Loading...
HomeMy WebLinkAbout06-21-21 Planning Board Agenda & Packet MaterialsA.Call Meeting to Order B.Disclosures C.Changes to the Agenda D.Approval of Minutes D.1 Approval of Minutes for 06-07-21(Happel) E.Public Comment Please state your name and address in an audible tone of voice for the record.This is the time for THE PLANNING BOARD OF BOZEMAN, MONTANA PB AGENDA Monday, June 21, 2021 WebEx Meeting Information Via Webex: https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php? MTID=e055d29761635cf886e926e52ab862e1e Click the Register link, enter the required information, and click submit. Click Join Now to enter the meeting Via Phone: This is for listening only if you cannot watch the stream or channel 190 • Call-in toll number (US/Canada ): 1-650-479-3208 • Access code: 182 821 9994 Public Comment: If you are interested in commenting in writing on items on the agenda, please send an email to agenda@bozeman.net prior to 4:00pm on Monday, June 21st, 2021. You may also comment by visiting the City's public comment page. You can also comment by joining the Webex meeting. If you do join the Webex meeting, we ask you please be patient in helping us work through this online meeting. If you are not able to join the Webex meeting and would like to provide oral comment you may send a request to agenda@bozeman.net with your phone number, the item(s) you wish to comment on, and someone will call you during the meeting to provide an opportunity to comment. You may also send the above information via text to 406-224-3967. As always, the meeting will be streamed through the City's video page (click the Streaming Live in the drop down menu), and available in the City on cable channel 190. 1 individuals to comment on matters falling within the purview of the Committee.There will also be an opportunity in conjunction with each action item for comments pertaining to that item.Please limit your comments to three minutes. F.Special Presentations G.Action Items G.1 Bridger Meadows Major Subdivision Preliminary Plat, Application 20351 (Rosenberg) G.2 Bozeman Gateway Phase 4 Major Subdivision, Application 19436 (Rosenberg) H.FYI/Discussion H.1 PCC Regional Housing Study Invi (Saunders) I.Adjournment For more information please contact Tom Rogers at trogers@bozeman.net This board generally meets the 2nd and 4th Monday of each month from 6:00 PM to 8:00 PM Committee meetings are open to all members of the public. If you have a disability and require assistance, please contact our ADA coordinator, Mike Gray at 582-3232 (TDD 582-2301). 2 Memorandum REPORT TO:Planning Board FROM:Taylor Chambers - Community Development Technician II SUBJECT:Approval of Minutes for 06-07-21 MEETING DATE:June 21, 2021 AGENDA ITEM TYPE:Minutes RECOMMENDATION:Suggested Motion: I move to approve the June 7th meeting minutes. STRATEGIC PLAN:1.2 Community Engagement: Broaden and deepen engagement of the community in city government, innovating methods for inviting input from the community and stakeholders. BACKGROUND:None UNRESOLVED ISSUES:None ALTERNATIVES:1. Approve meeting minutes with corrections. 2. Do not approve meeting minutes. FISCAL EFFECTS:None Attachments: 06-07-21 Planning Board Minutes DRAFT.pdf Report compiled on: June 8, 2021 3 Bozeman Planning Board Meeting Minutes, 06-07-21 Page 1 of 4 THE PLANNING BOARD MEETING OF BOZEMAN, MONTANA MINUTES Monday, June 7th, 2021 Due to scheduled maintenance, the meeting MUST end no later than 7:50 00:00:28 WebEx Meeting Information A) 00:03:26 Call Meeting to Order Present: Henry Happel, Cathy Costakis, Mark Egge, George Thompson, Matthew Hausauer, Jennifer Madgic Absent: Richard Rudnicki, Gerald Pape C) 00:04:14 Changes to the Agenda B) 00:05:05 Disclosures D) 00:05:12 Approval of Minutes D.1 Minutes Approval for 05-17-21 05-17-21 Planning Board Minutes DRAFT.pdf 00:05:30 Motion D) Approval of Minutes Cathy Costakis: Motion Matthew Hausauer: 2nd 00:05:41 Vote on the Motion to approve D) Approval of Minutes. The Motion carried 5 - 0 Approve: Henry Happel Cathy Costakis Mark Egge Matthew Hausauer Jennifer Madgic 4 Bozeman Planning Board Meeting Minutes, 06-07-21 Page 2 of 4 Disapprove: None E) 00:06:01 Public Comment David Fine (City of Bozeman Urban Renewal Program Manager) commented on behalf of the Urban Renewal Board regarding the N. 7th Design and Connectivity Plan. F) 00:18:28 Action Items F.1 00:18:33 Blackwood Groves Major Subdivision Preliminary Plat, Application No. 20447 20447 PB Staff Report June 7.docx 00:20:45 Board member Hausauer recused himself from the action item due to conflict of interest. 00:21:53 Motion Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20447 and move to recommend approval of the subdivision with conditions and subject to all applicable code provisions. Jennifer Madgic: Motion Mark Egge: 2nd Commissioner Madgic spoke to her motion. 00:24:49 Vote on the Motion to approve Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20447 and move to recommend approval of the subdivision with conditions and subject to all applicable code provisions. The Motion carried 5 - 0 Approve: Henry Happel Cathy Costakis Mark Egge George Thompson Jennifer Madgic Disapprove: None F.2 00:25:33 Review of existing subarea plans of the Bozeman Community Plan 2020. 00:26:03 North 7th Connectivity Plan Board member Costakis spoke to the board regarding her work on the North 7th Connectivity Project. 5 Bozeman Planning Board Meeting Minutes, 06-07-21 Page 3 of 4 00:32:29 Board Discussion Board members discussed and asked questions regarding the N. 7th Connectivity Project. 00:46:09 Bozeman Creek Neighborhood Plan Commissioner Madgic presented to the board on the Bozeman Creek Neighborhood Plan. 00:49:56 Board Discussion Board members discussed and asked questions regarding the Bozeman Creek Neighborhood plan. 01:22:24 Bozeman Deaconess Health Services Sub Area Plan Board member Thomson presented to the board on the Bozeman Deaconess Sub Area Plan. 01:32:16 Board Discussion Board members discussed and asked questions regarding the Bozeman Deaconess Sub Area Plan. 01:43:21 Motion that the planning board send an official letter to Bozeman Deaconess regarding the need to update their current neighborhood plan. Jennifer Madgic: Motion George Thompson: 2nd 01:47:03 Vote on the Motion to approve That the planning board send an official letter to Bozeman Deaconess regarding the need to update their current neighborhood plan. The Motion carried 6 - 0 Approve: Henry Happel Cathy Costakis Mark Egge George Thompson Matthew Hausauer Jennifer Madgic Disapprove: None F.3 Sixth work session to define and refine Planning Board goals for 2020 and implementation of the Bozeman Community Plan 2020. Memo to PB-210511-Final.pdf Memo to the City-Dev. Narr.-210511.pdf Due to time constraints, this item was tabled to a future meeting. 6 Bozeman Planning Board Meeting Minutes, 06-07-21 Page 4 of 4 G) 01:47:24 FYI/Discussion Board member Costakis inquired about board consolidation. Staff Liaison Rogers informed board members of upcoming meetings and content for the Planning Board. H) 01:50:18 Adjournment For more information please contact Tom Rogers at trogers@bozeman.net. This board generally meets the 2nd and 4th Monday of each month from 6:00 PM to 8:00 PM 7 Memorandum REPORT TO:Planning Board FROM:Sarah Rosenberg, Associate Planner Brian Krueger, Development Review Manager Martin Matsen, Director of Community Development SUBJECT:Bridger Meadows Major Subdivision Preliminary Plat, Application 20351 MEETING DATE:June 21, 2021 AGENDA ITEM TYPE:Community Development - Quasi-Judicial RECOMMENDATION:Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20351 and move to recommend approval of the subdivision with conditions and subject to all applicable code provisions. STRATEGIC PLAN:4.2 High Quality Urban Approach: Continue to support high-quality planning, ranging from building design to neighborhood layouts, while pursuing urban approaches to issues such as multimodal transportation, infill, density, connected trails and parks, and walkable neighborhoods. BACKGROUND:The Bridger Meadows major subdivision proposes to create 16 residential lots and 5 common open space lots. It is affiliated with a Planned Unit Development (application 20350). For full background information, see attached staff report. UNRESOLVED ISSUES:None ALTERNATIVES:1. Approve the application with the recommended conditions; 2. Approve the application with modifications to the recommended conditions; 3. Deny the application based on the Commission’s findings of non- compliance with the applicable criteria contained within the staff report; or 4. Open and continue the public hearing on the application, with specific direction to staff or the applicant to supply additional information or to address specific items. This alternative is requested if the Commission wishes to amend or add conditions of approval. FISCAL EFFECTS:NA Attachments: 20351 PB Staff Report.pdf 8 Report compiled on: June 17, 2021 9 Page 1 of 27 20351, Staff Report for the Bridger Meadows Major Subdivision Public Hearing Date: Planning Board June 21, 2021 at 6:00 via WebEx. A WebEx link will be provided with the Planning Board agenda. City Commission, July 20, 2021 at 6:00 pm via WebEx. A WebEx link will be provided with the City Commission agenda. Project Description: Preliminary plat to create a major subdivision that includes 16 residential lots and 5 common open space lots. The development also includes a 7.15 acre wildlife refuge and wetland preservation site and 1.72 acres of open space. The property is zoned R-1. The property is zoned R-1. This project includes a PUD and comments on the PUD are affiliated with application number 20350. Six relaxations are requested with the PUD application. Project Location: S31, T01S, R05E, C.O.S. 885 TRACT NW4SE4, 12 acres, Bozeman, Gallatin County, Montana Recommendation: The application conforms to standards and is sufficient for approval with conditions and code provisions. Planning Board Recommended Motion: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20351 and move to recommend approval of the subdivision with conditions and subject to all applicable code provisions. Commission Recommend Motion: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 20351 and move to approve the subdivision with conditions and subject to all applicable code provisions. Report Date: June 16, 2021 Staff Contact: Sarah Rosenberg, Associate Planner Lance Lehigh, Project Engineer Agenda Item Type: Action (Quasi-judicial) EXECUTIVE SUMMARY Unresolved Issues There are no known unresolved issues. 10 20351, Staff Report Bridger Meadows Major Subdivision Page 2 of 27 Project Summary This report is based on the application materials submitted and any public comment received to date. The property owner and applicant submitted a preliminary plat application to create 16 residential lots and five common open space lots on 11.87 acres. The development also includes a 7.15 acre wildlife refuge and wetland preservation site, and 1.72 acres of open space. The site is presently vacant and surrounded by residential subdivisions to the north and east, a commercial development to the south and Glen Rotary Park to the west. The site is accessed from Birdie Drive to the east and emergency vehicle access from Commercial Drive to the south. The property is zoned R-1. This preliminary plat application is affiliated with a Preliminary Planned Unit Development (PUD), application 20350. The Design Review Board (DRB) reviewed the PUD on Wednesday, June 9 and recommended approval of the PUD 5-0. Six relaxations to the Bozeman Municipal Code (BMC) zoning regulations are proposed with the application: 1. 38.400.010.A.8. A relaxation from the requirement for a second means of public access to the site. 2. 38.400.010.A.9. A relaxation to allow for a cul-de-sac. 3. 38.400.020.A.2. A relaxation from the 60’ width right of way requirement, instead providing a 50’ width. 4. 38.400.080. A relaxation from the requirement to provide a sidewalk along both sides of the street with only one side of the street having a sidewalk. 5. 38.410.040.B. A relaxation from the block length requirements. 6. 38.410.100.A.2. A relaxation from the requirements to reduce the watercourse setback for lots 4 through 14, which is 50 feet. The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate. The Development Review Committee (DRC) deemed the application adequate for continued review on May 19, 2021. Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny the subdivision application by August 11, 2021, unless there is a written extension from the developer, not to exceed one year. The Planning Board will review this application on Monday, June 21 and make a recommendation to the City Commission. Written public comment has been received that opposes the project. A public comment was received at the Design Review Board meeting on June 9, 2021 from the Rabb Law Firm who represents the Links Condominium Association (COA). According to the public comment, there is a pending legal lawsuit between Golf Course Partners, and the Links COA in regards to the 11 20351, Staff Report Bridger Meadows Major Subdivision Page 3 of 27 access easement to the Bridger Meadows property. At this time, the City is reviewing the access easements and will require valid, recorded easements at final plat to ensure access to the property. Additional public comment has been received in opposition of the development. The public comment can be found at this link: https://weblink.bozeman.net/WebLink/Browse.aspx?id=237629&dbid=0&repo=BOZEMAN&cr =1 Alternatives 1. Approve the application with the recommended conditions; 2. Approve the application with modifications to the recommended conditions; 3. Deny the application based on the Commission’s findings of non-compliance with the applicable criteria contained within the staff report; or 4. Open and continue the public hearing on the application, with specific direction to staff or the applicant to supply additional information or to address specific items. This alternative is requested if the Commission wishes to amend or add conditions of approval. 12 20351, Staff Report Bridger Meadows Major Subdivision Page 4 of 27 TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................ 1 Unresolved Issues ............................................................................................................... 1 Project Summary ................................................................................................................. 2 Alternatives ......................................................................................................................... 3 SECTION 1 - MAP SERIES .......................................................................................................... 5 SECTION 2 – REQUESTED RELAXATIONS ............................................................................ 9 SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL ............................................ 9 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS ...................... 13 SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS .......................................... 17 SECTION 6 - STAFF ANALYSIS AND FINDINGS ................................................................. 