Loading...
HomeMy WebLinkAbout08-02-21 Planning Board Agenda & Packet MaterialsA.Call Meeting to Order B.Disclosures C.Changes to the Agenda D.Approval of Minutes D.1 Approval of minutes from 07-19-21(Happel) E.Public Comment Please state your name and address in an audible tone of voice for the record.This is the time for THE PLANNING BOARD OF BOZEMAN, MONTANA PB AGENDA Monday, August 2, 2021 WebEx Meeting Information Via Webex: https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php? MTID=ecfe22ab25aef18233eb4db3bda08e1df Click the Register link, enter the required information, and click submit. Click Join Now to enter the meeting Via Phone: This is for listening only if you cannot watch the stream or channel 190 • Call-in toll number (US/Canada ): 1-650-479-3208 • Access code: 182 180 4358 Public Comment: If you are interested in commenting in writing on items on the agenda, please send an email to agenda@bozeman.net prior to 4:00pm on Monday, August 2nd, 2021. You may also comment by visiting the City's public comment page. You can also comment by joining the Webex meeting. If you do join the Webex meeting, we ask you please be patient in helping us work through this online meeting. If you are not able to join the Webex meeting and would like to provide oral comment you may send a request to agenda@bozeman.net with your phone number, the item(s) you wish to comment on, and someone will call you during the meeting to provide an opportunity to comment. You may also send the above information via text to 406-224-3967. As always, the meeting will be streamed through the City's video page (click the Streaming Live in the drop down menu), and available in the City on cable channel 190. 1 individuals to comment on matters falling within the purview of the Committee.There will also be an opportunity in conjunction with each action item for comments pertaining to that item.Please limit your comments to three minutes. F.Action Items F.1 Bozeman Gateway Phase 5 Major Subdivision Preliminary Plat, Application 20094(Rosenberg) F.2 Ongoing work sessions to define and refine Planning Board goals for 2020 and implementation of the Bozeman Community Plan 2020.(Happel) G.FYI/Discussion H.Adjournment For more information please contact Tom Rogers at trogers@bozeman.net This board generally meets the 2nd and 4th Monday of each month from 6:00 PM to 8:00 PM Committee meetings are open to all members of the public. If you have a disability and require assistance, please contact our ADA coordinator, Mike Gray at 582-3232 (TDD 582-2301). 2 Memorandum REPORT TO:Planning Board FROM:Taylor Chambers - Community Development Technician II SUBJECT:Approval of minutes from 07-19-21 MEETING DATE:August 2, 2021 AGENDA ITEM TYPE:Minutes RECOMMENDATION:I move to approve the meeting minutes from July 19th, 2021 STRATEGIC PLAN:1.2 Community Engagement: Broaden and deepen engagement of the community in city government, innovating methods for inviting input from the community and stakeholders. BACKGROUND:None UNRESOLVED ISSUES:None ALTERNATIVES:1. Approve meeting minutes with corrections. 2. Do not approve meeting minutes. FISCAL EFFECTS:None Attachments: 07-19-21 Planning Board Minutes DRAFT.pdf Report compiled on: July 26, 2021 3 Bozeman City Commission Meeting Minutes, 07-19-21 Page 1 of 4 THE PLANNING BOARD MEETING OF BOZEMAN, MONTANA MINUTES Monday, July 19th, 2021 00:01:09 WebEx Meeting Information A) 00:12:17 Call Meeting to Order Present: Henry Happel, Cathy Costakis, Gerald Pape, Mark Egge, George Thompson, Jennifer Madgic Absent: Richard Rudnicki, Matthew Hausauer, Paul Spitler B) Disclosures C) 00:13:03 Changes to the Agenda Board member Pape informed the board that he will have to leave the meeting early. D) 00:14:14 Approval of Minutes D.1 Minutes Approval for 06-21-21, 03-03-20, 05-05-20, 05-19-20, 06-02-20, 06-16-20, 07- 21-20, 07-28-20, and 08-17-20 062121 Planning Board Minutes DRAFT.pdf 03-03-20 Planning Board Minutes DRAFT.pdf 05-05-20 Planning Board Minutes DRAFT.pdf 05-19-20 Planning Board Minutes DRAFT.pdf 06-02-20 Planning Board Minutes DRAFT.pdf 06-16-20 Planning Board Minutes DRAFT.pdf 07-21-20 Planning Board Minutes DRAFT.pdf 07-28-20 Planning Board Minutes DRAFT.pdf 08-17-20 Planning Board Minutes DRAFT.pdf 00:15:04 Motion D) Approval of Minutes Mark Egge: Motion Jennifer Madgic: 2nd 4 Bozeman City Commission Meeting Minutes, 07-19-21 Page 2 of 4 00:15:20 Vote on the Motion to approve D) Approval of Minutes. The Motion carried 6 - 0 Approve: Henry Happel Cathy Costakis Gerald Pape Mark Egge George Thompson Jennifer Madgic Disapprove: None E) 00:15:29 Public Comment No public comment at this time. G) 00:19:47 FYI/Discussion Chairman Happel updated board members that work is still being done on requesting an update of the Bozeman Deaconess Hospital sub-area plan. F) 00:21:27 Action Items F.1 00:21:29 Ongoing work sessions to define and refine Planning Board goals for 2020 and implementation of the Bozeman Community Plan 2020. Community_outreach_Costakis - Pape.pdf 00:26:40 Presentation from Board member Costakis. Board member Costakis presented gave an update on the meetings she had with City staff and recommended that the board focus on communication rather than engagement in their outreach goals. 00:36:26 Board Questions Board members directed questions to board member Costakis. 00:54:26 Motion that the board prepare an executive summary of the Growth Policy and a document that will serve as an editorial to be published in the Chronicle. Jennifer Madgic: Motion Gerald Pape: 2nd 00:56:52 Vote on the Motion to approve That the board prepare an executive summary of the Growth Policy and a document that will serve as an editorial to be published in the Chronicle. The Motion carried 6 - 0 5 Bozeman City Commission Meeting Minutes, 07-19-21 Page 3 of 4 Approve: Henry Happel Cathy Costakis Gerald Pape Mark Egge George Thompson Jennifer Madgic Disapprove: None Memo to the City-Dev. Narr.-210511.pdf Chairman Happel reminded the Board that City Staff does not recommend that the Board ask for involvement in development proposals at the early stage. Commissioner Madgic commented that she felt that the board should wait until the executive summary is released and see what the general consensus is after that. Board member Pape commented that he would be in favor of requesting that the board be part of the early development process. 01:15:00 Motion That the board issue instructions that applicants are strongly recommended to state, in brief, the benefits that they see their development bringing to the City. Gerald Pape: Motion Cathy Costakis: 2nd 01:15:54 Vote on the Motion to approve that the board issue instructions that applicants are strongly recommended to state, in brief, the benefits that they see their development bringing to the City. The Motion carried 6 - 0 Approve: Henry Happel Cathy Costakis Gerald Pape Mark Egge George Thompson Jennifer Madgic Disapprove: None M Egge UDC Code Edits for Affordability.pdf 01:44:33 Summary 6 Bozeman City Commission Meeting Minutes, 07-19-21 Page 4 of 4 Chairman Happel provided a summary of board member's comments and desires regarding changing the UDC. 01:51:49 Motion That the Planning Board take up consideration and discussion of UDC code edits to be proposed by members of the board. Mark Egge: Motion George Thompson: 2nd 01:55:20 Vote on the Motion to approve that the Planning Board take up consideration and discussion of UDC code edits to be proposed by members of the board. The Motion carried 6 - 0 Approve: Henry Happel Cathy Costakis Gerald Pape Mark Egge George Thompson Jennifer Madgic Disapprove: None H) 01:57:59 Adjournment For more information please contact Tom Rogers at trogers@bozeman.net. This board generally meets the 2nd and 4th Monday of each month from 6:00 PM to 8:00 PM 7 Memorandum REPORT TO:Planning Board FROM:Sarah Rosenberg, Associate Planner Brian Krueger, Development Review Manager Martin