Loading...
HomeMy WebLinkAbout18 - Design Report - Sundance Subdivision Phs A & C - Water, Sewer, Paving, Storm Drainage JOB NO. B13-016 GREAT FALLS, BOZEMAN, KALISPELL & SHELBY, MT | SPOKANE, WA | LEWISTON, ID | WATFORD CITY, ND | MEDIA, PA JUNE 2018 406.586.0277 tdhengineering.com 234 East Babcock Street Suite 3 Bozeman, MT 59715 CLIENT ENGINEER Baxter Meadows Land Partners TD&H Engineering 234 East Babcock Street, Suite 3 Bozeman, MT 59715 Engineer: Ahren Hastings , PE WATER, SE WER, PAVING AND STOR M DRAINAGE IMPROVEMENTS SUNDANCE SUBDIVISION P HASES A & C INFRASTRUCTRE IMPROV EMENTS BOZEMAN, MONTANA DESIGN REPORT 7-24-18 Ammeded 5.11.2020 to include Equestrian Lane extension to Davis Lane 2 Purpose and Introduction The purpose of this report is to explain how water, sanitary sewer, and storm sewer facilities will be designed to meet City of Bozeman Design Standards and provide service to the Sundance Subdivision. The report will provide information on the design of the above mentioned infrastructure. The boundary of the Sundance Subdivision can be seen on the DRAFT final plat shown in Figure 1. During the preliminary plat approval process the design for the infrastructure improvements to serve these lots has already been submitted and approved with the City of Bozeman, attached here. The overall design intent has remained the same since preliminary plat approval with minor changes to the planned development. These changes have not altered the overall design for utility sizing or road construction. Lot 2 is still planned to be developed in to residential units with the addition of commercial space along the eastern boundary, Figure 2. This design has been approved by the City of Bozeman through the Master Site Plan submittal process. The number of units has decreased from the original subdivision preliminary plat approval being swapped for commercial space. The original subdivision design for infrastructure improvements will exceed the requirements of the new proposed Lot 2 design. Lots 3 and 4 are still planned to be developed in accordance with the original preliminary plat design. However, a portion of the area originally located in lot 3 will now be dedicated park space to meet site plan requirements for lot 2. The residential/commercial area to be developed will therefore be reduced and original subdivision design for infrastructure improvements will exceed the requirements of the new proposed Lots 3 and 4 design. Lot 1 is not included in this phase of final plat design and is unchanged from original preliminary plat design. It will be a remainder lot at this time. Design Report Detailed design considerations and requirements are shown in the attached original design report. The following summarizes those designs applicable to the infrastructure design for Phases A and C. Water All new water mains will be 8-inch diameter, class 51, ductile iron pipe. Hydrant leads will be 6-inch ductile iron pipe. Due to the nature of the subdivision and the anticipated use of the large lots, 8-inch diameter stubs will be or have previously been extended to the proposed lots. This is being done to allow for construction of future water mains and looping of water mains specific to the site plans that will be developed for these lots. Sewer Equestrian Ln extension shown in Figure 1a. 3 Each lot in the subdivision has or will have at least an 8-inch sewer stubbed out to the lot. All new sewer mains will be 8-inch diameter SDR 35 PVC. The sewer mains have been sized for the development based upon the following values from the City of Bozeman Design Standards and Specification Policy, Revised 3/31/2011: Residential  2.11 people / unit  188 Units  89 gallons / capita / day  150 gallons / acre / day infiltration  2000 gallons per acre per day average (commercial)  25 gallons per acre per day average (park) New sewer mains will be designed to roughly parallel the road centerline grades. A capacity check on 8-inch sewer main using the minimum slope of 0.4% and a Manning’s friction factor of 0.013 indicates new wastewater flows from the subdivision will not exceed the pipe’s capacity assuming 75% of the maximum capacity. 