Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
06-23-21 DRB Agenda & Packet
A.Call meeting to order B.Disclosures C.Changes to the Agenda D.Approval of Minutes D.1 Minutes Approval for 06-9-21(Hufstetler) E.Public Comment Please state your name and address in an audible tone of voice for the record. This is the time for THE DESIGN REVIEW BOARD OF BOZEMAN, MONTANA DRB AGENDA Wednesday, June 23, 2021 WebEx Meeting Information Via Webex: https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php? MTID=e76aa0226c038dda45d8177573227fd2c Click the Register link, enter the required information, and click submit. Click Join Now to enter the meeting Via Phone: This is for listening only if you cannot watch the stream or channel 190 • Call-in toll number (US/Canada ): 1-650-479-3208 • Access code: 182 143 5622 Public Comment: If you are interested in commenting in writing on items on the agenda, please send an email to agenda@bozeman.net prior to 4:00pm on Wednesday, June 23rd, 2021. You may also comment by visiting the City's public comment page. You can also comment by joining the Webex meeting. If you do join the Webex meeting, we ask you please be patient in helping us work through this online meeting. If you are not able to join the Webex meeting and would like to provide oral comment you may send a request to agenda@bozeman.net with your phone number, the item(s) you wish to comment on, and someone will call you during the meeting to provide an opportunity to comment. You may also send the above information via text to 406-224-3967. As always, the meeting will be streamed through the City's video page (click the Streaming Live in the drop down menu), and available in the City on cable channel 190. 1 individuals to comment on matters falling within the purview of the Committee. There will also be an opportunity in conjunction with each action item for comments pertaining to that item. Please limit your comments to three minutes. F.Action Items F.1 Bozeman Gateway Phase 4 Apartments, Application 21032 (Rosenberg) G.FYI/Discussions H.Adjournment For more information please contact Brian Krueger bkrueger@bozeman.net This board generally meets the 2nd and 4th Wednesday of the month from 5:30 to 7:30 Committee meetings are open to all members of the public. If you have a disability and require assistance, please contact our ADA coordinator, Mike Gray at 582-3232 (TDD 582-2301). 2 Memorandum REPORT TO:Design Review Board FROM:Taylor Chambers - Community Development Technician II SUBJECT:Minutes Approval for 06-9-21 MEETING DATE:June 23, 2021 AGENDA ITEM TYPE:Minutes RECOMMENDATION:Suggested Motion: I move to approve the meeting minutes for June 9th, 2021 STRATEGIC PLAN:1.2 Community Engagement: Broaden and deepen engagement of the community in city government, innovating methods for inviting input from the community and stakeholders. BACKGROUND:None UNRESOLVED ISSUES:None ALTERNATIVES:1. Approve meeting minutes with corrections. 2. Do not approve meeting minutes. FISCAL EFFECTS:None Attachments: 06-09-21 DRB Minutes DRAFT.pdf Report compiled on: June 10, 2021 3 Bozeman Design Review Board Meeting Minutes, 06-09-21 Page 1 of 6 THE DESIGN REVIEW BOARD MEETING OF BOZEMAN, MONTANA MINUTES Wednesday, June 9th, 2021 WebEx Meeting Information A) Call meeting to order Present: Mark Hufstetler, Allison Bryan, Erin Eisner, Paul East, Brady Ernst, Cyndy Andrus Absent: Troy Scherer B) 00:00:01 Disclosures C) 00:00:19 Changes to the Agenda D) 00:00:34 Approval of Minutes D.1 Approval of meeting minutes for April 28th, 2021 04-28-21 DRB Minutes DRAFT.pdf 00:00:52 Motion D) Approval of Minutes Brady Ernst: Motion Allison Bryan: 2nd 00:01:05 Vote on the Motion to approve D) Approval of Minutes. The Motion carried 5 - 0 Approve: Mark Hufstetler Allison Bryan Erin Eisner Paul East Brady Ernst Disapprove: None 4 Bozeman Design Review Board Meeting Minutes, 06-09-21 Page 2 of 6 E) 00:01:14 Public Comment F) 00:03:57 Action Items F.1 00:04:02 Bridger Meadows Preliminary Planned Unit Development, application 20350. 20350 DRB Staff Report.docx 00:04:24 Staff Presentation City Planner Sarah Rosenberg presented to the Bridger Meadows PPUD to the board and recommended that the PUD conformed to standards and is sufficient for approval with conditions and code provisions. 00:15:41 Applicant Presentation Walter Banzinger introduced the applicant team and briefly presented the project to the board. Mike Hickman provided additional comments regarding the project to the board members. 00:20:09 Board Questions Board members directed questions to staff and the applicants. 00:31:39 Public Comment Opportunity Michael Rabb commented in opposition of the action item. Greg Garrigues commented in opposition of the action item. 00:47:51 Motion “Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20350 and move to recommend approval of the Bridger Meadows Planned Unit Development application with relaxations numbers 1-6, subject to conditions and all applicable code provisions.” Brady Ernst: Motion Erin Eisner: 2nd 00:48:28 Board Discussion Board member Eisner commented in support of the action item. Chairman Hufstetler commented on concerns he had regarding the action item. 00:53:15 Vote on the Motion to approve “Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20350 and move to recommend approval of the Bridger Meadows Planned Unit 5 Bozeman Design Review Board Meeting Minutes, 06-09-21 Page 3 of 6 Development application with relaxations numbers 1-6, subject to conditions and all applicable code provisions.” The Motion carried 5 - 0 Approve: Mark Hufstetler Allison Bryan Erin Eisner Paul East Brady Ernst Disapprove: None F.2 00:55:26 21-047, Flanders Mill Apartments Phase II & III; A Site Plan application for the construction of 122 residential units consisting of seven 12-unit buildings, three 6-unit buildings, and five 4-unit buildings. 21047 Flanders Mill Ph II & II DRB SR.pdf 4-Plex(2-1)_SP2.3ExteriorElevations_01-21-21.pdf 4-Plex(2-2)_SP2.3ExteriorElevations_01-21-21.pdf 6-Plex_SP2.3ExteriorElevations_01-27-2.pdf 12-Plex_SP2.3ExteriorElevations_01-21-21.pdf L101OverallLandscapePlan_12-18-20.pdf C1.1CivilDimensionPlan_02-18-21.pdf 00:55:36 Staff Presentation City Planner Jacob Miller presented Flanders Mill Apartments Phase II & III to the board and recommended that the application meets criteria for approval. 01:04:16 Applicant Presentation Ben Elias provided additional comments to the board regarding the action item. 01:05:19 Board Questions Board members directed questions to staff and the applicant. 