Matsen, Director of Community Development SUBJECT:Bozeman Gateway Phase 5 Major Subdivision Preliminary Plat, Application 20094 MEETING DATE:August 2, 2021 AGENDA ITEM TYPE:Community Development - Quasi-Judicial RECOMMENDATION:Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20094 and move to recommend approval of the subdivision with conditions and subject to all applicable code provisions. STRATEGIC PLAN:4.2 High Quality Urban Approach: Continue to support high-quality planning, ranging from building design to neighborhood layouts, while pursuing urban approaches to issues such as multimodal transportation, infill, density, connected trails and parks, and walkable neighborhoods. BACKGROUND:Bozeman Gateway Phase 5 major subdivision proposes to create 5 lots that include two developable lots and three open space lots on a 6.9 acre parcel. For full background information, see attached staff report. UNRESOLVED ISSUES:None ALTERNATIVES:NA FISCAL EFFECTS:NA Attachments: 20094 PB Staff Report.pdf Report compiled on: July 28, 2021 8 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 1 of 22 20094 Staff Report for the Bozeman Gateway Phase 5 Major Subdivision Public Hearing Date: Planning Board August 2, 2021 at 6:00 via WebEx. A WebEx link will be provided with the Planning Board agenda. City Commission, August 17, 2021 at 6:00 pm via WebEx. A WebEx link will be provided with the City Commission agenda. Project Description: Preliminary plat to create a 5 lot major subdivision that includes 2 developable lots and 3 open space lots on 6.9 acres within the Bozeman Gateway PUD. The property is zoned B-2. Project Location: Remainder tracts of Tract 2A of the Amended Plat of West College, Minor Subdivision Number 195.A, Bozeman, Gallatin County, Montana Recommendation: The application conforms to standards and is sufficient for approval with conditions and code provisions. Planning Board Recommended Motion: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20094 and move to recommend approval of the subdivision with conditions and subject to all applicable code provisions. Commission Recommend Motion: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20094 and move to approve the subdivision with conditions and subject to all applicable code provisions. Report Date: July 29, 2021 Staff Contact: Sarah Rosenberg, Associate Planner Lance Lehigh, Project Engineer Agenda Item Type: Action (Quasi-judicial) EXECUTIVE SUMMARY Unresolved Issues There are no known unresolved issues. Project Summary This report is based on the application materials submitted and any public comment received to date. 9 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 2 of 22 The property owner and applicant submitted a preliminary plat application to create five lots that includes two developable lots and three open space lots. Phase 5 is part of the Bozeman Gateway Planned Unit Development (PUD) Subdivision which consists of a 72-acre mixed use development. This is the final phase of the Bozeman Gateway development. It is located directly south and west of the Huffine Lane/West College Street intersection, west of Fowler Avenue and north of West Garfield Street. Phase 1, 2, and 3 are currently being development in accordance with the PUD. Phase 4 received preliminary plat approval on July 20, 2021. Phase 5 is unplatted and currently sits vacant. Technology Boulevard West will continue to the west through this phase. The development for Phase 5 will include commercial uses and a 2.85 acre open space corridor that runs north-south. A tributary to the Baxter Border Stream flows south to north along the west side of Fowler Avenue. There are some wetlands on the east side of the site along Fowler. A relaxation to encroach to the watercourse setback was approved with the original PUD back in 2006. The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate. The Development Review Committee (DRC) deemed the application adequate for continued review on July 12, 2021. Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny the subdivision application by October 4, 2021, unless there is a written extension from the developer, not to exceed one year. The Planning Board will review this application on Monday, August 2, 2021 and make a recommendation to the City Commission. The City Commission will review this application and make a final determination on Tuesday, August 17, 2021. No written public comment has been received. Alternatives 1. Approve the application with the recommended conditions; 2. Approve the application with modifications to the recommended conditions; 3. Deny the application based on the Commission’s findings of non-compliance with the applicable criteria contained within the staff report; or 4. Open and continue the public hearing on the application, with specific direction to staff or the applicant to supply additional information or to address specific items. This alternative is requested if the Commission wishes to amend or add conditions of approval. 10 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 3 of 22 TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................ 1 Unresolved Issues ............................................................................................................... 1 Project Summary ................................................................................................................. 1 Alternatives ......................................................................................................................... 2 SECTION 1 - MAP SERIES .......................................................................................................... 4 SECTION 2 – REQUESTED VARIANCES ................................................................................. 7 SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL ............................................ 7 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS ...................... 11 SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS .......................................... 14 SECTION 6 - STAFF ANALYSIS AND FINDINGS ................................................................. 14 Applicable Subdivision Review Criteria, Section 38.240.130.A.5.b, BMC. .................... 14 Primary Subdivision Review Criteria, Section 76-3-608 ................................................. 16 Preliminary Plat Supplements ........................................................................................... 18 APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY...................................... 21 APPENDIX B – NOTICING AND PUBLIC COMMENT ......................................................... 21 APPENDIX C – PROJECT BACKGROUND ............................................................................. 22 APPENDIX D - OWNER INFORMATION ................................................................................ 22 ATTACHMENTS ......................................................................................................................... 22 11 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 4 of 22 SECTION 1 - MAP SERIES Figure 1. Zoning classification 12 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 5 of 22 Figure 2. Preliminary Plat Figure 2. Preliminary Plat 13 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 6 of 22 Figure 3. Master Site Plan Phase 5 14 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 7 of 22 SECTION 2 – REQUESTED VARIANCES There are no variances requested with this subdivision application. SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to the preliminary plat application. Staff has considered the impacts as identified in the staff analysis and application materials and these conditions of approval are reasonably related and roughly proportionate to the development. 