Project Description 1
Design Report Water 1
Design Report Sewer 4
APPENDICES:
A. Plans and Profiles
B. Design Calculations
C. Water Modeling
1
PROJECT DESCRIPTION:
The Arrowleaf Park & Perennial Park proposed project site is located within the Northwest ¼ of
Section 1 of Township 2 South and Range 5 East P.M.M. The project located in Bozeman,
Montana, is between Tschache Lane and East Baxter Lane and between Sacco Drive and
Walton’s Stream/Ditch.
The proposed site improvements cover the majority of the site with commercial buildings
located on the south side of the property and apartment buildings scattered on the rest of the
property. The proposed project also includes asphalt drives and parking lots, concrete
sidewalks, utility services and landscaping.
Design Report:
Water:
The proposed project site has three water stubs extending onto the property from Sacco Drive.
The water stubs which extend onto the property consist of one twelve inch and two eight inch
connections. Based on the layout of the proposed site, not all of the water stubs available are
proposed to be used for this project site. All new water mains will be class 51, ductile iron pipe
and installed per the Montana Public Works Standard Specifications (MPWSS) and the City of
Bozeman Modifications to MPWSS. Hydrant leads will be 6-inch ductile iron pipe. Service sizes
were determined based on the Uniform Plumbing Code.
The proposed eight inch ductile iron water main that will run through the site shall connect to
the most northerly water main stub, which is the twelve inch stub located off of Sacco Drive.
After making a loop through the site, the proposed eight inch water main shall reconnect to
existing water main in Tschache Lane. There is currently no water stub at on Tschache Lane at
or near the point of connection. This connection will require digging into the street and
installing a twelve by eight tapping tee. The water main shall be dedicated to the City of
Bozeman and located in an easement as shown on the plans.
The eight inch water stub immediately south of the twelve inch stub from Sacco Drive shall be
used as a domestic service line to the proposed 96 Unit Senior Living building located directly
east of Sacco Drive. The existing eight inch service shall be reduced by mean of a eight by four
inch reducer after an eight inch valve is installed on the stub. The four inch domestic line shall
then continue into the building. The fire service shall connect to the building from a six inch
service line on the other side of the building. The domestic meter inside the building is
proposed to be a 2 inch meter.
The last and most southerly available eight inch water stub to the property shall be abandoned.
The contractor shall dig into the street and remove the eight inch connection point at the water
main and repair the water main with a sleeve or a link of pipe and couplers if necessary. Work
2
shall be done in accordance with the City of Bozeman design standards and specification policy
section V.A.6.h.
As per the local fire department it has been determined that the project shall include three fire
hydrants onsite. Hydrants locations are shown in the attached plans. All proposed buildings
shall have sprinkler systems.
All of the commercial and residential buildings onsite shall have a fire and domestic service line
from the eight inch water main. The estimated demands for the project are summarized in
Table 1.0 and calculations are provided in the Appendix. These calculations will be verified by
the mechanical designer.
Table 1.0
Estimated Water Demands
Building Use
Average Day
Demand
(gpd)
Max. Day
Demand
(gpd)
Peak Hour
Demand
(gpm)
Commercial Building A: Community
Health Partners 9,375 21,561 20
Mixed Use Commercial Building B: Early
Learning Center and Promise Building 7,052 16,220 15
Senior Living Building - 96 Unit 35,415 81,454 74
Rowhouse A: 8 unit 2,952 6,788 7
Rowhouse B: 8 unit 2,952 6,788 7
12-Plex A 4,427 10,182 10
12-Plex B 4,427 10,182 10
24 -Plex A 8,854 20,364 19
24 -Plex B 8,854 20,364 19
24 -Plex C 8,854 20,364 19
24 -Plex D 8,854 20,364 19
Community Building 5,903 13,576 13
Total Demands: 107,919 248,207 232
3
Table 1.1
Water Services Line Sizes
Building Use
Domestic
Water Service
Size (inch)
Fire Line
Service Size
(inch)
Commercial Building A: Community
Health Partners 2 4
Mixed Use Commercial Building B: Early
Learning Center and Promise Building 2 4
Senior Living Building - 96 Unit 4 6
Rowhouse A: 8 unit 2 2
Rowhouse B: 8 unit 2 2
12-Plex A 1.5 2
12-Plex B 1.5 2
24 -Plex A 2 2
24 -Plex B 2 2
24 -Plex C 2 2
24 -Plex D 2 2
Community Building 0.75 2
The water distribution system was modeled using Bentley’s WaterCAD software. The model
was calibrated by simulating Hydraulic Grade Line information and Maximum Day Demand
Average Pressure information provided by the City of Bozeman. More than 3,500 gpm is
available with a system minimum residual pressure of 20 psi at the new development, which is
looped with existing 12” mains on either side of the development. Please see appendix C for
modeling results.
