HomeMy WebLinkAbout18 - Design Report - The Crossing at Baxter Meadows Ph 4G & 4H - Water, Sewer, Pavement, Storm
2304 N. 7TH AVENUE | SUITE L | BOZEMAN, MT 59715 | (406) 587-2781
Professional Consulting Engineers and Land Surveyors
Equal Opportunity Employer | www.hyaliteeng.com
July 25, 2018
City of Bozeman Engineering Department
20 East Olive Street, 1st Floor
Bozeman, MT 59715
Attn: Griffin Nielsen, EI
Review Engineer
RE: Phase 4G & 4H of The Crossing at Baxter Meadows Subdivision
Bozeman, Montana
Design Report Update Memo
Dear Griffin:
The entirety of Phases 4G & 4H of The Crossing at Baxter Meadows have previously been designed
and presented in the 2013 TD&H “Engineering Design Report The Crossing at Baxter Meadows” for
Phases 4B-4I, however a few of the items needed to be restated and/or clarified specific to Phases
4G & 4H.
Purpose & Introduction
Phases 4G & 4H of The Crossing are located directly south-west of Phase 4F, which was constructed
in 2016-2017. Phase 4G consists of the same preliminary platted 9 lots, while 4H consist of the
same 5 lots, as seen on the included preliminary plat (see section 6).
Water
The proposed water infrastructure essentially remains the same as in the original 2013 Design
Report, therefore the water model remains valid. The water system will tie into existing stubs
located at all 3 points; just south of Lolo/Vaquero intersection, the dead end stub located in
Tschache Lane, as well as the stub located just west of Fire Station #3. All water mains will be
continued at 8ӯ, as will the stub outs for future connection.
Sewer
The proposed sewer infrastructure remains the same as in the original 2013 Design Report,
therefore the estimated flow and pipe calculations remain valid. The sewer system will tie into
existing stubs located at 2 points; just south of Lolo/Vaquero intersection, as well as the stub
located in Tschache Lane. All sewer mains will be continued at 8ӯ, as will the stub outs for
future connection.
Pavement Design
The proposed road infrastructure remains the same as in the original 2013 Design Report, therefore
the proposed sections will be utilized.
Letter to City of Bozeman Engineering Department
Re: Phase 4G & 4H of The Crossing at Baxter Meadows Subdivision
Design Report Update Memo
July 25, 2018
Page 2 of 2
L:\172708\Engineering Reports\Crossing 4G & 4H- CoBoz Design Report 07252018.docx
Stormwater
The proposed storm basins have essentially remained the same as in the original 2013 Design
Report. Updated information has been provided in the included Storm Report regarding the
updated layout of storm water infrastructure, repositioning of storm ponds, as well as the RCP
arch culverts under Vaquero Parkway.
Floodplain
The culverts under Vaquero Parkway were sized the same as previously modeled in the 2007
Floodplain Analysis by TD&H (as referenced in the 2013 Design Report) and therefore the floodplain
is the same as modeled at that time.
I hope that the enclosed information allows you to approve this submittal. If for any reason you
have any questions or need any additional information during the review of this project please
feel free to give me a call at 587-2781 or send an email to bmegaard@hyaliteeng.com.
Sincerely,
Brett Megaard, PE
Project Engineer