Loading...
HomeMy WebLinkAboutMWWM_plumbingletter_04-09-2021Page | 1 SE Engineers PO Box 10776 Bozeman, MT 59718 04/09/21 Midwest Welding and Machine Peak Hour Demand • Building Average Daily Demand (Qave) o General Business and office facilities = 25 gal/ employee/shift) (ref: 15A NCAC 02T.0114 Wastewater Design Flow Rates - see attached) ▪ 32 Employees (per Midwest Welding) ▪ 1 shift (per Midwest Welding) ▪ Qave = 25 gal x 32 Employees ▪ Qave = = 800 gal/ day • Peaking Factor (Qmax/Qave) = (18 + P1/2) / (4 + P½) (ref: Design Standards and Specifications Policy; City of Bozeman March 2004) o P = Population in thousands o P = 32 employees (from Midwest Welding) = 0.032 Thousand of People o Qmax = ((18 + 0.179) / (4 + 0.179)) x 800 o Qmax = 4.35 x 800 o Qmax = 3,480 gal/ day SE Engineers Bill Edden, PE Owner, Mechanical Engineer