MEMORANDUM
Purpose
As part of the City’s review of the Planned Unit Development (PUD) and Site Plan (SP) applications the
City is requiring the intersection of Max Avenue and Catron Street be improved to an acceptable level of
service. A mini-roundabout was selected to mitigate the impacts of the increased trip generation. The
proposed roundabout will increase the impervious surface at the intersection by 2,604 FT2, or 0.06 acres.
A figure showing the additional area of impervious material is included in Attachment A. This report
defines the proposed stormwater improvements to address the additional impervious area.
Hydrology
The existing configuration of the intersection of Max Avenue and Catron Street does not have curb and
gutter. In general, the paved surface drains to adjacent road side swales, with the exception of the
southeast corner of intersection, which drains to an adjacent ditch. The other intersection quadrants all
eventually drain to the north via a system of existing culverts, ponds, and swales. A culvert (12-inch) runs
from the pond at the southwest corner of the intersection, under Catron Street, to the swale in the
northwest quadrant of the intersection. The swale then drains to a culvert (12-inch) under Max Avenue
which flows into a structure in the northeast corner of the intersection where it changes directions and
flows to an outlet to the north. The culvert under Catron Street is approximately 0.3 feet lower than the
culvert under Max Avenue, causing some ponding in the swale before stormwater begins to discharge.
The collected stormwater eventually drains to an open channel located behind the Holiday Inn Express
adjacent to Valley Center Drive.
Figure 1 - Current System Configuration
TO: Griffin Nielsen, EIT
FROM: Erik Garberg, PE – Senior Civil Engineer
DATE: 06/14/19
SUBJECT: Roundabout Costco Project - Mini-roundabout Stormwater Design Analysis –
Revision 2
MEMORANDUM
Page 2 of 4
Figure 2 - Southwest Quadrant Pond
Figure 3 - Southeast Quadrant Drainage
Figure 4 - Northwest Quadrant Swale
MEMORANDUM
Page 3 of 4
Figure 5 - Northeast Quadrant Drainage
Figure 6 - North Outlet
The proposed project will maintain the existing drainage pattern described above with additional storage
consisting of a pond and a combination overflow manhole structure in the northwest corner of the
intersection. This stormwater management method was selected based on the City direction and review
of multiple design iterations. The tables below summarize the inputs and outputs of the rational method,
for a 10-yr storm event using City of Bozeman’s IDF curves for the pre and post development conditions.
Stormwater calculations are included in Attachment B.
Figure 7 – Roundabout Pre-development Stormwater Inputs and Results (10-yr event)
Drain Area (ac)0.06
Run-off Coefficient 0.2
Time of Concentration (min)5
10-yr Peak Run off (cfs)0.04
10-yr Volume (cuft)11
Roundabout - Pre-Development
MEMORANDUM
Page 4 of 4
Figure 8 - Roundabout Post Development Stormwater Inputs and Results (10-yr event)
The calculations indicate that the additional impervious area of the roundabout will produce a total of 51
cuft of run-off. A pond will be installed with a volume of 51 cuft in the northwest quadrant of the
intersection of Max Avenue and Catron Street to retain the entire 10-year design storm volume with no
deduction for the pre-development condition. Additionally, a stormwater manhole will be installed to
extend the existing drainage beneath new pedestrian crossing in that quadrant. The proposed structure
will act as a stormwater overflow as the rim will be set at an elevation to discharge only after the required
51 cuft volume is retained. See attachment E for proposed improvements.
Reviewing the Stormwater Master Plan for The Gallatin Center PUD Final Plan Revised November 1998
indicated the pre-development flow from the pond at the northeast corner of the Target lot is 3.7 CFS.
This project will add 0.17 CFS for the 10-y event or .20 CFS for the 25-yr event for a total flow of 3.9 CFS
allowing for rounding under both peak flow conditions. The controlling run of 12-inch HDPE discharge
pipe is the section flowing north with a slope of 0.41%. Using Hydraflow Express by Autodesk the
maximum flow from a 12-inch HDPE pipe with a Manning’s N of 0.015 and slope of 0.41% is 14.49 CFS
at 8-inches of depth. Pertinent excerpts from the above referenced Gallatin Center Stormwater report are
included in Attachment D.
The proposed pond will have a storage volume of 51 cuft and only discharge after the required volume is
detained. The discharging piping has sufficient capacity to accommodate the new and existing flows with
significant surplus capacity.
Conclusion
Attachment E contains a figure detailing the existing condition and the pond installed as part the design of
the proposed roundabout. The pond will provide stormwater retention necessary to offset the drainage
produced by the additional impervious surface.
