STORMWATER MAINTENANCE PLAN
Boulder Creek Apartments - 18420
Owner’s responsibility for routine inspection and maintenance
1. Keep the outlet and inlets of the facility free of leaves, rocks, and other debris.
2. The storm water facilities are to be mowed regularly. During the summer,
approximately once every two weeks, the grass is to be mowed and the cuttings are
to be promptly removed and disposed of. Unless visibly tainted, dispose of lawn
clippings in the same manner as yard waste. Otherwise, bag and take to a sanitary
landfill.
3. Remove sediment by hand with a flat bottom shovel during the summer months
whenever sediment covers vegetation. Have the grass cut short in that particular
location so that the bed can be made as level as possible.
5. Re-sod damaged or maintained areas immediately, or use grass plugs from the
adjacent up-slope area.
6. Inspect the facilities periodically, especially after heavy rains (preferably monthly
and after each storm that delivers .5 inches of rainfall).
7. Inspect flow control outlet semi-annually. Clean outlet when soil and vegetation
buildup interfere with flow introduction.
9. See that litter and other debris are removed in order to reduce the tendency to
channel when trash accumulates.
10. Owner to maintain and fund Operation and Maintenance of stormwater detention
facility.
Signed _________________________