17 Applicable Subdivision Review Criteria, Section 38.240.130.A.5.b, BMC. .................... 17 Primary Subdivision Review Criteria, Section 76-3-608 ................................................. 19 Preliminary Plat Supplements ........................................................................................... 22 APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY...................................... 25 APPENDIX B – NOTICING AND PUBLIC COMMENT ......................................................... 26 APPENDIX C – PROJECT BACKGROUND ............................................................................. 26 APPENDIX D - OWNER INFORMATION ................................................................................ 26 ATTACHMENTS ......................................................................................................................... 26 13 20351, Staff Report Bridger Meadows Major Subdivision Page 5 of 27 SECTION 1 - MAP SERIES Figure 1. Zoning classification 14 Page 6 of 27 Figure 2. Preliminary Plat 15 20351, Staff Report Bridger Meadows Major Subdivision Page 7 of 27 Figure 3. Illustrative Plan 16 20351, Staff Report Bridger Meadows Major Subdivision Page 8 of 27 Figure 4. Watercourse Exhibit 17 Page 9 of 27 SECTION 2 – REQUESTED RELAXATIONS There are no variances requested with this subdivision application. The associated PUD has requested six relaxations. Analysis of the requested relaxations is provided under the PUD staff report. To enable understanding of why the proposed plat does not comply with typical standards, the relaxations are listed here: 1. 38.400.010.A.8. A relaxation from the requirement for a second means of public access to the site. 2. 38.400.010.A.9. A relaxation to allow for a cul-de-sac. 3. 38.400.020.A.2. A relaxation from the 60’ width right of way requirement, instead providing a 50’ width. 4. 38.400.080. A relaxation from the requirement to provide a sidewalk along both sides of the street with only one side of the street having a sidewalk. 5. 38.410.040.B. A relaxation from the block length requirements to allow for a longer block length. 6. 38.410.100.A.2. A relaxation from the requirements to reduce the watercourse setback for lots 4 through 14, which is 50 feet. SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to the preliminary plat application. Staff has considered the impacts as identified in the staff analysis and application materials and these conditions of approval are reasonably related and roughly proportionate to the development. 1. BMC 38.220.070. The applicant shall submit with the application for Final Plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval and noted code provisions have been satisfactorily addressed. This narrative shall be in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. 2. BMC 38.220.070.A.7. Simultaneously with filing of the final plat, in conjunction with required or offered dedications, the subdivider (or owner of the property being subdivided if the owner is not the subdivider) shall transfer ownership to the property owners’ association of any open space proposed to be conveyed to the property owners’ association and all its right, title, and interest in any improvements made to such parkland or open space. For the transfer of real property, the subdivider or owner of the property shall submit with the application for final plat a warranty deed or other instrument acceptable to the City Attorney transferring fee simple ownership to the property owners association and associated realty transfer certificate. The subdivider or owner of the property must record the deed or 18 20351, Staff Report Bridger Meadows Major Subdivision Page 10 of 27 instrument at the time of recording of the final plat. For personal property installed upon open space owned by the property owners association, the subdivider shall provide an instrument acceptable to the City Attorney transferring all its rights, title and interest in such improvements including all applicable warranties to such improvements. 3. BMC 38.240.150.A.3. Deeds and Realty transfer certificates must be provided for transfer of any platted tract to the City or other entity in association with filing of the final plat. 4. BMC 38.410.060.A. The final plat must provide and depict all necessary utility easements and they must be described, dimensioned and shown on each subdivision block of the final plat in their true and correct location. 5. BMC 38.220.320. In order to disclose to future purchasers their obligations regarding open space established in the municipal code the following language shall be included on the Conditions of Approval Sheet of the final plat: “As established by 38.220.320.A, 38.340.150.A.3.d, and other applicable elements of the municipal code, ownership of all common open space areas and trails, and responsibility of maintenance thereof and for city assessments levied on the common open space lands shall be that of the property owners’ association. Maintenance responsibility shall include, in addition to the common open space and trails, all vegetative ground cover, and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and as adjacent to public parks or other common open space areas. All areas within the subdivision that are designated herein as common open space including trails are for the use and enjoyment by residents of the development and the general public. The property owners’ association shall be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all common open space areas and trails. At the same time of recording the final plat of the subdivision the subdivider shall transfer ownership of all common open space areas within each phase to the property owners’ association created by the subdivider to maintain all common open space areas within Bridger Meadows subdivision. The City may release the Bridger Meadows Property Owners’ Association from the obligation to maintain parks dedicated to the City at the City’s discretion.” 6. Codes, Covenants & Restrictions must be updated and submitted with initial final plat to be recorded after approval. 7. BMC 38.220.070. The final plat must contain the following notation on the Conditions of Approval sheet: a. The responsibility of maintenance for the stormwater facilities, stormwater open space lots, pedestrian open space lots and street frontage landscaping for the perimeter streets must be that of the property owners’ association. Maintenance responsibility must include, all vegetative ground cover, boulevard trees and irrigation systems in the public right-of-way boulevard strips along all external 19 20351, Staff Report Bridger Meadows Major Subdivision Page 11 of 27 perimeter development streets. The property owners’ association must be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all perimeter street frontage landscaping and stormwater facilities and all open space landscaping. b. All stormwater facilities not on property dedicated to the City of Bozeman require public utility easement for storm water facility maintenance. c. Due to known high groundwater conditions in the area no basements will be permitted with future development of the site. No crawl spaces will be permitted with future development of the site, unless a professional engineer registered in the State of Montana certifies that the lowest point of any proposed structure is located above the seasonal high groundwater level and provide supporting groundwater data prior to the release of building permit. In addition, sump pumps are not allowed to be connected to the sanitary sewer system. Sump pumps are also not allowed to be connected to the drainage system unless capacity is designed into the drainage system to accept the pumped water. Water from sump pumps may not be discharged onto streets, such as into the curb and gutter. d. All downstream water user facilities will not be impacted by this Subdivision. e. All lots are subject to a 10- foot wide front yard utility easement. f. All Open Space and Public Access areas are to be owned and maintained by the property owners association. 8. BMC 38.410.130.C. If water rights or cash-in-lieu of water rights, have not been provided with Final Plat, then water rights or cash-in-lieu must be provided with any future site plan development or applicable development application. 9. A 1 foot no access strip shall be placed along all lots directly adjacent to the emergency access to prevent direct lot access onto the emergency access pathway. 10. BMC 38.410.060. As presented, common open space lots 02 and 04 as well as the small section that runs through Lot 7 allows for conveyance/detention for stormwater runoff from public rights of way and Emergency Access. Public drainage easements must be provided for they conveyance and detention of stormwater on these lots. The applicant may contact the Engineering Department to receive a copy of the drainage easement template. The easement must be filed prior to Final Plat Approval and the easement document number must be referenced on the Final Plat. 11. The applicant must provide and file with the County Clerk and Recorder's office executed Waivers of Right to Protest Creation of Special Improvement Districts (SID’s) or special districts for the following, if not already filed: a. Intersection improvements at Story Mill Road and Rouse Avenue including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage. 20 20351, Staff Report Bridger Meadows Major Subdivision Page 12 of 27 b. Intersection improvements at East Griffin Drive and Rouse Avenue including lighting, signalization, paving, curb/gutter, sidewalk, and storm drainage. The document filed must specify that in the event an SID is not utilized for the completion of these improvements, the developer agrees to participate in an alternate financing method for the completion of the improvements on a fair share, proportionate basis as determined by square footage of property, taxable valuation of the property, traffic contribution from the development, or a combination thereof. The applicant must provide a copy of the filed SID waiver prior to Final Plat Approval. 12. The applicant did not provide any information on how the adjacent emergency/public access off Commercial Drive will be maintained both on and off-site. The applicant is advised that the City will not maintain the emergency/public access to the Bridger Meadows Development. The applicant must provide the following prior to Final Plat Approval: a. The applicant must submit a draft maintenance agreement between the City and associated parties’ that agrees to indemnify and hold the City harmless for any damages and clearly delineates maintenance and replacement responsibilities associated with the emergency /public access easement, which includes snow removal, pavement maintenance, painting, striping, traffic marking, and all other maintenance responsibilities. b. The draft agreement must be accompanied by an exhibit stamped by a licensed professional surveyor. c. The draft agreement must be submitted for approval from the Public Works Director with subsequent approval from the City's Legal Department. d. Upon City review and approval, the applicant must provide an owner executed original agreement to the City prior to Final Plat Approval. e. The agreement must be incorporated into the Property Owners Association Documents. f. A Condition of approval must be added to the plat that clearly identifies the maintenance agreement and the responsible parties. 13. BMC 38.400.010. The proposed emergency access will also be used for public access to the proposed development. The applicant must provide an emergency/public access agreement that clearly defines the intended use given the unique nature of how the access will be utilized by both the City and the public. The easement must be recorded and provided to engineering prior to Final Plat Approval. The recorded easement number must be written in on the final plat. 14. BMC 38.400.010. Because the applicant has requested a relaxation from the requirement to have a second means of public access to the site leaving only one means of public access to the site, the sole means of public access, which may be the subject of pending litigation, is 21 20351, Staff Report Bridger Meadows Major Subdivision Page 13 of 27 critically necessary. A public utility easement and a valid public access easement must be recorded and provided to engineering prior to Final Plat Approval. The recorded easement number(s) must be written in on the final plat. 15. BMC 38.600.210. A floodplain permit must be submitted and approved prior to final plat. 16. BMC 38.220.020 & 38.610.050. Prior to final plat, the applicant must provide the Community Development Department with a written statement of a wetland boundary determination from the U.S. Army Corps of the wetland status. If the wetlands are determined to be jurisdictional, an approved 404 permit for any changes to the wetland must be submitted to the Community Development office prior to final plat approval. The applicant must contact the Gallatin County Conservation District, Montana Department of Environmental Quality, and U.S. Army Corps of Engineers regarding the proposed project and any required permits (i.e., 310, 404, Turbidity exemption, etc.) must be obtained by the applicant. Approved stream and wetland permits shall be provide prior to public infrastructure approval for public infrastructure impacts to jurisdictional wetland and streams. Permits and a FEMA approved LOMR-F must be provided prior to Final Plat Approval. 17. BMC 38.410.100. No accessory structures, patios, or recreational equipment (i.e. swingset, trampoline. etc.) can be located within the watercourse setback. This language must be included in the Property Owners Association Documents/Covenants. 18. BMC 38.420.030. Final payment for cash-in-lieu of parkland will be determined and paid at the time of final plat. A parkland table and CIL amount must be printed on the final plat. 19. BMC 38.430.040. The Planned Unit Development Final Plan shall be completed and approved by the City of Bozeman before the approval of the final plat. SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS The following are procedural requirements not yet demonstrated by the plat and must be satisfied at the final plat. 1. The final plat must conform to all requirements of the Bozeman Municipal Code and the Uniform Standards for Subdivision Plats (Uniform Standards for Certificates of Survey and Subdivision Plats (24.183.1104 ARM) and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements were received, a platting certificate, and all required and corrected certificates. The Final Plat application shall include three (3) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent). The Gallatin County Clerk & Recorder’s office has elected to continue the existing medium requirements of 2 mylars with a 1½” binding margin on one side for both plats and COS’s. The Clerk and Recorder will file the new Conditions of Approval sheet as the last same sized mylar sheet in the plat set. 22 20351, Staff Report Bridger Meadows Major Subdivision Page 14 of 27 2. BMC 38.100.080.A. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 3. BMC 38.220.300 & 310. The Property Owners’ Association (POA) documents must be finalized and recorded with the final plat. The POA documents must include the requirements of Section 38.220.300 and 320. 4. BMC 38.270.030. The applicant must submit plans and specifications for water and sewer main extensions, streets, and storm water improvements, prepared and signed by a professional engineer (PE) registered in the State of Montana, which must be provided to and approved by the City Engineer. Water and sewer plans must also be approved by the Montana Department of Environmental Quality. The applicant must also provide professional engineering services for construction inspection, post-construction certification, and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. Building permits will not be issued prior to City acceptance of the site infrastructure improvements unless all provisions set forth in Section 38.270.030.C of the Bozeman Municipal Code are met to allow for concurrent construction. 5. BMC 38.410.060.A. The final plat must provide all necessary utility easements and they must be described, dimensioned and shown on each subdivision block of the final plat in their true and correct location. The recorded easement number must be documented on the final plat. a. The applicant is advised that all dedicated public easements must be recorded the City’s standard template easement documents separate from the plat and the recorded document number must be listed on the final plat. Easements will be deemed inadequate if they are not in a final draft format (signatures are not required for the draft review). Easements must be stamped by a licensed professional surveyor. In preparing signature blocks on any upcoming documents, please make the following changes: Jeff Mihelich, City Manager; Mike Maas, City Clerk. If a new member is established, the easement documents must be updated. 6. BMC 38.410.060. The applicant must provide a ten foot private utility easement (power, gas, communication, etc.) along the developments property frontage. The applicant may contact the Engineering Department to receive a copy of a utility easement template. The easement must be recorded and provided to engineering prior to final plat approval. The recorded easement number must be written in on the final plat. 7. BMC 38.410.060. The proposed water and sewer lines extending from Shady Glen Lane to Boylan Road reside in a public access and utility easement. The Final Plat must reference the recorded easement number. 23 20351, Staff Report Bridger Meadows Major Subdivision Page 15 of 27 8. BMC 38.240.150.A.3.d Transfer of ownership of public land, off-site land, private land, personal property, improvements and water rights; documents required. a. For the transfer of real property in satisfaction of required or offered dedications to the city, and required or offered donations or grants to the property owners' association (POA), the subdivider or owner of the property must submit with the application for final plat a warranty deed or other instrument acceptable to the city attorney transferring fee simple ownership to the city or the POA. b. For the transfer of personal property installed upon POA-owned open space, the subdivider must provide the city an instrument acceptable to the city attorney transferring all its rights, title and interest in such improvements including all applicable warranties to such improvements to the city or the POA. c. The subdivider or owner of the property must record the deed or instrument transferring ownership or interests at the time of recording of the final plat with the original of such deed or instrument returned to the city or POA as applicable. d. For the transfer of ownership interest in water, the subdivider or owner of the property must submit with the application for final plat a deed or other instrument acceptable to the city attorney transferring ownership to the city or POA, along with all required state department of natural resources and conservation documentation, certification and authorization. 9. BMC 38.270.030, Completion of Improvements. If it is the developer’s intent to file the plat prior to the completion of all required improvements, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the preliminary plat submittal information and conditions of approval. If the final plat is filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. 10. BMC 38.240.450 requires a certificate of completion of improvements. The certificate must specifically list all installed improvements and financially guaranteed improvements. 11. BMC 38.240.520 requires a certificate of completion of non-public improvements. Certificate must specifically list all installed improvements and financially guaranteed improvements. 12. BMC 38.240.530. When irrigation of public facilities are to be installed prior to final plat approval, the final plat of subdivision must contain a certificate of completion of water- related improvements. The certificate must list all completed and accepted improvements, including but not limited to all irrigation system record drawings. The subdivision proposes irrigation of public street frontage. This certificate must be provided on the final plat. 24 20351, Staff Report Bridger Meadows Major Subdivision Page 16 of 27 13. BMC 38.220.020 & 38.610.050. Approved stream and wetland permits shall be provided prior to public infrastructure approval for public infrastructure impacts to jurisdictional wetland and streams. Permits shall be provided prior to Final Plat Approval. 14. BMC 38.410.100. With the final plat, a watercourse planting plan must be prepared that identifies the maintenance of the watercourse setback landscaping. The landscaping identified in the watercourse planting plan must be installed or financially guaranteed prior to final plat approval. 15. BMC 38.220.020. The developer must provide the community development department with a copy of all required streambed, streambank or wetlands permits, or written notification from the appropriate agency that a permit is not required, prior to the commencement of any work on the site or final plat approval, whichever is sooner. 16. BMC 38.240.050. Water rights, or cash-in-lieu thereof, as calculated by the Director of Public Works, is due with the filing of each subdivision final plat. 17. BMC 38.240.420. If there are liens or mortgages against the property, the appropriate Mortgagee certificate must be included. 18. BMC 38.410.120. If mail delivery will not be to each individual lot within the development, the developer shall provide an off-street area for mail delivery within the development in cooperation with the USPS. It shall not be the responsibility of the City to maintain or plow any mail delivery area constructed within a City right-of-way. If cluster boxes are use a dedicated area to pull up and access the boxes must be provided. 19. BMC 38.420.030.D. Where a cash (or improvement) donation has been accepted in-lieu of land dedication, the amount must be stated on the final plat. 20. BMC 38.410.100. With the final plat, a watercourse planting plan must be prepared that identifies the maintenance of the watercourse setback landscaping. The landscaping identified in the watercourse planting plan must be installed or financially guaranteed prior to final plat approval. 21. BMC 38.400.010. No parking is allowed along cul-de-sac. No parking signs must be installed prior to final plat approval. 22. BMC 38.410.060. Utility easements shall be provided in accordance with the Bozeman Municipal Code. The required 10-foot front yard easement is required for all lots unless written confirmation is submitted with the preliminary plat from ALL utility companies providing service indicating that front yard easements are not needed. 23. BMC 38.220.320. Covenants. Covenants, restrictions, and articles of incorporation for the creation of a property owners’ association shall be submitted with the final plat application for review and approval by the Department of Community Development and shall contain, but not be limited to the following items: 1) the orientation and setbacks for corner lots, 2) all additional setbacks required when lots are adjacent to pathway corridors and minor arterial 25 20351, Staff Report Bridger Meadows Major Subdivision Page 17 of 27 roads, 3) provisions for fences, 4) provisions for snow removal, maintenance and upkeep of all common areas, public and private parks, trails, storm water runoff facilities, 5) guidelines that outline architectural and landscape requirements for each individual lot and/or phase of the subdivision, including placement of boulevard trees at a regular spacing for each residential lot, 6) provisions that outline the renewal of an annual contract with a certified landscape nursery person for the upkeep and maintenance of all parklands, common open space, trails, etc., 7) landscape details for detention ponds, outlet structures, boulevard trees, parkland, irrigation, etc., 8) mitigation of groundwater with established floor elevations, 9) noxious weed control, and 10) assessment of existing and future Special Improvement Districts. These documents shall be submitted to the city attorney and shall not be accepted by the City until approved as to legal form and effect. A draft of these documents must be submitted for review and approval by the Community Development Department at least 30 working days prior to submitting a final plat application. These documents shall be executed and submitted with the initial final plat to be filed with the Gallatin County Clerk and Recorder at the time of final plat recordation. SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS The DRC determined that the application is adequate for continued review and found that application conforms to standards and is sufficient for approval with conditions and code provisions on May 19, 2021. Public hearing date for the Planning Board is on June 21, 2021 at 6:00pm. The hearing will be held via WebEx with a WebEx link provided with the Planning Board agenda. Public hearing date for the City Commission is July 20, 2021 at 6:00 PM. The hearing will be held via WebEx with a WebEx link provided with the City Commission Agenda. SECTION 6 - STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis is a summary of the completed review. Applicable Subdivision Review Criteria, Section 38.240.130.A.5.b, BMC. In considering applications for subdivision approval under this title, the advisory boards and City Commission shall consider the following: 1) Compliance with the survey requirements of Part 4 of the Montana Subdivision and Platting Act The preliminary plat has been prepared in accordance with the survey requirements of the Montana Subdivision and Platting Act by a Professional Engineer registered in the State of Montana. As outlined in code provision number 1, the final plat must comply with State statute, Administrative Rules of Montana, and the Bozeman Municipal Code. A conditions of approval sheet must be included and updated with the required notations can be added as required by conditions or code. 26 20351, Staff Report Bridger Meadows Major Subdivision Page 18 of 27 2) Compliance with the local subdivision regulations provided for in Part 5 of the Montana Subdivision and Platting Act The final plat must comply with the standards identified and referenced in the BMC. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as a condition of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or Montana law. Sections 3 and 4 of this report identify conditions and code corrections necessary to meet all regulatory standards. Therefore, upon satisfaction of all conditions and code corrections the subdivision will comply with the local subdivision regulations. 3) Compliance with the local subdivision review procedures provided for in Part 6 of the Montana Subdivision and Platting Act The application was received on November 11, 2020 and was deemed inadequate for further review on December 22, 2020. Revised application materials were received on March 10, 2021 and May 14, 2021. The City deemed the application adequate for review on May 19, 2021. Public hearings are scheduled for June 21 and July 20, 2021. The hearings before the Planning Board and City Commission have been properly noticed as required by the Bozeman Municipal Code. Based on the recommendation of the DRC and other applicable review agencies, as well as any public testimony received on the matter, the Planning Board must forward a recommendation in a report to the City Commission who will make the final decision on the applicant’s request. The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate. Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny the subdivision application by August 11, 2021, unless there is a written extension from the developer, not to exceed one year. Public notice for this application was given as described in Appendix C and public comment has been received and is outlined below. On June 16, 2021 this major subdivision staff report was completed and forwarded with a recommendation of conditional approval for consideration to the Planning Board. 4) Compliance with Chapter 38, BMC and other relevant regulations Based on review of the Development Review Committee and the Department of Community Development all applicable regulations are met if all code requirements are satisfied. Pertinent code provisions and site specific requirements are included in this report for City Commission consideration in Sections 3 and 4. 5) The provision of easements to and within the subdivision for the location and installation of any necessary utilities The final plat will provide and depict all necessary utilities and required utility easements. Condition of approval 4 requires that all easements, existing and proposed, must be accurately 27 20351, Staff Report Bridger Meadows Major Subdivision Page 19 of 27 depicted and addressed on the final plat and in the final plat application. Public utilities will be located within dedicated street rights of way. Code provision 5, 6, 7, and 22 state that utility easements need to be provided along front yards and are to be granted with the final plat in accordance with standards. Access must be provided to all sanitary sewer lines and manholes. 6) The provision of legal and physical access to each parcel within the subdivision and the notation of that access on the applicable plat and any instrument transferring the parcel The final plat will provide legal and physical access to each parcel within the developable area. The subject property is accessed from an internal drive through the Links Condominium development off Birdie Lane to the east. A Public Access and Utility Easement between Golf Course Partners and Bridger Center, LLC grants access to the property through the Links Condominium Development. This is the only public access to the site and all lots are accessed from this internal drive. Condition of approval 14 recognizes the legal challenge to this public access easement and requires a valid, recorded public access easement prior to final plat approval. A relaxation with the PUD is requested for only one access to the site when two are required as outlined in the PUD staff report. The DRC is in support of this request. A secondary emergency access is provided at the south of the development between lots 15 and 16 for emergency vehicles. Condition of approval number 12 requires a maintenance agreement to be provided with the final plat. Primary Subdivision Review Criteria, Section 76-3-608 1) The effect on agriculture This subdivision will not impact agriculture. There is no agricultural production on the property. The subject property is designated as Urban Neighborhood according to the City of Bozeman Community Plan. 2) The effect on Agricultural water user facilities This subdivision will not impact agricultural water user facilities. A domestic well exists on the property that will be abandoned in accordance with the Montana Department of Environmental Quality (MDEQ). 