1. BMC 38.220.070. The applicant shall submit with the application for Final Plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval and noted code provisions have been satisfactorily addressed. This narrative shall be in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. 2. BMC 38.220.070.A.7. Simultaneously with filing of the final plat, in conjunction with required or offered dedications, the subdivider (or owner of the property being subdivided if the owner is not the subdivider) shall transfer ownership to the property owners’ association of any open space proposed to be conveyed to the property owners’ association and all its right, title, and interest in any improvements made to such parkland or open space. For the transfer of real property, the subdivider or owner of the property shall submit with the application for final plat a warranty deed or other instrument acceptable to the City Attorney transferring fee simple ownership to the property owners association and associated realty transfer certificate. The subdivider or owner of the property must record the deed or instrument at the time of recording of the final plat. For personal property installed upon open space owned by the property owners association, the subdivider shall provide an instrument acceptable to the City Attorney transferring all its rights, title and interest in such improvements including all applicable warranties to such improvements. 3. BMC 38.240.150.A.3. Deeds and Realty transfer certificates must be provided for transfer of any platted tract to the City or other entity in association with filing of the final plat. 4. BMC 38.410.060.A. The final plat must provide all necessary utility easements and they must be described, dimensioned and shown on each subdivision block of the final plat in their true and correct location. 5. BMC 38.220.320. In order to disclose to future purchasers their obligations regarding open space established in the municipal code the following language shall be included on the Conditions of Approval Sheet of the final plat: “As established by 38.220.320.A, 38.340.150.A.3.d, and other applicable elements of the municipal code, ownership of all common open space areas and trails, and responsibility of maintenance thereof and for city assessments levied on the common open space lands shall be that of the property owners’ association. Maintenance responsibility shall include, in addition to the common 15 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 8 of 22 open space and trails, all vegetative ground cover, and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and as adjacent to public parks or other common open space areas. All areas within the subdivision that are designated herein as common open space including trails are for the use and enjoyment by residents of the development and the general public. The property owners’ association shall be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all common open space areas and trails. At the same time of recording the final plat of the subdivision the subdivider shall transfer ownership of all common open space areas within each phase to the property owners’ association created by the subdivider to maintain all common open space areas within Bozeman Gateway subdivision. The City may release the Bozeman Gateway Property Owners’ Association from the obligation to maintain parks dedicated to the City at the City’s discretion.” 6. Codes, Covenants & Restrictions must be updated and submitted with initial final plat to be recorded after approval. 7. The final plat must contain the following notation on the conditions of approval sheet of the final plat: “The responsibility for the maintenance of the stormwater facilities and associated landscaping in the open space lots and street frontage landscaping for the perimeter streets must be that of the property owners’ association. Maintenance responsibility must include the functioning of the stormwater facilities, all vegetative ground cover, boulevard trees and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and any vegetative ground cover and landscaping on the open space lots. The property owners’ association must be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all perimeter street frontage landscaping and open space lots and stormwater facilities. The perimeter streets of this subdivision include Garfield Street, Fowler Avenue, Huffine Lane, and Technology Boulevard. 8. Simultaneously with filing of the final plat, in conjunction with required or offered dedications, the subdivider (or owner of the property being subdivided if the owner is not the subdivider) shall transfer ownership to the property owner’s association of all any open space proposed to be conveyed to the property owner’s association and all its right, title, and interest in any improvements made to such parkland or open space. For the transfer of real property, the subdivider or owner of the property shall submit with the application for final plat a warranty deed or other instrument acceptable to the City Attorney transferring fee simple ownership to the property owner’s association and associated realty transfer certificate. The subdivider or owner of the property must record the deed or instrument at the time of recording of the final plat. For personal property installed upon open space owned by the property owner’s association, the subdivider shall provide an instrument acceptable to the City Attorney transferring all its rights, title and interest in such improvements including all applicable warranties to such improvements. 16 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 9 of 22 9. A notice prepared by the City shall be filed concurrently with the final plat so that it will appear on title reports. It shall read substantially as follows: Lots within the Bozeman Gateway Subdivision Phase 5 are subject to specific design standards and unique building setbacks from property lines. These standards may be found in Bozeman Gateway Development Manual. Lot owners are advised that these are specific to the Bozeman Gateway Subdivision and are in place of the general development standards of the City of Bozeman Zoning. If a development standard is not specifically established in the Bozeman Gateway Subdivision approval documents the general standards of the City apply. Modification of the special standards would require an amendment to the Bozeman Gateway Planned Unit Development. Modifications are strongly discouraged. It is the obligation of the lot owner to be fully informed as to these standards before beginning any home or site design process. Approval by the design review entity established in the covenants of the development does not bind the City of Bozeman to approve a construction plan. 10. BMC 38.220.020 & 38.610.050. The applicant must perform a wetland delineation per BMC code. Approved stream and wetland permits shall be provide prior to public infrastructure approval for public infrastructure impacts to jurisdictional wetland and streams. Permits shall be provided prior to Final Plat Approval for impacts related to Open Space infrastructure. 11. BMC 38.220.040. As presented, forty-five (45) feet of West Garfield Street ROW is to be dedicated along the southern frontage of the proposed subdivision (intersection of Fowler and West Garfield). The applicant must dedicate the West Garfield Street ROW in the Certificate of Dedication of prior to final plat approval. The applicant is advised that the City of Bozeman will accept responsibility for the maintenance of West Garfield Street. 12. BMC 38.410.130. Compliance with BMC 38.410.130 shall be met prior to Final Plat approval. The applicant must contact Griffin Nielsen with the City of Bozeman Engineering Department for any cash in lieu of water rights determination. 13. BMC 38.240.410. Technology Blvd West is a privately maintained street located within public ROW as referenced in the provided approved PUD documentation. Prior to Final Plat Approval, the certificate of dedication shall reflect private maintenance. 