01:18:14 Public Comment Opportunity. No public comment at this time. 01:20:00 Motion “Having reviewed and considered the application materials, and all the information presented, I hereby adopt the findings presented in the staff report for application 21047 and move to recommend approval of the site plan application subject to conditions and all applicable code provisions.” Brady Ernst: Motion Allison Bryan: 2nd 6 Bozeman Design Review Board Meeting Minutes, 06-09-21 Page 4 of 6 01:20:41 Board Discussion Board member Ernst commented in favor of the action item. Board member East commented in favor of the action item. Board member Eisner commented in favor of the action item. Board members Bryan commented in favor of the action item. Chairman Hufstetler commented in favor of the action item. 01:27:35 Vote on the Motion to approve “Having reviewed and considered the application materials, and all the information presented, I hereby adopt the findings presented in the staff report for application 21047 and move to recommend approval of the site plan application subject to conditions and all applicable code provisions.” The Motion carried 5 - 0 Approve: Mark Hufstetler Allison Bryan Erin Eisner Paul East Brady Ernst Disapprove: None F.3 01:28:24 One11 2.0 Site Plan and Certificate of Appropriateness (COA) with Demolition (DEM), Application 20456 20456 DRB Staff Report.pdf ArchitecturalSitePlan Level 1 FloorPlan Level 2 FloorPlan Level 3 - 5 FloorPlan Level 6 FloorPlan Roof Plan BuildingElevations Building Elevations PerspectiveViews DemolitionExhibit Existing Conditions Civil Site Plan Landscape Plan 01:28:39 Staff Presentation 7 Bozeman Design Review Board Meeting Minutes, 06-09-21 Page 5 of 6 City Planner Danielle Garber presented the One11 2.0 Site Plan to the board and recommended that the project complies with the Site Plan criteria with code provisions and conditions of approval. 01:43:48 Applicant Presentation Nicole Stine presented on behalf of the applicant. 01:47:47 Board Questions Board members directed questions to staff and the applicant. 02:09:32 Public Comment Opportunity No public comment at this time. 02:11:20 Motion Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20456 and move to recommend approval of the site plan application subject to conditions and all applicable code provisions. Brady Ernst: Motion Allison Bryan: 2nd 02:12:07 Board Discussion Board member Ernst commented on hesitancies he had with the project but that he overall was in favor of the action item. Board member Bryan commented with concerns regarding parking. Board member Eisner commented in favor of the action item. Board members East commented with concerns regarding the project. Board member Hufstetler commented in opposition of the action item. 02:31:18 Vote on the Motion to approve Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20456 and move to recommend approval of the site plan application subject to conditions and all applicable code provisions. The Motion failed 2 - 3 Approve: Erin Eisner Brady Ernst Disapprove: Mark Hufstetler Allison Bryan 8 Bozeman Design Review Board Meeting Minutes, 06-09-21 Page 6 of 6 Paul East G) 02:32:19 FYI/Discussions H) 02:32:28 Adjournment For more information please contact Brian Krueger bkrueger@bozeman.net. This board generally meets the 2nd and 4th Wednesday of the month from 5:30 to 7:30 9 Memorandum REPORT TO:Design Review Board FROM:Sarah Rosenberg, Associate Planner Brian Krueger, Development Review Manager Martin Matsen, Director of Community Development SUBJECT:Bozeman Gateway Phase 4 Apartments, Application 21032 MEETING DATE:June 23, 2021 AGENDA ITEM TYPE:Community Development - Quasi-Judicial RECOMMENDATION:“Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 21032 and move to recommend approval of the site plan application with departure subject to conditions and all applicable code provisions.” STRATEGIC PLAN:4.2 High Quality Urban Approach: Continue to support high-quality planning, ranging from building design to neighborhood layouts, while pursuing urban approaches to issues such as multimodal transportation, infill, density, connected trails and parks, and walkable neighborhoods. BACKGROUND:The applicant submitted a site plan application to construct four apartment buildings within the Bozeman Gateway Planned Unit Development. There will be 231 units between the four buildings that include 6 studios, 115 one bedroom units, 99 two bedroom units, and 9 three bedroom units. With the original adoption of the Bozeman Gateway PUD, the City Commission placed a condition that a residential component was required within Phase 4 of the development. This application is to satisfy those requirements. In addition to the apartments, the northern two buildings contain amenities for the residents that include a fitness center, package drop center, recreation room, lounge, conference room, and study spaces. Outdoor amenities include an outdoor pool, BBQ area, plaza space, pet areas, and common open space. A departure is requested: • 38.510.030.B. 40% transparency instead of 60% transparency on the north and east elevation of building 1 and the north and west elevation of building 2. Pursuant to section 38.340.020, the Design Review Board (DRB) authority, the DRB is required to make advisory comments and a recommendation to the Director on this application. The Design Review Board meeting will occur on June 23, 2021 via WebEx. Upon adequacy of the application, public notice will commence. After the public comment period is closed, the Director of Community Development will make the final decision on this application. 10 UNRESOLVED ISSUES:None ALTERNATIVES:NA FISCAL EFFECTS:NA Attachments: 21032_DRBStaffReport.docx Cover Letter 2021-03-02.pdf A1.1 Overall Site Plan 2021-04-21.pdf Elevations combined.pdf G2.0 3D Views 2021-04-21.pdf 1010006_L1.0_Landscape Plan - Overall_2021-04-30.pdf Report compiled on: June 16, 2021 11 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 1 of 14 Application No.21032 Type Site Plan Project Name Bozeman Gateway Phase 4 Apartments Summary Site plan for the construction of four apartment buildings with 231 units with associated parking lot upgrades. Zoning B-2 Growth Policy Regional Commercial & Services Parcel Size 8.7 acres Overlay District(s) None Street Address North of West Garfield Street and east of Harmon Stream Boulevard Legal Description Tract 2 of Minor Subdivision 195A, Amended plat of West College Minor Subdivision #195, Owner Quadrant Communities LLC, 353 Marshall Avenue, Suite I, St. Louis, MO 63119 Applicant Same as owner Representative Morrison-Maierle, 2880 Technology Blvd, Bozeman, MT 59718 Staff Planner Sarah Rosenberg Engineer Karl Johnson Noticing Public Comment Period Site Posted Adjacent Owners Mailed Newspaper Legal Ad NA NA NA N/A Advisory Boards Board Date Recommendation Development Review Committee Still under review The application is deemed inadequate with minor revisions needed. Upon adequacy, the project will be noticed Design Review Board 6/23/2021 TBD Recommendation Approval Decision Authority Director of Community Development Date Motion: “Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 21032 and move to recommend approval of the site plan application with departure subject to conditions and all applicable code provisions.” 