HomeMy WebLinkAbout13-1 - Sewer Report 2020-03-03 1 Sewer This section is a response to the requirements of the City of Bozeman Unified Development Ordinance Section 38.220.060 relative to Water and Sewer. The original Sanitary Sewer Design Report provides analysis for the entire PUD including Phase 5. Flows from Phase 5 are designed to flow east to the existing sewer main in Fowler Avenue (see updated sewer main exhibit). Since the report was written, the City of Bozeman Design Standards and Specifications have been revised to reflect a lower required flow rate for B-2 zoning, decreasing from 3495 gal/ac/day to 2000 gal/ac/day. Previous calculations combined with the reduction in B-2 flow rates indicate that the existing system will meet the required sewer design criteria for Phase 4 of the Bozeman Gateway. The manhole located at the intersection of Fowler and Technology Blvd was dipped on 12/30/2019 and was found to have a sewage depth of 0.2’. Due to the timing of this measurement during the holiday season, it is conservatively assumed that the average existing flow depth is 0.5’. The outlet pipe has a diameter of 21”. Assuming a minimum slope of 0.1% has a capacity flowing full of 6.3cfs (2,827.6gpm). At a depth of 0.5’ the pipe is approximately 29% full and flowing at a rate of 1.06cfs (475.8gpm). Based on the Sewer Facility Plan’s 2000 gal/ac/day for 6.9 acres, the wastewater produced by Phase 5 is 13,800gpd or 0.02cfs (8.98gpm). The contribution of Phase 5 increases the flow to 1.08cfs (495gpm) which equates to a pipe depth of 0.51 or 29%. The 21” pipe has more than enough capacity to accommodate the development. Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Dec 31 2019 Existing Pipe Flow Circular Diameter (ft) = 1.75 Invert Elev (ft) = 100.00 Slope (%) = 0.10 N-Value = 0.011 Calculations Compute by: Known Depth Known Depth (ft) = 0.50 Highlighted Depth (ft) = 0.50 Q (cfs) = 1.061 Area (sqft) = 0.57 Velocity (ft/s) = 1.86 Wetted Perim (ft) = 1.98 Crit Depth, Yc (ft) = 0.37 Top Width (ft) = 1.58 EGL (ft) = 0.55 0 1 2 3 Elev (ft)Section 99.50 100.00 100.50 101.00 101.50 102.00 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Sunday, Dec 29 2019 21in PVC Flowing Full Circular Diameter (ft) = 1.75 Invert Elev (ft) = 100.00 Slope (%) = 0.10 N-Value = 0.011 Calculations Compute by: Q vs Depth No. Increments = 10 Highlighted Depth (ft) = 1.58 Q (cfs) = 6.312 Area (sqft) = 2.28 Velocity (ft/s) = 2.77 Wetted Perim (ft) = 4.38 Crit Depth, Yc (ft) = 0.93 Top Width (ft) = 1.05 EGL (ft) = 1.69 0 1 2 3 Elev (ft)Section 99.50 100.00 100.50 101.00 101.50 102.00 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Monday, Jan 20 2020 Proposed Pipe Flow Circular Diameter (ft) = 1.75 Invert Elev (ft) = 100.00 Slope (%) = 0.10 N-Value = 0.011 Calculations Compute by: Known Q Known Q (cfs) = 1.08 Highlighted Depth (ft) = 0.51 Q (cfs) = 1.080 Area (sqft) = 0.59 Velocity (ft/s) = 1.83 Wetted Perim (ft) = 2.00 Crit Depth, Yc (ft) = 0.37 Top Width (ft) = 1.59 EGL (ft) = 0.56 0 1 2 3 Elev (ft)Section 99.50 100.00 100.50 101.00 101.50 102.00 Reach (ft) OPEN SPACE 2 OPEN SPACE 3 OPEN SPACE 4 COMMON AREA 1ALOT 1A1 LOT 3A LOT 1A LOT 4 LOT 5 LOT 6 LOT 7 LOT 5 OPEN SPACE 5COMMON AREA 2A OPEN SPACE 6 LOT 14A COMMON AREA 3A LOT 16A COMMON AREA 4A LOT 17A LOT 25A LOT 22B LOT 46 LOT 45 COMMON AREA 12 LOT 48 COMMON AREA 7 COMMON AREA 6A LOT 24A LOT 23A OPEN SPACE 10 LOT 1 LOT 2 LOT 3 LOT 4 LOT 1A LOT 5 LOT 6 LOT 3 LOT 4 OPEN SPACE 1 LOT 1 LOT 6 LOT 7 COMMON AREA 5A LOT 19A LOT 2A1 LOT 4A LOT 35 LOT 36 COMMON AREA 11 LOT 37 LOT 38 COMMON AREA 10 LOT 40 LOT 41 LOT 42 COMMON AREA 14 COMMON AREA 13 LOT 44 LOT 43 OPEN SPACE 1B COMMON AREA 8 OPEN SPACE 1A LOT 2 SSSSSSSSSSSSSSSSSSSSSSWWSSWWSS SS SS SS SSW SS W W W W W W W W W W W W W W W W W WWWWWWWWW W WWWWW W W W WWWWWWWWWWWW WSSSS SS SS SS SS SS SS SS SS SSWSSW SSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWW SS W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSWSS W SSSSWWWSS SS SS SS SS CONNECTION POINT EXST. MH JO516 CONNECTION POINT EXST. MH JO602 2W 1W 3W 5W 4W 1E 2E 3E 4E 1W ANALYZED SANITARY SEWER SEGMENT SEE APPENDIX A & B PROPOSED SANITARY SEWER MAIN PROPERTY BOUNDARY LEGEND SSWWWW W W SSBOZEMAN GATEWAY SEWER LAYOUT