Loading...
HomeMy WebLinkAboutTrafficMemo_06092021 cushingterrell.com June 09, 2021 Development Review Engineer City of Bozeman 20 E. Olive Street Bozeman, MT 59715 RE: UPS Bozeman Parcel Distribution Facility Traffic Memo To whom it may concern: The purpose of this memo, at the request of the City of Bozeman, is to address the additional traffic generated from the proposed above-mentioned project and compare to the estimated traffic generated from the underlying subdivision, Nelson Meadows. For this analysis, the traffic impact study for the underlying subdivision prepared by Morrison Maierle (Traffic Impact Study Park Place Industrial Park, June 2018) was utilized. Table 2 of this report (shown below) provides an overall calculation summary of the trip generation for the subdivision. According to the Traffic Impact Study, the values in the table above were calculated using trip generation rates found in Trip Generation, 10th Edition by the ITE. The number of units used in this calculation is estimated based on a percentage of overall property square footage. Utilizing the same methodology for the subject property, the gross floor area anticipated for Lot 1A is as follows: Lot Area (Lot 1A) = 404,323 SF Buildable Area = (93%) x (Lot Area) = 376,020 SF Anticipated Gross Floor Area = (20%) x (Buildable Area) = 75,204 SF Using the anticipated gross floor area for Lot 1A as a fraction of the total subdivision, the estimated trip generation values are as follows: Enter Exit Total Enter Exit Total Enter Exit Total Lot 1A 75.2 144 144 287 35 8 43 8 31 40 Originally Anticipated Traffic Generation Summary (Based on Underlying TIS) Property Units Average Weekday Trips Average Weekday, AM Peak Hour Trips Average Weekday, PM Peak Hour Trips 2 cushingterrell.com The actual proposed gross floor area for the project site is 35,100 SF. As such the trip generation values were updated using the same ratios in the table below: Lastly, estimated traffic values provided by UPS for the purpose of pavement design were used to estimate traffic generation values which are summarized in the table below. Additionally, the anticipated traffic distribution during the peak hour is approximately 40 employees arriving in personal vehicles near 8 am and leaving around 9:30 in package delivery cars. The PM hours is more difficult to predict as employees will all be returning at different times. As shown in comparing the above tables, the estimated values calculated are anticipated to be less than that of what the underlying subdivision calculated. Furthermore, the TIS includes warrant conditions for intersection improvements (traffic light) at Nelson Rd and Frontage Rd. It is concluded that approximately 85% of the subdivision can be developed before satisfying the warrant for the intersection improvements. It is anticipated that the development of the subject property will be completed prior to Nelson Meadows reaching this threshold. Sincerely, Adam Schlegel, PE Civil Engineer cc: UPS_BOZEMAN File Enter Exit Total Enter Exit Total Enter Exit Total Lot 1A 35.1 67 67 134 16 4 20 4 15 19 Traffic Generation Summary (Based on Proposed Building) Property Units Average Weekday Trips Average Weekday, AM Peak Average Weekday, PM Peak Enter Exit Total Lot 1A 35.1 113 112 225 Property Units Average Weekday Trips Traffic Generation Summary (Based EALs used for Pavement Desgin)