14. BMC 38.240.510. The applicant must add the required text as stated in BMC Section 38.240.510 to the Conditions of Approval Sheet 3 prior to Final Plat Approval. 15. BMC 38.220.070. The final plat must contain the following notation on the Conditions of Approval sheet: a. The responsibility of maintenance for the stormwater facilities, stormwater open space lots, pedestrian open space lots and street frontage landscaping for the perimeter streets must be that of the property owners’ association. Maintenance responsibility must include, all vegetative ground cover, boulevard trees and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets. The property owners’ association must be responsible 17 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 10 of 22 for levying annual assessments to provide for the maintenance, repair, and upkeep of all perimeter street frontage landscaping and stormwater facilities and all open space landscaping. b. All public stormwater facilities not on property dedicated to the City of Bozeman shall be located within public drainage easements that provide for storm water facility maintenance responsibility by the property owners association. c. A 1-foot no access strip shall be placed along all lots fronting on U.S. 191. d. Due to the known high groundwater conditions in the area no basements will be permitted with future development of the site. No crawl spaces will be permitted with future development of the site, unless a professional engineer registered in the State of Montana certifies that the lowest point of any proposed structure is located above the seasonal high groundwater level and provide supporting groundwater data prior to the release of building permit. In addition, sump pumps are not allowed to be connected to the sanitary sewer system. Sump pumps are also not allowed to be connected to the drainage system unless capacity is designed into the drainage system to accept the pumped water. Water from sump pumps may not be discharged onto streets, such as into the curb and gutters where they may create a safety hazard for pedestrians and vehicles. e. All downstream water user facilities will not be impacted by this subdivision. f. All lots are subject to a 10-foot wide front yard utility easement. g. All open space and public access areas to be owned and maintained by the property owners association. h. If water rights or cash-in-lieu of water rights, have not been provided with final Ppat, then water rights or cash-in-lieu must be provided with any future site plan development or applicable development application. 16. BMC 38.430.040. The Planned Unit Development Final Plan shall be completed and approved by the City of Bozeman before the approval of the final plat. 17. BMC 38.220.020 & 38.610.050. Prior to final plat approval, the applicant must provide the Community Development Department with a written statement of a wetland boundary determination from the U.S. Army Corps of the wetland status. If the wetlands are determined to be jurisdictional, an approved 404 permit for any changes to the wetland must be submitted to the Community Development office prior to final plat approval. The applicant must contact the Gallatin County Conservation District, Montana Department of Environmental Quality, and U.S. Army Corps of Engineers regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) must be obtained by the applicant. Approved stream and wetland permits shall be provide prior to public infrastructure approval for public infrastructure impacts to jurisdictional wetland and streams. 18 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 11 of 22 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS The following are procedural requirements not yet demonstrated by the plat and must be satisfied at the final plat. 1. The final plat must conform to all requirements of the Bozeman Municipal Code and the Uniform Standards for Subdivision Plats (Uniform Standards for Certificates of Survey and Subdivision Plats (24.183.1104 ARM) and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The Final Plat application shall include three (3) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent). The Gallatin County Clerk & Recorder’s office has elected to continue the existing medium requirements of 2 mylars with a 1½” binding margin on one side for both plats and COS’s. The Clerk and Recorder will file the new Conditions of Approval sheet as the last same sized mylar sheet in the plat set. 2. BMC 38.100.080.A. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 3. BMC 38.220.300 & 310. The Property Owners’ Association (POA) documents must be finalized and recorded with the final plat. The POA documents must include the requirements of Section 38.220.300 and 320. 4. BMC 38.270.030. The applicant must submit plans and specifications for water and sewer main extensions, streets, and storm water improvements, prepared and signed by a professional engineer (PE) registered in the State of Montana, which must be provided to and approved by the City Engineer. Water and sewer plans must also be approved by the Montana Department of Environmental Quality. The applicant must also provide professional engineering services for construction inspection, post-construction certification, and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. Building permits will not be issued prior to City acceptance of the site infrastructure improvements unless all provisions set forth in Section 38.270.030.C of the Bozeman Municipal Code are met to allow for concurrent construction. 5. BMC 38.410.060.A. The final plat must provide all necessary easements and they must be described, dimensioned and shown on each subdivision block of the final plat in their true and correct location. The recorded easement number must be documented on the final plat. a. The applicant is advised that all dedicated public easements must be recorded the City’s standard template easement documents separate from the plat and the recorded document number must be listed on the final plat. Easements will be deemed inadequate if they are not in a final draft format (signatures are not required for the 19 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 12 of 22 draft review). Easements must be stamped by a licensed professional surveyor. In preparing signature blocks on any upcoming documents, please make the following changes: Jeff Mihelich, City Manager; Mike Maas, City Clerk. If a new member is established, the easement documents must be updated. b. Utility easements shall be provided in accordance with the UDC. The required 10- foot front yard easement is required along the lots on Fowler Road. The easement must be recorded prior to final plat approval. c. A city standard thirty (30) foot wide sewer and water pipeline and access easement and agreement for public water and sewer utilities located outside of dedicated public right of way must be provided with the final plat. The easement must be recorded prior to final plat approval. d. Prior to public infrastructure approval, the applicant shall obtain a public street and utility easement from the adjoining property owner for the portion of Technology Blvd West situated on the adjoining property to provide for a total dedicated right of way and easement width of 60 feet. e. Any public access easement for the proposed sidewalk system that resides within open space must have an easement recorded prior to final plat approval. f. A public drainage easement shall be provided for all stormwater facilities conveying runoff from dedicated public right of way. The easement must be recorded prior to final plat approval. 