8-inch sewer mains will be able to adequately handle the flows as described above. However, since this subdivision falls within the Baxter Meadows Lift Station zone adequate capacity must be present in the lift station to support these flows. From the original Baxter Lift Station design report, for B2 zoning, 3,495 gpd/ac was used. This project falls entirely within B-2 zoning and the size of Lots 2, 3, 4, Sundance Park and R2 make up a total of 23.9 acres. Allocated capacity within the lift station is calculated as follows: 3,495 gpd/ac x 23.9 ac = 83,531 gpd / 1440 min/day = 58.0 gpm 150 gpd/ac x 23.9 ac = 3,585 gpd / 1440 min/day = 2.5 gpm Peaking factor from original lift station design report = 3.01 (58.0x3.01)+2.5 = 177.1 gpm (allocated flow in lift station) Estimated flow for this subdivision is calculated as follows: Lots 3, 4 and R2 are commercial and total 11.89 acres 2,000 gpd/ac x 11.89 ac = 23,780 gpd / 1440 min/day = 16.5 gpm Sundance Park total 2.83 acres 25 gpd/ac x 2.83 ac = 70.75gpd / 1440 min/day = 0.05 gpm 150 gpd/ac x 14.72 ac = 2,208 gpd / 1440 min/day = 1.5 gpm Peaking factor from original subdivision design report = 4.1 (16.5 x4.1)+2.5 = 70.2 gpm Lots 2 is 188 residential units and 0.67 acres (29,397 SF) of commercial 2,000 gpd/ac x 0.67 ac = 1,340 gpd / 1440 min/day = 0.9 gpm 188 x 2.11 x 89 = 35,305 gpd / 1440 min/day = 24.5 gpm 4 150 gpd/ac x 9.132 ac = 1,370 gpd / 1440 min/day = 1.0 gpm Peaking factor from original subdivision design report = 4.1 (25.4x4.1)+1.0 = 105.1 gpm Total Estimated Peak Flow = 105.1+ 70.2 = 175.3 gpm < 177.1 gpm Pavement Design and Construction Three new road sections will be constructed to accommodate the Sundance Subdivision: 1. Caspian Avenue from Baxter Lane to Equestrian Lane 2. Equestrian lane from Caballo Avenue to east of Caspian Avenue 3. Galloway Street from Caspian Avenue to Equestrian Lane The proposed roads line up with existing roads in the Baxter Meadows Development. The alignment of these roads is in conformance with anticipated roads that were master planned in the expired Baxter Meadows PUD. A City of Bozeman standard 60-foot right-of-way and 35-foot wide (top back of curb to top back of curb) road section is proposed. Stormwater Treatment Solids, silt, oils, grease and other pollutants will be removed from the stormwater prior to discharge from the site as required by the City of Bozeman Design Standards. Catch basins with 9-inch sumps and detention ponds will collect and allow for heavier solids to settle out before storm water is discharged into the Spring Ditch. The grass lined detention ponds will also remove much of the grease, oils and silt from the stormwater. Based on technical research, grass lined swales/ponds trap urban runoff contaminants and provide a high level of treatment. Grease and oils coming in contact with the grass will stick to the grass and biodegrade naturally. During the detention pond design, it will be necessary to capture the first half inch of runoff, and keep it on site. This may be accomplished with a dry well or series of drywells that would reintroduce that initial runoff to the soil. Stormwater Conveyance and Detention Ponds In the pre-developed condition, storm water that does not infiltrate into the ground flows to the north into the existing wetland on the north side of Kimberwicke Street and is ultimately conveyed off the property through the Spring Ditch which flows in a northerly direction through the region. The Spring Ditch is considered a stream/ditch according to the Gallatin County Conservation District. Davis Ln 5 Because