HomeMy WebLinkAboutA1_06092021
A1
DEVELOPMENT REVIEW APPLICATION
PROJECT IMAGE
PROJECT INFORMATION
Project name:
Project type(s):
Description:
Street address:
Zip code:
Zoning:
Gross lot area:
Block frontage:
Number of buildings:
Type and Number of dwellings:
Non-residential building size(s):
(in stories)
Non-residential building height(s):
Number of parking spaces:
Afordable housing (Y/N):
Cash in lieu of parkland (Y/N):
VICINITY MAP
CITY USE ONLY
Submittal date:
Application fle number:
Planner:
DRC required (Y/N): Revision Date:
Development Review Application A1 Page 1 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
UPS Bozeman Parcel Distribution Facility
Distribution Center
Parcel Distribution Facility
Royal Wolf Way
59715
M-1 Light Manufacturing District
9.282 acres (Lot 1 = 5.273 AC, Lot 27 = 4.008 AC)
Other
1
N/A
35,100 (+/-) SF
1
86
N
N/A
DEVELOPMENT REVIEW APPLICATION
1. PROPERTY OWNER
Name:
Full address (with zip code):
Phone:
Email:
2. APPLICANT
Name:
Full address (with zip code):
Phone:
Email:
3. REPRESENTATIVE
Name:
Full address (with zip code):
Phone:
Email:
4. SPECIAL DISTRICTS
Overlay District: Neighborhood Conservation None
Urban
Renewal District: Downtown North 7th Avenue Northeast North Park None
5. CERTIFICATIONS AND SIGNATURES
This application must be signed by both the applicant(s) and the property owner(s) (if diferent) for all application types before the
submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only.
As indicated by the signature(s) below, the applicant(s) and property owner(s) submit this application for review under the terms
and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development
approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special
conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may
be assessed for my project. Further, I agree to grant City personnel and other review agency representative’s access to the subject
site during the course of the review process (Section 38.34.050, BMC). I (We) hereby certify that the above information is true
and correct to the best of my (our) knowledge.
Certifcation of Completion and Compliance – I understand that conditions of approval may be applied to the application and that
I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with
municipal code provisions.
Statement of Intent to Construct According to the Final Plan – I acknowledge that construction not in compliance with the approved
fnal plan may result in delays of occupancy or costs to correct noncompliance.
continued on next page
Development Review Application A1 Page 2 of 3 Revision Date: 5.16.18
REQUIRED FORMS: Varies by project type, PLS
BT-OH, LLC
55 Glenlake Parkway NE, Atlanta GA, 30328
815.262.4543
rshedden@ups.com
United Parcel Service - Rob Shedden
3300 Airport Drive, Rockford, Illinois 61109
815.262.4543
rshedden@ups.com
Cushing Terrell - Adam Schlegel
411 East Main Street Suite 101, Bozeman, MT 59715
406.922.7111
adamschlegel@cushingterrell.com
DEVHLOPM ENT REVIEW APPLICATICN
/kpilL
h6,rr P Sl*t/*,hPk-
l"Lq, I sAuJt,^
lf signing as a corporation or LLC, please provide the title and position of the individual signing on behalf of the corporation/LlC,
Attach separate sheets for additional owner signatures.
Applicant Signature:
Printed Name:
Owner Signature:
Printed Name:
Qwner Signature:
Printed Name:
6. APPLICATIONTYPES
Checkall thatapply, use noted forms.
n 1. Pre-application Consultation
tl z. Maste/site Plan
B 3. Site Plan
tr 4. Subdivision pre-application
tr 5. Subdivision preliminary plan
n 6. Subdivision final plan
n 7^ Subdivision exemption
n 8. Condominium Review
tr 9- PUDconceptplan
fl ro. PUupreliminaryplan
E u. PuPfnalplan
E fZ. Annexation and lnitial Zoning
fl tS. ad*inistrative lnterpretation Appeal
E] ta. Rd*inistrative Project Decision Appeal
U fS. Commercial Non-residential COA
EI fe. Historic Neighborhood
Conservation Overlay COA
fl 17. lnformal Review
E 18. Zoning DeVtation/Departure
E 19. Zoning or Subdivision Variance
I ZO. Conditional Use Permit
E 2t. Special Temporary Use Permit
El ZZ. Special Use Permit
E ZS. n"gulated Activities in Wetlands
fi 24. Zon"Map Amendment (non-Annexation)
fl zs. uoct"*tAmendment
E Ze. g.o"rth PolicyAmendment
E ZZ. Na"amcation/Plan Amendment
E ZA. f*t"nsionof Approved Plan
fl 29. ReasonableAccommodation
E SO. Comprehensive Sign Plan
E 31. other,
FORM
None
MSP
SP
PA
PP
FP
SE
CR
PUDC
PUDP
PUDFP
ANNX
AIA
APA
ccoA
NCOA
FORM
INF
None
z/svAR
CUP
. STUP
SUP
WR
ZMA
TfA
GPA
MOD
EXT
RA
csP
CONTACT US
Alfred M. Stiff Professional Building
2O East Olive Street 5971-5 (FED EX and UPS Only)
PO Box 1230
Bozeman, M-l 59771,
phone 4O6.582.226A
Jax 4A6.5822263
planning@bozeman.net
www.bozeman.net
Development Review Application A1 Page 3 of3 Revision Date:5.16.18
REQUIRED FORMS:Varies by project type, PLS