Loading...
HomeMy WebLinkAboutFloorPlan_6.25.21UP UP W/D REF.DWUP 20’ − 0"20’ − 0"30’ − 0"1’ − 2" B C 1 2 10’ − 0"10’ − 0"2HVAC COMPRESSOR NEW CONST TO (E) GARAGE (E) GARAGE 1.2 1.3 1.4 1.58’ − 5 1/4"8’ − 5 1/4"8’ − 8"2’ − 0"2’ − 0" A 9’ − 0"2 3/4"2 3/4" 2 1 1 97’ − 6"7’ − 6"7’ − 6"7’ − 6"19’ − 1"5’−6 wall5’−6 wall 5’−6 wall5’−6 wall 5’ − 4" ridge beam 10’ − 5"4’ − 6"7’ − 6"7’ − 7"6’ − 4"7’ − 4"6’ − 4"EXTERIOR DECKB C 1 2 30’ − 0"43 8 5 7 7’ − 0"23’ − 0"5’ − 2"11’ − 8"7 86 5 4 6 hvac hvac 1.2 1.3 1.4 1.5 A 3 3’ − 2"16’ − 9" 1’ − 4 1/2"1’ − 0"10’ − 10 1/2" 16’ − 8 3/4"6’ − 1 1/4"6’ − 8 1/2"5’ − 0"6’ − 5"3’ − 9 1/2"3’ − 7 1/2"6’ − 2"GROUNDING ELECTRODE PORTAL FRAME W/ HOLD−DOWNS PER IRC 2012 R602.10.6.2, W/ 5/8" ABOLTS MIN. 7" EMBED8"x16" FTG, TYP. W/ (2) ROWS #4 CONT. 4" CONCRETE SLAB W/ #3 REBAR @ 24" O.C. EA. WAY OVER 4" LAYER 3/4" MINUS BEDDING, HOLD 4" FROM T.O.FDN., SLOPE TO DOORC1 3’−10" FDN, TYP. FOUNDATION NOTES: 1. CONDITIONED CRAWL SPACE BY MECHANICAL CONTRACTOR. 2. ANY CONCRETE POURED AGAINST WOOD MUST BE SEPARATED WITH GALVANIZED METAL FLASHING. 3. COORDINATE GARAGE DOOR BLOCKOUT DEPTH AND LOCATION WITH MAIN FLOOR PLAN AND G.C. B C 1 2 2’ − 0"GARAGE DOOR BLOCKOUT16’ − 0"2’ − 0"20’ − 0"30’ − 0"C1C1C11’ − 2" 1.2 1.3 1.4 1.5 A PIER FOOTING: 24"x24"x8"D footing W/ (3) #4 EA. WAY, TYP. OF (4) PIER : 12"x12"x58"H W/ #3 HOOPS @12" O.C., (2) #3 HOOPS AT THE TOP, W/ (4) #4 VERT., TYP. OF (4) 20’ − 9" BLK. OUT 3’ − 6"5’ − 9"20’ − 0"9’ − 0"2’ − 0" 2 3/4" 8’ − 5 1/4"8’ − 8"8’ − 5 1/4" 2 3/4" 2’ − 0" HEADER SCHEDULE: UNLESS NOTED OTHERWISE: ALL HEADERS <4’−0" = (1) 1−3/4"x9−1/2" LVL or (2) 2x10 (#2 GRADE LUMBER) ALL HEADERS >4’−0" = (2) 1−3/4"x9−1/2" LVL or (3) 2x10 (#2 GRADE LUMBER) W/ 2 TRIMMERS UPPER FLOOR FRAMING NOTES: 1. UPPER FLOOR FRAMING, FLOOR TRUSSES AS NOTED. COORDINATE TRUSS DESIGN WITH MANUFACTURER. 2. PROVIDE CONT. BLOCKING AT ALL BEARING WALLS AND CANTILEVER FLOOR FRAMING LOCATIONS. 