12 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 2 of 14 PROJECT SUMMARY The applicant submitted a site plan application to construct four apartment buildings within the Bozeman Gateway Planned Unit Development. There will be 231 units between the four buildings that include 6 studios, 115 one bedroom units, 99 two bedroom units, and 9 three bedroom units. With the original adoption of the Bozeman Gateway PUD, the City Commission placed a condition that a residential component was required within Phase 4 of the development. This application is to satisfy those requirements. In addition to the apartments, the northern two buildings contain amenities for the residents that include a fitness center, package drop center, recreation room, lounge, conference room, and study spaces. Outdoor amenities include an outdoor pool, BBQ area, plaza space, pet areas, and common open space. A departure is requested: 38.510.030.B. 40% transparency instead of 60% transparency on the north and east elevation of building 1 and the north and west elevation of building 2. Pursuant to section 38.340.020, the Design Review Board (DRB) authority, the DRB is required to make advisory comments and a recommendation to the Director on this application. The Design Review Board meeting will occur on June 23, 2021 via WebEx. Upon adequacy of the application, public notice will commence. After the public comment period is closed, the Director of Community Development will make the final decision on this application. CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. Additional conditions of approval and code corrections are required and will be included with the final report provided to the Director of Community Development. Recommended Conditions of Approval: 1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 2. Prior to site plan approval, the Final PUD to the Bozeman Gateway must be approved. 3. Those that may be identified by the DRB as recommended conditions. 13 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 3 of 14 Figure 1: Current Zoning Map 14 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 4 of 14 Figure 2: Site plan 15 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 5 of 14 Figure 3: Building One Elevations 16 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 6 of 14 Figure 4: Building Two Elevations 17 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 7 of 14 Figure 5: Building Three Elevations 18 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 8 of 14 Figure 6: Building Four Elevations 19 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 9 of 14 ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis in this report is a summary of the completed review. Plan Review, Section 38.230.100, BMC In considering applications for plan approval under this title, the Director of Community Development shall consider the following: 1. Conformance with Article 1 -Consistency with the City’s adopted Growth Policy 38.100.040.D Meets Code? Growth Policy Land Use Regional Commercial and Services Yes Zoning B-2 (Community Business District)Yes Comments: The site plan conforms to the zone district and growth policy land use designation. The property is within the City’s municipal service area. Staff finds that the project does contribute to the goals of the Community Plan. 2. Conformance with Article 1 -All other applicable laws, ordinances, and regulations (38.100.080) Meets Code? Condominium ownership NA Comments: The development complies with the regulations outlined in this staff report. See analysis below. 3. Conformance with Article 2, including the cessation of any current violations (38.200.160) Meets Code? Current Violations None Yes Comments: There are no current violations on the subject property. 4.Conformance with Article 2 -Submittal material (38.220) requirements and plan review for applicable permit types (38.230) Meets Code? Site Plan Yes Submittal requirements 38.220.100 Yes Phasing of development 38.230.020.B No. of phases:NA NA Comments: The application meets all the site plan submittal requirements. It conforms to the plan review criteria as outlined below. Any additional use permit (Conditional Use Permit) 38.230.120 or (Special use Permit) 38.230.120 NA Comments:NA 5. Conformance with Article 3 -Zoning Provisions (38.300)Meets Code? Permitted uses 38.310 Multi-family Yes Form and intensity standards 38.320 Zoning: B-3 Setbacks (feet) Structures Parking / Loading Yes Front Block frontage standard, see section 7a Rear 10 feet 10 feet Side 5 feet 8 feet Alley NA NA 20 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 10 of 14 Comments: A relaxation with the Bozeman Gateway PUD allows for ground floor residential as a permitted use. The form and intensity standards set by the B-2 zone district are met with this application. See section 7a below for block frontage analysis. Lot coverage 21%Allowed 100%Yes Building height 41’Allowed 85.8’Yes Comments: A relaxation allows buildings within the Bozeman Gateway PUD to be built up to 85.8’. Applicable zone specific or overlay standards 38.330-40 NA Comments: NA General land use standards and requirements 38.350 NA Comments: There are no encroachments. Applicable supplemental use criteria 38.360 NA Supplemental uses/type NA NA Comments: There are no supplemental uses or types with this application. Wireless facilities 38.370 NA Affordable Housing 38.380.010 NA Affordable housing plan NA Comments: NA 6a.Conformance with Article 4 -Community Design Provisions: Transportation Facilities and Access (38.400) Meets Code? Streets 38.400.010 Yes Street and road dedication 38.400.020 Yes Access easements NA Level of Service 38.400.060 Yes Transportation grid adequate to serve site Yes Comments: The Traffic Impact Study was reviewed by the Engineering Division and found that the level of service