4
Sanitary Sewer:
The project shall connect to the eight inch sanitary sewer stub on the north end of the project
as shown in the plan and profile drawings. The size, depth, and location of the existing sewer
stub shall be field verified prior to ordering manholes for the site. The sanitary sewer main
running through the site shall be eight inch SDR 35 PVC and installed per the Montana Public
Works Standard Specifications (MPWSS) and per the City of Bozeman Modifications to MPWSS.
The sanitary sewer main shall be dedicated to the City of Bozeman and located in an easement
as shown on the plans.
Six inch services shall extend to within five feet of each building where a cleanout shall be
installed prior to continuing into the building. Six inch services where used at all locations to
minimize grade. The senior living building will have a sewer service coming out of the north
and south end of the building due to the length of the building. All sewer services shall be SDR
26 and installed per the Montana Public Works Standard Specifications (MPWSS) and per the
City of Bozeman Modifications to MPWSS. The estimated demands for the project are
summarized in Table 2.0 and calculations are provided in the Appendix. These calculations will
be verified by the mechanical designer.
Table 2.0
Estimated Sanitary Sewer Demands
Building Use
Average Day
Demand
(gpd)
Peak Demand
(gpd)
Peak Demand
(gpm)
Commercial Building A: Community
Health Partners 993 4,346 4
Mixed Use Commercial Building B: Early
Learning Center and Promise Building 3,313 14,212 10
Senior Living Building - 96 Unit 13,841 57,323 40
Rowhouse A: 8 unit 1,279 5,611 4
Rowhouse B: 8 unit 1,279 5,611 4
12-Plex A 1,843 8,042 6
12-Plex B 1,843 8,042 6
24 -Plex A 3,536 15,241 11
24 -Plex B 3,536 15,241 11
24 -Plex C 3,536 15,241 11
24 -Plex D 3,536 15,241 11
Community Building 2,557 11,108 8
Total Demands: 41,092 175,259 126
APPENDIX A
Plans and Profiles
See Plan set dated May 4, 2020 for Arrowleaf Park and Perennial Park
APPENDIX B
DESIGN CALCULATIONS
Project: Arrowleaf Park & Perennial Park
Date: 4-28-20
Water Demand Calculations
Commercial Building A: Community Health Partners
Residential Units:24 units
People:52.08 people 2.17 people /unit per COB Design Standards
Commercial Space:19,000.00 sf
Commercial Demand:520.55 gpd 10,000 gal/year/1,000 sf per CILWR calc
Average Day Demand:9,374.15 gpd ((units)*(people/unit)*(170gpd/person)) + commercial demand
Max. Day Demand:21,560.54 gpd 2.3:1 max day to avg day ratio
Max. Hour Demand:19.53 gpm 3:1 max hour to avg day ratio
Mixed Use Commercial Building B: Early Learning Center and Promise Building
Residential Units:12 units
People:26.04 people 2.17 people /unit per COB Design Standards
Commercial Space:12,000.00 sf
Max. Employees&Children:105
GPD/Employee&Child:25 per Table 3.1-1 of DEQ4 for a daycare
Total Commercial Flow:2625 gpd
Average Day Demand:7,051.80 gpd ((units)*(people/unit)*(170gpd/person)) + commercial demand
Max. Day Demand:16,219.14 gpd 2.3:1 max day to avg day ratio
Max. Hour Demand:14.69 gpm 3:1 max hour to avg day ratio
Project: Arrowleaf Park & Perennial Park
Date: 4-28-20
Water Demand Calculations
Residential Units: 12-Plex
Residential Units:12 units
People:26.04 people 2.17 people /unit per COB Design Standards
Average Day Demand:4,426.80 gpd ((units)*(people/unit)*(170gpd/person))
Max. Day Demand:10,181.64 gpd 2.3:1 max day to avg day ratio
Max. Hour Demand:9.22 gpm 3:1 max hour to avg day ratio
There are 2 proposed 12 plexes
Residential Units: 24-Plex
Residential Units:24 units
People:52.08 people 2.17 people /unit per COB Design Standards
