability in adjacent residential areas, there is potential to develop an employee paid parking permit system. This strategy is frequently implemented in other communities as a parking benefit district. Expand and clarify signage: Downtown has instituted some branded parking signage and wayfinding. Consistent rules and signage can help clarify regulations and make it more clear what parking is available to visitors. The consistently branded signage should continue to be installed across the system. Common branding and wayfinding for public parking will also help Downtown businesses thrive. Expand structured parking: The Bridger Park Structure added 435 spaces to Downtown and helped spur redevelopment of key projects. Looking ahead, a second parking structure will be an important tool to help offset growth and leverage high quality downtown development. A technical feasibility study is currently underway to evaluate six separate downtown Eliminate parking requirements in the “Core Area” and simplify standards for the rest of the B3 zone by eliminating all parking reductions in favor of a flat standard and making shared parking and off-site parking easier. Institute the following requirements: • 0.6 spaces per hotel room (including accessory uses up to 20% of the building area) • 1 space per 1,000 gross square feet for all commercial uses to create a simple “blended rate.” Explore options to allow more urban design variations (low seating wall in lieu of internal landscape islands for example) as a substitute for internal parking lot landscaping in B3. Refer to Appendix page 11 for more information. CODE CORNER P ROUSEMAIN STWILLSON5TH AVE F E A B CD ID Location Near Current Demand Area Leverages Future Development A Addition to Bridger Park Structure Medium/High High B Babcock & Bozeman High High C Wallace @ Library Medium High D Olive & Black High High E Babcock & Grand High Low F Third & Mendenhall High Medium sites for potential to accommodate a future parking structure. Beyond site efficiency and capacity, the future structured parking site should also be selected based on its ability to both help meet current demand in pressured areas today and to anticipate new demand created by future development in high growth areas of Downtown. Other qualitative factors like the potential of the site to be developed with minimal impact to natural features, in a way that meets design standards, and/or promotes multi-modal connections should also be considered. To support this evaluation, the six possible sites were studied for their potential to meet these objectives. While all six sites meet the needs in some ways, the parking lots at Olive and Black and at Babcock and Rouse may best address both current and future demand. Another solution for efficient parking is to explore automated stacked parking, as is being considered in several proposed projects now. OBSERVED +85% OCCUPANCY IN 2017 WTI PARKING STUDY KEY 50 - 2019 Downtown Bozeman Improvement Plan 51 - 2019 Downtown Bozeman Improvement Plan 19 5 # SECTION QUICK SUMMARY RECOMMENDED CODE LANGUAGE EXISTING CODE LANGUAGE 11 38.540.050. 7 (several sections would need to be amended to coordinat e edits) Exempt the “Core Area” from parking requirements and group and simplify the parking requirements for rest of B3 with a blended rate factor that has “built-in” reductions that recognize shared public surface and structured parking, transit availability, bike infrastructure, walkability, mixed use, variable hours of operation for different business types and overall district capture of parking demand (park once; shop twice concept). Note this recommendation only works in combination with the other parking recommendations to “unlock” existing spaces, create more choices beyond driving and expand parking capacity. Principles: More Than Main Street Heart of a Thriving City Walkable and Accessible For Everyone Eliminate parking requirements in the “Core Area.” Establish new factors: • 0.6 spaces per hotel room (including accessory uses up to 20% of the building area) • 1 space per 1000 gross square feet for all other uses. Eliminate the list of parking reductions. [Examples of current requirements:] Residential: 1 space per unit Retail: 1 per 300 SF net Office: 1 per 250 SF net Health & Exercise: 1 per 300 net Hotels: 1.1 per guest room (+ accessory uses) Restaurants: 1 space per 50 square feet of indoor public serving area + 1 space per 100 square feet of outdoor area List of reductions: More than one adjustment may apply. Multiple adjustments are added together to modify the minimum required parking from Table 38.540.050-3 in a single operation. Multiple adjustments are not applied sequentially. The first 3,000 gross square feet of a non-residential building within the B-3 district or adjacent to designated storefront block frontage per section 38.500.010 is not included in the calculation of required parking. 