Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19 A3.2.2 Elevations Future Expansion 05052021
MAIN LEVEL100' -0"T.O. UPPER WALL119' -5"T.O. FOOTING96' -2"ABCDT.O. WH WALL118' -0"3" / 12"9" / 12"6" / 12"4' - 10"WOOD TRIM, GREYFUTURE PHASE20' - 0"CONC RETAINING WALLCONC RETAINING WALLFUTURE EXPANSIONMAIN LEVEL100' -0"T.O. WALL109' -1 1/8"UPPER LEVEL110' -3 7/8"T.O. UPPER WALL119' -5"221A4.11A4.11A4.21A4.22A4.22A4.21133T.O. WH WALL118' -0"METAL FASCIA AND SOFFIT-PAINTED, TYPBOX RIB SIDING COLOR 2 -TYP.FIBREX WINDOWS TYP.NOTE: VERIFY WINDOWS WITH BLOCK FRONTAGE REQUIREMENTS. COBASPHALT SHINGLES -BLACKT.O. WALL18' - 0"MIN. TRUSS HEAL1' - 0"WOOD SHIPLAP T AND G - CHARCOAL BLACK4-0 ENTRY COVEROTHER BLOCK for OTHER BUILDINGS CLASSIFICATION FRONTAGE 38.510.0302436 SF X .10 = 243.6 sf REQUIRED273 SF PROVIDED31.599" / 12"6" / 12"6" / 12"8' - 2 1/2"FIRST PHASE BLANK WALL TREATMENT OF WINDOWSFUTURE PHASE ADDITION12' - 0"EXPANSION AREASEE LANDSCAPE PLAN FOR BLANK WALL ENHANCED LANDSCAPING AREASEE PHASE 2 LANDSCAPING PLAN ON L-P2213AABBCCDD40' - 0"20' - 0"FUTURE EXPANSION5 X 5 CONCRETE PADNEW ACCESS DOOR2213ABCD3" / 12"3" / 12"6" / 12"6" / 12"6" / 12"6" / 12"3" / 12"1/2" / 12"1/2" / 12"3" / 12"3" / 12"GUTTERGUTTER GUTTERGUTTER4' - 0"4' - 0"4' - 0"4' - 0"2' - 0"3' - 0"3' - 0"2' - 0"2' - 0"1' - 4"8"10' - 0"10' - 0"DSDSDSDS DSDSDSSCUPPER AND DOWNSPOUTSCUPPER AND DOWNSPOUTMEMBRANE ROOFASPHALT SHINGLESRIDGE RIDGEASPHALT SHINGLESMEMBRANE ROOFMEMBRANE ROOFVALLEYVALLEYRIDGE RIDGEDSDSDSDSDS8"9" / 12"9" / 12"SEE LANDSCAPE PLAN L-P2 FOR ENHANCED BLANK WALL PLANTINGDRAWING NUMBER:PHASE:DATE:DRAWING TITLE:PROJECT NUMBER:DRAWN BY / CHECKED BY:REVISIONS:0"1"2"5/5/2021 12:54:56 PMA3.2.2ELEVATIONS -FUTURE EXPANSION20-15KOHDMAY 05 | 2021AuthorCheckerSITE PLAN3480 PRINCE LANEBOZEMAN MTNO. DESCRIPTION DATE3/16" = 1'-0"EAST ELEVATION - LOADING DOCK FUTURE EXPANSION13/16" = 1'-0"NORTH - ENTRY Copy 121/16" = 1'-0"MAIN LEVEL31/16" = 1'-0"ROOF PLAN4