6. BMC 38.410.060. The applicant shall provide easements for all agricultural water user facilities located on the proposed subdivision property prior to final plat approval. The applicant shall coordinate the location of easements with Farmers Canal Company. The existing easement for Farmers Canal provides for a pipeline to be constructed on the existing section of open channel canal. This easement shall be modified as needed if this portion of the canal will not be placed in a pipeline. The applicant must provide the 30 foot farmers canal and public access easement documentation. The recorded easement number must be written in on the final plat. Written approval from Farmers Canal Company for all associated modifications or impacts to agricultural water user facilities is required with the final plat. 7. BMC 38.240.410.Technology Blvd West is a privately maintained street located within public ROW as referenced in the provided approved PUD documentation. Prior to Final Plat Approval, the certificate of dedication shall reflect private maintenance. 8. BMC 38.270.030, Completion of Improvements. If it is the developer’s intent to file the plat prior to the completion of all required improvements, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the preliminary plat submittal information and conditions of approval. If the final plat is filed prior to the installation of all improvements, the developer shall supply the 20 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 13 of 22 City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. 9. BMC 38.240.450. The applicant is advised where public improvements are to be installed prior to Final Plat Approval, the final plat of subdivision must contain a certificate of completion of public improvements. Prior to final plat approval, sheet one certificates must list all completed and accepted improvements, if applicable. 10. BMC 38.240.530. The Certificate of Completion of water-related improvements is not shown on sheet one of the plat and must be shown, if applicable prior to final plat approval. 11. BMC 38.240.530. When irrigation of public facilities are to be installed prior to final plat approval, the final plat of subdivision must contain a certificate of completion of water- related improvements. The certificate must list all completed and accepted improvements, including but not limited to all irrigation system record drawings. The subdivision proposes irrigation of public street frontage. This certificate must be provided on the final plat. 12. BMC 38.240.420. If there are liens or mortgages against the property, the appropriate Mortgagee certificate must be included. 13. BMC 38.410.120. If mail delivery will not be to each individual lot within the development, the developer shall provide an off-street area for mail delivery within the development in cooperation with the USPS. It shall not be the responsibility of the City to maintain or plow any mail delivery area constructed within a City right-of-way. If cluster boxes are use a dedicated area to pull up and access the boxes must be provided. 14. BMC 38.220.320. Covenants. Covenants, restrictions, and articles of incorporation for the creation of a property owners’ association shall be submitted with the final plat application for review and approval by the Department of Community Development and shall contain, but not be limited to the following items: 1) the orientation and setbacks for corner lots, 2) all additional setbacks required when lots are adjacent to pathway corridors and minor arterial roads, 3) provisions for fences, 4) provisions for snow removal, maintenance and upkeep of all common areas, public and private parks, trails, storm water runoff facilities, 5) guidelines that outline architectural and landscape requirements for each individual lot and/or phase of the subdivision, including placement of boulevard trees at a regular spacing for each residential lot, 6) provisions that outline the renewal of an annual contract with a certified landscape nursery person for the upkeep and maintenance of all parklands, common open space, trails, etc., 7) landscape details for detention ponds, outlet structures, boulevard trees, parkland, irrigation, etc., 8) mitigation of groundwater with established floor elevations, 9) noxious weed control, and 10) assessment of existing and future Special Improvement Districts. These documents shall be submitted to the city attorney and shall not be accepted by the City until approved as to legal form and effect. A draft of these documents must be submitted for review and approval by the Community Development Department at least 30 working days prior to submitting a final plat application. These documents shall be executed and submitted with the initial final plat to be filed with the Gallatin County Clerk and Recorder at the time of final plat recordation. 21 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 14 of 22 SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS The DRC determined that the application is adequate for continued review and found that application conforms to standards and is sufficient for approval with conditions and code provisions on July 12, 2021. Public hearing date for the Planning Board is on August 2, 2021 at 6:00pm. The hearing will be held via WebEx with a WebEx link provided with the Planning Board agenda. Public hearing date for the City Commission is August 17, 2021 at 6:00 PM. The hearing will be held via WebEx with a WebEx link provided with the City Commission Agenda. SECTION 6 - STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis is a summary of the completed review. Applicable Subdivision Review Criteria, Section 38.240.130.A.5.b, BMC. In considering applications for subdivision approval under this title, the advisory boards and City Commission shall consider the following: 1) Compliance with the survey requirements of Part 4 of the Montana Subdivision and Platting Act The preliminary plat has been prepared in accordance with the survey requirements of the Montana Subdivision and Platting Act by a Professional Engineer registered in the State of Montana. As outlined in code provision number 1, the final plat must comply with State statute, Administrative Rules of Montana, and the Bozeman Municipal Code. A conditions of approval sheet must be included and updated with the required notations can be added as required by conditions or code. 2) Compliance with the local subdivision regulations provided for in Part 5 of the Montana Subdivision and Platting Act The final plat must comply with the standards identified and referenced in the BMC. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as a condition of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. Sections 3 and 4 of this report identify conditions and code corrections necessary to meet all regulatory standards. Therefore, upon satisfaction of all conditions and code corrections the subdivision will comply with the local subdivision regulations. 22 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 15 of 22 3) Compliance with the local subdivision review procedures provided for in Part 6 of the Montana Subdivision and Platting Act The application was received on March 21, 2020 and was deemed inadequate for further review. Revised application materials were received on June 27, 2020, March 10, 2021, and June 7, 2021. The City deemed the application adequate for review on July 12, 2021. Public hearings are scheduled for August 2 and August 17, 2021. The hearings before the Planning Board and City Commission have been properly noticed as required by the Bozeman UDC. Based on the recommendation of the DRC and other applicable review agencies, as well as any public testimony received on the matter, the Planning Board must forward a recommendation in a report to the City Commission who will make the final decision on the applicant’s request. The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate. Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny the subdivision application by October 4, 2021 unless there is a written extension from the developer, not to exceed one year. Public notice for this application was given as described in Appendix C and no public comment has been received. On July 29, 2021 this major subdivision staff report was completed and forwarded with a recommendation of conditional approval for consideration to the Planning Board. 4) Compliance with Chapter 38, BMC and other relevant regulations Based on review of the Development Review Committee and the Department of Community Development all applicable regulations are met if all code requirements are satisfied. Pertinent code provisions and site specific requirements are included in this report for City Commission consideration in Sections 3 and 4. 5) The provision of easements to and within the subdivision for the location and installation of any necessary utilities The final plat will provide and depict all necessary utilities and required utility easements. Condition of approval 4 requires that all easements, existing and proposed, must be accurately depicted and addressed on the final plat and in the final plat application. Public utilities will be located within dedicated street right of ways. Code provision 5 states that utility easements need to be provided and granted with the final plat in accordance with standards. 6) The provision of legal and physical access to each parcel within the subdivision and the notation of that access on the applicable plat and any instrument transferring the parcel Access to the property is from Fowler Avenue to the east which is a City maintained road. Technology Boulevard West is being extended from the east and required to be privately maintained per condition of approval number 13 and code provision number 7. 23 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 16 of 22 Primary Subdivision Review Criteria, Section 76-3-608 1) The effect on agriculture This item was waived by the DRC with the pre-application. 2) The effect on Agricultural water user facilities Agricultural water user facilities on site include canals, irrigation ditches, and streams that provide irrigation water to downstream users. The Farmer’s Canal, tributary to the Baxter Border stream, Section Line Ditch, and Upper Cattail Creek (Harmon Stream) all transport irrigation water through the property. No modifications to the existing agricultural water user facilities will be done with this phase and the ability of the facilities to deliver water to downstream users will be protected. 3) The effect on Local services Water/Sewer – Water and sewer systems exist to serve the subdivision. The subdivider proposes to extend water and sewer mains to the subdivision. Code provision 4 requires the applicant to submit plans for water and sewer main extensions, approved by the Montana Department of Environmental Quality, to be reviewed by the City. Code provision 5 requires a city standard sewer easement where the sewer system is located. Building permits will not be issued prior to city acceptance of site infrastructure improvements, unless concurrent construction is requested and conditions allow. Water rights exist for the subject property, the applicant proposes to transfer to City ownership existing water rights as outlined in condition number 12. Streets – The Growth Policy and subdivision standards require adequate connectivity of a development to the street grid. Access is taken from West Garfield to the south, Fowler Avenue to the east, and Huffine Lane to the north. West Technology Boulevard will be constructed to a 60-foot street section off Fowler Avenue. All internal streets will be privately maintained as outlined in condition of approval number 13 and code provision number 7. A traffic impact study was provided with the application and found that the infrastructure that exists and is proposed for the project will service the development. Police/Fire – The area of the subdivision is within the service area of both these departments. No concerns on service availability have been identified. Stormwater - The subdivision will construct storm water control facilities to conform to municipal code. Phase 5 lies within the scope of the previously approved drainage plan and will incorporate minor basins and low impact development for runoff. The responsibility of the stormwater facilities is the responsibility of the Property Owners Association (POA) as outlined in condition of approval 15. Inspection of installed facilities prior to final plat will verify that standards have been met. Parklands – No parkland is required since there will be no residential component in this phase. 24 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 17 of 22 4) The effect on the Natural environment No significant negative impacts to the natural environment have been identified. There are no floodplains located within the subject property. A wetland delineation report was completed and determined that there are 1.45 acres of wetlands and 2613 linear feet of tributaries. A relaxation to allow encroachment into the watercourse setback was granted with the original PUD adoption in 2006. With the adoption of the PUD, wetland impact credits were paid for equating 1.94 acres. .65 acres have been impacted with phases 1-4. Phase 5 expects to impact .86 acres of wetlands with the majority on the northeastern corner of the development where infrastructure and buildings will be located. The remaining .59 acres of wetlands are located within the open space areas and are expected to be preserved. Per condition of approval number 16, permits affiliated with the wetlands (404, 310, Turbidity exemption) is required with the final plat. The site is in an area of high groundwater which may negatively impact future structures or cause illicit discharges into the sanitary sewer and over burden the surface drainage system. Condition 16d prohibits use of basements or crawl spaces unless a professional engineer certifies that the structure has been designed in such a way to accommodate seasonal high groundwater and requires addition of a notation of this restriction on the conditions of approval sheet. This requirement will protect both future structure owners from future hazards of flooding and lessen burden on the public from illicit discharges. BMC 38.550.070 requires use of wells or surface water rights to irrigate parks and open spaces rather than municipal water supply. The application will irrigate open space and boulevard strips landscaping with wells. 5) The effect on Wildlife and wildlife habitat No significant negative impacts to the wildlife and wildlife habitat have been identified. There are no known populations of large mammals or endangered species that occupy the site. 6) The effect on Public health and safety With the recommended conditions of approval and required plat corrections, the subdivision will not significantly impact public health and safety. The intent of the regulations in Chapter 38 of the Bozeman Municipal Code is to protect the public health, safety and general welfare. The subdivision has been reviewed by the DRC which has determined that it is in general compliance with the title with conditions and code provisions. Any other conditions deemed necessary to ensure compliance have been noted throughout this staff report. Condition of approval 1 requires full compliance with all applicable code requirements. All subdivisions must be reviewed against the criteria listed in 76-3-608.3.b-d, Mont Code Ann. and as a result, the Department of Community Development has reviewed this application against the listed criteria and further provides the following summary for submittal materials and requirements. All infrastructure will meet City standards and the improvements to the watercourses will not impact the current floodplains on the project site nor will they increase flood risk on the property or surrounding properties. 