Average Day Demand:8,853.60 gpd ((units)*(people/unit)*(170gpd/person))
Max. Day Demand:20,363.28 gpd 2.3:1 max day to avg day ratio
Max. Hour Demand:18.45 gpm 3:1 max hour to avg day ratio
There are 4 proposed 24 plexes
Residential Units: Rowhouse
Residential Units:8 units
People:17.36 people 2.17 people /unit per COB Design Standards
Average Day Demand:2,951.20 gpd ((units)*(people/unit)*(170gpd/person))
Max. Day Demand:6,787.76 gpd 2.3:1 max day to avg day ratio
Max. Hour Demand:6.15 gpm 3:1 max hour to avg day ratio
There are 2 proposed sets of Townhomes
Residential Units: Senior Living
Residential Units:96 units
People:208.32 people 2.17 people /unit per COB Design Standards
Average Day Demand:35,414.40 gpd ((units)*(people/unit)*(170gpd/person))
Max. Day Demand:81,453.12 gpd 2.3:1 max day to avg day ratio
Max. Hour Demand:73.78 gpm 3:1 max hour to avg day ratio
Residential Units: Community Building
Residential Units:16 units
People:34.72 people 2.17 people /unit per COB Design Standards
Average Day Demand:5,902.40 gpd ((units)*(people/unit)*(170gpd/person))
Max. Day Demand:13,575.52 gpd 2.3:1 max day to avg day ratio
Max. Hour Demand:12.30 gpm 3:1 max hour to avg day ratio
Project: Arrowleaf Park & Perennial Park
Date: 4-28-20
Sewer Demand Calculations
Commercial Building A: Comm. Health Partners
Residential Units:0 units
People:0 people 2.17 people /unit per COB Design Standards
Thousands of People:0 thousands of people
Property Size:2.5 acres
Total Residential Flow:0 gpd (units)*(people/unit)*(65gpd/person)
Commercial Space:9500 sf
Single Family Equivalent:9.5 units 1,000 sf per SFE
People:20.62 people 2.17 people/unit per COB Design Standards
Thousands of People 0.0206 thousands of people
Total Commercial Flow:617.5 gpd (units)*(people/unit)*(65gpd/person)
Total Flow Rate:617.5 gpd residential + commercial
Infiltration Rate:375 gpd (area) *(150 gpd/acre)
Avg. Day Demand:992.5 gpd flow rate + infiltration rate
Peaking Factor:4.3787214
Peak Demand:4345.881 gpd (avg. day demand)*(peaking factor)
Peak Demand:3.02 gpm (peak demand)/(24hr/day)/(60min/hr)
Commercial Building B: Family Promise Building
Residential Units:12 units
People:26.04 people 2.17 people /unit per COB Design Standards
Thousands of People:0.02604 thousands of people
Property Size:3 acres
Total Residential Flow:1692.6 gpd (units)*(people/unit)*(65gpd/person)
Commercial Space:18000 sf
Single Family Equivalent:18 units 1,000 sf per SFE
People:39.06 people 2.17 people/unit per COB Design Standards
Thousands of People 0.0391 thousands of people
Total Commercial Flow:1170 gpd (units)*(people/unit)*(65gpd/person)
Total Flow Rate:2862.6 gpd residential + commercial
Infiltration Rate:450 gpd (area) *(150 gpd/acre)
Avg. Day Demand:3312.6 gpd flow rate + infiltration rate
Peaking Factor:4.2901331
Peak Demand:14211.495 gpd (avg. day demand)*(peaking factor)
Peak Demand:9.87 gpm (peak demand)/(24hr/day)/(60min/hr)
Project: Arrowleaf Park & Perennial Park
Date: 4-28-20
Sewer Demand Calculations
Residential Units: 12-Plex
Residential Units:12 units
People:26.04 people 2.17 people /unit per COB Design Standards
Thousands of People:0.02604 thousands of people
Property Size:1 acres
Total Flow Rate:1692.6 gpd (units)*(people/unit)*(65gpd/person)
Infiltration Rate:150 gpd (area) *(150 gpd/acre)
Avg. Day Demand:1842.6 gpd flow rate + infiltration rate
Peaking Factor:4.3643
Peak Demand:8041.62 gpd (avg. day demand)*(peaking factor)
Peak Demand:5.58 gpm (peak demand)/(24hr/day)/(60min/hr)
There are 2 proposed 12 plexes
Residential Units: 24-Plex
Residential Units:24 units
People:52.08 people 2.17 people /unit per COB Design Standards
