Loading...
HomeMy WebLinkAbout4192025 C100 Existing Site Features and Topography 2021-05-248''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W8''W 8''W8''W8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS8''SS8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W8''SS8''SS8''SS 8''SS 8''SS 8''SS 8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W8''W 8''W 8''W 8''W8''W 8''W8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''SS8''SS8''SS8''SS8''SS8''W8''W8''W8''W8''W8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS8''SS8''W8''W8''W8''SS8''W8''W8''W8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''W '.STORM STORM STORM T STORM STORM STORM8''W8''WN77° 01' 59. 3 3 " W 1 0 6 . 8 9 ' N89° 18' 14.00"E 213.54'N89° 18' 14.00"E 293.22' N 3 5 ° 5 5 ' 2 4 . 9 0 "W 1 0 7 . 7 3 '43.84'N2° 42' 42.11"W 53.31'9.47'S23 ° 00 ' 31 .43 "E 141 . 9 3 ' N90° 00' 00.00"W 391.12' N90° 00' 00.00"W 391.12' S23° 00' 31.43"E 32.59' N90° 00' 00.00"W 381.58' 100.00'100.00'107.45' N90° 00' 00.00"E 368.21' N23° 00' 31.43"W 12.77'N11° 12' 45.64"W 130.85'N11° 12' 45.63"W 90.42'S0° 43' 38.03"W 66.41'N0° 43' 38.02"E 557.51'N89° 18' 14.00"E 1035.23'N0° 00' 00.00"E 63.01'R=330.00'L=93.33'Δ=16°12'13"R=330.00'L=39.20'Δ=6°48'19"S23° 00 ' 31 . 4 3 "E 112 .12 ' S23° 00' 31.43"E 32.59'S23° 00 ' 31 .43 "E 6 7 . 27 'R=270.00'L=81.02'Δ=17°11'38"R=270.00'L=27.40'Δ=5°48'54"S0° 00' 00.00"E 125.06'S0° 00' 00.00"E 120.01'R=330.00'L=65.93'Δ=11°26'51"R=330.00' L=10.70' Δ=1°51'25"S23 ° 0 0 ' 3 1 .43 "E 64 .09 ' S23° 00' 31.43"E 30.00'S23° 00 ' 31 . 4 3 "E 69 .55 'S23° 00 ' 31 .43 "E 48 .34 'R=270.00'L=2 6.46'Δ=5 °36'54" R=270.00' L=7.16' Δ=1°31'13"N0° 00' 00.00"E 63.01'N90° 00' 00.00"E 90.19' N0° 00' 00.00"E 3.39' N90° 00' 00.00"E 64.50' S0° 00' 00.00"E 3.30' S89° 58' 04.16"E 85.54' N86° 58' 55.72"E 30.35' N78° 49' 46.19"E 20.98'S11° 13' 48.14"E49.73'N78° 49' 28.94" E 72.00' 10' FRONTYARD SETBACK 15' FRONTYARD SETBACK 10' P.U.E. 10' P.U.E. 10' P.U.E. 20' REARYARD SETBACK 10' SIDEYARD SETBACK 60' RIGHT OF WAY 60' RIGHT OF WAY 10.00' UTILITY EASEMENT (TYP) 36.00' EXISTING STREAM CENTERLINE47414740 4742 4743 4744 47454746 4747 4748 50' WATER COURSE SETBACK 20' STORMWATER CONVEYANCE     VERIFY SCALE! THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING.  MODIFY SCALE ACCORDINGLY! 2021COPYRIGHT © MORRISON-MAIERLE, INC., SHEET NUMBER PROJECT NUMBER DRAWING NUMBER DATEDESCRIPTIONNO.BY N:\4192\025 - THE BOULDERS SITE DEVELOPMENT\ACAD\SHEETS\4192025 C100 EXISTING SITE FEATURES AND TOPOGRAPHY.DWG PLOTTED BY:CELINE SAUCIER ON Jun/04/2021 REVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 2880 Technology Blvd West Bozeman, MT  59718 406.587.0721 www.m-m.net engineers surveyors planners scientists MorrisonMaierle BOULDER CREEK APARTMENTS 4192.025 MONTANA EXISTING SITE FEATURES, TOPOGRAPHY & REMOVAL PLAN C100  CMS  CMS MEE 8/10/2020 1 REVISION 1 - C.O.B. DRC REVIEW 8/10/2020CMS 3 REVISION 3 - DRC COMMENTS 5/24/2021CMS 2 REVISION 2 - DRC COMMENTS 