Loading...
HomeMy WebLinkAbout06-19-21 Public Comment - C. Brizzolara - Parking Garage IdeasFrom:Chris Brizzolara To:Agenda Subject:Agenda Proposal for ARF Date:Saturday, June 19, 2021 4:12:03 PM Attachments:BuildBozemanbyBozemanParking GaragePlan2021.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi, I would like to propose for my parking garage idea to be added to the agenda, and for it to receive $1 for funding and research, in order to establish and create an official, preliminary budget dollar amount figure, for the first two proposed construction projects by the M Trail, enclosed in this packet. The first project is a completely underground, concrete parking garage for the M trail. And the second is a tunnel over the road, behind the M trail parking lot, by usingballoon formwork in place, that would require no demolition of Bridger Canyon. These projects would be able to be used as real accurate figure to estimate how much my Bozeman Central Park and Pedestrian/Bike Pathway Circle would cost to implement. Thank You, Christopher Brizzolara june 19th, 2021 OF PLOT DATE: category: PROJECT title: infrastructure BRIZZOLARA 'S BUILD BOZEMAN BY BOZEMAN 2020S PLAN bozeman, montana, usa idea: location: ivupgrade them trailuse this project to gauge Bozeman central park cost m Trail infrastructure upgrades as a pilot system for Bozeman central park & burying I-90, 7th, 19th & oak street use the excavated dirt & backfill once a tunnel's built use the balloon formwork that is an Australian technique that avoids car and kangaroo crashes our city needs parking garages and I am offering a design I came up with, while earning my master's degree in architecture at la universita di roma, for free. this project will be a test run for implementing the 5 parking garages I have proposed in my build Bozeman by Bozeman plan. if this were to be passed and built, I would also recycle all the dirt needed to excavate for the parking garage, and throw it on top of a 500' new span of tunnel. balloon framework would be placed on the road over one night, and concrete would be poured on top to create a wildlife and pedestrian bridge over bridger canyon drive. this project would also work as a pilot and test run for my eventual plan of creating Bozeman central park and pedestrian pathway that would bury I-90. https://uni-span.com.au/news/a-guide-to-tunnel-formwork/ subterranean parking garage with water lines i build Bozeman by Bozeman for bozeman june 19th, 2021 OF PLOT DATE: category: PROJECT title: infrastructure BRIZZOLARA 'S BUILD BOZEMAN BY BOZEMAN 2020S PLAN bozeman, montana, usa idea: location: ivparking garage1 of 6 proposed garages ii m trail pilot garage and tunnel/pedestrian pathway third garage fourth garage & condo building condosb1 c1 c2Bozeman bowl bowling alley babcock st church st.camera brizzolara's free design then the first garage downtown should be behind the post office behind holy rosary corner of babcock & church also, not shown but proposed would be Walmart's parking lot june 19th, 2021 OF PLOT DATE: category: PROJECT title: infrastructure BRIZZOLARA 'S BUILD BOZEMAN BY BOZEMAN 2020S PLAN bozeman, montana, usa idea: location: iv the other Montana university town, Missoula has the advantage of a river running through the city, with a pedestrian bike path on both sides connecting all the major points and intersections of their city. This series of proposals builds off of the previous new subdivision and off West North Park, and this proposal will create the first phase of building a walking loop and bike path, as well as 2 centralized parks for over 360 total acres of new city parks. The idea is to create 3 parks and link them with a pedestrian walkway/bike paths connecting to each other, and it would be designed after the town of Lucca, Italy. The town of Lucca has a pedestrian road above their ancient brick walls that surround the city, and it allows access on and off at all the city’s major intersections. GRADUALLY build Bozeman's new central Park & create a pedestrian pathway & Walking circle If balloon formwork were to be used to bury I - 90 from N 19th St. past 7th Street, then once backfilled, this pathway park would bridge over I - 90 and connect all the other subdivisions together. This would also link to the new Bozeman Central Park. The seventh proposal is to, through eminent domain, buy the 38+ acres behind, and north east of, the Bridger Peaks Shopping Center, for what is proposed to be another new subdivision of single family homes only. The area could provide 77 half- acre lots at $50,000 to generate $3,850,000. If the lots were also financed by the city, it would generate around $5,467,000. Then, if these homes were to be financed by the city's revolving loan fund, and built at $163,333, the city could generate another $16,802,562 if offered 15 year, 5% mortgages/construction loans. With this expected 21 million+ dollar income, The idea would be to reinvest and build infrastructure similar to Lucca's and Missoula's walking paths and parks. Missoula's core river trail lucca, Italy's pedestrian park on top of their walls there are Restaurants & bathroom facilities spread throughout #1 #2 #4 #3 8 #5 #7 #13 & 14 6 #9 & #10 #12 11 https://i.pinimg.com/originals/57/05/26/570526ab4b03a 9fde1619380e2c3849d.jpg  https://www.inthelooptravel.com/adventures/exploring-the- historic-city-walls-of-lucca https://bewitchedbyitaly.com/wp-content/uploads /elementor/thumbs/Walls-of-Lucca.jpg BOZEMAN'S CENTRAL PARK6 & 7 out of 22 brizzolara proposals new bozeman central park iii june 19th, 2021 OF PLOT DATE: category: PROJECT title: infrastructure BRIZZOLARA 'S BUILD BOZEMAN BY BOZEMAN 2020S PLAN bozeman, montana, usa idea: location: iv The 8th proposal would be to build a new neighborhood able to supply 40-203 lots behind Walmart, located as #8 on the southeastern white plot of land. The 9th proposal is to then destroy Walmart’s parking lot, and build them a subterranean parking garage for customers to use, that will also prevent RVs from living in the new parking space. The 10th proposal is to backfill over the parking garage and establish a second park above it, and above I - 90's intersection with 7th Street. If approved, over 8 acres of new, additional city parks would be built on top of the current, ugly highway lanes, and on top of 7th Street. The 11th proposal is to then destroy and bury Oak Street. It would only be the span between 7th and 19th, and the new section of Oak Street would be tunneled, with a pedestrian pathway and bike path on top, and it's earth would be reused for backfilling the parks. The 12th proposal would be to completely bury 19th Street connecting it to the West North Park subdivision, as well as the Cat Tail Lake subdivision. Of course now it will also connect with the new Bozeman Central Park and its subdivision, as well as the new subdivision behind Walmart. The past 11 proposals are now connecting via this massive new pedestrian, centralized park system that buries the town’s most busiest intersections, streets, and parking lots. expand bozeman central park with a SECOND PARK & A SIXTH SUBDIVISION behind walmart If the city were able to sell these lots behind Walmart at $50,000 EACH, it would generate about $2,000,000 - $10,150,000. If the plots were also financed by the city, it’d generate between 2.8 - 14.4 million dollars. If the city financed the construction loans for these homes to be built, at HomeAdvisor’s lowest average price of building a home estimate of $163,333, this which could generate an income on the land and on the construction loans/ mortgages of: $653,332 - $6,631,319 for the 20% Down Payment + $8,093,103 - $37,756,840 Total of 180 Payments + $2,840,000 - $14,413,000 on Land & Interest $11,586,435 - $58,801,159 by Year 15 Total ELECTRICAL LINES RUNNING PARALLEL WITH I - 90, and throughout the city will BE PLACED IN THE NEW TUNNEL AND HIDDEN from view. #8 #9 & 10 #11 #12 Central Park west north park brick city new subdivision hrdc cat tail lake subdivision I-90 buried TUNNEL OVER I-90, TO BUILD A NEW PARK & NEIGHBORHOOD8 - 12 out of 22 connect Bozeman with pathways above our buried streets iv