Attachments
Attachment A – Impervious Area Figure
Attachment B – Hydrology Calculations
Attachment C – Miscellaneous Calculations
Attachment D – Stormwater Report Excerpts
Attachment E – Proposed Conditions
Drain Area (ac)0.06
Run-off Coefficient 0.9
Time of Concentration (min)5
10-yr Peak Run off (cfs)0.17
25-yr Peak Run off (cfs)0.2
10-yr Volume (cuft)51
Roundabout - Post Development
ATTACHMENT A – IMPERVIOUS AREA FIGURE
ATTACHMENT B – HYDROLOGY CALCULATIONS
1. 10-yr Pre-development
2. 10-yr Post Development
3. 25-yr Post Development
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.514 Thursday, 01 / 24 / 2019
Hyd. No. 1
Roundabout Pre-development Drainage
Hydrograph type = Rational Peak discharge = 0.038 cfs
Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 11 cuft
Drainage area = 0.060 ac Runoff coeff.= 0.2
Intensity = 3.145 in/hr Tc by User = 5.00 min
IDF Curve = Bozeman IDF.IDF Asc/Rec limb fact = 1/1
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (min)
Roundabout Pre-development Drainage
Hyd. No. 1 -- 10 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.5 Tuesday, 07 / 17 / 2018
Hyd. No. 1
Roundabout
Hydrograph type = Rational Peak discharge = 0.170 cfs
Storm frequency = 10 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 51 cuft
Drainage area = 0.060 ac Runoff coeff.= 0.9
Intensity = 3.145 in/hr Tc by User = 5.00 min
IDF Curve = Bozeman IDF.IDF Asc/Rec limb fact = 1/1
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Roundabout
Hyd. No. 1 -- 10 Year
Hyd No. 1
Hydrograph Report
Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v10.514 Tuesday, 06 / 11 / 2019
Hyd. No. 1
25-yr Roundabout
Hydrograph type = Rational Peak discharge = 0.196 cfs
Storm frequency = 25 yrs Time to peak = 5 min
Time interval = 1 min Hyd. volume = 59 cuft
Drainage area = 0.060 ac Runoff coeff.= 0.9
Intensity = 3.627 in/hr Tc by User = 5.00 min
IDF Curve = Bozeman 10 and 25 IDF.IDF Asc/Rec limb fact = 1/1
0 1 2 3 4 5 6 7 8 9 10
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
25-yr Roundabout
Hyd. No. 1 -- 25 Year
Hyd No. 1
ATTACHMENT C – MISCELLANEOUS CALCULATIONS
1. 12-inch HDPE pipe capacity
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.Tuesday, Jun 11 2019
<Name>
Circular
Diameter (ft)= 1.00
Invert Elev (ft)= 1.00
Slope (%)= 0.41
N-Value = 0.002
Calculations
Compute by:Known Depth
Known Depth (ft)= 0.80
Highlighted
Depth (ft)= 0.80
Q (cfs)= 14.49
Area (sqft)= 0.67
Velocity (ft/s)= 21.51
Wetted Perim (ft)= 2.22
Crit Depth, Yc (ft)= 1.00
Top Width (ft)= 0.80
EGL (ft)= 7.99
0 1 2
Elev (ft)Section
0.50
1.00
1.50
2.00
2.50
3.00
Reach (ft)
ATTACHMENT D – GALLATIN CENTER STORMWATER
REPORT EXCERPTS
ATTACHMENT E – PROPOSED CONDITION
CATRON STREET AND MAX AVENUE ROUNDABOUT GEOMETRY AND TEMPORARY TRAFFIC CONTROL NOTESCONSTRUCTION NOTES:
C8.6
TEMPORARY TRAFFIC CONTROL NOTES:COSTCO WAREHOUSE ADDITIONCIVIL SITE IMPROVEMENTS406-586-883414108 PE
999 LAKE DRIVEISSAQUAH, WA 98027TEL: (425) 313-8100PREPARED FORCOSTCO WHOLESALE CORPORATION
CONSTRUCTION NOTES:
1 CATRON ST PLAN
SCALE: 1" = 20'
2 CATRON ST PROFILE
SCALE: H: 1" = 20' V: 1" = 5'
WATER SYSTEM NOTES:
SEWER SYSTEM NOTES:
#
1
CATRON STREET AND MAX AVENUE ROUNDABOUTPLAN AND PROFILEC8.14COSTCO WAREHOUSE ADDITIONCIVIL SITE IMPROVEMENTS406-586-883414108 PE
999 LAKE DRIVEISSAQUAH, WA 98027TEL: (425) 313-8100PREPARED FORCOSTCO WHOLESALE CORPORATION