Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
(43) EX-8 const. traffic 02-26-2021
MANLEY ROADROUSE AVE.(HWY 81)BOYLAN ROAD GRIFFIN DRIVE BRI D G E R D RI V E PROPOSED SITE BRIDGER CENTER DRIVE COMMERCIAL DRIVE LEGEND CONSTRUCTION TRAFFIC - EXITING CONSTRUCTION TRAFFIC - ENTERING FIGURE NUMBER © PROJECT NO.DRAWN BY: DSGN. BY: APPR. BY: DATE: COPYRIGHT MORRISON-MAIERLE, INC.,2020 N:\5311\001.01 - PUD\ACAD\Exhibits\5311-001_CONSTRUCTION TRAFFIC ROUTE MAP.dwg Plotted by mike g. hickman on Sep/22/2020 engineers surveyors planners scientists MorrisonMaierle 2880 Technology Blvd West Bozeman, MT 59718 406.587.0721 www.m-m.net 5311.001 EX. 8 DS BOZEMAN MONTANA CONSTRUCTION TRAFFIC ROUTE MAP MGH BRIDGER MEADOWS JRN 09/2020 600 12003006000 SCALE IN FEET 1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 6TH EDITION DATED APRIL 2010 (MPWSS); THE CITY OF BOZEMAN MODIFICATIONS TO THE MPWSS; AND THE PROJECT SPECIFICATIONS. 2.THE CONTRACTOR'S OPERATIONS SHALL BE CONFINED WITHIN THE PROJECT LIMITS. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE PROJECT SITE WHERE APPROVED BY THE OWNER AND OUTSIDE OF PROTECTED OPEN SPACE. IT SHALL BE UNDERSTOOD THAT THE RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF EQUIPMENT AND MATERIALS ON OR NEAR THE SITE WILL BE ENTIRELY THAT OF THE CONTRACTOR AND THAT NO CLAIM SHALL BE MADE AGAINST THE OWNER BY REASON OF ANY ACT OF AN EMPLOYEE OR TRESPASSER. 3.THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN A MANNER TO MINIMIZE INCONVENIENCE TO THE ADJACENT BUSINESSES. 4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS, ALL COSTS FOR PROTECTING, REMOVING, AND RESTORING EXISTING IMPROVEMENTS SHALL BE BORNE SOLELY BY THE CONTRACTOR. 5.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 6.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS-OF-WAY AND MAKE SURE STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY. 7.CONSTRUCTION WORK ZONE TRAFFIC SIGNS SHALL BE FURNISHED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH APPLICABLE REQUIREMENTS OF THE REGULATORY AGENCIES HAVING JURISDICTION. A TRAFFIC CONTROL PLAN, PREPARED BY THE CONTRACTOR, MAY BE REQUIRED BY THE CITY OR STATE. "CONSTRUCTION AHEAD" WARNING SIGNS ARE TO TO BE INSTALLED ALONG ADJACENT ROADS OR DRIVEWAYS. FLASHERS WITH CAUTION TAPE ARE TO BE INSTALLED WHERE ANY CONSTRUCTION ACTIVITY CROSSES A SIDEWALK OR PEDESTRIAN PATH IN ACCORDANCE WITH THE SPECIFICATIONS AND ANY OR ALL LOCAL REGULATIONS. 8.NO STOPPING, PARKING, OR STORING OF CONSTRUCTION MATERIALS IN THE PUBLIC STREETS /ROADS, RIGHTS-OF-WAY, OR ANY DRIVEWAY IS ALLOWED. 9.CONTRACTOR IS RESPONSIBLE FOR PROJECT DUST CONTROL. GENERAL NOTES: Know what's below. before you dig.Call R