HomeMy WebLinkAbout06-19-21 Public Comment - C. Brizzolara - Parking Garage IdeasFrom:Chris Brizzolara
To:Agenda
Subject:Agenda Proposal for ARF
Date:Saturday, June 19, 2021 4:12:03 PM
Attachments:BuildBozemanbyBozemanParking GaragePlan2021.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Hi,
I would like to propose for my parking garage idea to be added to the agenda, and for
it to receive $1 for funding and research, in order to establish and create an official,
preliminary budget dollar amount figure, for the first two proposed construction
projects by the M Trail, enclosed in this packet.
The first project is a completely underground, concrete parking garage for the M trail.
And the second is a tunnel over the road, behind the M trail parking lot, by usingballoon formwork in place, that would require no demolition of Bridger Canyon. These
projects would be able to be used as real accurate figure to estimate how much my
Bozeman Central Park and Pedestrian/Bike Pathway Circle would cost to implement.
Thank You,
Christopher Brizzolara
june 19th, 2021
OF
PLOT DATE:
category:
PROJECT title:
infrastructure
BRIZZOLARA 'S
BUILD BOZEMAN
BY BOZEMAN
2020S PLAN
bozeman,
montana,
usa
idea:
location:
ivupgrade them trailuse this project
to gauge
Bozeman
central park
cost
m Trail infrastructure upgrades as a pilot system for
Bozeman central park & burying I-90, 7th, 19th & oak street
use the excavated dirt & backfill once a tunnel's built
use the balloon formwork that
is an Australian technique that
avoids car and kangaroo crashes
our city needs parking garages
and I am offering a design I came up
with, while earning my master's degree
in architecture at la universita di
roma, for free. this project will be a
test run for implementing the 5
parking garages I have proposed in my
build Bozeman by Bozeman plan.
if this were to be passed and built,
I would also recycle all the dirt
needed to excavate for the parking
garage, and throw it on top of a 500'
new span of tunnel.
balloon framework would be
placed on the road over one night,
and concrete would be poured on
top to create a wildlife and
pedestrian bridge over bridger
canyon drive.
this project would also work as
a pilot and test run for my eventual
plan of creating Bozeman central
park and pedestrian pathway that
would bury I-90.
https://uni-span.com.au/news/a-guide-to-tunnel-formwork/
subterranean parking garage with water lines
i
build Bozeman by
Bozeman for bozeman
june 19th, 2021
OF
PLOT DATE:
category:
PROJECT title:
infrastructure
BRIZZOLARA 'S
BUILD BOZEMAN
BY BOZEMAN
2020S PLAN
bozeman,
montana,
usa
idea:
location:
ivparking garage1 of 6
proposed
garages
ii
m trail pilot garage and tunnel/pedestrian pathway
third
garage
fourth
garage
& condo
building condosb1
c1
c2Bozeman
bowl
bowling
alley
babcock st
church st.camera
brizzolara's free design
then the first garage
downtown should be behind
the post office
behind holy rosary
corner of babcock & church
also, not shown but proposed
would be Walmart's parking lot
june 19th, 2021
OF
PLOT DATE:
category:
PROJECT title:
infrastructure
BRIZZOLARA 'S
BUILD BOZEMAN
BY BOZEMAN
2020S PLAN
bozeman,
montana,
usa
idea:
location:
iv
the other Montana university town, Missoula has the advantage of a river running through the city,
with a pedestrian bike path on both sides connecting all the major points and intersections of their city.
This series of proposals builds off of the previous new subdivision and off West North Park, and this
proposal will create the first phase of building a walking loop and bike path, as well as 2 centralized
parks for over 360 total acres of new city parks. The idea is to create 3 parks and link them with a
pedestrian walkway/bike paths connecting to each other, and it would be designed after the town of
Lucca, Italy. The town of Lucca has a pedestrian road above their ancient brick walls that surround the
city, and it allows access on and off at all the city’s major intersections.
GRADUALLY build Bozeman's new central Park
& create a pedestrian pathway & Walking circle
If balloon formwork were to be
used to bury I - 90 from N 19th St. past
7th Street, then once backfilled, this
pathway park would bridge over I - 90
and connect all the other
subdivisions together. This would also
link to the new Bozeman Central
Park.