15% reduction when the site is within 800 feet of a parking structure of at least 200 spaces 10% reduction where the development is within 800 feet of a developed and serviced transit stop. 10% reduction for on-site bicycle facilities 11 - 2019 Downtown Bozeman Improvement Plan Appendix 20 ALIGN HEIGHT WITH EXISTING ZONING AND COMMUNITY PLAN Currently, building heights Downtown are limited by the B-3 zoning district to a maximum of 55 feet in the “Core Area” (defined as Main Street and one half block north and south to the alleys from Grand Avenue to Rouse Avenue) and 70 feet in the rest of the B-3 zone. Recently codified transition language further limits the height of buildings on the edge of the B-3 District when they are adjacent to some residential zoning districts. The Downtown core area contains a mix of buildings that range from one-story storefronts to the seven-story Baxter Hotel and the nine- story Armory Hotel. The diversity of building heights across the district adds interest and visual relief to the street, creating a rhythm of change and variation that is an important ingredient of dynamic downtown urban design. While height or density minimums are not regulated, in a downtown like Bozeman’s where affordability and vibrancy are values, it is also important to avoid underdevelopment. Appropriate scales of development are essential for future projects so that the community can meet its goals of sustainable infill, affordability, and a dynamic street life. Many Downtown buildings are designated as “storefront blocks” to promote retail and frequent entries that also add rhythm and walkability to a street. This comes with a requirement for a minimum height of 13 feet for the first floor, to add flexibility to all buildings in this zone to accommodate public uses like retail or lobbies. Improved diagram better illustrating current transition code requirements. The Community Plan update proposes that the Bozeman will have a diverse skyline with buildings that range from three- to seven-stories. Today’s Downtown height limit of 70 feet does not allow new buildings to reach seven stories due to the needed floor-to-floor heights for urban development, active ground floors, and contemporary building practices. Some buildings surpass this limit, like the historic Baxter or the new hotel and adaptive reuse project at the Armory which obtained a height deviation. Seven stories are already permitted by building conventions in other districts across the city when certain accommodations are made by the project. The 2009 DBIP decreed that Downtown should be home to buildings of the greatest height across the city. Bozeman has evolved since that aspiration, with many other districts carrying height and density as well. Still, to support a lively and vibrant Downtown for the long-term, buildings in Downtown should continue to achieve comparable height to other mixed use districts across the community. To accomplish this, the Downtown height requirements should be considered in context of the Community Plan’s aspirations and zoning across the city. Downtown’s height limits should Excerpted from the UDC; Figure 38-320-060: 45 Degree angle stepback rule for certain zone edge development be adjusted to enable buildings of seven stories outside of the historic core, rather than specifying 70 feet which more usually results in five-story buildings. For buildings with seven stories, urban design guidelines could be put in place to shape and break down the massing while still enabling the density needed for a vibrant, inclusive Downtown. For example, the floor plates on levels five through seven can be designed to step back from the building edge to break down the form. A height increase to seven stories could also be an opportunity to address long-term affordability by incentivizing smaller units through height bonuses. Guidelines that are specific to the B-3 zone should build on ideas in Article 5, tailoring them to Downtown specific issues. 114 - 2019 Downtown Bozeman Improvement Plan 115 - 2019 Downtown Bozeman Improvement Plan 21 Encourage a Mix of Scales SENSITIVE TRANSITIONS Downtown is in the unique position of needing to both continue to promote redevelopment and to ensure that there is a careful balance between adjacent residential scale neighborhoods and new Downtown projects. Density is an important element to these projects in order to foster desired traits like Downtown vibrancy and broader housing affordability. Still, there are concerns that future development will be too tall, bulky or close to residential single family homes. Babcock and Mendenhall Streets both have many surface lots and underutilized sites that are likely to be developed in the coming years. As the “outer core” of Downtown, this “halo” around Main Street is a logical - and important - place to locate buildings of greater height and mass, up to seven stories. It is walkable to transit connections and employment and away from single family housing. However, adjacent to the surrounding residential zones, buildings should begin to taper down and gradually adjust downward. This is the intent of the transition language today. Recent revisions to the UDC included the addition of standards requiring a more gradual transition between new buildings and existing residential properties. This transition language applies in places where B-3 zoning is immediately adjacent to residential zones. It includes provisions for new B-3 development that require a setback from the property line and a stepped back building form for upper stories, supporting the needs of both Downtown and nearby neighborhoods. Although the B-3 zone allows for development up to the lot line (zero lot line), new buildings within the transition zone are required