Loading...
HomeMy WebLinkAboutAmbientAirUtilityApprovalOfRetentionPondInEasement_06222021 Tim Staub From: Workman, Dustin <Dustin.Workman@northwestern.com> Sent: Monday,June 7, 2021 7:56 AM To: Tim Staub Cc: Haag, Nicholas Subject: RE:Ambient Air- Nelson Meadows Thanks Tim. The proposed pond being 9' from our existing utilities would suffice. I would approve the location of the pond within the utility easement. Thanks, Dustin From:Tim Staub<tstaub@chengineers.com> Sent: Friday,June 4, 2021 5:01 PM To:Workman, Dustin <Dustin.Workman@northwestern.com> Cc: Haag, Nicholas<Nicholas.Haag@contractor.northwestern.com> Subject: [EXTERNAL] RE: Ambient Air- Nelson Meadows CAUTION: This Email is from an EXTERNAL source outside of North Western Energy. The Original Sender of this email is tstaub@chengineers.com. Are you expecting the message? Is this different from the message sender displayed above? Do not click on links or open attachments unless you are sure you recognize the sender and you know the contents are safe. j If you believe the email to be malicious and/or phishing email, please use the Report Phish button. Hi guys, Thanks for looking into this. It turns out that the locator missed the utilities along Prince on our lot. Not sure why, but they did.We got it marked and went back out to take measurements. Here is the final layout.The top of the pond is almost 9'from the closest dry utility. Please let me know if this is approvable. Thanks, Tim From:Workman, Dustin <Dustin.Worl<man@northwestern.com> Sent: Friday, May 28, 2021 12:54 PM To:Tim Staub<tstaub@chengineers.com> Cc: Haag, Nicholas<Nicholas.Haag@contractor.northwestern.com> Subject: RE: Ambient Air- Nelson Meadows Hi Tim, There is electric and gas along Prince Dr on the northern easement location that feeds to the lot adjacent to the west. Those line will need to be surveyed and shown so we can compare to the proposed retention/detention pond locations. I'll let Nick answer the question regarding the Tx and service location. Thanks, Dustin 1 Tim Staub From: Luke, Edward <Edward.Luke@charter.com> Sent: Tuesday,June 8, 2021 9:24 AM To: Tim Staub Cc: Self, Ed L Subject: RE: Ambient Air- Nelson Meadows Tim, The proposed pond being 9' from our existing utilities would suffice. I would approve the location of the pond within the utility easement. Thanks Ed Luke I Construction Coordinator I C: =406.595.60021 IT: 406.586.63811 201 Evergreen Dr Suite B I Bozeman, MT, 59715 Charter From:Tim Staub<tstaub@chengineers.com> Sent: Monday,June 7, 2021 8:36 AM To:Sam 011ar(sollar@mt-opticom.com)<sollar@mt-opticom.com>;Jana Jones(jana.harmon@centurylink.com) <jana.harmon@centurylink.com>; Luke, Edward <Edward.Luke@charter.com>; Self, Ed L<Ed.Self@charter.com> Subject: [EXTERNAL] FW: Ambient Air- Nelson Meadows CAUTION: below before following Hello all, I am working on a new site plan in Nelson Meadows for Ambient Air Solutions.The City gave us the following comment: "Storm water facilities may not encroach into the twenty foot utility easement unless written approval is obtained from all impacted utilities. The applicant must provide documentation of this approval prior to site plan approval." At your earliest convenience, please take a look at the attached drawing and let me know if you support the 7' encroachment of the pond within the 20' utility easement on Prince Lane. The top of pond will be approximately 9' from the nearest utility. I have been in communication with Dustin Workman at Northwestern and he has signed off on it. See below. Thanks, Tim Staub Tim Staub From: Sam 011ar <Sollar@mt-opticom.com> Sent: Friday,June 11, 2021 9:53 AM To: Tim Staub Subject: RE:Ambient Air- Nelson Meadows Hey Tim, Having the proposed pond 9' from utilities is acceptable Thank you for your time and energy Sam o From:Tim Staub<tstaub@chengineers.com> Sent: Monday,June 7, 2021 8:36 AM To:Sam 011ar<Sollar@mt-opticom.com>;Jana Jones (jana.harmon@centurylink.com) <jana.harmon@centurylink.com>; Ed Luke (Edward.luke@charter.com)<Edward.luke@charter.com>; Ed Self(Ed.Self@Charter.com) <Ed.Self@Charter.com> Subject: FW: Ambient Air- Nelson Meadows Hello all, I am working on a new site plan in Nelson Meadows for Ambient Air Solutions.The City gave us the following comment: "Storm water facilities may not encroach into the twenty foot utility easement unless written approval is obtained from all impacted utilities. The applicant must provide documentation of this approval prior to site plan approval." At your earliest convenience, please take a look at the attached drawing and let me know if you support the 7' encroachment of the pond within the 20' utility easement on Prince Lane. The top of pond will be approximately 9' from the nearest utility. I have been in communication with Dustin Workman at Northwestern and he has signed off on it. See below. Thanks, Tim Staub From:Workman, Dustin <Dustin.Worl<man(@northwestern.com> Sent: Monday,June 7, 2021 7:56 AM To:Tim Staub<tstaub@chengineers.com> Cc: Haag, Nicholas<Nicholas.Haag@contractor.northwestern.com> Subject: RE:Ambient Air- Nelson Meadows Thanks Tim. The proposed pond being 9' from our existing utilities would suffice. I would approve the location of the pond within the utility easement. Thanks, Dustin From:Tim Staub<tstaub@chengineers.com> Sent: Friday,June 4, 20215:01 PM 1