Loading...
HomeMy WebLinkAbout4192025 C410-Erosion & Sediment Control 2021-05-248''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SSSTORM STORM T STORM STORM8''W8''W8''W8''W8''WN90° 00' 00.00"W 391.12' N90° 00' 00.00"W 391.12' S23° 00' 31.43"E 32.59' N90° 00' 00.00"E 368.21' N23° 00' 31.43"W 12.77'N11° 12' 45.64"W 130.85'N11° 12' 45.63"W 90.42'S0° 43' 38.03"W 66.41'N0° 43' 38.02"E 557.51'N0° 00' 00.00"E 63.01'R=330.00'L=93.33'Δ=16°12'13"R=330.00'L=39.20'Δ=6°48'19"S23 ° 00 ' 31 .43 "E 112 . 1 2 ' S23° 00' 31.43"E 32.59'S23 ° 0 0 ' 3 1 .43 "E 69 .55 'S23° 0 0 ' 3 1 . 43 "E48.3 4 'R=270.00'L=26.46'Δ=5 °36'54" R=270.00' L=7.16' Δ=1°31'13"N0° 00' 00.00"E 63.01'N90° 00' 00.00"E 90.19' N0° 00' 00.00"E 3.39' N90° 00' 00.00"E 64.50' S0° 00' 00.00"E 3.30' S89° 58' 04.16"E 85.54' N86° 58' 55.72"E 30.35' N78° 49' 46.19"E 20.98'S11° 13' 48.14"E49.73'N78° 49' 28.94"E 72.00' WS WS WS W W W W W W W W W W W W WWWSWSFIREFIREWSWSFIREFIREFIRE WS SS SSSS SSWWWWWSS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SDSD SS SS FIRE FIRE FIRE DYHSD 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SSSTORM STORM T STORM STORM8''W8''W8''W8''W8''WN90° 00' 00.00"W 391.12' N90° 00' 00.00"W 391.12' S23° 00' 31.43"E 32.59' N90° 00' 00.00"E 368.21' N23° 00' 31.43"W 12.77'N11° 12' 45.64"W 130.85'N11° 12' 45.63"W 90.42'S0° 43' 38.03"W 66.41'N0° 43' 38.02"E 557.51'N0° 00' 00.00"E 63.01'R=330.00'L=93.33'Δ=16°12'13"R=330.00'L=39.20'Δ=6°48'19"S23 ° 00 ' 31 .43 "E 112 . 1 2 ' S23° 00' 31.43"E 32.59'S23 ° 0 0 ' 3 1 .43 "E 69 .55 'S23° 0 0 ' 3 1 . 43 "E48.3 4 'R=270.00'L=26.46'Δ=5 °36'54" R=270.00' L=7.16' Δ=1°31'13"N0° 00' 00.00"E 63.01'N90° 00' 00.00"E 90.19' N0° 00' 00.00"E 3.39' N90° 00' 00.00"E 64.50' S0° 00' 00.00"E 3.30' S89° 58' 04.16"E 85.54' N86° 58' 55.72"E 30.35' N78° 49' 46.19"E 20.98'S11° 13' 48.14"E49.73'N78° 49' 28.94"E 72.00' 60' RIGHT OF WAY 60' RIGHT OF WAY SHERWOOD WAY PHASE II 18 PLEX PHASE I 12 PLEX PHASE III 12 PLEX OPEN SPACE OPEN SPACE FUTURE BLDG SITE (NOT IN PROJECT)ABIGAIL LANE   VERIFY SCALE! THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY! 2021COPYRIGHT © MORRISON-MAIERLE, INC., SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DATEDESCRIPTIONNO.BY N:\4192\025 - THE BOULDERS SITE DEVELOPMENT\ACAD\SHEETS\4192025 C410-EROSION & SEDIMENT CONTROL.DWG PLOTTED BY:CELINE SAUCIER ON Jun/04/2021 REVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net engineers surveyors planners scientists MorrisonMaierle BOULDER CREEK APARTMENTS 4192.025 MONTANA EROSION & SEDIMENT CONTROL PLAN C410 CMS CMS MEE 8/10/2020 1 REVISION 1 - C.O.B. DRC REVIEW 8/10/2020CMS 3 REVISION 3 - DRC COMMENTS 5/24/2021CMS 2 REVISION 2 -DRC COMMENTS 2/12/2021CMS BOZEMAN Know what's below. before you dig.Call R Know what's below. before you dig.Call R GRAPHIC SCALE 0 (IN FEET) 10 201020 1 INCH = 20 FT THIS SITE HAS BEEN DESIGNED TO BE ACCESSIBLE TO INDIVIDUALS WITH DISABILITIES IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT. PROPOSED LOT LINE 1 NOTES BY SYMBOL: INSTALL TYPE D INLET PROTECTION FILTER PER DETAIL 3 ON SHEET C020 PRIOR TO THE DISTURBANCE OF ANY PORTION OF THE SITE. 3 EROSION & SEDIMENT CONTROL NOTES: 1.EROSION AN SEDIMENT CONTROL ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE CITY OF BOZEMAN'S BEST MANAGEMENT PRACTICE (BMP) MANUAL FOR CONSTRUCTION SITES. VERSION 3 - SEPTEMBER 1, 2016. 2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN. 3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO CONTROL ON-SITE EROSION. 6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED. 7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END OF EACH WORKING DAY. INSTALL TRACKOUT CONTROL SYSTEM PER DETAIL 2 ON SHEET C020 OR AS RECOMMENDED BY MANUFACTURER 1 INSTALL CONCRETE WASHOUT FACILITY PER DETAIL 4 ON SHEET C0202 4 PROPOSED ASPHALT PARKING LOT 4 4 4 2 3 3 3 3 TEMPORARY JOB SITE DUMPSTER TEMPORARY SANITARY FACILITY TEMPORARY JOB SITE TRAILER CONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITS PROPOSED STRAW WATTLE SEE 1/C020 PROPOSED STRAW WATTLE SEE 1/C020 PROPOSED STRAW WATTLE SEE 1/C020 8/10/20