to be set back five to ten feet (depending on the adjacent zone) and are limited to an initial 38 feet in building height from the property line adjacent to other zones. From there, the building form is held to a 45 degree step-back rule for zone edge development, up to the B-3 building height limit. Going forward this language will be tested on actual projects of varied size, each of which will have unique characteristics of site and design. The following recommendations build on the current zoning code and offer additional ways to balance the density, mass, design and scale of Downtown and nearby neighborhoods in a variety of different Downtown conditions. Explore “Gentle” Residential Infill North and south of Downtown, additional scale appropriate infill housing can support the affordability and compatibility goals of both Downtown and nearby neighborhoods. This might include strategic density by enabling more accessory dwelling units, housing along alleys, small rowhouses or stacked townhouses. Recent zoning modifications have already moved in this direction and should be reinforced and adjusted as needed in the future. In the “Core Area,” the maximum height should be five stories with a requirement that the upper level be stepped back at least ten feet from the street-facing facade. Refer to Appendix page 9 for more information. Outside of the “Core Area,” the maximum height should be seven stories with the requirement that the upper levels (5+) be stepped back at least ten feet from the street-facing facade. Refer to Appendix page 9 for more information. The height restrictions should cross-reference the existing zone edge transition section of the code which will further limit height and increase setbacks along the edge of the B3 zone. Refer to Appendix page 9 for more information. CODE CORNERConsider Unique Needs of Narrow or Small Parcels Many properties in the area are small sites where it is not feasible to build to the full height allowed Downtown in B-3. They could be adversely impacted by restrictions to allowable setbacks. For projects with overall heights of less than 38 feet and for narrow sites, it may be beneficial to clarify that buildings less then 38 feet can have decreased setbacks in order to support infill on narrow lots. For buildings on large sites that can be developed to greater height and density, maintain the existing five to ten feet setbacks and current step-backs. 116 - 2019 Downtown Bozeman Improvement Plan 117 - 2019 Downtown Bozeman Improvement Plan 22 3 # SECTION QUICK SUMMARY RECOMMENDED CODE LANGUAGE EXISTING CODE LANGUAGE 6 Table 38.320.050, Footnote 9 Coordinate with the Community Plan – “Shape of Our City” to allow up seven stories for B3 (outside of the Core Area) with step back requirements for upper floors that face a street. Additionally, cross-reference that required zone edge transitions may further limit height in certain areas of the periphery of B3. (Also need to clarify setback implications of transitions for small/narrow lots.) Coordinate with future Affordable Housing Action Plan to explore ways to use height to incentivize smaller units that have long term affordability restrictions in place. Principles: More than Main Street For Everyone Heart of a Thriving City 9. Maximum building height in the B-3 district is 5 stories in the “Core Area” and 7 stories outside the “Core Area.” [TBD: consider also adding a height in feet or maximum story height.] For buildings with more than four stories, the floor plates on levels five through seven shall step back at least 10 feet from the street-facing building edge(s) to break down the form. Note that zone edge transitions may further limit height in accordance with Section 38.320.060. 9. Maximum building height in the B-3 district must be 55 feet in the district core area and 70 feet outside of the core area. 7 38.400.100. A Add flexibility for the Engineering Department to look at site-specific details when evaluating required street vision triangles. Use existing code language for access standards – Section 38.400.090.H “Modifications of property access standards” as a template. [TBD - coordinate with Engineering Department to work out exact language and standards.] Example language: Modifications of street vision triangle standards. 1. Some of the standards listed in this section, may be relaxed by the review authority if it is shown during the development review process that more efficient design can be accomplished without jeopardizing the public's health, safety and welfare, the intent of this chapter, or the intent of the city's growth policy… Arterial streets. On corner lots on arterial streets in all districts, no fence, wall or planting in excess of 30 inches… is permitted within a triangular area defined as follows: beginning at the intersection of the projected curblines … thence 50 feet along one curbline, thence diagonally to the point 50 feet from the point of beginning on the other curblines, then to the point of beginning, except when traffic control signals are installed, in which case the a local street vision triangle shall apply. Nothing in this section prohibits portions of buildings 12 feet or more above grade from encroaching into required vision triangle setbacks. [40 feet for Local/Collectors] 9 - 2019 Downtown Bozeman Improvement Plan Appendix 23