of the nature of this development and the large lot sizes, several possibilities exist for further development of these lots. As a result, installation of storm drainage infrastructure on the lots is not possible at this time. Future site plans and further subdivision of the lots must account for their own storm water. Storm water on each lot that is not already accounted for in previously installed infrastructure must be detained onsite and released at the predevelopment rate. Storm water detention and conveyance will be reviewed by the City of Bozeman for each lot individually though the site plan or additional subdivision process. Due to the nature of the subdivision and the anticipated use of the large lots, 18-inch diameter stubs will be or have previously been extended to the proposed lots. This is being done to allow for construction of future storm water mains specific to the site plans that will be developed for these lots. During site plan design and review for Lot 2 a new stormdrain detention pond is proposed north of Kimberwicke to account for stormwater runoff in Lot 2. The size of this pond is determined by available area though an easement agreement. As Lot 2 is developed it will utilize capacity of this pond which will be determined during the site plan submittal process. Should further capacity be required it will utilize other areas or methods, i.e. underground infiltration. Ground Water This area of Bozeman is known for high ground water. A geotechical evaluation on the lot to the west encountered shallow ground water. Depths to ground water may vary. Road profiles throughout the development should be set above existing ground. Due to the elevated ground water levels, careful consideration of ground water and assistance from design professionals should be considered prior to installation of structures with basements or crawlspaces. All infrastructure improvements (water, sewer, and storm drain) have been desinged and sized to serve all surrounding lots. The Equestrian Lane extension does not change the intened use of the surrounding lots. The extension is proposed in order to better serve the full perimeter of the adjacent lots to Equestrian Lane and provide better access to underground utilities when the lots are developed. No changes to the calculations and design already approved have been made as part of this extension. N89°44'02"E 765.80'N00°16'28"W 666.60'N89°43'32"E 406.00'S00°16'16"W 1045.71'S89°43'38"W 615.34'S00°15'44"E 599.91'S89°43'23"W 385.05'N00°16'34"W 1039.07'S89°43'38"W 161.30'S00°16'22"E60.00'SURVEYED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:Engineeringtdhengineering.comMONTANAWASHINGTONIDAHOGREAT FALLS-BOZEMAN-KALISPELL-SHELBYLEWISTONSPOKANENORTH DAKOTAWATFORD CITYB13-016FIGURE 1 FIGURE 1A FREFREFREFREBRABRA BUILDING C-1COMMERCIAL1-STORY7,170 SF6 STALLS 7 STALLS 9 STALLS8 STALLS 6 STALLS 9 STALLS9 STALLSPARKING REQUIREDCOMMERCIAL SPACEGROSS AREA29,397 SFNET AREA (80%) 23,517 SFOFFICE:1 STALL / 250 SF94 STALLS REQ'D70% OF COMMERCIAL PARKING PROVIDED WITH A JOINT PARKINGAGREEMENT94 (70%) = 65 JOINT STALLS94 (30%) = 29 DEDICATED COMMERCIAL STALLS REQ'DHOUSING188 UNITS1.5 STALLS/UNIT 52 1-BR 28% 78 STALLS (1.5/UNIT)2 STALLS/UNIT 112 2-BR 60% 224 STALLS (2/UNIT)3 STALLS/UNIT 24 3-BR 12% 72 STALLS (3/UNIT)HOUSING PARKING374 HOUSING STALLS REQ'DTOTAL PARKING REQ'D403 STALLS(INCL. 10 ADA STALLS)PARKING PROVIDED GARAGE STALLS (24' DEEP) 112 (60% OF UNITS) TANDEM STALLS (18' DEEP) 103 SURFACE STALLS283 PARALLEL STALLS 38 (KIMBERWICKE & GALLOWAY ST.) EXISTING ANGLED STALLS 38 (CASPIAN LANE)TOTAL PARKING PROVIDED 574 STALLS(INCL. 12 ADA STALLS)DEDICATED COMMERCIAL 29 STALLSALLOWABLE HOUSING 545 STALLSBUILDING C-2COMMERCIAL2-STORY7,528 SF / LEVEL15,057 SF TOTALBUILDING C-3COMMERCIAL1-STORY7,170 SF24' FIRE LANE24' FIRE LANE24' FIRE LANE24' FIRE LANEPROPOSED SITE LAYOUTPARK MEADOWS