25 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 18 of 22 Preliminary Plat Supplements A subdivision pre-application plan review was completed by the DRC on February 21, 2019. The DRC found that more information was needed prior to the application going forward to preliminary plat so revisions were submitted on April 22, 2019. Staff offers the following summary comments on the supplemental information required with Article 38.220.060, BMC. 38.220.060.A.1 Surface Water In 2005, a wetland delineation was conducted identifying the proposed impacted areas. Based on the proposed impact areas within the overall Bozeman Gateway Development, a total of 1.94 acres of wetland credits were purchased in 2005. Up until 2019, the actual impacted area has been less than the area planned and purchased resulting in an unused credit of approximately 1.29 acres. Since 2005, changes to the development as well as upstream flows have altered the shape and area of the wetland resulting in a new 2019 wetland delineation. Phase 5 will result in .86 acres of impacts to the wetlands. The primary mitigation is to avoid and preserve wetland characteristics where possible. A tributary to the Baxter Border Stream flows from south to north along the west side of Fowler Avenue. It has a perennial flow and serves to convey irrigation flow from the Farmer’s Canal to downstream users. The Baxter Border Ditch will remain largely undistributed by the project. The stream will remain in its natural state, protected within an open space corridor. The open space area will be enhanced with trails and landscaping to provide a pedestrian corridor reaching from Huffine Lane to the south boundary of the project. 38.220.060.A.2 Floodplains There are no floodplains on the subject property. 38.220.060.A.3 Groundwater Groundwater depth was monitored and had depths that vary from 4.3’ below the ground surface. As a supplement to the original water table, a hydrograph from a nearby well has been submitted with the application. Elevating the roads slightly above the existing ground assist in providing separation to the groundwater. Condition of approval 16 restricts the use of basements and crawl spaces due to high groundwater. 38.220.060.A.4 Geology, Soils and Slopes This subdivision will not significantly impact the geology, soils or slopes. Alluvial deposits derived from the mountains south of Bozeman underlie the subdivision. There are no geological hazards or unusual features that limit the suitability of the land for the proposed uses. The project area generally slopes from south to north at approximately 1.25 percent. Two soil types exist on the site that are similar to those found throughout Bozeman. Limitations to development are primarily depth to groundwater, bearing capacity, frost heave potential, shrink-swell potential and flooding. 26 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 19 of 22 To minimize erosion, the construction contract shall provide for seeing of slopes in cut and fill areas. Methods of erosion control and revegetation shall be in conformance to the Montana Department of Environmental Quality Montana Sediment and Erosion Control Manual. 38.220.060.A.5 Vegetation On site vegetation is limited to grasses, forbs and a few locations with low growing shrubs, such as wild roses, found along fence lines and near drainage courses. There are no critical plant communities on site. A weed management plan is included in the application. 38.220.060.A.6 Wildlife There is little wildlife or habitat on site. In the past, the site has been used for pasture and growing of hay crops. Phase 5 is currently not utilized. There are no known populations of large mammals that occupy the site nor are there are known endangered species utilizing the site. 38.220.060.A.7 Historical Features There are no known historical features located within the property. A Cultural Evaluation was conducted in 2004 that stated that the Farmer’s Canal may be significant in terms of National Register criteria but the integrity of the entire canal system has been compromised over time. If any historic items are discovered during construction, the State Historic Preservation Office will be contacted. 38.220.060.A.8 Agriculture Materials waived. 38.220.060.A.9 Agricultural Water User Facilities This subdivision will not significantly impact agricultural water user facilities. See discussion above under primary review criteria. 38.220.060.A.10 Water and Sewer The subdivision will not significantly burden city water and sewer infrastructure with the recommended conditions of approval and code provisions. See discussion above under primary review criteria. 38.220.060.A.11 Stormwater Management The subdivision will not significantly impact stormwater infrastructure. The stormwater systems will be maintained by the Bozeman Gateway POA. See discussion above under primary review criteria. 38.220.060.A.12 Streets, Roads and Alleys The subdivision will not significantly impact the City’s street infrastructure. See primary review criteria above for further information. 27 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 20 of 22 38.220.060.A.13 Utilities This subdivision will not significantly impact utilities. Standard 10-ft utility easements will be provided across all lots. See discussion above under primary review criteria regarding extension of water and sewer. All private utilities are available in the area. 38.220.060.A.14 Educational Facilities A letter was sent to Todd Swinehart, P.E., Director of Facilities, Bozeman Public Schools. The assumption was made that the existing zoning designation and mixed-use development will not generate any students within the development. 38.220.060.A.15 Land Use Phase 5 is consistent with those allowed by B-2 zoning. Existing land uses bordering the east and north sides of the Bozeman Gateway property are commercial businesses. The properties bordering the south and west are public lands owned by Montana State University and is agricultural use. The proposed uses will not adversely affect adjacent land uses in the area. Three lots are open space which equate to 2.85 acres or 41.5% of the total area. Two lots are commercial lots which equate to 3.38 acres or 49.2% of the total area. The streets equate to .64 acres or 9.3% of the total area. In total, Phase 5 is 5 lots and 6.87 acres. Access to the existing public lands will not be affected by the development. All open space within the planned area will be open to the public and easily accessible. No hazards or nuisances will be created by the development. Safety issues related to construction activity will be effectively controlled by standards construction management practices. 38.220.060.A.16 Parks and Recreation Facilities No parkland is dedicated with Phase 5 since there is no residential component. There are green space corridors that run from north to south of the property. These corridors will provide pedestrian and bicycle circulation connecting the internal aspects of the project as well as providing connections to surrounding lands. Open space areas will be owned and maintained by the applicant. 38.220.060.A.17 Neighborhood Center Plan The open space lots along the eastern perimeter of Phase 5 connect to the existing trail and open space network to the north. This shared community space and trail system encourages gathering, relaxing and recreating. A bike/pedestrian trail and sidewalk connects to the properties on the north which then connect to the overall trail network of the development that continues eastward to MSU. The open space will also protect an existing stream corridor that will remain for the most part in its natural state. 38.220.060.A.18 Lighting Plan The preliminary lighting plan is in accordance with the requirements of the UDC and Bozeman Gateway Development Manual. Light spacing on streets meets the requirements of the City of Bozeman Design Standards and Specifications Policy. 28 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 21 of 22 38.220.060.A.19 Miscellaneous Materials waived. 