and infrastructure is adequate to accommodate the development. A new traffic control devise will be installed at the east access on to Technology Blvd. Sidewalks 38.400.080 Yes Comments: Sidewalks will be constructed to meet city standards. Besides the sidewalks that service each building, there is a sidewalk that runs the length of the internal drive aisle that cuts east-west through the center of the development. Drive access 38.400.090 Access to site: 4 Yes Fire lanes, curbs, signage and striping Yes Comments:Two accesses to the site are taken from West Garfield Street to the south and one from Harmon Stream Boulevard to the west and one from the internal drive to the east. Street vision triangle 38.400.100 Yes Transportation pathways 38.400.110 Yes Pedestrian access easements for shared use pathways and similar transportation facilities Yes Public transportation 38.400.120 NA Comments:Access easements are being reviewed under the subsequent Phase 4 Preliminary Plat application (19436) 21 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 11 of 14 6b. Conformance with Article 4 –Community Design Provisions: Community Design and Elements (38.410) Meets Code? Neighborhood centers 38.410.020 NA Comments:No neighborhood center is required. Lot and block standards 38.410.030-040 Yes Midblock crossing: rights of way for pedestrians alternative block delineation Yes Comments: An internal drive runs east-west through the subject property. This internal drive contains an easement that is tied to the subdivision that is under review. If the development is adjacent to an existing or approved public park or public open space area, have provisions been made in the plan to avoid interfering with public access to and use of that area NA Provisions for utilities including efficient public services and utilities 38.410.050-060 NA Easements (City and public utility rights-of-way etc.)NA Water, sewer, and stormwater NA Other utilities (electric, natural gas, communications)NA CIL of water NA Comments: Utilities, easements, water, sewer, and stormwater is not under the purview of the DRB. The final analysis of this will be with the final staff report. Municipal infrastructure requirements 38.410.070 NA Comments: Municipal infrastructure requirements is not under the purview of the DRB. The final analysis will be with the final staff report. Grading & drainage 38.410.080 NA Location, design and capacity of stormwater facilities NA Stormwater maintenance plan NA Landscaping: native species, curvilinear, 75% live vegetation 38.410.080.H NA Comments: Stormwater is not under the purview of the DRB. The final analysis of this will be with the final staff report. Watercourse setback 38.410.100 NA Watercourse setback planting plan 38.410.100.2.f NA 6c. Conformance with Article 4 –Community Design Provisions: Park and Recreation Requirements (38.420) Meets Code? Parkland requirements 38.420.020.A 8.96 ac. X 8 units/ac. X 0.03 ac.= 2.15 ac.Under review Cash donation in lieu (CIL) 38.420.030 Under review Improvements in-lieu Under review Comments:At this time, the applicant and Parks Department are working through the parkland dedication requirement. It is anticipated that CIL will be used to accommodate parkland requirements. Park Frontage 38.420.060 NA Park development 38.420.080 NA Recreation pathways 38.420.110 NA Park/Recreational area design NA Comments: NA 7a. Conformance with Article 5 –Project Design:Block Frontage Standards (38.510) Meets Code? Block frontage classification Mixed/Landscape, Storefront, Special Residential, Trail/Park Yes 22 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 12 of 14 Departure criteria Transparency (Storefront)Yes Comments: West Garfield Street and Harmon Stream Boulevard have a block frontage designation of mixed with emphasis on landscape. There is appropriate pedestrian connection, weather protection, façade transparency, landscaping, and building placement to meet the block frontage standards. The east elevation of building 2 adheres to trail/park block frontage and meets all requirements. Since all buildings have ground floor residential, they must adhere to special residential block frontage. Each of the units have a raise deck at least one foot above grade and a gate. The buildings that are set back from the road and do not have a main entrance have pathways that link the units to the sidewalk. The north and west elevation of building 1 and the north and east elevation of building 2 have a storefront block frontage designation. A relaxation was granted with the PUD to allow residential uses on the ground floor. A departure is requested from the 60% façade transparency (38.510.030.B) requirement to allow a reduction of transparency on the ground floor between 30” and 10’ above the sidewalk on the north elevation of building 1 and 2, the west elevation of building 2, and the east elevation of building 1. The north elevation of building one has a façade transparency of 46% and the north elevation of building two has a façade transparency of 47%. Since the ground floor has residential uses, a reduction of façade transparency assists in providing some privacy for those units. The east elevation of building 1 and the west elevation of building 2 have transparency of 55%. The DRC is in support of this relaxation request. 7b. Conformance with Article 5 –Project Design: Site Planning and Design Elements (38.520) Meets Code? Design and arrangement of the elements of the plan (e.g., buildings, circulation, open space and landscaping, etc.) so that activities are integrated with the organizational scheme of the community, neighborhood, and other approved development and produce an efficient, functionally organized and cohesive development Yes Relationship to adjacent properties 38.520.030 Yes Non-motorized circulation and design systems to enhance convenience and safety across parking lots and streets, including, but not limited to paving patterns, pathway design, landscaping and lighting 38.420.040 Yes Comments:All buildings feature pedestrian connections to a sidewalk. In order to connect the buildings, there are sidewalks that run north south and east west through the center of the development. Any sidewalk that crosses a parking lot or paved area accessible to vehicles contains contrasting materials. There is also a trail that runs north south within the common open space on the eastern side of the subject property that connects to the existing trail system within the Bozeman Gateway development. Design of vehicular circulation systems to assure that vehicles can