The seventh proposal is to,
through eminent domain, buy the 38+
acres behind, and north east of, the
Bridger Peaks Shopping Center, for
what is proposed to be another new
subdivision of single family homes only.
The area could provide 77 half-
acre lots at $50,000 to generate
$3,850,000. If the lots were also
financed by the city, it would
generate around $5,467,000. Then, if
these homes were to be financed by the
city's revolving loan fund, and built
at $163,333, the city could generate
another $16,802,562 if offered 15 year, 5%
mortgages/construction loans.
With this expected 21 million+
dollar income, The idea would be to
reinvest and build infrastructure
similar to Lucca's and Missoula's
walking paths and parks.
Missoula's core river trail
lucca, Italy's pedestrian park
on top of their walls
there are Restaurants &
bathroom facilities
spread throughout
#1
#2
#4
#3
8
#5
#7
#13
& 14
6
#9 & #10
#12
11
https://i.pinimg.com/originals/57/05/26/570526ab4b03a
9fde1619380e2c3849d.jpg
https://www.inthelooptravel.com/adventures/exploring-the-
historic-city-walls-of-lucca
https://bewitchedbyitaly.com/wp-content/uploads
/elementor/thumbs/Walls-of-Lucca.jpg
BOZEMAN'S CENTRAL PARK6 & 7 out of 22
brizzolara
proposals
new bozeman
central park
iii
june 19th, 2021
OF
PLOT DATE:
category:
PROJECT title:
infrastructure
BRIZZOLARA 'S
BUILD BOZEMAN
BY BOZEMAN
2020S PLAN
bozeman,
montana,
usa
idea:
location:
iv
The 8th proposal would be to build a new
neighborhood able to supply 40-203 lots behind
Walmart, located as #8 on the southeastern
white plot of land.
The 9th proposal is to then destroy
Walmart’s parking lot, and build them a
subterranean parking garage for customers to
use, that will also prevent RVs from living in the
new parking space.
The 10th proposal is to backfill over the
parking garage and establish a second park
above it, and above I - 90's intersection with 7th
Street. If approved, over 8 acres of new,
additional city parks would be built on top of
the current, ugly highway lanes, and on top of
7th Street.
The 11th proposal is to then destroy and
bury Oak Street. It would only be the span
between 7th and 19th, and the new section of
Oak Street would be tunneled, with a pedestrian
pathway and bike path on top, and it's earth
would be reused for backfilling the parks.
The 12th proposal would be to completely
bury 19th Street connecting it to the West North
Park subdivision, as well as the Cat Tail Lake
subdivision. Of course now it will also connect
with the new Bozeman Central Park and its
subdivision, as well as the new subdivision behind
Walmart.
The past 11 proposals are now connecting
via this massive new pedestrian, centralized park
system that buries the town’s most busiest
intersections, streets, and parking lots.
expand bozeman central park with a SECOND PARK
& A SIXTH SUBDIVISION behind walmart
If the city were able to sell these lots behind Walmart at $50,000 EACH, it
would generate about $2,000,000 - $10,150,000. If the plots were also financed by the
city, it’d generate between 2.8 - 14.4 million dollars.
If the city financed the construction loans for these homes to be built,
at HomeAdvisor’s lowest average price of building a home estimate of
$163,333, this which could generate an income on the land and on
the construction loans/ mortgages of:
$653,332 - $6,631,319 for the 20% Down Payment
+ $8,093,103 - $37,756,840 Total of 180 Payments
+ $2,840,000 - $14,413,000 on Land & Interest
$11,586,435 - $58,801,159 by Year 15 Total
ELECTRICAL LINES RUNNING
PARALLEL WITH I - 90, and
throughout the city
will BE PLACED IN
THE NEW TUNNEL
AND HIDDEN
from view.
#8
#9
& 10
#11
#12
Central
Park
west
north
park
brick
city
new
subdivision
hrdc
cat
tail
lake
subdivision
I-90 buried
TUNNEL OVER I-90, TO BUILD A NEW PARK & NEIGHBORHOOD8 - 12 out of 22
connect
Bozeman with
pathways above
our buried
streets
iv