3. PROVIDE FULL BLOCKING BETWEEN BOTTOM OF BEAMS AND WALL/FOUNDATION AT BEARING LOCATIONS. MECH. CHASE BUILT IN TRUSSES B C 1 2 @16" O.C. 5’ − 4" ENGINEERED FLOOR TRUSSES AT 16" O.C. 30’ − 0" 3−1/2"x16" VLAM RIM 3−1/2"x16" VLAM RIM RIM TRUSS2x12 TREATED LEDGER 3−1/8"x12" GLULAM (−2") OFF LAYOUT FOR PLUMBING DROPS 3−1/8"x16" GLULAM20’ − 0"1’ − 4" 1’ − 2" 1’ − 6" 1.2 1.3 1.4 1.5 A REV:PROJECT NAME:ADDRESS:OWNER:LEGAL:A1.01 MAIN LEVEL PLAN431 NORTH GRANDOBER RESIDENCE − GARAGE/ADU ADDITION REVISED ROOFTRAVIS OBERLOT 5 & 6, BLOCK 7 OF BEALL’S 3RD ADDITION5−5−2021 C1 C2 PLAN NOTES: 1. ALL WALLS AT THE MAIN LEVEL ARE 9’−1 1/8" U.N.O. ALL WALLS AT THE UPPER LEVEL ARE 8’−1 1/8" U.N.O. 2. ALL DIMENSIONS SHOWN ARE TO FACE OF FRAMING. 3. ALL WINDOWS TO BE TAPE SEALED AND FOAM FILLED SPACE BETWEEN WINDOW AND FRAMING. 4. PROVIDE 1−1/2" GRIPPABLE HANDRAIL 34" ABOVE NOSING AT ALL STAIRS WITH FOUR OR MORE RISERS. GUARD SHALL BE LOCATED ALONG OPEN−SIDED WALKING SURFACES, INCLUDING STAIRS, RAMPS AND LANDINGS AND SHALL BE NOT LESS THAN 36" IN HEIGHT AS MEASURED VERTICALLY ABOVE THE ADJACENT WALKING SURFACE OR THE LINE CONNECTING THE LEADING EDGES OF THE TREADS. GUARDS ON THE OPEN SIDES OF STAIRS SHALL HAVE A HEIGHT NOT LESS THAN 34 INCHES AND NOT MORE THAN 38 INCHES AS MEASURED VERTICALLY FROM A LINE CONNECTING THE LEADING EDGES OF THE TREADS. THE TRIANGULAR OPENINGS AT THE OPEN SIDE OF THE STAIR, FORMED BY THE RISE, TREAD, AND BOTTOM RAIL OF A GUARD, SHALL NOT ALLOW PASSAGE OF A SPHERE OF 6 INCHES. GUARDS TO BE CONSTRUCTED TO RESIST 200# CONCENTRATED LOAD IN ANY DIRECTION AT THE TOP RAIL. 5. ALL INTERIOR DOORS ARE TO BE CENTERED IN OPENINGS OR LOCATED AS DIMENSIONED. 6. PROVIDE 1/2" TYPE X GYP BOARD AT ANY GARAGE/HOUSE COMMON WALLS AND 5/8" TYPE X GYP AT CEILING AND UNDER STAIR. 7. ALL WINDOW HEAD HEIGHTS ARE AS NOTED, REFER TO WINDOW SCHEDULE. 8. CRAWL SPACE AND ATTIC ACCESS SHALL BE 30"x22" MIN. 9. PROVIDE EXHAUST VENT FOR WATER HEATER OF CPVC OR OTHER HIGH TEMPERATURE MATERIAL AS REQ. BY MANUFACTURER. 10. ALL WATER HEATERS WITH PAN & STRAP. 11. WATER HEATER T&P VALVE WILL BE PIPED TO FLOOR DRAIN IN MECHANICAL ROOM. 12. IF MECHANICAL ROOM IS ACCESSED FROM GARAGE, WATER HEATER SHALL BE 18" ABOVE GARAGE FLOOR ON METAL STANDS W/ SECURING STRAPS. 13. DOOR AT GARAGE/HOUSE COMMON WALL TO BE SELF CLOSING AND RATED 20 MINUTES. 14. ALL GLAZING IN DOORS SHALL BE SAFETY GLAZING MATERIAL (TEMPERED). 