move safely and easily both within the site and between properties and activities within the general community 38.420.050 Yes Internal roadway design 38.520.050.D Yes Comments:There are four vehicle accesses to the site. An internal roadway runs east west to the site connecting Harmon Stream Boulevard to the existing development to the east. This internal roadway contains a sidewalk on the north side and street trees on both sides. On-site open space 38.520.060 Yes Total required 28,300 SF Yes Total provided >28,300 SF Yes Comments: All units beside the studio apartments contain private balconies. Shared open space includes a gym, pet area, bike shop, clubhouse, pool, and green space with BBQ, seating, and tables. The final calculations are still under review since some of the shared open space identified (green space in front of 23 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 13 of 14 7d. Conformance with Article 5 –Parking (38.540)Meets Code? Parking requirements 38.540.050 409.5 Yes Parking requirements residential 38.540.050.A.1 409.5 Reductions residential 38.540.050.A.1.b None Parking requirements nonresidential 38.540.050.A.2 NA Reductions nonresidential 38.540.050.A.2.c NA Provided off-street 369 Provided on-street 43 Bicycle parking 38.540.050.A.4 40.95 Comments: There are 412 parking spaces provided. There are 48 bicycle parking spaces provided. The DRC is requesting that there be at least 30% covered bicycle parking due to the amount of residences in the area. Loading and uploading area requirements 38.540.080 NA First berth –minimum 70 feet length, 12 feet in width, 14 feet in height NA Additional berth –minimum 45 feet length NA Comments:NA 7e. Conformance with Article 5 –Landscaping (38.550)Meets Code? Mandatory landscaping requirements 38.550.050 Yes Drought tolerant species 75% required Yes Parking lot landscaping Yes Additional screening Yes Street frontage Yes Street median island Yes Acceptable landscape materials Yes Protection of landscape areas Yes Irrigation: plan, water source, system type Yes Residential adjacency NA Comments:There are two trees on the corner of Technology Blvd and Harmon Stream Blvd that are within the site vision triangle which need to be removed. More than 75% drought tolerant landscaping is provided, parking lot landscaping meets standards, and street trees and plantings line the internal roadways and streets. Landscaping of public lands 38.550.070 NA building 3 and 4) cannot count towards the calculations. Nevertheless, even with the amount that does not count, there is still adequate open space. More seating is required in the shared open space green areas per 38.520.060.D which needs to be shown with the next revision. Location and design of service areas and mechanical equipment 38.520.070 Yes Comments:Mechanical and utility equipment is screened via landscaping and a screen wall. The trash enclosure is appropriately screened by landscaping. 7c. Conformance with Article 5 –Project Design: Building Design (38.530)Meets Code? Compatibility with, and sensitivity to, the immediate environment of the site and the adjacent neighborhoods and other approved development 38.530.030 Yes Building massing and articulation 38.530.040 Yes Building details, materials, and blank wall treatments 38.530.050-070 Yes Comments: All buildings meet building design standards. The main materials include lap siding, brick veneer, stucco paneling, and panel siding. 24 Staff Report Bozeman Gateway Phase 4 Apartments Site Plan Application 21032 June 17, 2021 Page 14 of 14 Comments:There are no public lands on site. 7f. Conformance with Article 5 –Signs (38.560)Meets Code? Allowed SF/building 38.560.060 NA NA Proposed SF/building NA NA Comments: Signage is not provided with the application. A sign permit is required prior to erecting any sign. 7g. Conformance with Article 5 –Lighting (38.560)Meets Code? Site lighting (supports, cutoff, footcandles, temperature) 38.570.040 Yes Building-mounted lighting (supports, cutoff, footcandles, temperature) 38.570.040.B Under review Comments: At this time, more information is needed on the building mounted lighting to determine if it meets standards. This information is required with the next submittal prior to final determination by the Director of Community Development 8. Conformance with Article 6 –Natural Resource Protection Meets Code? Floodplain regulations 38.600 NA Wetland regulations 38.610 NA Comments: NA 9. Relevant Comment from Affected Parties (38.220)Meets Code? Public Comment NA Comments: The public notice period will be conducted upon adequacy. 10. Division of Land Pertaining to Subdivisions (38.240-Part 4)Meets Code? Subdivision exemptions NA Required easements NA Comments: A subsequent subdivision application is being reviewed (19136) 25 March 2, 2021 Sarah Rosenberg, Associate Planner City of Bozeman Department of Planning and Community Development P.O. Box 1230 Bozeman, MT 59771-1230 Re: Phase 4 Apartments – Bozeman Gateway Site Plan Application MMI#: 6558.002.02 Dear Sarah: The following Site Plan application is for the development of Phase 4 Apartments (231 units) to be located on Lot 1 in Block 6 of Phase 4 of The Bozeman Gateway. The property includes 8.7 acres zoned B-2, the complex will consist of 4 separate apartment buildings that wrap each corner of the site to create a semi-enclosed courtyard feel. In addition to the apartments, the northern two buildings will house amenities for the residents including a fitness center, package drop center, a lounge, rec room, conference room and study spaces. Each of the buildings will have 3 floors and with the complex requiring 410 parking spaces total. 412 parking spots have been proposed throughout the site, 31 of which are covered. Handicapped-accessible parking will also be provided near each of the 4 buildings. In addition to parking, there will be bike racks located outside each building. Outside, there are welcoming spaces to recreate and relax. The site plan proposes an outdoor pool, BBQ areas, plaza spaces as well as plenty of green space and pet areas. Sidewalks are proposed throughout the site to provide easy pedestrian access to all buildings and parking areas. The goal is to create a living community within the Bozeman Gateway where residents can have easy walking access to nearby shops, restaurants and amenities. To be part of the developments welcoming spaces it is being requested that Open Spaces 7, 8 and 9 of the PUD be counted toward require parkland. These Open Spaces are located just east of the buildings and can be identified on Sheet C300. The site will not have any materials adverse effect upon the abutting property. The site does not have any special requirements to protect the public health, safety and general welfare. This project went through the City of Bozeman’s concept review process in August of 2020. Responses to the concept review comments received are included in this application. 