Loading...
HomeMy WebLinkAboutENG 3 - Stormwater Memo and Report 2021-05-24memo Page 1 TO: Karl Johnson FROM: Celine Saucier, PE DATE: May 24, 2021 JOB NO.: 4192.025 RE: Supplemental Storm Information CC: Urgent For Review Please Comment Please Reply For Your Use This memo presents information for Engineering Comment #3 for the Boulder Creek Apartments Site Plan Review: β€œIt is unclear how runoff from drainage area 2 will be retained and treated. A drainage swale is shown grading offsite. The drainage report must identify how this drainage will reach the intended destination of retention pond #2. The report must clearly demonstrate runoff is being treated and post development runoff is kept to predevelopment conditions.” Per the attached stormwater report SD1.0 Exhibit, Drainage Area 2 (DA2) encompasses the eastern portion of the proposed Phase 1 development as well as the eastern portion of the future development. As a part of the Stormwater Management Design Report by C&H, June 2015, the existing Retention Pond #7 in the northeast corner of the Boulder Creek Subdivision was designed to hold the runoff from DA2 using a C value of 0.5. However, since the C value of the proposed site is 0.7, Retention Pond #2 will be constructed to retain the stormwater volume difference between C=0.7 and C=0.5. The on-site Retention Pond #2 will have an overflow into a swale that will drains into the existing Retention Pond #7. Since the ultimate destination of this stormwater runoff is to two retention ponds which do not discharge into any adjacent waterways, retention ponds #2 and #7 act as a method of treatment, removing sediments and pollutants from the stormwater runoff. Retention Pond #2 in the northeast corner of Lot 4, will be constructed with Phase 1 to retain the portion of DA2 that will be constructed with this project. The portion of DA2 within Phase 1 will flow to Retention Pond 2 using a 6” deep swale at 1.3% (See Grading Sheet C601 and Detail 7/C050). Supplemental Storm Information Page 2 The 25-year storm flow that the temporary swale will be required to convey for the DA2 flows on proposed property is as follows: A = 0.8 acres (34822.77SF) C- 0.7 Overland Tc = 5min Intensity at Tc = 3.8 in/hr Post-development Peak Runoff: 2.13cfs The swale will be able to contain the 25-year storm flow from the portion of DA2 within Phase 1 as the capacity of the swale is 4.48cfs. This calculation is shown in the attached channel report. Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Jun 1 2021 6in Deep Swale Capacity Trapezoidal Bottom Width (ft) = 1.00 Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 1.30 N-Value = 0.025 Calculations Compute by: Q vs Depth No. Increments = 5 Highlighted Depth (ft) = 0.50 Q (cfs) = 4.481 Area (sqft) = 1.50 Velocity (ft/s) = 2.99 Wetted Perim (ft) = 5.12 Crit Depth, Yc (ft) = 0.50 Top Width (ft) = 5.00 EGL (ft) = 0.64 0 1 2 3 4 5 6 7 Elev (ft)Depth (ft)Section 99.75 -0.25 100.00 0.00 100.25 0.25 100.50 0.50 100.75 0.75 101.00 1.00 Reach (ft)