Thousands of People:0.05208 thousands of people
Property Size:1 acres
Total Flow Rate:3385.2 gpd (units)*(people/unit)*(65gpd/person)
Infiltration Rate:150 gpd (area) *(150 gpd/acre)
Avg. Day Demand:3535.2 gpd flow rate + infiltration rate
Peaking Factor:4.3111
Peak Demand:15240.58 gpd (avg. day demand)*(peaking factor)
Peak Demand:10.58 gpm (peak demand)/(24hr/day)/(60min/hr)
There are 4 proposed 24 plexes
Residential Units: Rowhouse
Residential Units:8 units
People:17.36 people 2.17 people /unit per COB Design Standards
Thousands of People:0.01736 thousands of people
Property Size:1 acres
Total Flow Rate:1128.4 gpd (units)*(people/unit)*(65gpd/person)
Infiltration Rate:150 gpd (area) *(150 gpd/acre)
Avg. Day Demand:1278.4 gpd flow rate + infiltration rate
Peaking Factor:4.3884
Peak Demand:5610.12 gpd (avg. day demand)*(peaking factor)
Peak Demand:3.90 gpm (peak demand)/(24hr/day)/(60min/hr)
There are 2 proposed sets of Rowhouses
Project: Arrowleaf Park & Perennial Park
Date: 4-28-20
Sewer Demand Calculations
Residential Units: Senior Living
Residential Units:96 units
People:208.32 people 2.17 people /unit per COB Design Standards
Thousands of People:0.20832 thousands of people
Property Size:2 acres
Total Flow Rate:13540.8 gpd (units)*(people/unit)*(65gpd/person)
Infiltration Rate:300 gpd (area) *(150 gpd/acre)
Avg. Day Demand:13840.8 gpd flow rate + infiltration rate
Peaking Factor:4.1415
Peak Demand:57322.15 gpd (avg. day demand)*(peaking factor)
Peak Demand:39.81 gpm (peak demand)/(24hr/day)/(60min/hr)
Residential Units: Community Building
Residential Units:16 units
People:34.72 people 2.17 people /unit per COB Design Standards
Thousands of People:0.03472 thousands of people
Property Size:2 acres
Total Flow Rate:2256.8 gpd (units)*(people/unit)*(65gpd/person)
Infiltration Rate:300 gpd (area) *(150 gpd/acre)
Avg. Day Demand:2556.8 gpd flow rate + infiltration rate
Peaking Factor:4.3442
Peak Demand:11107.29 gpd (avg. day demand)*(peaking factor)
Peak Demand:7.71 gpm (peak demand)/(24hr/day)/(60min/hr)
TD&H Sewer Calculations
Project: Arrowleaf Park & Perennial Park
Pipe Sizing Check - Services
Input Values
d =6 Inches =0.5 ft
y =3 Inches =0.25 ft
Calculated Values (Equations from Fluid Mechanics by Chow)
Theta (Ø)3.141593 rad 2*arccos(1-y/(d/2))
Area (A)0.10 ft2 (1/8)*(Ø-sinØ)d2
Wetted Perimeter (P)0.79 ft 0.5Ød
Hydraulic Radius (R )0.13 ft (.25)*(1-(sinØ)/Ø)d
Top Width (T)0.50 ft (sin 0.5Ø)d
Mannings Equation (Equation from Fundamentals of Mechanics by Munson)
n =0.013 (For PVC per COB Design Standards)
S0 =0.02 ft/ft
Q = 0.40 cfs Q = 1.49/n*A*R2/3*S0
0.5
Q = 178.55 gpm Q gpm = (Q cfs) (7.48 gal/ft3)(60 sec/min)
V = 4.05 ft/s V= Q/A
Results A 6" diameter sewer service at a minimum 2 % flowing half
has capacity for 178 gpm.
A 6" diameter sewer service at a minimum 2 % flowing full
has capacity for 357 gpm.
TD&H Sewer Calculations
Project: Arrowleaf Park & Perennial Park
Pipe Sizing Check - Mains
Input Values
d =8 Inches =0.666667 ft
y =4 Inches =0.333333 ft
Calculated Values (Equations from Fluid Mechanics by Chow)
Theta (Ø)3.141593 rad 2*arccos(1-y/(d/2))
Area (A)0.17 ft2 (1/8)*(Ø-sinØ)d2
Wetted Perimeter (P)1.05 ft 0.5Ød
Hydraulic Radius (R )0.17 ft (.25)*(1-(sinØ)/Ø)d
Top Width (T)0.67 ft (sin 0.5Ø)d
Mannings Equation (Equation from Fundamentals of Mechanics by Munson)
n =0.013 (For PVC per COB Design Standards)
S0 =0.004 ft/ft
Q = 0.38 cfs Q = 1.49/n*A*R2/3*S0
0.5
Q = 171.96 gpm Q gpm = (Q cfs) (7.48 gal/ft3)(60 sec/min)
V = 2.20 ft/s V= Q/A
Results An 8" diameter sewer service at a minimum 0.4 % flowing half
has capacity for approximately 171 gpm.