26 If you should have any questions regarding this Site Plan Application, don’t hesitate to contact me. Sincerely, _____________________________ James A. Ullman, PE Project Engineer 27 12710558318181818879103101092211811152211948963988564584767887743877412878866BUSSTOPARBY'SMUSEBIG SKYDENTALHY DH YDH YDH YDH YDH YDH YDH YD10' - 0"15' - 0"15'-0"SETBACKSTOREFRONT FRONTAGESTOREFRONT FRONTAGETRAIL/PARK FRONTAGELANDSCAPE FRONTAGELANDSCAPE FRONTAGEMIXED USE FRONTAGE20' - 0" 20' - 0"10' - 0"MIXED USE FRONTAGE10'-0"SETBACK20'-0"SETBACK15'-0"SETBACKINTERNAL ROAD FRONTAGEBUILDING 4BUILDING 3BUILDING 2BUILDING 1GARAGE 1GARAGE 2G A R A G E 3GARAGE 4GARAGE 5GARAGE 6TRASHTRASHTRASHTRASHMAIL KIOSKBLOCK 6LOT 18.7 ACRESPOOLDOG PARK10' - 0"10'-0"SETBACK10' - 0"WEST GARFIELD STREETHARMON STREAM BLVD.TECHNOLOGY BLVD. WESTARCHITECTURE · PLANNING · DEVELOPMENT · INTERIORS1425 WEST MAIN ST. · SUITE A · BOZEMAN, MONTANA · 59715TELEPHONE: (406) 587-1204 · EMAIL: FHA@FHARCHITECTS.COM© 2019 FHA. It is unlawful to use any or all of these document without the expressed written consecnt of Faure Halvorsen Architects PC.A R C H I T E C T SF A U R E H A L V O R S E NDATE: 20204/15/2021 2:00:22 PMA1.1CLIENT NAME, PROJECT LOCATIONBOZEMAN GATEWAY APARTMENTSBOZEMAN GATEWAY, BOZEMAN, MT, 59715OVERALLSITE PLANJOB NO: 20-311NORTH1" = 30'-0"OVERALL SITE PLAN128 DARK RED BRICKALUMINUM STOREFRONT CURTAIN WALL SYSTEMVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGPEWTER ARMOR SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITEAWNING TRIMMED w/ STM A36 STEEL CHANNEL, COLOR: BLACKSTEEL HEADER,COLOR: BLACK5/4" TRIM, COLOR: WHITEBLACK SMOOTH PANELINGELECTRIC METERS, SEE LANDSCAPE PLAN FOR SCREENINGFINISHED GRADE99' - 0"41' - 10 7/8"44' - 6"PLATE HT13' - 0"ELECTRIC METERS, SEE LANDSCAPE PLAN FOR SCREENINGBLDG 1&2 PLATE HT113' - 0"DARK RED BRICKALUMINUM STOREFRONT CURTAIN WALL SYSTEMFIXED VINYL WINDOW SYSTEM, COLOR: WHITESTERLING GRAY STUCCO PANELING, 4'x4' SQUARESAWNING TRIMMED w/ STM A36 STEEL CHANNEL, COLOR: BLACKOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITESTEEL HEADER,COLOR: BLACKSECURITY LIGHTFINISHED GRADE99' - 0"41' - 10 7/8"44' - 6"STOREFRONT FRONTAGEFACADE TRANCPARENCY: 55% OF AREA BETWEEN 2'-6" & 10'-0"WEATHER PROTECTION: 72%ARCHITECTURE · PLANNING · DEVELOPMENT · INTERIORS1425 WEST MAIN ST. · SUITE A · BOZEMAN, MONTANA · 59715TELEPHONE: (406) 587-1204 · EMAIL: FHA@FHARCHITECTS.COM© 2019 FHA. It is unlawful to use any or all of these document without the expressed written consecnt of Faure Halvorsen Architects PC.A R C H I T E C T SF A U R E H A L V O R S E NDATE: 20204/16/2021 4:18:38 PMA3.1CLIENT NAME, PROJECT LOCATIONBOZEMAN GATEWAY APARTMENTSBOZEMAN GATEWAY, BOZEMAN, MT, 59715BUILDING 1EXTERIORELEVATIONSJOB NO: 20-3111/8" = 1'-0"BUILDING 1 SOUTH ELEVATION11/8" = 1'-0"BUILDING 1 EAST ELEVATION229 BLDG 1&2 PLATE HT113' - 0"DARK RED BRICKSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITEVERTIAL ROD RAILING COLOR: BLACK5/4" TRIM, COLOR: WHITEPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSRED ROCK FALLS 8" GROOVE VERTICAL SIDINGBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"44' - 6"41' - 10 7/8"MIXED USE FRONTAGEFACADE TRANCPARENCY: 22%DARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: KNIGHT'S ARMORBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"41' - 9 5/8"44' - 6"STOREFRONT FRONTAGEFACADE TRANSPARENCY: 46% OF AREA BETWEEN 2'-6" & 10'-0"WEATHER PROTECTION: 70%7' - 6"2' - 6"ARCHITECTURE · PLANNING · DEVELOPMENT · INTERIORS1425 WEST MAIN ST. · SUITE A · BOZEMAN, MONTANA · 59715TELEPHONE: (406) 587-1204 · EMAIL: FHA@FHARCHITECTS.COM© 2019 FHA. It is unlawful to use any or all of these document without the expressed written consecnt of Faure Halvorsen Architects PC.A R C H I T E C T SF A U R E H A L V O R S E NDATE: 20204/16/2021 4:23:14 PMA3.2CLIENT NAME, PROJECT LOCATIONBOZEMAN GATEWAY APARTMENTSBOZEMAN GATEWAY, BOZEMAN, MT, 59715BUILDING 1EXTERIORELEVATIONSJOB NO: 20-3111/8" = 1'-0"BUILDING 1 WEST ELEVATION11/8" = 1'-0"BUILDING 1 NORTH ELEVATION230 BLDG 1&2 PLATE HT113' - 0"DARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEAWNING TRIMMED w/ STM A36 STEEL CHANNEL, COLOR: BLACKBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"44' - 5 7/8"43' - 3"TRAIL/PARK FRONTAGEFACADE TRANCPARENCY: 16.5%ELECTRIC METERS, SEE LANDSCAPE PLAN FOR SCREENINGFINISHED GRADE99' - 0"41' - 10 7/8"44' - 4 7/8"STOREFRONT FRONTAGEFACADE TRANCPARENCY: 47% OF AREA BETWEEN 2'-6" & 10'-0"WEATHER PROTECTION: 63% 2' - 6"10' - 0"BLDG 1&2 PLATE HT113' - 0"FINISHED GRADE99' - 0"41' - 10 7/8"44' - 4 7/8"BLDG 1&2 PLATE HT113' - 0"DARK RED BRICKSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEAWNING TRIMMED w/ STM A36 STEEL CHANNEL, COLOR: BLACKALUMINUM STOREFRONT CURTAIN WALL SYSTEMSTEEL HEADER,COLOR: BLACKFINISHED GRADE99' - 0"44' - 5 7/8"43' - 3"STOREFRONT FRONTAGEFACADE TRANCPARENCY: 55% OF AREA BETWEEN 2'-6" & 10'-0"WEATHER PROTECTION: 72%2' - 6"10' - 0"ARCHITECTURE · PLANNING · DEVELOPMENT · INTERIORS1425 WEST MAIN ST. · SUITE A · BOZEMAN, MONTANA · 59715TELEPHONE: (406) 587-1204 · EMAIL: FHA@FHARCHITECTS.COM© 2019 FHA. It is unlawful to use any or all of these document without the expressed written consecnt of Faure Halvorsen Architects PC.A R C H I T E C T SF A U R E H A L V O R S E NDATE: 20204/16/2021 5:15:12 PMA3.3CLIENT NAME, PROJECT LOCATIONBOZEMAN GATEWAY APARTMENTSBOZEMAN GATEWAY, BOZEMAN, MT, 59715BUILDING 2EXTERIORELEVATIONSJOB NO: 20-3111/8" = 1'-0"BUILDING 2 EAST ELEVATION21/8" = 1'-0"BUILDING 2 NORTH ELEVATION41/8" = 1'-0"BUILDING 2 SOUTH ELEVATION11/8" = 1'-0"BUILDING 2 WEST ELEVATION331 DARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEAWNING TRIMMED w/ STM A36 STEEL CHANNEL, COLOR: BLACKBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"39' - 2 7/8"LANDSCAPE FRONTAGEFACADE TRANCPARENCY: 22%ELECTRIC METERS, SEE LANDSCAPE PLAN FOR SCREENINGDARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEAWNING TRIMMED w/ STM A36 STEEL CHANNEL, COLOR: BLACKBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"INTERNAL ROAD FRONTAGEFACADE TRANCPARENCY: 22%DARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEAWNING TRIMMED w/ STM A36 STEEL CHANNEL, COLOR: BLACKSECURITY LIGHTBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"INTERNAL ROAD FRONTAGEFACADE TRANCPARENCY: 20%DARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEAWNING TRIMMED w/ STM A36 STEEL CHANNEL, COLOR: BLACKBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"39' - 2 7/8"ELECTRIC METERS, SEE LANDSCAPE PLAN FOR SCREENINGARCHITECTURE · PLANNING · DEVELOPMENT · INTERIORS1425 WEST MAIN ST. · SUITE A · BOZEMAN, MONTANA · 59715TELEPHONE: (406) 587-1204 · EMAIL: FHA@FHARCHITECTS.COM© 2019 FHA. It is unlawful to use any or all of these document without the expressed written consecnt of Faure Halvorsen Architects PC.A R C H I T E C T SF A U R E H A L V O R S E NDATE: 20204/16/2021 4:39:16 PMA3.4CLIENT NAME, PROJECT LOCATIONBOZEMAN GATEWAY APARTMENTSBOZEMAN GATEWAY, BOZEMAN, MT, 59715BUILDING 3EXTERIORELEVATIONSJOB NO: 20-3111/8" = 1'-0"BUILDING 3 SOUTH ELEVATION11/8" = 1'-0"BUILDING 3 EAST ELEVATION21/8" = 1'-0"BUILDING 3 WEST ELEVATION31/8" = 1'-0"BUILDING 3 NORTH ELEVATION432 DARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"39' - 2 7/8"LANDSCAPE FRONTAGEFACADE TRANCPARENCY: 22%ELECTRIC METERS, SEE LANDSCAPE PLAN FOR SCREENINGDARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"INTERNAL ROAD FRONTAGEFACADE TRANCPARENCY: 20%DARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEBLACK SMOOTH PANELINGMATERIAL TRANSITION TRIM BOARDFINISHED GRADE99' - 0"MIXED USE FRONTAGEFACADE TRANCPARENCY: 21%DARK RED BRICKVERTIAL ROD RAILING COLOR: BLACKRED ROCK FALLS 8" GROOVE VERTICAL SIDINGAUTUMN RED LAP SIDINGPEWTER SMOOTH PANEL SIDING w/ BATTEN STRIPSSTERLING GRAY STUCCO PANELING, 4'x4' SQUARESOPERABLE VINYL WINDOW SYSTEM, COLOR: WHITE5/4" TRIM, COLOR: WHITEAWNING TRIMMED w/ STM A36 STEEL CHANNEL, COLOR: BLACKSECURITY LIGHTBLACK SMOOTH PANELINGFINISHED GRADE99' - 0"39' - 2 7/8"ELECTRIC METERS, SEE LANDSCAPE PLAN FOR SCREENINGARCHITECTURE · PLANNING · DEVELOPMENT · INTERIORS1425 WEST MAIN ST. · SUITE A · BOZEMAN, MONTANA · 59715TELEPHONE: (406) 587-1204 · EMAIL: FHA@FHARCHITECTS.COM© 2019 FHA. It is unlawful to use any or all of these document without the expressed written consecnt of Faure Halvorsen Architects PC.A R C H I T E C T SF A U R E H A L V O R S E NDATE: 20204/16/2021 4:40:48 PMA3.5CLIENT NAME, PROJECT LOCATIONBOZEMAN GATEWAY APARTMENTSBOZEMAN GATEWAY, BOZEMAN, MT, 59715BUILDING 4EXTERIORELEVATIONSJOB NO: 20-3111/8" = 1'-0"BUILDING 4 SOUTH ELEVATION11/8" = 1'-0"BUILDING 4 EAST ELEVATION21/8" = 1'-0"BUILDING 4 WEST ELEVATION31/8" = 1'-0"BUILDING 4 NORTH ELEVATION433 ARCHITECTURE · PLANNING · DEVELOPMENT · INTERIORS1425 WEST MAIN ST. · SUITE A · BOZEMAN, MONTANA · 59715TELEPHONE: (406) 587-1204 · EMAIL: FHA@FHARCHITECTS.COM© 2019 FHA. It is unlawful to use any or all of these document without the expressed written consecnt of Faure Halvorsen Architects PC.A R C H I T E C T SF A U R E H A L V O R S E NDATE: 20204/16/2021 4:55:43 PMG2.0CLIENT NAME, PROJECT LOCATIONBOZEMAN GATEWAY APARTMENTSBOZEMAN GATEWAY, BOZEMAN, MT, 597153D VIEWSJOB NO: 20-31134 W W W W W W W W W W W W W W WWWWWWF F F SD SD SD SD SD SD UP UP OFFICE MANAG E R ' S OFFIC E OFFICE CONFER E NC E ROOM AMAZONDELIVE R Y LEASINGDESK LOBBY WORKROOM LOUNGE FIRE RIS E R ROOM MECH. A-1 LEASI N G O F F I C E CLU B H O U S E A-1 A-1 B-1 B-1 B-1 A-1 A-1 A-1 A-1 A-1 A-1 A-1 A-1 B-2 B-2 A-4 B-6 C-1 RESTROOM RESTROOM VESTIB L E I.T./MEC H METER S C R E E N UP UP BIKE REP A I R PET WA S H GYM FIRE RISERROOM MECH. A-1S-1 S-1 B-1 A-1 A-1 B-1 B-1 B-2 B-2 B-1 B-1 ENTRY A-1 A-1 A-1 A-1 BENCH SAUNA SHWR. SHWR. MEN'S LOCKERS BENCH SAUNA SHWR. WOMEN'S LOCKERS SHWR. A-1 A-1 A-1 A-1A-1 B-1B-2 A-5 B-1A-1 C-1 A-1 A-4 A-1 A-1 B-2B-2 A-4 A-1 A-1 A-1 C-1 B-1 A-1 A-1 B-1 A-1 B-1 B-2 B-2 B-2 A-5 B-1 A-1A-1A-1 A-4 A-4METING ROOM Mail KioskR R R R R R N N N N N N N N Y XS Y P P P P S S S S Y Y Y X X X X X S P Q S Q R Q T Q T Q Q R Q R T R YYY R* R* R* Y Y Y Y Y Y Y V V V V V U U UU Q Q Q Q BUILDING 1 BUILDING 2 BUILDING 3BUILDING 4 R* R* R* Y Y Y R R R XX P P Y Y V V J J J JGGGG E E E E E EEEEJ J J J J F F F F L L L L L L L L J J D D D D D D H H B A A A L L K L K K B K B A JAAJJ F J A C E E E E E EEEEE F F D DD DDD DH HH HH HH H A A A A A A F F F F F C C C C C C C C B B B B B B B H H H H H H H H H H H H H H H D D D D D H* H*G* G*G* G*G* G* G* E*E* E* E* E*E* E* A* A* A* A* A* A* A* A* A* H* H* H* H* H* H* H*H* C* C* C* D D D D J SCALE 1"=50' Overall Landscape Plan 0 50 100 200 Jerald Saunders - Landscape Architect MT License # LA-19969 3/2/21 Plan Revisions 1 Revisions: Consultants: Date Description No. Sheet Title: Date: Job #: Sheet No: Drawn: Checked:BOZEMAN GATEWAYBozeman, MontanaLWH JAS Overall Landscape Plan L1.0 1/27/21 1010.006 NOTES: 1. ALL IMPROVEMENTS MUST FOLLOW THE RECOMMENDATIONS OF THE CONDITIONS OF THE APPROVAL FOR THE PUD AND DEVELOPMENT MANUAL. 2. MULCH TO BE DOUBLE GROUND BARK MULCH UNLESS OTHERWISE SPECIFIED. 3. ALL PLANTING BED EDGES TO BE SEPARATED FROM LAWNS WITH COMMERCIAL GRADE ALUMINUM EDGING ('CLEANLINE' BY PERMALOC, OR APPROVED EQUAL). 4. ALL PLANTING BEDS (EXCLUDING ANNUAL BEDS) TO RECEIVE A LAYER OF WEED BARRIER FABRIC WITH A WEIGHT GREATER THAN 3.2 OUNCES PER SY. 5. ALL DISTURBED LAWN AREAS WITH 4:1 OR STEEPER SLOPES SHALL BE HYDRO-SEEDED AND HAVE EROSION CONTROL BLANKET. ALL OTHER LAWN AREAS TO BE SODDED WITH A FESCUE BLEND SOD APPROPRIATE FOR WATER CONSERVATION. 6. TOPSOIL IN ALL DISTURBED LAWN AREAS AT 6" DEPTH. 7. SOIL MIX IN ALL PLANTING BEDS AT 12" DEPTH. 8. PROVIDE UNDERGROUND IRRIGATION SYSTEM TO PROVIDE IRRIGATION TO ALL LANDSCAPE AREAS. CONTRACTOR TO PROVIDE DESIGN-BUILD DRAWINGS FOR REVIEW BY LANDSCAPE ARCHITECT. SYSTEM SHALL BE DESIGNED TO PROMOTE WATER CONSERVATION AND SHALL PREVENT WATER OVERFLOW OR SEEPAGE INTO THE STREET, SIDEWALK, OR PARKING AREAS. SEE SHEET L2.1 FOR WATERING DIAGRAM. PROJECT LIMITS FUTURE BUILDING FUTURE BUILDING PLANTING SCHEDULE - PHASE 1 BOULEVARD TREES QUANTITYSYMBOL BOTANICAL NAME COMMON NAME CONTAINER TYPESIZE Ulmus americana 'Lewis & Clark'Lewis & Clark American Elm B&B2"cal SPACING MATURE HEIGHT DROUGHT TOLERANT (DT) MT NATIVE (Y/N) AND/OR Tilia cordata 'Morden'Morden Littleleaf Linden B&B2"cal Ulmus japonica x wilsoniana 'Morton'Accolade Elm B&B2"cal Quercus macrocarpa Bur Oak B&B2"cal Gleditsia triacanthos f. inermis 'Dursan'Prairie Silk Thornless Honeylocust B&B2"cal Celtis occidentalis Common Hackberry B&B2"cal Betula papyrifera Paper Birch B&B2"cal Acer platanoides Norway Maple B&B2"cal as shown as shown as shown as shown as shown as shown as shown as shown 40-50' 50-70' 30-50' 40-60' 50-70' 60-70' 30-50' 60-70' CANOPY TREES (non-boulevard, species are in addition to those listed under 'boulevard