Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
15-2 - Fig 1 Minor Drainage Basins 2020-03-03
SS SS SSSSSSSSSSSSSSSSSS SS SSSSWWSSWWSS SSSSSSSSSSWSSWWWW WWWWWW W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSS SSSSSS W SS WSS SS SS SS SS SS SS SS SS SSWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W WSScoSD WSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSEXISTING72" STORM MHBEEHIVE GRATEEL=4840.2336"IE(N)=4833.5330"IE(W)=4833.53EXISTING60" STORM MHRIM EL=4842.6330"IE(E)=4837.1330"IE(SW)=4837.1330" RCPIE(NE)=4837.75240 LF of 30" RCPS=1.5% 48 L F o f 3 0 " R C P S=1. 5 %BURIED FIBEREL=4835.2772" STORM MH #1RIM EL=4843.002-24"IE(NW)=4833.3030"IE(NE)=4833.3072" STORM MH #3BEEHIVE GRATERIM EL=4839.2030"IE(NE)=4835.1430"IE(SE)=4835.1430"IE(SW)=4835.1430" PVCIE=4836.64131 LF o f 30 " PVCS=0.85%176 LF o f 30 " PVCS=0.85%68 LF of 2-24" PVCS=0.4%48" STORM MHRIM EL=4846 .5030"IE(NW)=4841.5030"IE(S)=4841.5060 LF of 30" PVCS=10.60%12" CLEAN OUTIE(S)=4838.88IE(N)=4835.8272" STORM MH #2BEEHIVE GRATERIM EL=4838 .7030"IE(NE)=4834.4130"IE(SW)=4834.4118"IE(SE)=4835.2012"IE(S)=4835.6082 LF o f 30 " PVCS=0.85%56 LF of 18" HDPES=5.00%22 LF OF 12" PVCS=1.00%30" PVCIE=4838.3848" STORM MHRIM EL=4842.9012" IE(SW)=4839.328" IE(SE)=4836.6012' IE (E)=4836.60114 LF of 12" PVCS=2.00%6" PVCIE=4837.24SSSSSSSSSSFMINOR BASIN 3AREA = 8.87 Ac.MINOR BASIN 1AREA = 5.22 Ac.MINOR BASIN 2AREA = 4.18 Ac.MINOR BASIN 5AREA = 1.35 Ac.MINOR BASIN 6AREA = 3.08 Ac.MINOR BASIN 4AREA = 2.14 Ac.MINOR BASIN 7AREA = 8.27 Ac.MINOR BASIN 8AREA = 0.80 Ac.MINOR BASIN 9AREA = 4.31 Ac.MINOR BASIN 10AREA = 0.92 Ac.MINOR BASIN 11AREA = 19.00 Ac.FIGURE NUMBER©PROJECT NO.DRAWN BY:DSGN. BY:APPR. BY:DATE:COPYRIGHT MORRISON-MAIERLE, INC.,2020N:\3638\009\ACAD\DRAINAGE-MSTR-2020.dwg Plotted by celine saucier on Jan/28/2020engineers surveyors planners scientistsMorrisonMaierle2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.net3638.009FIG.1BOZEMAN GATEWAYBOZEMANMONTANAMINOR DRAINAGE BASINSPHASE 5 PRELIM PLATCJFMGHJAU01/2020SCALE IN010010020050FEETSTORMTECHSYSTEM 3-1STORMTECHSYSTEM 1DETENTIONPOND 1STORMTECHSYSTEM 2O.S .O.S .O.S .O.S .O.S .STORMTECHSYSTEM 5(FUTURE)STORMTECHSYSTEM 4(FUTURE)STORMTECHSYSTEM 6(FUTURE)STORMTECHSYSTEM 3-2STORMTECHSYSTEM 7STORMTECHSYSTEM 8STORMTECHSYSTEM 9-2(FUTURE)STORMTECHSYSTEM 9-1DRY WELL10-2DRY WELL10-1STORMTECHSYSTEM 11-1DETENTIONPOND 3-1DETENTIONPOND 3-2O.S .O.S .STORMTECHSYSTEM 10O.S .STORMTECH SYSTEM 11-2(CURRENTLY PROPOSED)