APARTMENTSNORTH030' 60'120'15'SCALE: 1"=30'7 STALLS7 STALLS10 STALLS8 STALLS 14 EXISTING STALLS9 STALLS24 EXISTING STALLS 9 STALLS7 STALLS7 STALLSCLUBHOUSE AT MAIN LEVEL4,266 SF7 STALLS11 PARALLEL STALLS (9' x 24')9 STALLS11 STALLS10 STALLS8 STALLSMAILBOXESPAVILION25'SETBACK7'SETBACK7'SETBACK 7'SETBACK8 STALLS9 STALLS9 STALLS9 STALLS10 STALLS9 STALLS7 STALLS7 STALLS6 STALLS 25'SETBACKDAVIS LANEGALLOWAY STREETCASPIAN LANE KIMBERWICKE ST.6 PARALLEL STALLS (9' x 24')SNOW STORAGESNOW STORAGE SNOW STORAGE 21 PARALLEL STALLS (9' x 24')30' PUBLICEASEMENT30' PUBLIC EASEMENT 5' SETBACK5' SETBACK5' SETBACK 5' SETBACK 10 STALLS9 STALLS8 STALLS 2 ST. 6 STALLS 12 TANDEM STALLS12 TANDEM STALLS12 TANDEM STALLS3 STALLS6 TANDEM STALLS12 TANDEM STALLS12 TANDEM STALLS18'18' 18'24'4.86' 2.69' 7.2'3.5'2.81' 2.81'3.5' 24'24' 24' 24' 18'NO PARKINGNO PARKING24'11 TANDEM STALLS18'2.59'14 TANDEM STALLS12 TANDEM STALLS18'24'1 STALL 1 STALL 5 STALLS24' FIRE LANE 24' FIRE LANE 1 STALLBUILDING TYPE 1BUILDING TYPE 1BUILDING TYPE 2BUILDING TYPE 2BUILDING TYPE 2BUILDING TYPE 2BUILDING TYPE 2BUILDING TYPE 2BUILDINGTYPE 3BUILDINGTYPE 3 BUILDINGTYPE 3FIGURE 2 Retention Area Roads Lots 2, 3 & 4 Park Hard Undeveloped Landscaped Total Hard Turf Landscaped Weighted Surfaces Area Area Area Coeff.Coeff.Coeff.Average C (sf)(sf)(sf)(sf)C Coeff.C CAVG Proposed 95,000 687,159 123,275 905,434 0.9 0.3 0.1 0.34 Total Lot Area 905,434 sf Total Lot Area 20.786 acres Sundance Sub Phase A and C C Value Determination- 7-24-2018 J:\2013\B13-016 Rockworth-Sundance Apartments Phase 2\DOCUMENTS\7.24.18 COB Sub Infrastructure Re Submit\Storm Drain Calcs - Sundance Retention.xls TD&H Storm Drain Calculations Project: Sundance Sub Phase A and C Retention Calculations - 25 Year, 2 hr Event 7/24/2018 C Area 2-hr Q V Pond Top Pond Bottom Depth Actual Volume (ac)(i) in/hr (cfs)(cf)Area (sf)Area (sf)(ft)(cf) Retention Pond 0.34 20.79 0.28 1.943 13,991 16,421 13,108 1.00 14,765 Time to Concentration - A conservative time to concentration of 5 minutes was used in calculating 2-hr intensity. Drainage Basin Total Runnoff Volume i_25=0.78×t^(-0.64)AiCQQV7200 J:\2013\B13-016 Rockworth-Sundance Apartments Phase 2\DOCUMENTS\7.24.18 COB Sub Infrastructure Re Submit\Storm Drain Calcs - Sundance Retention.xls APPENDIX Original Preliminary Plat Subdivision Design Report 1 SUNDANCE SUBDIVISION PRELIMINARY PLAT DESIGN REPORT Purpose and Introduction The purpose of this report is to explain how water, sanitary sewer, and storm sewer facilities will be designed to meet City of Bozeman Design Standards and provide service to the Sundance Subdivision. The report will provide information on the preliminary design of the above mentioned infrastructure. The boundary of the Sundance Subdivision can be seen on the preliminary plat included in Appendix A. The Sundance Subdivision is a minor subdivision located on the northwestern side of Bozeman, Montana. The project is generally bounded by Caballo Avenue on the east, Baxter Lane on the south, Davis Lane on the east and undeveloped property to the north. The Sundance Subdivision consists of four lots and is zoned B-2. While the exact use of the future lots has not been finalized, a proposed development plan may include the following: Lot Acreage Assumed Units 1Population 1 4.478 50,000 SF of General Office 0 2 9.189 216 Apartments 456 3 6.691 80 Town Homes 169 4 3.247 20,000 SF General Office 0 1Population is based on 2.11 people per unit. The subdivision will be constructed in three phases with the possibility of additional, future subdivisions. The Master Utility plan that includes phase boundaries can be seen in Appendix B. Design Report Water The proposed water system will tie into existing mains installed during the development of Baxter Meadows Subdivision PUD Phase 2A and 2B. New water main connections will be necessary to provide water service to the