trees') Populus deltoides Plains Cottonwood B&B2"cal Acer x freemanii 'Jeffersred'Autumn Blaze Maple B&B2"cal Populus tremuloides Quaking Aspen (single stem)B&B2"cal as shown as shown as shown 40-60' 50-60' 65-100' COLUMNAR TREES Betula platyphylla 'Jefpark'Parkland Pillar White Birch B&B2"cal Populus tremula 'Erecta'Columnar Swedish Aspen B&B2"cal as shown as shown 30-40' 35-40' UNDERSTORY TREES Prunus virginiana 'Shubert'Canada Red Chokecherry B&B2"cal Acer tataricum 'GarAnn'Hot Wings Tatarian Maple B&B2"cal as shown as shown 20-30' 20-30' Syringa reticulata 'Ivory Silk'Ivory Silk Japanese Tree Lilac B&B2"cal as shown 20-25' Malus 'Radiant'Radiant Flowering Crabapple B&B2"cal as shown 15-30' Amelanchier x grandiflora 'Autumn Brilliance'Autumn Brilliance Serviceberry B&B2"cal as shown 40-50' EVERGREEN TREES Picea glauca 'Densata'Black Hills Spruce B&B6'h Juniperus scopulorum Rocky Mountain Juniper B&B6'h as shown as shown 30-40' 35-45' Pinus sylvestris Scotch Pine B&B6'h as shown 50-60' N, DT N, DT N, DT Y, DT N N N, DT Y (Cultivar), DT N, DT N, DT N Y Y N Y (Cultivar), DT N, DT N, DT Y, DT N, DT Y, DT Y SHRUBS AND LARGE ORNAMENTAL GRASSES Chrysothamnus nauseosus graveolens Tall Green Rabbitbrush Cont.24" Amelanchier alnifolia 'Regent'Regent Serviceberry Cont.24"4'o.c. 5'o.c. 4-6' 3-6' Hydrangea arborescens 'Annabelle'Annabelle Smooth Hydrangea Cont.24"4'o.c.3-5' Physocarpus opulifolius 'SMPOTW'Tiny Wine Ninebark Cont.24"3'o.c.3-4' Juniperus communis 'Effusa'Effusa Common Juniper Cont.24"4'o.c.18"h Ribes aureum Golden Currant Cont.24"4'o.c.3-5'Y, DT Y (Cultivar), DT N, DT N Y, DT Y (cultivar), DT Rhus aromatica 'Gro-low'Gro-low Fragrant Sumac Cont.24"4'o.c.2-3'N, DT Mahonia repens Creeping Oregon-grape Cont.18"18"o.c.1-2'Y, DT Potentilla fruticosa Potentilla Cont.24"4'o.c.2-4'Y, DT Philadelphus lewisii Lewis Mock Orange Cont.24"5'o.c.5-10'Y, DT Arctostaphylos uva-ursi Kinnikinnick Cont.12"3'o.c.6-12"Y, DT ORNAMENTAL GRASSES, PERENNIALS, AND ANNUALS Schizachyrium scoparium Little Bluestem Cont.1 gal. Bouteloua gracilis Blonde Ambition Blue Grama Cont.1 qt.18"o.c. 24"o.c. 18" 3-4' Panicum virgatum 'Heavy Metal'Heavy Metal Switchgrass Cont.1 gal.30"o.c.3-4' Achillea millefolium 'Paprika'Paprika Yarrow Cont.1 qt.18"o.c.18-24"Y (cultivar), DT Y (cultivar), DT Y, DT Y, DT CONTAINER TYPESIZE SPACING MATURE HEIGHT DROUGHT TOLERANT (DT) NATIVE (Y/N) AND/OR CONTAINER TYPESIZE SPACING MATURE HEIGHT DROUGHT TOLERANT (DT) NATIVE (Y/N) AND/OR Monarda fistulosa Wild Bergamot Cont.1 qt.24"o.c.2-4' Echinacea angustifolia Narrow-leaf Coneflower Cont.1 qt.18"o.c.18-24"Y, DT Y, DT Coreopsis tinctoria Plains Coreopsis Cont.1 qt.18"o.c.2-4' Liatris punctata Dotted Blazing Star Cont.1 qt.18"o.c.18-24"Y, DT Y, DT Athyrium filix-femina Lady Fern Cont.1 qt.24"o.c.1-3' Penstemon digitalis 'Husker Red'Husker Red Beardtongue Cont.1 qt.18"o.c.2-3'N, DT Y Symphyotrichum laeve Smooth Aster Cont.1 qt.24"o.c.2-4' Solidago rugosa 'Fireworks'Fireworks Goldenrod Cont.1 qt.30"o.c.2-3'N Y, DT Astilbe chinensis 'Visions'Visions Astilbe Cont.1 qt.18"o.c.12-18"N Rudbeckia fulgida var. sullivantii 'Goldsturm'Goldsturm Black-eyed Susan Cont.1 qt.24"o.c.2-3'N, DT Salvia nemorosa 'Caradonna'Caradonna Salvia Cont.1 qt.24"o.c.12-24"N, DT Hosta var.Hosta Cont.1 qt.varies varies N Seasonal annuals Aquilegia caerulea Colorado Columbine Cont.1 qt.18"o.c.12-24"Y A B C D E F G H J K L N P Q R S T U V X Y * Denotes future phase plantings, see sheet L1.3 for plan and separate schedule Spiraea betulifolia 'Glow Girl'Glow Girl Birchleaf spirea Cont.24"3'o.c.3-4'Y Symphoricarpos albus White Snowberry Cont.24"5'o.c.4-6'Y, DT a b c e f g h j k m n p q aa Denotes massed areas of grasses, perennials, and annuals. See below for plant selections. Specific locations of each plant TBD. 13 10 9 22 19 12 4 25 16 4 11 8 7 11 13 7 3 4 7 8 20 42 25 5 80 7 19 17 15 19 23 40 71 11 4618sf PLANTING CALCULATIONS AND ORDINANCE/DEVELOPMENT REQUIREMENTS: 1. Shade trees, and all trees to be installed in the boulevards, off-street parking lots, common open space areas, and public plazas will be installed at a min. of 2" caliper. 2. Evergreen trees will be a minimum of 5-6' in height. 3. Per Bozeman's UDC, all street rights-of-way shall be landscaped and must include one large canopy tree for each 50 feet of total street frontage. 1,967lf street frontage / 50ft = 39.34 = 40 required canopy trees (40 provided) 4. The Landscape Plan must provide 75 percent or greater of the proposed trees and shrubs as drought tolerant species: Trees: 233 total trees / 177 trees that are drought tolerant = 76% provided (min. 75% required) Shrubs: 550 total shrubs / 418 shrubs that are drought tolerant = 76% provided (min. 75% required) 5. The Landscape Plan shall indicate the total landscaped area and turf grass areas: Landscaped Areas (planting beds) = 18,441 sq.ft. Turf Grass Areas = 79,802 sq.ft. t 224 u 197 Hydrangea macrophylla 'Bailmer'Endless Summer Hydrangea Cont.24"4'o.c.3-5'Nd36 Rhododendron 'PJM'PJM Azalea Cont.18"4'o.c.4-5'Ns20 Caragana frutex 'Globosa'Globe Caragana Cont.24"3'o.c.2-3'N, DTr97 AMENITY DESCRIPTION / MODEL # 48"h Ameristar Echelon Ornamental aluminum, color: black 72"h Ameristar Echelon Plus ornamental aluminum fence w/ 3" picket airspace, color: black K9 Classic Artificial Turf (k9grass.com) Surface-mount round tube circular bike rack (Belson Outdoors model #CBBR-2CR-SS), Finish: Stainless Steel. 6 @ ea. bldg. 18-24"h Custom CMU built reinforced walls with masonry veneer and stone cap to match Arch. Surface-mount natural gas grill. Owner-supplied, Contractor-installed FURNITURE/AMENITY SCHEDULE QUANTITY 9 140lf 24 ±1,220sf ±165lf ±390lf Surface-mount 6' Scarborough bench w/ back by Landscape Forms (or approved equal)17 Bench Gas Grill Seat Wall Bike Rack Dog Park Surfacing Dog Park Fence Pool Fence 120V Outdoor LED string lights by AQLighting in 24-bulb strands (or approved equal)±235lf String Lighting 5'x30' Custom natural gas firepit. Brass burner and firepit frame by Warming Trends. Veneer and cap to match Arch.1 Linear Gas Firepit 48"sq ADA cast iron tree grate by Ironsmith (Item #4838) (or approved equal)6 Tree Grate 14' Hexagonal clerestory 'Oxford' structure by Poligon Structures (model #GXO-14)2 Gazebo 5'x5' Custom natural gas firepit. Brass burner and firepit frame by Warming Trends. Veneer and cap to match Arch.1 Square Gas Firepit Juniperus scopulorum 'Blue Arrow'Blue Arrow Juniper Cont.6'h as shown 15'N, DTv13 4/20/21 City Comments 2 Ribes alpinum Alpine Currant Cont.24"3'o.c.3-6'N, DTw10 4/28/21 City Comments 2 FUTURE PARKING PARK #1 PARK #2 PARK #3 35