DBP and COB Updates:
• The DBP has hired a new Operations Manager (Gaby Krevat) with a start date of 7/19/21.
• The appointment to the BID Board for the two expired terms has not yet been assigned to a city
commission meeting. To date, Jolee and Ileana are the only two applicants.
Downtown Plan Projects
Here are some updates regarding other projects proposed in the 2019 Downtown Plan.
Transportation & Mobility Analysis—The Phase 1 Transportation plan with the 3-lane concept, bike sharrows
and other traffic calming ideas have been completed and submitted to MDT and the City of Bozeman. The MDT
report has been completed with concerns about much of what was proposed. We are still waiting for the city to
report on the proposed plan due to staff changes. Phase 1 transportation plan, MDT’s report and additional
notes from the current term contract team will be include in July’s URD board meeting packet. City of Bozeman
comments have been delayed due to Shawn Kohtz’s departure. City response needed to move to Phase 2.
Structured Parking Planning—The parking decks were researched by the term team and most have been found
to be non-starters due to lack of space, retail wrap on ground-level restrictions and high costs/space ratios. The
US Bank building was added as a one-off to the parking structure studies. This initial study as well as the full
study of possible parking structure will be included in the URD board meeting packet in July. Baker Tilly has been
hired by the URD to do an initial analysis of the bonding capacity of the Downtown URD before sun-setting in
2032.
UDC Updates – Rob Pertzborn and Susan Riggs have been contracted by the URD to research and update the
URD/BID and downtown stakeholders updated on the City’s UDC Edits, the timeline for changes and how these
updates may impact downtown and why we should care. The City’s UDC update process has been moved back a
few times but, is slated to move forward in fall of 2021 with a focus on building height and parking
requirements. Ellie and Emily are scheduled to meet with Rob and Susan to provide a memo for URD next steps
at August board meeting. UDC edits on the fall 2021 revision schedule to include B-3 parking requirements and
B-3 height requirements.
North Rouse Lighting Project – This project was originally scheduled to be completed in Summer 2021 but has
been delayed due to contractor interest/availability. The bid was revised to have work completed in fall 2021,
one local contractor bid the project in the amount of $128,518.00 (10% increase from original estimate of
$115,000) and has been awarded to Montana Lines Inc. who is set to begin work by late August. There were
assembly line concerns with the large light pole order so, light poles have been ordered in advance with
confirmation they can be stored by City Streets Department for the contractor to access when needed.
Parking Policy Updates – Two Parking Commission subcommittees; Policy and Capacity have been formed to
develop a more focused work plan for city staff and the Parking Commission. Each subcommittee has met for
initial discussions. DBP staff is staying engaged in discussions. Ellie and Emily participated in the July 14 Capacity
Subcommittee meeting to discuss garage capacity, shared use agreement opportunities, and additional seasonal
bike parking. Many great ideas were discussed including the possibility of the URD to help fund the “Run DMC”
shuttle and future work with property owners on shared use agreements.
Outreach Bozeman
The Outreach Bozeman pilot program has been funded for summer of 2021. HRDC has hired an individual to
oversee the business outreach aspects of the program. An existing HRDC employee has also begun to work with
Marek (Bozeman Police Department) to shadow and assist in developing strategies for the program. A De-
escalating training was sent to engaged parties with additional trainings being held in the future for additional
property and business owners. The DBP will oversee all marketing and business outreach over the next several
months and will continue to work with HRDC, the city and the police department to assist in getting information
out to downtown property owners, business owners and patrons.
Maintenance Program Update
Currently we have one part-time general maintenance employee (Mike), one weekend general maintenance
employee and one part-time garage maintenance employee (Trish), and two seasonal part-time flower waterers
(Porter and Kodie).
Below are the maintenance statistics comparing the year-to-date figures from this year (FY21) to the
corresponding stats from last year (FY20).
FY2020 Y-T-D FY2021 Y-T-D
Total Avg/mnth Total Avg/mnth Difference
Trash Emptied 1868 187 3190 266 +1322
Recycling Emptied 459 46 736 61 +277
Graffiti Removed 390 40 441 37 +51
Building Projects
• Merin Condos (North Bozeman) 28 units of owner-occupied housing. Under construction.
• Village Downtown 30 new residential condo units and 9 single-family lots are under review by the City.
• AC Hotel (5 East Mendenhall) 6 story 140 room full-service hotel. Under construction.
• East End Flats (240 East Mendenhall) 6-story mixed use project. Development review completed and
final site plan approved.
• Carin Townhomes (northwest corner of W Beall & N Grand)—5 townhome condos currently under
construction.
• North Central (20 North Tracy)—Mountain View & Medical Arts buildings, phased master site plan
development proposing a total of 9 new mixed-use buildings, associated parking, open space and
infrastructure. Application submitted.
New Businesses
• Stretch Lab, 23 South Willson - OPEN
• Main Street Market/Brigade/Happy Box, 233 East Main - OPEN
• Cool Beans (next door to Main Street Over Easy), 9 East Main - OPEN
• Vienne (French bakery), 101 South Wallace - OPEN
• Tanoshii, 113 East Main - OPEN
• Sotheby’s International Realty, 424 E Main – OPEN
• Engel & Volkers Real Estate, 106 E Babcock – OPEN
• Sweet Peaks, 411 East Main – OPENING SOON
• Alara (by appt only space), 424 East Main – OPEN
• Residence Inn, 815 East Main Street - OPEN
• Sun Dial (Lark food truck), 122 West Main – OPENING SOON
• Last Call (modern Mexican restaurant), 19 S Willson, – OPENING SOON
• Pakeezah – 14 N Church- formerly 14 North- Moving/re-opening soon
• 27 East Main (formerly Crossroads) - to be redeveloped as a steak house
• TBD - 137 East Babcock—formerly Gallatin Laundry
• TBD - 544 East Main—formerly Heeb’s – building improvements underway
• TBD - 402 E Main St Suite 3— formerly The Montana Scene
• TBD – 34 N Bozeman- formerly Pakeezah
Upcoming DBA Events: more info at www.downtownbozeman.org
• Art Walks – 2nd Fridays: August 13, Sept. 10, 4-8pm
• Music on Main – 4 Thursdays: July 22- August 12, 6-9pm
• “Cruisin’ on Main” Car Show – Saturday, August 14 from 3-5pm (packet pick-up) & Sunday, August 15
from 6am-4pm