proposed lots and allow for future expansion. Water line loops have been provided where practical. The following summarizes the estimated demands created by the Sundance Subdivision along with other design input: • 625 people (residential) • 5.7 acres of office space 2 • 170 gallons per day per person average (residential) • 960 gallons per acre per day average (general business/business park) • C Factor of 130 • 3:1 maximum (peak) hour to average day ratio • 2.3:1 maximum day to average day ratio All new water mains will be 8 or 10-inch diameter, class 51, ductile iron pipe. Hydrant leads will be 6-inch ductile iron pipe. Due to the nature of the subdivision and the anticipated use of the large lots, 8-inch diameter stubs will be or have previously been extended to the proposed lots. This is being done to allow for construction of future water mains and looping of water mains specific to the site plans that will be developed for these lots. As a result of phasing, two dead end water mains are possible but measure less than the maximum dead end length of 500 feet. The maximum day plus fire flow scenario indicates there is ample water provided by the current system to provide domestic and fire flows to the end of the longest possible dead end main (Galloway Street). Our water calculations indicate a fire flow on the order of 2,400 gallons per minute (gpm) with a minimum system pressure of 20 pounds per square inch (psi) is achievable at the end of the temporary dead end water main. Future looping will improve this available fire flow. Water modeling and calculations are included in Appendix C. Sewer Each lot in the subdivision, except Lot 4, has at least an 8-inch sewer stubbed out to the lot. A new 8-inch sewer main will be constructed to provide an 8-inch sewer stub to Lot 4 along with provided sewer service to the lots in Minor Subdivision 400. All new sewer mains will be 8-inch diameter SDR 35 PVC. The sewer mains have been sized for the development based upon the following values from the City of Bozeman Design Standards and Specification Policy, Revised 3/31/2011: Residential • 2.11 people / unit • 89 gallons / capita / day • 150 gallons / acre / day infiltration • 625 people • 960 gallons per acre per day average (general business/business park) New sewer mains will be designed to roughly parallel the road centerline grades. A capacity check on 8-inch sewer main using the minimum slope of 0.4% and a Manning’s friction factor of 0.013 indicates new wastewater flows from the subdivision will not exceed the pipe’s capacity assuming 75% of the maximum capacity. Sewer calculations are included in Appendix D. 3 Pavement Design and Construction General Three new road sections will be constructed to accommodate the Sundance Subdivision: 1. Caspian Avenue from Baxter Lane to Equestrian Lane (625 feet) 2. Equestrian lane from Caballo Avenue to east of Caspian Avenue (550 feet) 3. Galloway Street from Caspian Avenue to Davis Lane (725 feet) The proposed roads line up with existing roads in the Baxter Meadows Development. The alignment of these roads is in conformance with anticipated roads that were master planned in the expired Baxter Meadows PUD. A City of Bozeman standard 60-foot right-of-way and 35-foot wide (top back of curb to top back of curb) road section is proposed. Design Considerations The performance of the pavement for The Crossing at Baxter Meadows Subdivision depends upon several factors, including (1) the characteristics of the supporting soil; (2) the magnitude and frequency of wheel load applications; (3) the quality of available construction materials; and (4) the desired period of design life. Based on the near surface materials encountered in the backhoe test pits, the predominant subgrade will either be a poorly-graded gravel (GP) or a silty clay (CL) soil. We recommend excavating to subgrade depth or