3) The effect on Local services Water/Sewer – Water and sewer systems exist to serve the subdivision. The subdivider proposes to extend water and sewer mains to the subdivision. Code provision 7 requires a city standard sewer easement where the sewer system is located. Code provision 3 requires the applicant to submit plans for water and sewer main extensions, approved by the Montana Department of Environmental Quality, to be reviewed by the City. Building permits will not be issued prior to city acceptance of site infrastructure improvements, unless concurrent construction is requested and conditions allow. Water rights exist for the subject property, the applicant proposes to transfer to City ownership existing water rights as outlined in code provision 8. 28 20351, Staff Report Bridger Meadows Major Subdivision Page 20 of 27 Streets – The Growth Policy and subdivision standards require adequate connectivity of a development to the street grid. Access is taken from Birdie Drive to the east via a drive aisle that goes through the Links Condominium to the site. This drive aisle will be privately maintained by the POA. A secondary access is an emergency vehicle access from the south off Commercial Drive. As outlined in condition of approval number 12, a maintenance agreement between the City and associated parties must be provided with the final plat for this secondary access. Condition number 13 outlines that this access can also be utilized by the public and the City. A preliminary public access easement between Golf Course Partners and Bridger Meadows Development has been provided to the City. Golf Course Partners owns the land in which the Links Condominium development is located. As outlined in condition of approval number 14, the valid, recorded easement must be documented on the final plat. A relaxation with the PUD to allow for a narrower street of 50 feet wide rather than the 60 feet wide local street width lot is requested. The drive itself meets City local street standards including curb-to-curb width, slopes, and horizontal alignment. The drive ends at a cul-de-sac which are typically prohibited unless they are deemed necessary due to site constraints and lack of options for legal access. A relaxation with the PUD requests the use of a cul-de-sac which has been found to be necessary for providing adequate access to the lots. A sidewalk is provided on the west side of Shady Glen Lane rather than on both sides of the street. A relaxation with the PUD requests that there only be a sidewalk on one side of the street since there the East Gallatin trail system is on the north side of the street. Police/Fire – The area of the subdivision is within the service area of both these departments. No concerns on service availability have been identified. Stormwater - The subdivision will construct storm water control facilities to conform to municipal code. Each individual lot will have roof drainage routed to rain barrels or on site infiltration facilities or to surface drain the runoff to the street to drain into stormwater storage, infiltration and treatment facilities. The maintenance of the stormwater facilities is the responsibility of the Property Owners Association (POA) as outlined in condition of approval 7. Inspection of installed facilities prior to final plat will verify that standards have been met. Parklands – Parkland will be provided through cash-in-lieu of a land dedication equating to .54 acres. As the subject property is adjacent to Glen Lake Rotary Park to the west and Story Mill Community Park to the south, the Parks Division determined that physical land was not necessary. Cash-in-lieu of parkland is required with the final plat as outlined in condition 17. 4) The effect on the Natural environment No significant negative impacts to the natural environment have been identified. Where intact wetlands and watercourses are present, setbacks have been delineated and identified pursuant to BMC 38.410.100. A 50 foot watercourse setback impacts lots 4-15. A relaxation to reduce the watercourse setback along these lots is requested with the PUD. Condition number 17 outlines that no structures can be built within the watercourse setback. Fill will be placed within the 29 20351, Staff Report Bridger Meadows Major Subdivision Page 21 of 27 wetlands in order to mitigate for the proposed watercourse buffer width reductions. In order to mitigate for the proposed watercourse buffer, native grasses will be planted within and along the buffer. Code provision 14 states that a watercourse planting plan must be prepared that identifies the maintenance of the watercourse setback landscaping and that must be installed or financially guaranteed prior to final plat approval. Condition 16 requires appropriate permitting from the Gallatin County Conservation District, Montana Department of Environmental Quality, and U.S. Army Corps of Engineers when there is any disturbance of wetlands on site. There is a 100-year floodway on the west side of the property. There is a proposed fill that is localized to lots 3-6 and 9-12. The excavation area is a historic artificial fill from an old road or railroad bed that is taking up space within the existing floodplain. This fill was placed prior to the current FEMA floodplain mapping and report. This project proposes to restore elevations to resemble the elevations prior to fill placement which will increase the flood storage volume. Condition 15 requires a floodplain permit to be approved prior to final plat. In total, there will be .09 acres of impacts on the wetlands and .41 acres of impacts to the floodplain area. The site is in an area of high groundwater which may negatively impact future structures or cause illicit discharges into the sanitary sewer and over burden the surface drainage system. Condition 7c prohibits use of basements or crawl spaces unless a professional engineer certifies that the structure has been designed in such a way to accommodate seasonal high groundwater and requires addition of a notation of this restriction on the conditions of approval sheet. This requirement will protect both future structure owners from future hazards of flooding and lessen burden on the public from illicit discharges. BMC 38.550.070 requires use of wells or surface water rights to irrigate parks and open spaces rather than municipal water supply. The application will irrigate open space and boulevard strips landscaping with wells. 5) The effect on Wildlife and wildlife habitat Wildlife habitat exists on the subject property. In a statement from the Montana Fish, Wildlife and Parks (MFWP) states that wildlife conflicts have happened in the area with black bears, moose, and mountain lions. The MFWP gave recommendations to assist in mitigating the conflicts during construction, landscaping, and post construction. They also stated that the development alone is not likely to negatively impact big game at a population level as the area is a small parcel and most will be preserved in open space. The open space will contain a 7.15 acre wildlife refuge which is contiguous to the 47 acre Glen Lake Rotary Park. This connection between the open spaces amplifies benefits to the wildlife in the area. Protective covenants for the property place restrictions, limitations, and regulations on all activities that may have any adverse effect on wildlife, native plants, and fisheries. The critical areas will be preserved by avoidance and any areas disturbed during construction will be reclaimed through plantings of diverse riparian vegetation. 30 20351, Staff Report Bridger Meadows Major Subdivision Page 22 of 27 6) The effect on Public health and safety With the recommended conditions of approval and required plat corrections, the subdivision will not significantly impact public health and safety. The intent of the regulations in Chapter 38 of the Bozeman Municipal Code is to protect the public health, safety and general welfare. The subdivision has been reviewed by the DRC which has determined that it is in general compliance with the title with conditions and code provisions. Any other conditions deemed necessary to ensure compliance have been noted throughout this staff report. Condition of approval 1 requires full compliance with all applicable code requirements. All subdivisions must be reviewed against the criteria listed in 76-3-608.3.b-d, Mont Code Ann. and as a result, the Department of Community Development has reviewed this application against the listed criteria and further provides the following summary for submittal materials and requirements. All infrastructure will meet City standards and the improvements to the watercourses will not impact the current floodplains on the project site nor will they increase flood risk on the property or surrounding properties. Preliminary Plat Supplements A subdivision pre-application plan review was completed by the DRC on September 25, 2019. The DRC found that more information was needed prior to the application going forward to preliminary plat so revisions were submitted on February 5, 2020. Staff offers the following summary comments on the supplemental information required with Article 38.220.060, BMC. 38.220.060.A.1 Surface Water The property contains natural and artificial surface water systems as identified in the C-1 Site Grading Plan and Drainage Plan. The East Gallatin River has a FEMA defined and regulated 100-year floodplain and floodway. Artificial surface waters on-site include an artificial lined pond in the southwestern quadrant of the site, a detention pond north of the site, an on-site detention pond in the southwest corner of the site, and an existing drainage ditch along Boylan Road at the northeastern corner of the site. The drainage ditch runs continuously due to ground water discharge from a French drain groundwater collection system. The lined pond fills with groundwater and overflows west to the East Gallatin River. 38.220.060.A.2 Floodplains The East Gallatin River floodplain is located within the project area. There is a 100-year floodway that is unaffected by the project on the west side of the development. Any fill within the floodplain fringe will require a floodplain permit from the City of Bozeman. A minor amount of fill on the edge of the floodplain fringe and outside of the floodway is expected. None of this fill will be placed until the CLOMR-F and City floodplain permit are approved. 31 20351, Staff Report Bridger Meadows Major Subdivision Page 23 of 27 38.220.060.A.3 Groundwater Data collected from monitoring wells registered a minimum depth to groundwater of 3.6 feet and a maximum depth of 4.4 feet in 2015 and a minimum depth of 5.7 feet and a maximum depth of 7.1 feet in 2020. No special steps or procedures are needed to protect the groundwater from degradation. Much of the development will require soil fill to bring finished grade to an elevation suitable for cover soil above proposed gravity sewer mains. The additional fill material will further protect the groundwater. Condition of approval 7 restricts the use of basements and crawl spaces due to high groundwater. The geotechnical report is included in the application materials. 38.220.060.A.4 Geology, Soils and Slopes This subdivision will not significantly impact the geology, soils or slopes. The sediment in the area consists of various homogenous mixtures of boulders, cobbles, gravel, sand, clay and volcanic ash. There are no geological hazards located on the property. Two unusual or manmade features exist onsite are the mitigated constructed pond and a remnant Union Pacific railroad bed. Neither feature has any geological significant or presents any geological hazard that would prevent development of the property. The building sites’ parent soils provide suitable bearing support for foundations or concrete slab construction. The top soil and subsurface soil are unsuitable for support of foundations. 38.220.060.A.5 Vegetation The main vegetative communities found on the property consists of Paulstrine shrub broadleaf deciduous forest, wetlands, and a fallowed hay pasture grassland. The forested areas were dominated by sandbar willow, red-osier dogwood, woods rose, quaking aspen and Bebb’s willow, alder, and canary reed grass. Wetland areas of the subject site were characterized by plant communities. A large percentage of vegetated wetlands and riparian areas onsite are supported by saturated groundwater conditions rather than inundation of floodwaters. Noxious weeds exist onsite. A weed management plan was provided and a final noxious weed control is required with the final plat as outlined in code provision number 23. Best management practices will be installed prior to project initiation to ensure that stormwater runoff from the areas of ground disturbance will be contained and treated onsite during construction. Low impact development designs such as infiltration galleries and bioswales will be incorporated into the project’s final landscape design. These design features will help with water conservation and serve as a supplementary water source for newly planted and established vegetation. 38.220.060.A.6 Wildlife Wildlife habitat exists on the property. The applicant is proposing 7.15 acres of wetland refuge. The development has been designed to limit pet and human activity within the wildlife refuge. 32 20351, Staff Report Bridger Meadows Major Subdivision Page 24 of 27 Protective covenants will place restrictions, limitation, and regulations on all activities that may have any adverse effect on wildlife. See discussion above under primary review criteria. 38.220.060.A.7 Historical Features There are no known historical features located within the property. If any historic items are discovered during construction, the State Historic Preservation Office will be contacted. 38.220.060.A.8 Agriculture This subdivision will not significantly impact agriculture. See discussion above under primary review criteria. 38.220.060.A.9 Agricultural Water User Facilities This subdivision will not significantly impact agricultural water user facilities. See discussion above under primary review criteria. 38.220.060.A.10 Water and Sewer The subdivision will not significantly burden city water and sewer infrastructure with the recommended conditions of approval and code provisions. The water system will be a new looped connection from Boylan Road to the north through Shady Glen Lane and connect to the existing water main in the Links Condominiums. See discussion above under primary review criteria. 