February 16, 2017
C&H Engineering & Surveying
Attn: Mr. Ryan Hudock
1091 Stoneridge Dr.
Bozeman, MT 59718
Subject: Boulder Creek Subdivision - Stormwater Pollution Prevention Plan Approval
Dear Mr. Ryan Hudock,
I have reviewed your re-submitted SWPPP for the Boulder Creek subdivision project and am
recommending the permit for approval. In addition, please understand that this is the Montana Department
of Environmental Quality’s (MDEQ) General Permit for Stormwater Discharge #MTR100000 (General
Permit) and is subject to their review and inspection at any time. The City of Bozeman’s approval does not
guarantee compliance with the General Permit.
A few things to note:
1) Please install all erosion and sediment control measures before ground disturbance activities are
initiated.
2) Please ensure all parties involved with this project are aware of the contents, responsibilities, and scope
of this permit. Often times good permits are submitted, but they are not adequately followed through
with in the field. This often results in a discharge of pollutants to local waterways. Strong
communication is your number one tool to ensure this does not occur.
3) A City stormwater inspection may take place during this project. Inspections will include a document
review and a site tour examining installed erosion and sediment control measures. It is critical that
documents are continually updated, stored onsite, and the content is implemented to avoid violations
being issued by the City.
Please let me know if you have any questions.
Sincerely,
Frank Greenhill, Stormwater Program Technician