natural gravel, which ever is encounter first, to determine if the resulting subgrade is gravel or clay. If the subgrade is native gravel, we recommend scarifying and re-compacting the upper 12 inches of the subgrade prior to constructing the base course gravel and asphalt pavement section. If the resulting subgrade is clay, we recommend over-excavating the clay, placing a geotextile, and constructing the base course and sub-base gravel section on top of the geotextile prior to placing the asphalt surfacing. The magnitude and frequency of wheel load applications have been estimated based on a 20-year design life, and the following parameters were used along with the AASHTO Pavement Design Method of Analysis to develop flexible pavement sections as detailed below: Reliability (R) = 95% Standard Deviation (So) = 0.35 Design Period (N) = 20 years 18-kip Equivalent Single Axle Loads (ESAL’s) for Local Streets = 50,000 CBR (gravel) = 25 (Mr = 13,500 psi) CBR (clay) = 3.0 (Mr = 4,500 psi) Design Serviceability Loss = 1.9 4 Flexible Pavement Requirements The proposed streets should be constructed with a total required flexible pavement thickness and individual layer thickness as follows: Local Streets w/ Native Silty Clay Subgrade: 3.0 inches of Hot Mix Asphaltic Concrete 6.0 inches of Base Course Gravel (1½ inch Minus Crushed) 18.0 inches of Sub-Base Gravel (Pit Run Gravel) or Native Subgrade Gravel Scarify & Re-compact 12 inches of Clay Subgrade *(Note: Separation/Stabilization Geotextile should be used for silty clay subgrade) ----- 27.0 inches Total Pavement Section Specification Requirements The following items should be incorporated into the project plans and specifications: 1. Hot Mix Asphaltic Concrete Surface – Montana Public Works Standard Specifications (MPWSS) Performance Graded (PG) binder having a 58-28 grade in accordance with AASHTO MP1. 2. Crushed Base Course – Crushed Base Course 1½ inch Minus Gravel conforming to Section 02235 of the Montana Public Works Standard Specifications (MPWSS) - The material should be compacted to a minimum of 95 percent of AASHTO T-99 Proctor near optimum moisture content. 3. Sub-Base Course - Sub-Base Course 6 inch Minus Pit Run Gravel. The materials should be compacted to a minimum of 95 percent of AASHTO T-99 Proctor near optimum moisture content. 4. Separation/Stabilization Geotextile – Mirafi 600X Woven fabric, or equal, should be used to facilitate compaction of sub-base gravels over saturated, pumping subgrade soils. The geotextile should be specified between the subgrade soils and the sub-base course gravel using the manufacturer’s recommendations. The analysis and recommendations submitted in this report are based upon the data obtained from soil boring logs at the site by SK Geotechnical in 2000 and 2001. Variations occur between specific sites tested, the nature and extent of which do not become evident until additional exploration or construction is conducted. A re-evaluation of the recommendations presented in this report should be made after performing on-site observations during construction to note the characteristics of any variations. 5 Stormwater Treatment Solids, silt, oils, grease and other pollutants will be removed from the stormwater prior to discharge from the site as required by the City of Bozeman Design Standards. Existing ponds and infrastructure exist in the area and were designed with future development in mind. The western portions of the subdivision may discharge directly to the streets or existing storm drainage infrastructure without being detained onsite. Existing detention ponds east of Vaquero Parkway will detain this runoff and restrict runoff to pre- development rates. Catch basins with 9-inch sumps and detention ponds will collect and allow for heavier solids to settle out before storm water is discharged into the Spring Ditch. The grass lined