38.220.060.A.11 Stormwater Management The subdivision will not significantly impact stormwater infrastructure. The stormwater systems will be maintained by the Bridger Meadows HOA. See discussion above under primary review criteria. 38.220.060.A.12 Streets, Roads and Alleys The subdivision will not significantly impact the City’s street infrastructure. As stated above under primary review criteria, public access to the site will come from Birdie Drive through the Links Condominium development and a secondary emergency access easement from the south off Commercial Drive. A traffic impact study was not required by the City Engineering Division. See primary review criteria above for further information. 38.220.060.A.13 Utilities This subdivision will not significantly impact utilities. Standard 10-ft front utility easements will be provided across all lots. See discussion above under primary review criteria regarding extension of water and sewer. All private utilities are available in the area. 38.220.060.A.14 Educational Facilities A letter was sent to Todd Swinehart, P.E., Director of Facilities, Bozeman Public Schools. The proposed development will be in the Hawthorne Elementary School, Chief Joseph Middle School and Bozeman High School attendance areas. At this time, the schools can accommodate 33 20351, Staff Report Bridger Meadows Major Subdivision Page 25 of 27 the proposed development, however, the elementary schools are nearing capacity. The bus systems can accommodate the estimated number of additional students. 38.220.060.A.15 Land Use There are 16 residential lots proposed on the subject property and 3 areas of open space totaling 7.68 acres. 38.220.060.A.16 Parks and Recreation Facilities See discussion above under primary review criteria. 38.220.060.A.17 Neighborhood Center Plan Glen Lake Rotary Park and Story Mill Community Park serve as the Bridger Meadows neighborhood center as it is exempt from the requirement to create a new one since it is within one-half mile of an existing neighborhood center. In addition, the Bridger Meadows site is located 1.1 miles from the Rouse and Tamarack streamline bus route, within 100 yards of the businesses located within Commercial Drive and Bridger Center Drive, and within 1 miles of services located in the Cannery District. 38.220.060.A.18 Lighting Plan The project proposes residential night sky compliant lamp posts as part of each lot’s development. 38.220.060.A.19 Miscellaneous Public Lands: The proposed development is directly adjacent to Glen Lake Rotary Park and is approximately .16 miles from Story Mill Park, which also serves as the Bridger Meadows Neighborhood Center. The project will create a 7.15 acre (60.2% of the total site area) wildlife refuge. Hazards: No known health or safety hazards are on or near the proposed subdivisions Wildlands-Urban Interface: Not applicable 38.220.060.A.20 Affordable Housing The City’s Legal Division has advised that due to the state’s adoption of HB 259 related to inclusionary zoning, the City will not enforce the requirements for affordable housing cash in lieu as originally required during the preliminary plat and as reflected in the findings of fact. The affordable housing plan and plat notes related to affordable housing and cash in lieu have been removed from this application or will be eliminated prior to final plat. APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses: The intent of the R-1 residential low density district is to provide for primarily single-household residential development and related uses within the city at urban densities. These purposes are accomplished by: 1. Providing for a minimum lot size in developed areas consistent with the established development patterns while providing greater 34 20351, Staff Report Bridger Meadows Major Subdivision Page 26 of 27 flexibility for clustering lots and housing types in newly developed areas. 2. Providing for such community facilities and services as will serve the area's residents while respecting the residential character and quality of the area. Adopted Growth Policy Designation: The Future Land Use Map of the Bozeman Community Plan designates the subject property to develop as “Urban Neighborhood.” This category primarily includes urban density homes in a variety of types, shapes, sizes, and intensities. Large areas of any single type of housing are discouraged. In limited instances, an area may develop at a lower gross density due to site constraints and/or natural features such as floodplains or steep slopes. Complementary uses such as parks, home-based occupations, fire stations, churches, schools, and some neighborhood-serving commerce provide activity centers for community gathering and services. The Urban Neighborhood designation indicates that development is expected to occur within municipal boundaries. This may require annexation prior to development. Applying a zoning district to specific parcels sets the required and allowed density. Higher density residential areas are encouraged to be, but are not required or restricted to, proximity to commercial mixed use areas to facilitate the provision of services and employment opportunities without requiring the use of a car. APPENDIX B – NOTICING AND PUBLIC COMMENT Notice was provided at least 15 and not more than 45 days prior to the Planning Board and City Commission public hearings. BMC 38.220.420, Notice was provided by posting the site, mailing by certified mail to adjacent property owners and by first class mail to all other owners within 200 feet on June 6, 2021. The site was posted with a notice on June 6, 2021 and a legal advertisement was published in the Bozeman Daily Chronicle on June 6, June 20, and July 18, 2021. Content of the notice contained all elements required by Article 38.220., BMC. Public comment has been received in opposition of the projecft and can be found at the following link: https://weblink.bozeman.net/WebLink/Browse.aspx?id=237629&dbid=0&repo=BOZEMAN&cr =1 APPENDIX C – PROJECT BACKGROUND The subject property was annexed into the city in May 2018 with R-1 zoning. APPENDIX D - OWNER INFORMATION Owner/Applicant/Representative: Bridger Center LLC, 3701 Tracker Trail, Suite 1B #20, Bozeman, MT, 59718 Report By: Sarah Rosenberg, AICP, Associate Planner ATTACHMENTS The full application and file of record can be viewed digitally at https://www.bozeman.net/government/planning/using-the-planning-map, select the “Project 35 20351, Staff Report Bridger Meadows Major Subdivision Page 27 of 27 Documents Folder” link and navigate to application #20351, as well as digitally at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Application materials – Available through the Laserfiche archive linked agenda materials and the full file is linked below. https://weblink.bozeman.net/WebLink/Browse.aspx?startid=228055&cr=1 This project can be viewed on the Community Development Viewer interactive map directly with this link: https://gisweb.bozeman.net/Html5Viewer/?viewer=planning&FILE_NUMBER=20-351 36 Memorandum REPORT TO:Planning Board FROM:Sarah Rosenberg, Associate Planner Brian Krueger, Development Review Manager Martin Matsen, Director of Community Development SUBJECT:Bozeman Gateway Phase 4 Major Subdivision, Application 19436 MEETING DATE:June 21, 2021 AGENDA ITEM TYPE:Community Development - Quasi-Judicial RECOMMENDATION:Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 19436 and move to recommend approval of the subdivision with conditions and subject to all applicable code provisions. STRATEGIC PLAN:4.2 High Quality Urban Approach: Continue to support high-quality planning, ranging from building design to neighborhood layouts, while pursuing urban approaches to issues such as multimodal transportation, infill, density, connected trails and parks, and walkable neighborhoods. BACKGROUND:This report is based on the application materials submitted and any public comment received to date. The property owner and applicant submitted a preliminary plat application to create 6 lots, 1 common area, and 3 open space lots on 15.8 acres. Phase 4 is part of the Bozeman Gateway Planned Unit Development (PUD) Subdivision which consists of a 72-acre mixed use development. It is located directly south and west of the Huffine Lane/West College Street intersection, west of Fowler Avenue and north of West Garfield Street. Phase 1, 2, and 3 are currently being development in accordance with the PUD. Phase 4 is unplatted and currently sits vacant. Phase 4 is considered the Town Center of the Bozeman Gateway PUD with a “main street” that runs east-west through the middle of the development. It will continue the concept of open space corridors that was approved with the PUD and previous phases. A north-south open space corridor is located on the east side of development and totals 1.72 acres. Phase 4 will include a combination of residential and commercial. With the adoption of the PUD back in 2006, a stipulation was placed on the development that it had to contain a residential component within Phase 4. Phase 4 will include this residential component along with commercial uses. The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate. The Development Review Committee (DRC) deemed the 37 application adequate for continued review on May 11, 2021. Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny the subdivision application by August 5, 2021, unless there is a written extension from the developer, not to exceed one year. The Planning Board will review this application on Monday, June 21 and make a recommendation to the City Commission. No written public comment has been received. UNRESOLVED ISSUES:None ALTERNATIVES:NA FISCAL EFFECTS:NA Attachments: 19436 PB Staff Report.docx Report compiled on: June 16, 2021 38 Page 1 of 21 19436, Staff Report for the Bozeman Gateway Phase 4 Major Subdivision Public Hearing Date:Planning Board June 21, 2021 at 6:00 via WebEx. A WebEx link will be provided with the Planning Board agenda. City Commission, July 20, 2021 at 6:00 pm via WebEx. A WebEx link will be provided with the City Commission agenda. Project Description: Preliminary plat to create a 10 lot major subdivision that includes 6 developable lots, 1 common area, and 3 open space lots on 15.8 acres within the Bozeman Gateway PUD. The property is zoned B-2. Project Location:Remainder tracts of Tract 2A of the Amended Plat of West College, Minor Subdivision Number 195.A, Bozeman, Gallatin County, Montana Recommendation: The application conforms to standards and is sufficient for approval with conditions and code provisions. Planning Board Recommended Motion: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 19436 and move to recommend approval of the subdivision with conditions and subject to all applicable code provisions. Commission Recommend Motion: Having reviewed and considered the application materials, public comment, and all the information presented, I hereby adopt the findings presented in the staff report for application 19436 and move to approve the subdivision with conditions and subject to all applicable code provisions. Report Date: June 16, 2021 Staff Contact:Sarah Rosenberg, Associate Planner Karl Johnson, Project Engineer Agenda Item Type: Action (Quasi-judicial) EXECUTIVE SUMMARY Unresolved Issues There are no known unresolved issues. Project Summary This report is based on the application materials submitted and any public comment received to date. 39 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 2 of 21 The property owner and applicant submitted a preliminary plat application to create 6 lots, 1 common area, and 3 open space lots on 15.8 acres. Phase 4 is part of the Bozeman Gateway Planned Unit Development (PUD) Subdivision which consists of a 72-acre mixed use development. It is located directly south and west of the Huffine Lane/West College Street intersection, west of Fowler Avenue and north of West Garfield Street. Phase 1, 2, and 3 are currently being development in accordance with the PUD. Phase 4 is unplatted and currently sits vacant. Phase 4 is considered the Town Center of the Bozeman Gateway PUD with a “main street” that runs east-west through the middle of the development. It will continue the concept of open space corridors that was approved with the PUD and previous phases. A north-south open space corridor is located on the east side of development and totals 1.72 acres. Phase 4 will include a combination of residential and commercial. With the adoption of the PUD back in 2006, a stipulation was placed on the development that it had to contain a residential component within Phase 4. Phase 4 will include this residential component along with commercial uses. The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate. The Development Review Committee (DRC) deemed the application adequate for continued review on May 11, 2021. Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny the subdivision application by August 5, 2021, unless there is a written extension from the developer, not to exceed one year. The Planning Board will review this application on Monday, June 21 and make a recommendation to the City Commission. No written public comment has been received. Alternatives 1. Approve the application with the recommended conditions; 2. Approve the application with modifications to the recommended conditions; 3. Deny the application based on the Commission’s findings of non-compliance with the applicable criteria contained within the staff report; or 4. Open and continue the public hearing on the application, with specific direction to staff or the applicant to supply additional information or to address specific items. This alternative is requested if the Commission wishes to amend or add conditions of approval. 40 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 3 of 21 TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................ 1 Unresolved Issues............................................................................................................... 1 Project Summary................................................................................................................. 1 Alternatives......................................................................................................................... 2 SECTION 1 - MAP SERIES.......................................................................................................... 4 SECTION 2 – REQUESTED VARIANCES ................................................................................. 7 SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL............................................ 7 SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS...................... 10 SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS.......................................... 14 SECTION 6 - STAFF ANALYSIS AND FINDINGS................................................................. 14 Applicable Subdivision Review Criteria, Section 38.240.130.A.5.b, BMC..................... 14 Primary Subdivision Review Criteria, Section 76-3-608 ................................................. 16 Preliminary Plat Supplements........................................................................................... 