Loading...
HomeMy WebLinkAboutC003ErosionControl_04212021SSS11ohohohohbtbtbtCCYELLOWSTONE MEMORIAL LLCPARCEL 1 & 2, & TRACT C - CERTIFICATE OF SURVEY 2581NELSON ROAD LLC - TRACT 1A - CERTIFICATE OF SURVEY 1372A30' DEDICATED ROW - NELSON MEADOWS SUBDIVISIONLIFT STATIONTRACTNELSONMEADOWSSUB.BARTIMCO PROPERTIES, LLCLOT 26, BLOCK 7NELSON MEADOWS SUBDIVISIONBURLINGTON NORTHERN RAILROADRIGHT-OF-WAYFRONTAGE ROADCERTIFICATE OF SURVEY2332 & 2952N88°57'33"E 600.74' (R-600.80')S6°33'44"E 446.65' (R-446.51')N89°06'33"W 62.16'S37°21'59"W 382.82' (R-382.69')N53°27'02"W 246.86'(R1-246.90')(R-682.82')N0°39'01"E 682.68'357.73' (R-357.85')324.95' (R-324.97')35.43'40.00'40.00'34.00'313.39'34.00'LOT 1ABLOCK 6NELSON MEADOWS SUBDIVISION9.282 Ac.404,304 Ft²BARTIMCO PROPERTIES, LLCLOT 2, BLOCK 5NELSON MEADOWS SUBDIVISIONBARTIMCO PROPERTIES, LLCLOT 16, BLOCK 4NELSON MEADOWS SUBDIVISIONS 01°37'56" W; 14.82'S 41°49'14" W; 8.30'S 83°01'45" W; 14.92'L =16 8 .1 5 ,R=180.00D = 5 3 ° 3 1 '28"ROYAL WOLF WAYROYAL WOLF WAYPRINCE LANE PRINCE LANE########################PROPOSEDBUILDING35,100 SFFFE = 4596.00#####################CF CF CF CF C F CFCFCFCF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CFCFCFCFCFCFCFCFCFCFCFCFSF SF SF SFSFSFSFSFSFSFSFSFSF SFSFSFCFCFCFCFCF CF CFCONVEYORSTAGINGAREATEMPORARYRESTROOM(S)MATERIAL STORAGE /STAGING AREA40 YD ROLL-OFFDUMPSTERSPILLRESPONSEKITstwstwstwstw stwstwstwstwstwstwstwstw459245954594CONSTRUCTIONTRAILER DRAWN BY |REVISIONS©| ALL RIGHTS RESERVEDCHECKED BY |®PARCEL DISTRIBUTION FACILITY UPS BOZEMAN, MONTANASITE PLAN SUBMITTAL04.21.20212021Know what'sbelow.Callbefore you dig.6/9/2021 11:06 AM | L:\UPS_BOZEMAN\BIMCAD\Civil\UPS_BZMN_C003-C004.dwgC003TEMP EROSIONCONTROL PLANSCHLEGEL-WHITE1C003TEMP EROSION CONTROL PLANNORTH02550100SCALE: 1" = 50'PROJECTLOCATIONEAST ON FRONTAGE ROADFOR LOCAL HARDWAREWEST ON FRONTAGE ROAD TOSERVE AS THE PRIMARYCONSTRUCTION ROUTE FOR MAJORBUILDING SUPPLIES AND EQUIPMENTFROM BELGRADE/JACKRABBIT AREA2C003NOT TO SCALECONSTRUCTION HAUL ROUTENORTHSEDIMENTATIONPONDSEDIMENTATIONPOND1.CONCRETE WASHOUT. SEE DETAIL 1/C004 & 2/C004.2.SILT FENCE. SEE DETAIL 3/C004.3.SEDIMENT CONTROL WATTLE. SEE 4/C004.4.TRACKING CONTROL PAD. SEE DETAIL 5/C004.5.INLET PROTECTION. SEE 6/C004. SITE PLAN KEY NOTES#1SILT FENCEINLET PROTECTIONCFSFCONSTRUCTION FENCESTAGING AREAVEHICLE TRACKINGEROSION CONTROL LEGEND22233333344555GENERAL NOTES1.CONTRACTOR RESPONSIBLE FOR IMPLEMENTATION OFAPPROPRIATE EROSION AND SEDIMENT CONTROL MEASURESDURING CONSTRUCTION.2.CONTRACTOR TO OBTAIN SWPPP PERMIT AND CITY OFBOZEMAN PERMIT, AND COMPLY WITH PERMITREQUIREMENTS IN REGARD TO MANAGING CONSTRUCTIONSTORMWATER.FLOW DIRECTION ARROW