An 8" diameter sewer service at a minimum 0.4 % flowing full
has capacity for approximately 344 gpm.
APPENDIX C
WATER MODELING
Scenario: Arrowleaf Park & Perennial Park
Maximum Day, Bozeman, MT
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
4/30/2020
WaterCAD
[10.02.03.06]
Bentley Systems, Inc. Haestad Methods Solution
CenterGNB North.wtg
Scenario: Arrowleaf Park & Perennial Park
Maximum Day, Bozeman, MT
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
4/30/2020
WaterCAD
[10.02.03.06]
Bentley Systems, Inc. Haestad Methods Solution
CenterGNB North.wtg
FlexTable: Junction Table
Fire Flow
(Available)
(gpm)
Pattern
(Constituent)
Pressure
(psi)
Hydraulic
Grade
(ft)
Demand
(gpm)
Elevation
(ft)
LabelID
3,500Fixed974,958.0004,734.00J-130
3,500Fixed974,958.00154,733.00J-231
3,500Fixed1004,958.00114,728.00J-333
3,500Fixed1004,957.9904,728.00J-435
3,500Fixed1004,957.9904,728.00J-537
3,500Fixed1004,957.98144,727.00J-639
3,500Fixed1004,957.9874,727.00J-741
3,500Fixed1004,957.98144,726.00J-843
3,500Fixed1004,957.9894,726.00J-945
3,500Fixed1004,957.98144,726.00J-1047
3,500Fixed1004,957.9874,726.00J-1149
3,500Fixed1004,957.98144,726.00J-1251
3,500Fixed1004,957.9854,726.00J-1353
3,500Fixed1004,957.9904,726.00J-1455
3,500Fixed1004,958.0054,726.00J-1557
3,500Fixed1004,958.0004,726.00J-1659
3,500Fixed1004,958.00574,728.00J-2994
3,500Fixed1004,958.0004,727.00J-3199
3,500Fixed994,958.0004,730.00J-32102
Page 1 of 127 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
4/30/2020
WaterCAD
[10.02.03.06]
Bentley Systems, Inc. Haestad Methods Solution
CenterGNB North.wtg
CITY OF BOZEMAN
Fire Flow Request Form
PHONE (406) 582-3200 FAX (406) 582-3201
Date: April 29th, 2020
Location Request: Lowe’s Area (1731 Tschache Lane)
Pressure Zone: Northwest
Hydrant GIS ID#: 2058, 2064, 2063
Adjacent Main: 12-inch DIP
The results of the fire flow information that you requested are as follows:
Hydrant ID#: 2058
Maximum Day Demand Available Fire Flow at 20 psi: 13020.21 gpm
Maximum Day Demand Minimum Pressure: 99.35 psi
Maximum Day Demand Average Pressure: 101.72 psi
Maximum Day Demand Maximum Pressure: 103.19 psi
Hydrant ID#: 2064
Maximum Day Demand Available Fire Flow at 20 psi: 10272.37 gpm
Maximum Day Demand Minimum Pressure: 99.25 psi
Maximum Day Demand Average Pressure: 101.62 psi
Maximum Day Demand Maximum Pressure: 103.09 psi
Hydrant ID#: 2063
Maximum Day Demand Available Fire Flow at 20 psi: 10510.88 gpm
Maximum Day Demand Minimum Pressure: 98.5 psi
Maximum Day Demand Average Pressure: 100.86 psi
Maximum Day Demand Maximum Pressure: 102.33 psi
If you have questions or need further information feel free to email.
Data Disclaimer: Water distribution information is calculated using hydraulic modeling software and is subject to variation.
Actual field conditions may vary. This information is provided to the requestor for evaluation purposes only, without
warranty of any kind, including, but not limited to any expressed or implied warranty arising by contract, stature, or law. In
no event regardless of cause, shall the City be liable for any direct, indirect, special, punitive or consequential damages of
any kind whether such damages arise under contract, tort, strict liability or inequity.
HOME OF MONTANA STATE UNIVERSITY
GATEWAY TO YELLOWSTONE PARK