15. THIS PROJECT SHALL COMPLY WITH THE 2012 INTERNATIONAL RESIDENTIAL CODE, 2012 UNIFORM PLUMBING CODE, 2012 INTERNATIONAL MECHANICAL CODE, AND THE 2014 NATIONAL ELECTICAL CODE. STRUCTURAL PANEL DESIGN NOTES: 1. ALL EXTEROIR WALLS FOR THIS PROJECT HAVE BEEN DESIGNED USING 2012 IRC (CS−WSP) CONTINUOUS SHEATHED − WOOD STRUCTURAL PANELS PER TABLE R602.10.1.2(2) AND R602.10.4.1 CONTINUOUS SHEATHING BRACED WALL PANELS, USING SEISMIC DESIGN CATEGORY SDC DO OR DI. ALL EXTERIOR WALLS ARE SHEAR WALL TYPE S1 UNLESS NOTED OTHERWISE, REFER TO SHEARWALL SCHEDULE ON A0.00. 2. ALL INTERIOR WALLS SHEAR WALLS AS INDICATED TO HAVE SHEETROCK SCREWS AT 7" SPACING AT EDGES AND FIELD SIZE PER IRC R702.3.5. 3. INDICATES SIMPSON HOLD−DOWN PER SCHEDULE ON A0.00. 4. INDICATES SIMPSON STRAP PER SCHEDULE ON A0.00. WHOLE HOUSE MECHANICAL VENTILATION REQUIRED −CODE SOURCES: 1. IRC 2012 SECTION R303.4, PROVIDE WHOLE HOUSE MECHANICAL VENTILATION WHEN LESS THAN 5 AIR CHANGE PER HOUR (ACH). (MONTANA ARM REQUIRES 4 OR LESS ACH’S). IF THE IBC 2012 IS BEING USED SECTION 1203.1 PROVIDES CLARIFICATION OF WHOLE HOUSE MECHANICAL VENTILATION. 2. IMC 2012 SECTION 401.2 AND 401.3 IN THE MECHANICAL CODE ALONG WITH SECTION 1057.3.1 TO 1057.3.3 IN THE 2012 IRC. 3. IECC 2012 SECTION R402.4.1.2 (ARM) STATES THAT THE BUILDING OR DWELLING UNIT WILL HAVE ACH. 4. ASHRAE 62.1 CAN ALSO BE CONSULTED FOR CODE CONFORMANCE. HRV’S 78 TO 80% EFFICIENT. 5. TESTING FOR TIGHTNESS REQUIRED IF DUCTWORK IS LOCATED OUTSIDE OF CONDITIONED BOUNDARY SUCH AS IN AN ATTIC OR GARAGE, SECTION 403.2 IECC 2012. 1/4" = 1’−0"1 MAIN LEVEL PLAN 1/4" = 1’−0"2 UPPER LEVEL PLAN 1/4" = 1’−0"4 FOUNDATION PLAN 1/4" = 1’−0"5 UPPER FLOOR FRAMING PLAN WINDOW SCHEDULE MARK WIDTH HEIGHT HEAD HEIGHT TYPE COMMENTS 1 4’ − 0" 2’ − 0" 6’ − 8" FIXED 2 4’ − 0" 2’ − 0" 6’ − 8" FIXED 3 1’ − 9" 1’ − 9" 6’ − 8" FIXED 4 5’ − 6" 1’ − 9" 6’ − 8" FIXED HEAD HEIGHT IF INTERIOR TRIM 5 2’ − 6" 3’ − 6" 6’ − 8" FIXED 6 6’ − 0" 5’ − 0" 6’ − 8" DBL. CASEMENT MATCH DOOR HEAD HEIGHT 7 3’ − 0" 5’ − 6" 6’ − 8" DBL. hUNG 8 3’ − 0" 5’ − 6" 6’ − 8" DBL. hUNG EGRESS AREA SCHEDULE NAME AREA GARAGE 600 SF ADU 600 SF ADU DECK 108 SF DOOR SCHEDULE MARK WIDTH HEIGHT COMMENTS 1 3’ − 0" 6’ − 8" 2 16’ − 0" 8’ − 0" O.H.DOOR 3 3’ − 0" 6’ − 8" 4 6’ − 0" 6’ − 8" PATIO SLIDER 5 2’ − 8" 6’ − 8" POCKET DOOR 6 2’ − 8" 6’ − 8" 7 2’ − 8" 6’ − 8" 8 5’ − 0" 6’ − 8" BI−PASS 9 3’ − 0" 6’ − 8" METAL INSULATED 10 8’ − 0" 7’ − 0"