17 APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY...................................... 20 APPENDIX B – NOTICING AND PUBLIC COMMENT ......................................................... 21 APPENDIX C – PROJECT BACKGROUND............................................................................. 21 APPENDIX D - OWNER INFORMATION................................................................................ 21 ATTACHMENTS......................................................................................................................... 21 41 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 4 of 21 SECTION 1 -MAP SERIES Figure 1. Zoning classification 42 Page 5 of 21 Figure 2. Preliminary Plat 43 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 6 of 21 Figure 3. Master Site Plan Phase 4 44 Page 7 of 21 SECTION 2 – REQUESTED VARIANCES There are no variances requested with this subdivision application. SECTION 3 - RECOMMENDED CONDITIONS OF APPROVAL Please note that these conditions are in addition to any required code provisions identified in this report. These conditions are specific to the preliminary plat application. Staff has considered the impacts as identified in the staff analysis and application materials and these conditions of approval are reasonably related and roughly proportionate to the development. 1.BMC 38.220.070. The applicant shall submit with the application for Final Plat review and approval, a written narrative stating how each of the conditions of preliminary plat approval and noted code provisions have been satisfactorily addressed. This narrative shall be in sufficient detail to direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal. 2.BMC 38.220.070.A.7. Simultaneously with filing of the final plat, in conjunction with required or offered dedications, the subdivider (or owner of the property being subdivided if the owner is not the subdivider) shall transfer ownership to the property owners’ association of any open space proposed to be conveyed to the property owners’ association and all its right, title, and interest in any improvements made to such parkland or open space. For the transfer of real property, the subdivider or owner of the property shall submit with the application for final plat a warranty deed or other instrument acceptable to the City Attorney transferring fee simple ownership to the property owners association and associated realty transfer certificate. The subdivider or owner of the property must record the deed or instrument at the time of recording of the final plat. For personal property installed upon open space owned by the property owners association, the subdivider shall provide an instrument acceptable to the City Attorney transferring all its rights, title and interest in such improvements including all applicable warranties to such improvements. 3.BMC 38.240.150.A.3. Deeds and Realty transfer certificates must be provided for transfer of any platted tract to the City or other entity in association with filing of the final plat. 4.BMC 38.410.060.A. The final plat must provide all necessary utility easements and they must be described, dimensioned and shown on each subdivision block of the final plat in their true and correct location. 5.BMC 38.220.320. In order to disclose to future purchasers their obligations regarding open space established in the municipal code the following language shall be included on the Conditions of Approval Sheet of the final plat: “As established by 38.220.320.A, 38.340.150.A.3.d, and other applicable elements of the municipal code, ownership of all common open space areas and trails, and responsibility of maintenance thereof and for city assessments levied on the common open space lands shall be that of the property owners’ association. Maintenance responsibility shall include, in addition to the common 45 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 8 of 21 open space and trails, all vegetative ground cover, and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and as adjacent to public parks or other common open space areas. All areas within the subdivision that are designated herein as common open space including trails are for the use and enjoyment by residents of the development and the general public. The property owners’ association shall be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all common open space areas and trails. At the same time of recording the final plat of the subdivision the subdivider shall transfer ownership of all common open space areas within each phase to the property owners’ association created by the subdivider to maintain all common open space areas within Bozeman Gateway subdivision. The City may release the Bozeman Gateway Property Owners’ Association from the obligation to maintain parks dedicated to the City at the City’s discretion.” 6.Codes, Covenants & Restrictions must be updated and submitted with initial final plat to be recorded after approval. 7.The final plat must contain the following notation on the conditions of approval sheet of the final plat: “The responsibility for the maintenance of the stormwater facilities and associated landscaping in the open space lots and street frontage landscaping for the perimeter streets must be that of the property owners’ association. Maintenance responsibility must include the functioning of the stormwater facilities, all vegetative ground cover, boulevard trees and irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets and any vegetative ground cover and landscaping on the open space lots. The property owners’ association must be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all perimeter street frontage landscaping and open space lots and stormwater facilities. The perimeter streets of this subdivision include Garfield Street, Harmon Stream Boulevard, and Technology Boulevard. 8.Simultaneously with filing of the final plat, in conjunction with required or offered dedications, the subdivider (or owner of the property being subdivided if the owner is not the subdivider) shall transfer ownership to the property owner’s association of all any open space proposed to be conveyed to the property owner’s association and all its right, title, and interest in any improvements made to such parkland or open space. For the transfer of real property, the subdivider or owner of the property shall submit with the application for final plat a warranty deed or other instrument acceptable to the City Attorney transferring fee simple ownership to the property owner’s association and associated realty transfer certificate. The subdivider or owner of the property must record the deed or instrument at the time of recording of the final plat. For personal property installed upon open space owned by the property owner’s association, the subdivider shall provide an instrument acceptable to the City Attorney transferring all its rights, title and interest in such improvements including all applicable warranties to such improvements. 46 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 9 of 21 9.A notice prepared by the City shall be filed concurrently with the final plat so that it will appear on title reports. It shall read substantially as follows: Lots within the Bozeman Gateway Subdivision Phase 4 are subject to specific design standards and unique building setbacks from property lines. These standards may be found in Bozeman Gateway Development Manual. Lot owners are advised that these are specific to the Bozeman Gateway Subdivision and are in place of the general development standards of the City of Bozeman Zoning. If a development standard is not specifically established in the Bozeman Gateway Subdivision approval documents the general standards of the City apply. Modification of the special standards would require an amendment to the Bozeman Gateway Planned Unit Development. Modifications are strongly discouraged. It is the obligation of the lot owner to be fully informed as to these standards before beginning any home or site design process. Approval by the design review entity established in the covenants of the development does not bind the City of Bozeman to approve a construction plan. 10.BMC 38.570.030. A Special Improvement Lighting District (SILD) must be created prior to Final Plat Approval. Note that Bozeman Gateway Site Z project will likely be creating a SILD, so adding these lights to that SILD will be acceptable. 11.BMC 38.400.080.Sidewalks must be installed along the north side of Garfield from the intersection of Harmon Stream Boulevard to the eastern boundary of this Phase prior to Final Plat approval. 12.BMC 38.410.130. Compliance with BMC 38.410.130 shall be met prior to Final Plat approval. The applicant must contact Griffin Nielsen with the City of Bozeman Engineering Department for any cash in lieu of water rights determination. 13.BMC 38.240.410.Technology Blvd West is a privately maintained street located within public ROW as referenced in the provided approved PUD documentation. Prior to Final Plat Approval, the certificate of dedication shall reflect private maintenance. 14.BMC 38.220.040.As presented, forty-five (45) feet of West Garfield Street ROW is to be dedicated along the southern frontage of the proposed subdivision (intersection of Fowler and West Garfield). The applicant must dedicate the West Garfield Street ROW in the Certificate of Dedication of prior to Final Plat Approval. The applicant is advised that the City of Bozeman will accept responsibility for the maintenance of West Garfield Street. 15.BMC 38.240.510. The applicant must add the required text as stated in BMC Section 38.240.510 to the Conditions of Approval Sheet 3 prior to Final Plat Approval. 16.BMC 38.220.070. The final plat must contain the following notation on the Conditions of Approval sheet: a. The responsibility of maintenance for the stormwater facilities, stormwater open space lots, pedestrian open space lots and street frontage landscaping for the perimeter streets must be that of the property owners’ association. Maintenance responsibility must include, all vegetative ground cover, boulevard trees and 47 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 10 of 21 irrigation systems in the public right-of-way boulevard strips along all external perimeter development streets. The property owners’ association must be responsible for levying annual assessments to provide for the maintenance, repair, and upkeep of all perimeter street frontage landscaping and stormwater facilities and all open space landscaping. b. All public stormwater facilities not on property dedicated to the City of Bozeman shall be located within public drainage easements that provide for storm water facility maintenance responsibility by the property owners association. c. A 1-foot no access strip shall be placed along all lots fronting on West Garfield Street d. Due to the known high groundwater conditions in the area no basements will be permitted with future development of the site. No crawl spaces will be permitted with future development of the site, unless a professional engineer registered in the State of Montana certifies that the lowest point of any proposed structure is located above the seasonal high groundwater level and provide supporting groundwater data prior to the release of building permit. In addition, sump pumps are not allowed to be connected to the sanitary sewer system. Sump pumps are also not allowed to be connected to the drainage system unless capacity is designed into the drainage system to accept the pumped water. Water from sump pumps may not be discharged onto streets, such as into the curb and gutters where they may create a safety hazard for pedestrians and vehicles. e. All downstream water user facilities will not be impacted by this Subdivision. f. All lots are subject to a 10-foot wide front yard utility easement. g. All Open Space and Public Access areas to be owned and maintained by the property owners association. h. If water rights or cash-in-lieu of water rights, have not been provided with Final Plat, then water rights or cash-in-lieu must be provided with any future site plan development or applicable development application. 17.BMC 38.420.030. Final payment for cash-in-lieu of parkland will be determined and paid at the time of final plat. A parkland table and CIL amount must be printed on the final plat. If final plat precedes site plan approval, CIL up to 8 du/ac is required prior to Final Plat at appraisal value at time of final plat. Balance of additional 4 du/ac due at subsequent site plan approval. 18.BMC 38.430.040. The Planned Unit Development Final Plan shall be completed and approved by the City of Bozeman before the approval of the final plat. SECTION 4 - CODE REQUIREMENTS REQUIRING PLAT CORRECTIONS The following are procedural requirements not yet demonstrated by the plat and must be satisfied at the final plat. 1. The final plat must conform to all requirements of the Bozeman Municipal Code and the Uniform Standards for Subdivision Plats (Uniform Standards for Certificates of Survey and Subdivision Plats (24.183.1104 ARM) and shall be accompanied by all required documents, including certification from the City Engineer that as-built drawings for public improvements 48 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 11 of 21 were received, a platting certificate, and all required and corrected certificates. The Final Plat application shall include three (3) signed reproducible copies on a 3 mil or heavier stable base polyester film (or equivalent). The Gallatin County Clerk & Recorder’s office has elected to continue the existing medium requirements of 2 mylars with a 1½” binding margin on one side for both plats and COS’s. The Clerk and Recorder will file the new Conditions of Approval sheet as the last same sized mylar sheet in the plat set. 2.BMC 38.100.080.A.The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as conditions of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or state law. 3.BMC 38.220.300 & 310. The Property Owners’ Association (POA) documents must be finalized and recorded with the final plat. The POA documents must include the requirements of Section 38.220.300 and 320. 4.BMC 38.270.030. The applicant must submit plans and specifications for water and sewer main extensions, streets, and storm water improvements, prepared and signed by a professional engineer (PE) registered in the State of Montana, which must be provided to and approved by the City Engineer. Water and sewer plans must also be approved by the Montana Department of Environmental Quality. The applicant must also provide professional engineering services for construction inspection, post-construction certification, and preparation of mylar record drawings. Construction shall not be initiated on the public infrastructure improvements until the plans and specifications have been approved and a preconstruction conference has been conducted. Building permits will not be issued prior to City acceptance of the site infrastructure improvements unless all provisions set forth in Section 38.270.030.C of the Bozeman Municipal Code are met to allow for concurrent construction. 