2/12/2020CMS BOZEMAN  Know what's below. before you dig.Call R Know what's below. before you dig.Call R GRAPHIC SCALE 0 (IN FEET) 20 402040 1 INCH = 40 FT THIS SITE HAS BEEN DESIGNED TO BE ACCESSIBLE TO INDIVIDUALS WITH DISABILITIES IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT. LOT 3 BLOCK 5 BOULDER CREEK SUB PHASE 1 ZONING: R4 SHERWOOD WAY LOT 4 BLOCK 5 BOULDER CREEK SUB PHASE 1 ZONING: R4 LOT 2 BLOCK 5 BOULDER CREEK SUB PHASE 1 ZONING: R4 LOT 1 BLOCK 5 BOULDER CREEK SUB PHASE 1 ZONING: R4 GENERAL NOTES: 1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 6TH EDITION DATED APRIL 2010 (MPWSS); THE CITY OF BOZEMAN MODIFICATIONS TO THE MPWSS; AND THE PROJECT SPECIFICATIONS. 2.REFERENCE ALL SURVEY MONUMENTS, SECTION CORNERS, 1/4 CORNERS, AND PROPERTY CORNERS PRIOR TO BEING DISTURBED BY CONSTRUCTION. ANY MONUMENTS AND CORNERS DISTURBED DURING CONSTRUCTION SHALL BE REPLACED BY A PROFESSIONAL LAND SURVEYOR (PLS) REGISTERED IN THE STATE OF MONTANA. 3.THE CONTRACTOR SHALL RESTORE ALL ROADWAY SURFACES TO EQUAL OR BETTER CONDITION THAN EXISTED PRIOR TO EXCAVATION AS DETERMINED BY AGENCY, OWNER, AND/OR ENGINEER. 4.THE LOCATION, DEPTH, AND SIZE OF THE EXISTING UTILITIES SHOWN ON THESE PLANS IS APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION, DEPTH, AND SIZE OF THE UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY DAMAGE TO THE EXISTING FACILITIES DUE TO FAILURE TO LOCATE OR PROPERLY PROVIDE PROTECTION WHEN LOCATION IS KNOWN. 5.ALL EXISTING PROPERTY LINES, EASEMENTS, AND BUILDINGS ARE SHOWN ON THIS SITE PLAN. 9.INVERT ELEVATIONS OBTAINED FROM BOULDER CREEK SUBDIVISION RECORD DRAWINGS DATED 9/12/2018 BY C&H.ABIGA IL  LANE EX 48" SSMH RIM: 4746.31 FL IN (S): 4736.36 (8") FL IN (E): 4736.28 (8") FL IN (W): 4736.39 (8") FL OUT (N): 4736.19 (8") 6" PVC SEWER SERVICE STUB EX 48" SSMH RIM: 4744.20 FL IN (S): 4735.42 (8") FL OUT (N): 4735.05 (8") EX 48" SSMH RIM: 4740.76 FL IN (S): 4733.87 (8") FL IN (E): 4733.82 (8") FL OUT (N): 4733.64 (8") EX 48" SSMH RIM: 4739.89 FL IN (S): 4732.26 (8") FL IN (W): 4732.19 (8") FL OUT (N): 4732.00 (8") EX 48" SSMH RIM: 4738.22 FL IN (E): 4731.12 (8") FL IN (S): 4731.24 (8") FL OUT (W): 4731.12 (8") (2) 4" PVC SEWER SERVICE STUBS 8" PVC SEWER MAIN STUB & CAP FL IN: 4734.31, S = 0.5% 6" PVC SEWER SERVICE STUB 6" PVC SEWER SERVICE STUB 4" PVC SEWER SERVICE STUB 4" D.I. FIRE SERVICE STUB AND CAP WITH C.O.B. BLOW-OFF ASSEMBLY 1.5" COPPER DOMESTIC WATER SERVICE STUB 8" D.I. WATER MAIN STUB AND CAP WITH C.O.B. BLOW-OFF ASSEMBLY 8" D.I. WATER MAIN STUB AND CAP WITH C.O.B. BLOW-OFF ASSEMBLY 4" D.I. FIRE SERVICE STUB AND CAP WITH C.O.B. BLOW-OFF ASSEMBLY 1.5" COPPER DOMESTIC WATER SERVICE STUB EX 48" SSMH RIM: 4747.93 FL IN (S): 4738.73 (8") FL OUT (W): 4738.57 (8") STORM INLET (48") RIM:4739.74 FL IN (S): 4735.68 (15") FL OUT (W): 4735.55 (18") EXISTING 8" WATER MAIN (TYP) EXISTING 8" SANITARY SEWER MAIN (TYP.) EXISTING STORM SEWER DRAINS TO DETENTION POND #5 OF BOULDER CREEK SUBDIVISION 8/10/20