38.220.060.A.20 Affordable Housing Materials waived. APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The intent of the B-2 community business district is to provide for a broad range of mutually supportive retail and service functions located in clustered areas bordered on one or more sides by limited access arterial streets. Multi-household dwellings, townhouses, and apartments are allowed as a secondary use due to their complementary nature and ability to enhance the walkability of these districts. Design standards emphasizing pedestrian oriented design are important elements of this district. Use of this zone is appropriate for arterial corridors, commercial nodes, and/or areas served by transit. Adopted Growth Policy Designation: The Future Land Use Map of the Bozeman Community Plan designates the subject property to develop as “Regional Commercial and Services.” Regionally significant developments in this land use category may be developed with physically large and economically prominent facilities requiring substantial infrastructure and location near significant transportation facilities. Due to the scale of these developments, location, and transition between lower density uses is important. Residential space should be located above the first floor to maintain land availability for necessary services. Development within this category needs well-integrated utilities, transportation, and open space networks that encourage pedestrian activity and provide ready-access within and adjacent to development. Large community scale areas in this land use category are generally 75 acres or larger and are activity centers for several surrounding square miles. These are intended to service the overall community as well as adjacent neighborhoods and are typically distributed by a one-to two-mile separation. APPENDIX B – NOTICING AND PUBLIC COMMENT Notice was provided at least 15 and not more than 45 days prior to the Planning Board and City Commission public hearings. BMC 38.220.420, Notice was provided by posting the site, mailing by certified mail to adjacent property owners and by first class mail to all other owners within 200 feet on July 16, 2021. The site was posted with a notice on July 16, 2021 and a legal advertisement was published in the Bozeman Daily Chronicle on July 18 and August 15, 2021. Content of the notice contained all elements required by Article 38.220., BMC. No public comment has been received at the time of the writing of this staff report. 29 20094 Staff Report for Bozeman Gateway Phase 5 Major Subdivision Page 22 of 22 APPENDIX C – PROJECT BACKGROUND Bozeman Gateway was created as a Planned Unit Development in 2006. There are five phases in total. Phases 1-3 have been subdivided and currently under development. Phase 4 preliminary plat was approved by the City Commission on July 20, 2021. APPENDIX D - OWNER INFORMATION Owner/Applicant: Mitchell Development & Investments, LLC, PO Box 738, Great Falls, MT 59403 Representative: Morrison-Maierle, Inc., PO Box 1113, Bozeman, MT 59718 Report By: Sarah Rosenberg, AICP, Associate Planner ATTACHMENTS The full application and file of record can be viewed digitally at https://www.bozeman.net/government/planning/using-the-planning-map, select the “Project Documents Folder” link and navigate to application #20094, as well as digitally at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Application materials – Available through the Laserfiche archive linked agenda materials and the full file is linked below. https://weblink.bozeman.net/WebLink/Browse.aspx?id=209880&dbid=0&repo=BOZEMAN This project can be viewed on the Community Development Viewer interactive map directly with this link: https://gisweb.bozeman.net/Html5Viewer/?viewer=planning&FILE_NUMBER=20-094 30 Memorandum REPORT TO:Planning Board FROM:Tom Rogers, Senior Planner Chris Saunders, Community Development Manager SUBJECT:Ongoing work sessions to define and refine Planning Board goals for 2020 and implementation of the Bozeman Community Plan 2020. MEETING DATE:August 2, 2021 AGENDA ITEM TYPE:Citizen Advisory Board/Commission RECOMMENDATION:As determined by the Board. STRATEGIC PLAN:4.1 Informed Conversation on Growth: Continue developing an in-depth understanding of how Bozeman is growing and changing and proactively address change in a balanced and coordinated manner. BACKGROUND:On December 21, 2020 the Planning Board initiated discussion on the Board priorities and goals for the coming year including implementation of the Community Plan 2020. The goals and objectives initiative continues. Chairman Happel prepared the attached memo to the Board describing the effort to continue this work, see "Memo to PB-210728". UNRESOLVED ISSUES:None ALTERNATIVES:As determined by the Board FISCAL EFFECTS:Not identified at this time. Attachments: Memo to PB-210728.pdf Report compiled on: April 14, 2021 31 MEMORANDUM TO: Bozeman Planning Board Members FROM: Henry Happel SUBJECT: Eighth Working Session on Goals and Objectives DATE: July 28, 2021 At our meeting on August 2, time permitting, I would propose that we take up the following goals and objectives matters in the following order: A. Community Outreach. 1. Report by me on progress on development of an Executive Summary of the 2020 Community Plan and accompanying guest editorial. 2. Report by Jen Madgic on the possibility of utilizing City resources to develop a video to accompany the Executive Summary. 3. Report by Cathy Costakis on preliminary work on finding sponsors/organizers for a regional summit on planning and growth issues B. Developer Statement of Benefits. 1. Report by me on our Memo to Community Development asking that the City request from developers a written narrative describing benefits to the City. C. Suggested Revisions to the UDC (A partially new topic). 1. Procedures for agreeing on UDC provisions to propose to the City Commission for rescission or amendment: This Board will have to provide and defend written arguments to the City Commission concerning the recission or amendment of UDC provisions it finds defective. In order to maximize rigorous thinking, I am of the opinion that at least an outline in writing of the argument regarding each UDC provision or set of provisions proposed for rescission or amendment should be prepared by the proponent before the provision(s) in question are taken up by the Board. We should discuss this. D. Financial Matters. 1. Assuming I have received advice from the City Attorney’s office, either I or someone from that office will discuss the legalities around the utilization of funds from the 2- mill levy on property owners. 32 2 E. Community Plan Oversight. 1. It was proposed at our first goals and objectives discussion back in December that, after receiving the required annual report from Community Development on actions taken to carry out the Community Plan, the Planning Board should have a public meeting to review the Plan and determine whether to suggest any amendments to it. We should discuss this proposal. 2. It was also proposed that the Board should periodically review metrics, both those described in the Community Plan and others as available, to track progress under the Plan and assess if each metric is providing the right data for informed decision making or should be revised. We should discuss this proposal as well. F. Changes to the Planning Board (A partially new topic). 1. It would appear that our Board is going to be merged with the Bozeman Zoning Commission and the Design Review Board. In addition, it was proposed at our first goals and objectives discussion that we look at how our Board will evolve/change once we become a Metropolitan Planning Organization (MPO). I am meeting with Marty Matsen prior to Monday and will provide a preliminary report on the prospects for these changes and their implications as viewed by the Community Development Department. We should then discuss issues that arise from these changes from the perspective of Board members. 33