5.BMC 38.410.060.A. The final plat must provide all necessary utility easements and they must be described, dimensioned and shown on each subdivision block of the final plat in their true and correct location. The recorded easement number must be documented on the final plat. a. The applicant is advised that all dedicated public easements must be recorded the City’s standard template easement documents separate from the plat and the recorded document number must be listed on the final plat. Easements will be deemed inadequate if they are not in a final draft format (signatures are not required for the draft review). Easements must be stamped by a licensed professional surveyor. In preparing signature blocks on any upcoming documents, please make the following changes: Jeff Mihelich, City Manager; Mike Maas, City Clerk. If a new member is established, the easement documents must be updated. 6.BMC 38.410.060. The applicant must provide a ten foot private utility easement (power, gas, communication, etc.) along the developments property frontage. The applicant may contact 49 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 12 of 21 the Engineering Department to receive a copy of a utility easement template. The easement must be recorded and provided to engineering prior to final plat approval. The recorded easement number must be written in on the final plat. 7.BMC 38.410.060. The applicant must provide public access easement for the proposed sidewalk system will reside along Tech Blvd West. The easement must be recorded and provided to engineering prior to Final Plat Approval. The recorded easement number must be written in on the final plat. a. As presented in easement note #7, the note reads as if the open space and sidewalks are for only those in the subdivision and not the general public. The applicant must either modify comment #7 or provide a public access easement for the sidewalk system. 8.BMC 38.410.060.C A public drainage easement shall be provided for all stormwater facilities conveying runoff from dedicated public ROW. The applicant may contact the Engineering Department to receive a copy of the drainage easement template. The easement must be recorded and provided to engineering prior to Final Plat Approval. The recorded easement number must be written in on the final plat 9.BMC 38.410.060.C. The applicant must provide a city standard thirty (30) foot wide Sewer and Water Pipeline and Access Easement and Agreement for public water and sewer utilities located outside of dedicated public right of way. The applicant may contact the Engineering Department to receive a copy of the easement template. The easement must be recorded and provided to engineering prior to Final Plat Approval. The recorded easement number must be written in on the final plat. 10.BMC 38.240.410.Technology Blvd West is a privately maintained street located within public ROW as referenced in the provided approved PUD documentation. Prior to Final Plat Approval, the certificate of dedication shall reflect private maintenance. 11.BMC 38.270.030,Completion of Improvements. If it is the developer’s intent to file the plat prior to the completion of all required improvements, an Improvements Agreement shall be entered into with the City of Bozeman guaranteeing the completion of all improvements in accordance with the preliminary plat submittal information and conditions of approval. If the final plat is filed prior to the installation of all improvements, the developer shall supply the City of Bozeman with an acceptable method of security equal to 150 percent of the cost of the remaining improvements. 12.BMC 38.240.450.The applicant is advised where public improvements are to be installed prior to Final Plat Approval, the final plat of subdivision must contain a certificate of completion of public improvements. Prior to Final Plat Approval, Sheet 1 certificates must list all completed and accepted improvements, if applicable. 13.BMC 38.240.530. The Certificate of Completion of water-related improvements is not shown on sheet 1 of the plat and must be shown, if applicable prior to Final Plat Approval. 50 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 13 of 21 14.BMC 38.240.530.When irrigation of public facilities are to be installed prior to final plat approval, the final plat of subdivision must contain a certificate of completion of water- related improvements. The certificate must list all completed and accepted improvements, including but not limited to all irrigation system record drawings. The subdivision proposes irrigation of public street frontage. This certificate must be provided on the final plat. 15.BMC 38.240.420. If there are liens or mortgages against the property, the appropriate Mortgagee certificate must be included. 16.BMC 38.240.The surveyor needs to provide their professional seal of surveyor prior to Final Plat Approval. 17.BMC 38.410.120.If mail delivery will not be to each individual lot within the development, the developer shall provide an off-street area for mail delivery within the development in cooperation with the USPS. It shall not be the responsibility of the City to maintain or plow any mail delivery area constructed within a City right-of-way. If cluster boxes are use a dedicated area to pull up and access the boxes must be provided. 18.BMC 38.420.030.D. Where a cash (or improvement) donation has been accepted in-lieu of land dedication, the amount must be stated on the final plat. 19.BMC 38.410.060. Utility easements shall be provided in accordance with the UDC. The required 10-foot front yard easement is required for all lots unless written confirmation is submitted with the preliminary plat from ALL utility companies providing service indicating that front yard easements are not needed. 20.BMC 38.220.320.Covenants. Covenants, restrictions, and articles of incorporation for the creation of a property owners’ association shall be submitted with the final plat application for review and approval by the Department of Community Development and shall contain, but not be limited to the following items: 1) the orientation and setbacks for corner lots, 2) all additional setbacks required when lots are adjacent to pathway corridors and minor arterial roads, 3) provisions for fences, 4) provisions for snow removal, maintenance and upkeep of all common areas, public and private parks, trails, storm water runoff facilities, 5) guidelines that outline architectural and landscape requirements for each individual lot and/or phase of the subdivision, including placement of boulevard trees at a regular spacing for each residential lot, 6) provisions that outline the renewal of an annual contract with a certified landscape nursery person for the upkeep and maintenance of all parklands, common open space, trails, etc., 7) landscape details for detention ponds, outlet structures, boulevard trees, parkland, irrigation, etc., 8) mitigation of groundwater with established floor elevations, 9) noxious weed control, and 10) assessment of existing and future Special Improvement Districts. These documents shall be submitted to the city attorney and shall not be accepted by the City until approved as to legal form and effect. A draft of these documents must be submitted for review and approval by the Community Development Department at least 30 working days prior to submitting a final plat application. These documents shall be executed and submitted with the initial final plat to be filed with the Gallatin County Clerk and Recorder at the time of final plat recordation. 51 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 14 of 21 SECTION 5 - RECOMMENDATIONS AND FUTURE ACTIONS The DRC determined that the application is adequate for continued review and found that application conforms to standards and is sufficient for approval with conditions and code provisions on May 11, 2021. Public hearing date for the Planning Board is on June 21, 2021 at 6:00pm. The hearing will be held via WebEx with a WebEx link provided with the Planning Board agenda. Public hearing date for the City Commission is July 20, 2021 at 6:00 PM. The hearing will be held via WebEx with a WebEx link provided with the City Commission Agenda. SECTION 6 - STAFF ANALYSIS AND FINDINGS Analysis and resulting recommendations are based on the entirety of the application materials, municipal codes, standards, and plans, public comment, and all other materials available during the review period. Collectively this information is the record of the review. The analysis is a summary of the completed review. Applicable Subdivision Review Criteria, Section 38.240.130.A.5.b, BMC. In considering applications for subdivision approval under this title, the advisory boards and City Commission shall consider the following: 1) Compliance with the survey requirements of Part 4 of the Montana Subdivision and Platting Act The preliminary plat has been prepared in accordance with the survey requirements of the Montana Subdivision and Platting Act by a Professional Engineer registered in the State of Montana. As outlined in code provision number 1, the final plat must comply with State statute, Administrative Rules of Montana, and the Bozeman Municipal Code. A conditions of approval sheet must be included and updated with the required notations can be added as required by conditions or code. 2) Compliance with the local subdivision regulations provided for in Part 5 of the Montana Subdivision and Platting Act The final plat must comply with the standards identified and referenced in the BMC. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed as a condition of approval, does not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman Municipal Code or State law. Sections 3 and 4 of this report identify conditions and code corrections necessary to meet all regulatory standards. Therefore, upon satisfaction of all conditions and code corrections the subdivision will comply with the local subdivision regulations. 52 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 15 of 21 3) Compliance with the local subdivision review procedures provided for in Part 6 of the Montana Subdivision and Platting Act The application was received on October 3, 2019 and was deemed inadequate for further review. Revised application materials were received on January 1, 2020, March 11, 2020, and April 7, 2021. The City deemed the application adequate for review on May 11, 2021. Public hearings are scheduled for June 21 and July 20, 2021. The hearings before the Planning Board and City Commission have been properly noticed as required by the Bozeman UDC. Based on the recommendation of the DRC and other applicable review agencies, as well as any public testimony received on the matter, the Planning Board must forward a recommendation in a report to the City Commission who will make the final decision on the applicant’s request. The final decision for a Major Subdivision Preliminary Plat with less than 50 lots must be made within 60 working days of the date it was deemed adequate. Pursuant to BMC 38.240.130 the city commission shall approve, conditionally approve or deny the subdivision application by August 5, 2021, unless there is a written extension from the developer, not to exceed one year. Public notice for this application was given as described in Appendix C and public comment has been received and is outlined below. On June 16, 2021 this major subdivision staff report was completed and forwarded with a recommendation of conditional approval for consideration to the Planning Board. 4) Compliance with Chapter 38, BMC and other relevant regulations Based on review of the Development Review Committee and the Department of Community Development all applicable regulations are met if all code requirements are satisfied. Pertinent code provisions and site specific requirements are included in this report for City Commission consideration in Sections 3 and 4. 5) The provision of easements to and within the subdivision for the location and installation of any necessary utilities The final plat will provide and depict all necessary utilities and required utility easements. Condition of approval 4 requires that all easements, existing and proposed, must be accurately depicted and addressed on the final plat and in the final plat application. Public utilities will be located within dedicated street right of ways. Code provision 5, 6, and 7 state that utility easements need to be provided and granted with the final plat in accordance with standards. 6) The provision of legal and physical access to each parcel within the subdivision and the notation of that access on the applicable plat and any instrument transferring the parcel Access to the property is from West Garfield Street to the south which is a City maintained road and Harmon Stream Boulevard to the west which is a privately maintained road. Technology Boulevard West is being extended from the east and required to be privately maintained per condition of approval number 13 and code provision number 10. 53 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 16 of 21 Primary Subdivision Review Criteria, Section 76-3-608 1) The effect on agriculture This item was waived by the DRC with the pre-application. 2) The effect on Agricultural water user facilities Agricultural water user facilities on site include canals, irrigation ditches, and streams that provide irrigation water to downstream users. The Farmer’s Canal, tributary to the Baxter Border stream, Section Line Ditch, and Upper Cattail Creek (Harmon Stream) all transport irrigation water through the property. No modifications to the existing agricultural water user facilities will be done with this phase and the ability of the facilities to deliver water to downstream users will be protected. 3) The effect on Local services Water/Sewer – Water and sewer systems exist to serve the subdivision. The subdivider proposes to extend water and sewer mains to the subdivision. Code provision 4 requires the applicant to submit plans for water and sewer main extensions, approved by the Montana Department of Environmental Quality, to be reviewed by the City. Code provision 9 requires a city standard sewer easement where the sewer system is located. Building permits will not be issued prior to city acceptance of site infrastructure improvements, unless concurrent construction is requested and conditions allow. Water rights exist for the subject property, the applicant proposes to transfer to City ownership existing water rights as outlined in condition number 12. Streets – The Growth Policy and subdivision standards require adequate connectivity of a development to the street grid. Access is taken from West Garfield to the south, Harmon Stream Boulevard to the west, and Technology Boulevard to the east. Diagonal parking is provided along Technology Boulevard. All internal streets will be privately maintained as outlined in condition of approval number 3 and code provision number 10. A traffic impact study was provided with the application and found that the infrastructure that exists and is proposed for the project will service the development. Police/Fire – The area of the subdivision is within the service area of both these departments. No concerns on service availability have been identified. Stormwater - The subdivision will construct storm water control facilities to conform to municipal code. Phase 4 lies within the scope of the previously approved drainage plan and will incorporate minor basins and low impact development for runoff. The responsibility of the stormwater facilities is the responsibility of the Property Owners Association (POA) as outlined in condition of approval 16. Inspection of installed facilities prior to final plat will verify that standards have been met. Parklands – Since phase 4 contains the residential component, parkland is required. Parkland will be provided through cash-in-lieu of a land dedication equating to 2.15 acres. Cash-in-lieu of parkland is required with the final plat as outlined in condition 17. 