Loading...
HomeMy WebLinkAbout018_SP202_COLOR ELEVATIONS_04-16-2021T.O. FOUNDATION100' -0"BGCEFHJLADT.O. MEZANINE109' -9 1/4"K9I9G9F1D9C1B1A1K23' - 5 1/4"MWP-2MWP-1MWP-3106105104102101-1103STF10515' - 8"20' - 4"101NELSON ROAD BLOCK FRONTAGE: (OTHER) "LANDSCAPE"WALL AREA:456.58 SFGLAZING AREA:213.61 SFPERCENTAGE OF GLAZING AREA TO WALL AREA:213.61 SF / 456.58 SF = 46.78%RA-2W10X45CCF-116' - 9 1/4"10' - 0"4' - 0"4' - 0"IC8C9F8F7F9T.O. PARAPET124' -10"RA-2MTL-21" / 12"1" / 12"T.O. FOUNDATION100' -0"2411131415T.O. MEZANINE109' -9 1/4"2.13567891010.111.11212.913.914.9MWP-323' - 5 1/4"15' - 8"107108121-2123-42032042052062072081122-3202201MWP-1MWP-2RA-2MWP-2MWP-3A.7T.O. PARAPET124' -10"RA-2RA-2MWP-1RA-2T.O. FOUNDATION100' -0"2411131415T.O. MEZANINE109' -9 1/4"2.13567891010.111.11212.913.914.9CCF-115' - 6"24' - 10"20' - 4"MWP-1MWP-3MWP-1MWP-3RM-2110125-2123-1128-2128-1122-1116-2111STF102ASF-2MWP-31RA-2MWP-2MWP-3212214216217A.7T.O. PARAPET124' -10"RA-2RA-314.16.2114.16.21T.O. FOUNDATION100' -0"BGCEFHJLADT.O. MEZANINE109' -9 1/4"K9I9G9F1D9C1B1A1K23' - 5 1/4"1" / 12"1" / 12"20' - 4"15' - 8"25' - 11"54' - 1"114' - 0"MTL-2MWP-1RA-2MWP-315' - 6"123-2123-3127-1101-2STF106210109IWTE-1C8C9F8F7F9T.O. PARAPET124' -10"MWP-3CCF-1RA-2MWP-2MWP-1228RA-214.16.21GENERAL FINISH PLAN NOTESSEE G201 FOR PARTITIONS AND ASSEMBLIES.ABCSEE G202 FOR FURTHER FINISH MATERIAL INFORMATION.USE WRITTEN DIMENSIONS. DO NOT SCALE DRAWINGS, WHERE NO DIMENSION IS PROVIDED CONSULT THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.DFRAMING CONTRACTOR IS TO COORDINATE LOCATION AND INSTALL ADEQUATE BLOCKING FOR ALL OWNER AND CONTRACTOR SUPPLIED EQUIPMENT.EALL MATERIAL AND FINISHES ARE TO BE AS SPECIFIED, OR APPROVED EQUAL.FCONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS SHOWING ANY CHANGES TO PLANS AND DIMENSIONING.GALL MECH & PLUMBING VENTING TO BE PAINTED OR PREFINISHED TO MATCH SIDING & ROOFING THROUGH WHICH IT PENETRATES.MATERIALSMWP-2 MBCI CORRUGATED METAL PROFILE: PBD -VERTICAL, COLOR: HAWAIIAN BLUE MWP-3 MBCI BOX RIB PROFILE: SHADOWRIB - HORIZONTAL, COLOR: MIDNIGHT BRONZEMWP-1 MBCI CORRUGATED METAL PROFILE: PBD - VERTICAL, COLOR: CHARCOAL GREYRM-1 MBCI STANDING SEAM ROOFING PROFILE: ULTRA DEK COLOR: MIDNIGHT BRONZEAny unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2020 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS4/27/2021 2:17:10 PMMIDWEST WELDING &MACHINEBozeman, Montana2029SP202COLORELEVATIONSSITE PLANREVIEWJANUARY 27, 2021SCALE:3/32" = 1'-0"1EASTSCALE:3/32" = 1'-0"3NORTHSCALE:3/32" = 1'-0"4SOUTHSCALE:3/32" = 1'-0"2WESTEXTERIOR MATERIAL SCHEDULESYMBOL MATERIAL MANUFACTURER TYPE, COLOR COMMENTSCCF-1 CAST-IN-PLACE CONCRETE FOUNDATIONSEE STRUCTURALGLZ-2 KALWALL GLAZINGMTL-2 DECORATIVE STEEL COLLUMN MIDWEST WELDING POWDER COATED TO MATCH HAWAIIAN BLUESIDINGMWP-1 CORRUGATED METAL PANELS MBCI PROFILE: PBD, COLOR: CHARCOAL GREYMWP-2 CORRUGATED METAL PANELS MBCI PROFILE: PBD, COLOR: HAWAIIAN BLUEMWP-3 BOXRIB METAL PANELS MBCI PROFILE: SHADOWRIB, COLOR: MIDNIGHTBRONZERM-1 STANDING SEAM ROOFING MBCI PROFILE: ULTRA-DEK, COLOR: MIDNIGHTBORNZERM-2 EPDMSFT-1 METAL SOFFIT PANEL MBCI PROFILE: ARTISAN WL BEADS, COLOR:MIDNIGHT BRONZEEXT. ELEVATION KEYED NOTESNO. DESCRIPTION1 DOWNSPOUT LOCATION2 MAN DOOR CANOPY3 ELECTRICAL BREAKER BOX, SEE ELECTRICAL4 LIGHT POST BY OWNER5 GAS METER, SEE PLUMBING6 ADA PARKING SIGN7 TRELLIS BY OWNERREVISION SCHEDULENo. Description Date1 SPRV-1 4.16.21