detention ponds will also remove much of the grease, oils and silt from the stormwater. Based on technical research, grass lined swales/ponds trap urban runoff contaminants and provide a high level of treatment. Grease and oils coming in contact with the grass will stick to the grass and biodegrade naturally. Stormwater Conveyance In the pre-developed condition, storm water that does not infiltrate into the ground flows to the north. Existing runoff is ultimately conveyed off the property through the Spring Ditch which flows in a northerly direction through the subdivision. The Spring Ditch is considered a stream/ditch according to the Gallatin County Conservation District. Because of the nature of this development and the large lot sizes, several possibilities exist for further development of these lots. As a result, installation of storm drainage infrastructure on the lots is not possible at this time. Future site plans and further subdivision of the lots must account for their own storm water. Storm water on each lot that is not already accounted for in previously installed infrastructure must be detained onsite and released at the predevelopment rate. Storm water detention and conveyance will be reviewed by the City of Bozeman for each lot individually though the site plan or additional subdivision process. Storm drainage calculations can be found in Appendix E. Ground Water This area of Bozeman is known for high ground water. A geotechical evaluation on the lot to the west encountered shallow ground water. Depths to ground water may vary. Road profiles throughout the development should be set above existing ground. Due to the elevated ground water levels, careful consideration of ground water and assistance from design professionals should be considered prior to installation of structures with basements or crawlspaces. APPENDIX A Preliminary Plat SURVEYED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:ENGINEERING CONSULTANTSTHOMAS, DEAN & HOSKINS, INC. QUALITY CHECK:DESIGNED BY:DRAWN BY:CAD NO.JOB NO.DATE:DESIGN REPORT BASEEngineeringtdhengineering.com1FIGUREB13-0169/10/14NAKLSKLSVICINITY MAPBOZEMAN, MONTANASUNDANCE SUBDIVISION APPENDIX B Master Utility Plan LOT 36.691 ACRESLOT 29.189 ACRESLOT 14.478 ACRESSUNDANCE APARTMENTSBAXTER MEADOWSPHASE 2BBAXTER MEADOWSPHASE 2A, BLOCK 16BAXTER MEADOWSPHASE 2A, BLOCK 18BAXTER MEADOWSPHASE 2A, BLOCK 20CABALLO AVE.VAQUERO PKWY.GALLOWAY ST.CASPIAN AVE.KIMBERWICKE ST.VAQUERO PKWY.GALLOWAY ST.EQUESTRIAN LANEDAVIS LANE DAVIS LANEBAXTER LANEBAXTER LANEMINOR SUBDIVISION 400LOT 43.247 ACRESBAXTER MEADOWSPHASE 4CASPIAN AVE. SPRING DITCH KIMBERWICKE ST.LOT 2LOT 3LOT 4LOT 1PHASE APHASE CPHASE BPHASE BOUNDARY(TYP)SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:DR C1.1REV DATE Engineering tdhengineering.com REVISION SUNDANCE APARTMENTS BOZEMAN, MONTANA MASTER UTILITY PLAN WATER AND SEWER B13-0169/5/14NA.DWGDR C1.1KLSNANALEGENDPHASE MAPJ:\2013\B13-016 Rockworth-Sundance Apartments Phase 2\CADD\CIVIL\DWG\DR C1.1.dwg, 12/3/2014 3:41:57 PM, KLS LOT 36.691 ACRESLOT 29.189 ACRESLOT 14.478 ACRESSUNDANCE APARTMENTSBAXTER MEADOWSPHASE 2BBAXTER MEADOWSPHASE 2A, BLOCK 16BAXTER MEADOWSPHASE 2A, BLOCK 18BAXTER MEADOWSPHASE 2A, BLOCK 20CABALLO AVE.VAQUERO PKWY.GALLOWAY ST.CASPIAN AVE.KIMBERWICKE ST.VAQUERO PKWY.GALLOWAY ST.EQUESTRIAN LANEDAVIS LANE DAVIS LANEBAXTER LANEBAXTER LANEMINOR SUBDIVISION 400LOT 43.247 ACRESBAXTER MEADOWSPHASE 4CASPIAN AVE. SPRING DITCH SHEETDESIGNED BY:QUALITY CHECK:JOB NO.FIELDBOOKDRAWN BY:DATE:DR C1.2REV DATE Engineering tdhengineering.com REVISION SUNDANCE APARTMENTS BOZEMAN, MONTANA MASTER UTILITY PLAN STREETS AND STORM WATER B13-0169/5/14NA.DWGDR C1.2KLSNANALEGENDJ:\2013\B13-016 Rockworth-Sundance Apartments Phase 2\CADD\CIVIL\DWG\DR C1.2.dwg, 12/3/2014 3:49:30 PM, KLS 8" 10" 8" Approximate Subdivision Boundary 8" 8" 8" 15" 8"Approximate Subdivision Boundary