54 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 17 of 21 4) The effect on the Natural environment No significant negative impacts to the natural environment have been identified. There are no floodplains located within the subject property. A wetland delineation report was completed and determined that no waters are located within the project area. The site is in an area of high groundwater which may negatively impact future structures or cause illicit discharges into the sanitary sewer and over burden the surface drainage system. Condition 16d prohibits use of basements or crawl spaces unless a professional engineer certifies that the structure has been designed in such a way to accommodate seasonal high groundwater and requires addition of a notation of this restriction on the conditions of approval sheet. This requirement will protect both future structure owners from future hazards of flooding and lessen burden on the public from illicit discharges. BMC 38.550.070 requires use of wells or surface water rights to irrigate parks and open spaces rather than municipal water supply. The application will irrigate open space and boulevard strips landscaping with wells. 5) The effect on Wildlife and wildlife habitat No significant negative impacts to the wildlife and wildlife habitat have been identified. There are no known populations of large mammals or endangered species that occupy the site. 6) The effect on Public health and safety With the recommended conditions of approval and required plat corrections, the subdivision will not significantly impact public health and safety. The intent of the regulations in Chapter 38 of the Bozeman Municipal Code is to protect the public health, safety and general welfare. The subdivision has been reviewed by the DRC which has determined that it is in general compliance with the title with conditions and code provisions. Any other conditions deemed necessary to ensure compliance have been noted throughout this staff report. Condition of approval 1 requires full compliance with all applicable code requirements. All subdivisions must be reviewed against the criteria listed in 76-3-608.3.b-d, Mont Code Ann. and as a result, the Department of Community Development has reviewed this application against the listed criteria and further provides the following summary for submittal materials and requirements. All infrastructure will meet City standards and the improvements to the watercourses will not impact the current floodplains on the project site nor will they increase flood risk on the property or surrounding properties. Preliminary Plat Supplements A subdivision pre-application plan review was completed by the DRC on February 21, 2019. The DRC found that more information was needed prior to the application going forward to preliminary plat so revisions were submitted on April 22, 2019. Staff offers the following summary comments on the supplemental information required with Article 38.220.060, BMC. 55 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 18 of 21 38.220.060.A.1 Surface Water Phase 4 has been significantly disturbed due to surrounding commercial development. An unnamed drainage along the eastern side of the property once drained into the Farmer’s Canal which has since been rerouted and piped underground along the south boundary of the project. With the rerouting of the Farmer’s Canal, a steady source of water was no longer provided to the unnamed drainage and wetland feature. Therefore, the unnamed drainage has become a drainage swale which now only receives occasional stormwater runoff from surrounding parking areas and streets. Two culvert/bridge crossings will be installed with the project providing access across the unnamed drainage to parking facilities. The Drainage Plan calls for 30” concrete culverts or an equivalent capacity bride span to be installed at the crossings. 38.220.060.A.2 Floodplains There are no floodplains on the subject property. 38.220.060.A.3 Groundwater Groundwater depth was monitored and had depths that vary from 7-11’ below the ground surface. As a supplement to the original water table, a hydrograph from a nearby well has been submitted with the application. Elevating the roads slightly above the existing ground assist in providing separation to the groundwater. Condition of approval 16 restricts the use of basements and crawl spaces due to high groundwater. 38.220.060.A.4 Geology, Soils and Slopes This subdivision will not significantly impact the geology, soils or slopes. Alluvial deposits derived from the mountains south of Bozeman underlie the subdivision. There are no geological hazards or unusual features that limit the suitability of the land for the proposed uses. Two soil types exist on the site that are similar to those found throughout Bozeman. Limitations to development are primarily depth to groundwater, bearing capacity, frost heave potential, shrink-swell potential and flooding. To minimize erosion, the construction contract shall provide for seeing of slopes in cut and fill areas. Methods of erosion control and revegetation shall be in conformance to the Montana Department of Environmental Quality Montana Sediment and Erosion Control Manual. 38.220.060.A.5 Vegetation On site vegetation is limited to grasses, forbs and a few locations with low growing shrubs, such as wild roses, found along fence lines and near drainage courses. There are no critical plant communities on site. A weed management plan is included in the application. 56 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 19 of 21 38.220.060.A.6 Wildlife See discussion above under primary review criteria. 38.220.060.A.7 Historical Features There are no known historical features located within the property. A Cultural Evaluation was conducted in 2004 that stated that the Farmer’s Canal may be significant in terms of National Register criteria but the integrity of the entire canal system has been compromised over time. If any historic items are discovered during construction, the State Historic Preservation Office will be contacted. 38.220.060.A.8 Agriculture Materials waived. 38.220.060.A.9 Agricultural Water User Facilities This subdivision will not significantly impact agricultural water user facilities. See discussion above under primary review criteria. 38.220.060.A.10 Water and Sewer The subdivision will not significantly burden city water and sewer infrastructure with the recommended conditions of approval and code provisions. See discussion above under primary review criteria. 38.220.060.A.11 Stormwater Management The subdivision will not significantly impact stormwater infrastructure. The stormwater systems will be maintained by the Bozeman Gateway POA. See discussion above under primary review criteria. 38.220.060.A.12 Streets, Roads and Alleys The subdivision will not significantly impact the City’s street infrastructure. See primary review criteria above for further information. 38.220.060.A.13 Utilities This subdivision will not significantly impact utilities. Standard 10-ft utility easements will be provided across all lots. See discussion above under primary review criteria regarding extension of water and sewer. All private utilities are available in the area. 38.220.060.A.14 Educational Facilities A letter was sent to Todd Swinehart, P.E., Director of Facilities, Bozeman Public Schools. The assumption was made that the existing zoning designation and mixed-use development will not generate many students within the development. 38.220.060.A.15 Land Use Phase 4 is consistent with those allowed by B-2 zoning. Existing land uses bordering the east and north sides of the Bozeman Gateway property are commercial businesses. The properties 57 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 20 of 21 bordering the south are public lands owned by Montana State University and is agricultural use. The proposed uses will not adversely affect adjacent land uses in the area. Access to the existing public lands will not be affected by the development. All open space within the planned area will be open to the public and easily accessible. No hazards or nuisances will be created by the development. Safety issues related to construction activity will be effectively controlled by standards construction management practices. 38.220.060.A.16 Parks and Recreation Facilities See discussion above under primary review criteria. 38.220.060.A.17 Neighborhood Center Plan The open space lots along the eastern perimeter of Phase 4 connect to the existing trail and open space network to the north. This shared community space and trail system encourages gathering, relaxing and recreating. A bike/pedestrian trail and sidewalk connects to the properties on the north which then connect to the overall trail network of the development that continues eastward to MSU. 38.220.060.A.18 Lighting Plan The preliminary lighting plan is in accordance with the requirements of the UDC and Bozeman Gateway Development Manual. Light spacing on streets meets the requirements of the City of Bozeman Design Standards and Specifications Policy. 38.220.060.A.19 Miscellaneous Materials waived. 38.220.060.A.20 Affordable Housing Materials waived. APPENDIX A –PROJECT SITE ZONING AND GROWTH POLICY Zoning Designation and Land Uses:The intent of the B-2 community business district is to provide for a broad range of mutually supportive retail and service functions located in clustered areas bordered on one or more sides by limited access arterial streets. Multi-household dwellings, townhouses, and apartments are allowed as a secondary use due to their complementary nature and ability to enhance the walkability of these districts. Design standards emphasizing pedestrian oriented design are important elements of this district. Use of this zone is appropriate for arterial corridors, commercial nodes, and/or areas served by transit. Adopted Growth Policy Designation:The Future Land Use Map of the Bozeman Community Plan designates the subject property to develop as “Regional Commercial and Services.” Regionally significant developments in this land use category may be developed with physically large and economically prominent facilities requiring substantial infrastructure and location near significant transportation facilities. Due to the scale of these developments, location, and 58 19436 Staff Report for Bozeman Gateway Phase 4 Major Subdivision Page 21 of 21 transition between lower density uses is important. Residential space should be located above the first floor to maintain land availability for necessary services. Development within this category needs well-integrated utilities, transportation, and open space networks that encourage pedestrian activity and provide ready-access within and adjacent to development. Large community scale areas in this land use category are generally 75 acres or larger and are activity centers for several surrounding square miles. These are intended to service the overall community as well as adjacent neighborhoods and are typically distributed by a one-to two-mile separation. APPENDIX B – NOTICING AND PUBLIC COMMENT Notice was provided at least 15 and not more than 45 days prior to the Planning Board and City Commission public hearings. BMC 38.220.420, Notice was provided by posting the site, mailing by certified mail to adjacent property owners and by first class mail to all other owners within 200 feet on June 6, 2021. The site was posted with a notice on June 6, 2021 and a legal advertisement was published in the Bozeman Daily Chronicle on June 20 and July 18, 2021. Content of the notice contained all elements required by Article 38.220., BMC. No public comment has been received at the time of the writing of this staff report. APPENDIX C – PROJECT BACKGROUND Bozeman Gateway was created as a Planned Unit Development in 2006. There are five phases in total. Phases 1-3 have been subdivided and currently under development. APPENDIX D - OWNER INFORMATION Owner/Applicant: Mitchell Development & Investments, LLC, PO Box 738, Great Falls, MT 59403 Representative: Morrison-Maierle, Inc., PO Box 1113, Bozeman, MT 59718 Report By:Sarah Rosenberg, AICP, Associate Planner ATTACHMENTS The full application and file of record can be viewed digitally at https://www.bozeman.net/government/planning/using-the-planning-map, select the “Project Documents Folder” link and navigate to application #19436, as well as digitally at the Community Development Department at 20 E. Olive Street, Bozeman, MT 59715. Application materials – Available through the Laserfiche archive linked agenda materials and the full file is linked below. https://weblink.bozeman.net/WebLink/Browse.aspx?startid=210885&cr=1 This project can be viewed on the Community Development Viewer interactive map directly with this link: https://gisweb.bozeman.net/Html5Viewer/?viewer=planning&FILE_NUMBER=19-436 59 Memorandum REPORT TO:Planning Board FROM:Chris Saunders - Senior Planner SUBJECT:PCC Regional Housing Study Invi MEETING DATE:June 21, 2021 AGENDA ITEM TYPE:Administration RECOMMENDATION:Not an action item. STRATEGIC PLAN:1.2 Community Engagement: Broaden and deepen engagement of the community in city government, innovating methods for inviting input from the community and stakeholders. BACKGROUND:None UNRESOLVED ISSUES:None ALTERNATIVES:None FISCAL EFFECTS:None Attachments: PCC Regional Housing Study Invitation .docx Report compiled on: June 17, 2021 60 Please join the next Planning Coordination Council meeting Featuring the Gallatin County Regional Housing Needs Study Tuesday, August 3, 2021 3:30-5:00PM (meeting and presentation will be recorded for future viewing) ONLINE ONLY MEETING Public & planning board members register as ATTENDEES (PCC members & presenters register as PANELISTS) Event:Planning Coordination Committee (PCC) Type:Unlisted Event Event address for attendees: https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php?MTID=e0bb99 0fdaf16e193ff815bc0dcaa75d5 Event address for panelists: https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php?MTID=e35dac 0cf1ddd4361d42a406614e82ae2 Date and time:Tuesday, August 3, 2021 3:30 pm Mountain Daylight Time (Denver, GMT-06:00) Duration:1 hour 30 minutes Description: Event number:182 205 4562 Event password:RySRDM6Z73D Host key:414661 Panelist Info: Panelist password:PCC061421 Panelist numeric password: 547398 Video Address:1822054562@cityofbozeman.webex.com You can also dial 173.243.2.68 and enter your meeting number. Audio conference:Call-in toll number (US/Canada) 1-650-479-3208 Access code: 182 205 4562 Maximum number of registrants: 10000 61