HomeMy WebLinkAbout06-15-21 City Commission Meeting Agenda and Packet MaterialsA.Call to Order - 6:00 PM - WebEx Video Conference
B.Pledge of Allegiance and a Moment of Silence
C.Changes to the Agenda
D.Authorize Absence
D.1 Authorize the Absence of Deputy Mayor Cunningham (Maas)
E.FYI
F.Commission Disclosures
G.Consent
THE CITY COMMISSION OF BOZEMAN, MONTANA
REGULAR MEETING AGENDA
Tuesday, June 15, 2021
This meeting will be held using Webex, an online videoconferencing system. You can join this meeting:
Via Webex:
https://cityofbozeman.webex.com/cityofbozeman/onstage/g.php?
MTID=e6d59cf9a32cb275484a37c653adbf5a4
Click the Register link, enter the required information, and click submit.
Click Join Now to enter the meeting.
Via Phone: This is for listening only if you cannot watch the stream or channel 190
United States Toll
+1-650-479-3208
Access code: 182 861 5133
If you are interested in commenting in writing on items on the agenda please send an email to
agenda@bozeman.net prior to 12:00pm on the day of the meeting. You may also comment by visiting
the Commission's comment page.
You can also comment by joining the Webex meeting. If you do join the Webex meeting, we ask you
please be patient in helping us work through this online meeting.
If you are not able to join the Webex meeting and would like to provide oral comment you may send a
request to agenda@bozeman.net with your phone number, the item(s) you wish to comment on, and
the City Clerk will call you during the meeting to provide comment.
You may also send the above information via text to 406-224-3967. As always, the meeting will be
streamed through the Commission's video page and available in the City on cable channel 190.
1
G.1 Accounts Payable Claims Review and Approval (Stewart)
G.2 Approve the South Bozeman Technology District and Pole Yard Urban Renewal District Work
Plans and Budgets for Fiscal Year 2022 and Annual Reports for Fiscal Year 2021(Fine)
G.3 Authorize the City Manager to sign a Conditional Irrevocable Offer of Dedication with
Gallatin Mall Group, LLC for the Gallatin Valley Mall Redevelopment (20412)(Johnson)
G.4 Ratify the Signature of the City Manager on an Agreement for Professional Employment
Services with GOVTEMPSUSA, LLC.(Rosenberry)
G.5 Authorize the City Manager to Sign a Professional Services Agreement with Comcate for
Public Comment Software(McMahan)
G.6 Authorize the City Manager to Sign a Professional Services Agreement with Water Systems
Optimization, Inc. for the 2021 Water Distribution System Audit(Ahlstrom)
G.7 Resolution 5288 Update to the Policy and Fee Schedule for Facility Use and Programs for
Parks and Recreation(Overton)
H.Public Comment
This is the time to comment on any matter falling within the scope of the Bozeman City
Commission. There will also be time in conjunction with each agenda item for public comment
relating to that item but you may only speak once. Please note, the City Commission cannot take
action on any item which does not appear on the agenda. All persons addressing the City
Commission shall speak in a civil and courteous manner and members of the audience shall be
respectful of others. Please state your name and address in an audible tone of voice for the record
and limit your comments to three minutes.
I.Action Items
I.1 Downtown Business Improvement District Fiscal Year 2021 Annual Report and Fiscal Year
2022 Budget and Work Plan(Cope)
I.2 Downtown Urban Renewal District Fiscal Year 2021 Annual Report and Fiscal Year 2022
Budget and Work Plan(Cope)
I.3 Midtown Urban Renewal District Fiscal Year 2022 Work Plan and Budget and Fiscal Year
2021 Annual Report(Fine)
I.4 North Park Urban Renewal District Fiscal Year 2022 Work Plan and Budget and Fiscal Year
2021 Annual Report(Fine)
I.5 Northeast Urban Renewal District Fiscal Year 2022 Work Plan and Budget and Fiscal Year
2021 Annual Report(Fine)
I.6 Resolution 5289 Setting Cemetery Fees and Perpetual Care Fund Deposits (Donald)
I.7 FY22 City Manager Recommended Budget- Special Revenue Funds Presentation (Donald)
2
J.FYI / Discussion
K.Adjournment
City Commission meetings are open to all members of the public. If you have a disability that requires
assistance, please contact our ADA Coordinator, Mike Gray, at 582-3232 (TDD 582-2301).
Commission meetings are televised live on cable channel 190 and streamed live at www.bozeman.net.
City Commission meetings are re-aired on cable Channel 190 Wednesday night at 4 p.m., Thursday at
noon, Friday at 10 a.m. and Sunday at 2 p.m.
In order for the City Commission to receive all relevant public comment in time for this City
Commission meeting, please submit via www.bozeman.net or by emailing agenda@bozeman.net no
later than 12:00 PM on the day of the meeting. Public comment may be made in person at the
meeting as well.
3
Memorandum
REPORT TO:City Commission
FROM:Mike Maas, City Clerk
SUBJECT:Authorize the Absence of Deputy Mayor Cunningham
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Administration
RECOMMENDATION:I move to authorize the absence of Deputy Mayor Cunningham.
STRATEGIC PLAN:1.1 Outreach: Continue to strengthen and innovate in how we deliver
information to the community and our partners.
BACKGROUND:Deputy Mayor Cunningham notified the Mayor and City Manager of his
intended absence.
UNRESOLVED ISSUES:None
ALTERNATIVES:None
FISCAL EFFECTS:None
Report compiled on: June 3, 2021
4
Memorandum
REPORT TO:City Commission
FROM:Levi Stewart, Interim Accounting Technician
Kristin Donald, Finance Director
SUBJECT:Accounts Payable Claims Review and Approval
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Finance
RECOMMENDATION:The City Commission approves payment of the claims.
STRATEGIC PLAN:7.5. Funding and Delivery of City Services: Use equitable and sustainable
sources of funding for appropriate City services, and deliver them in a lean
and efficient manner.
BACKGROUND:Section 7-6-4301 MCA states that claims should not be paid by the City until
they have been first presented to the City Commission. Claims presented to
the City Commission have been reviewed by the Finance Department to
ensure that all proper supporting documentation has been submitted, all
required departmental authorized signatures are present indicating that the
goods or services have been received and that the expenditure is within
budget, and that the account coding is correct.
UNRESOLVED ISSUES:None
ALTERNATIVES:As suggested by the City Commission.
FISCAL EFFECTS:The total amount of the claims to be paid is presented at the bottom of the
Expenditure Approval List posted on the City’s website at
http://www.bozeman.net/government/finance/purchasing. Individual claims
in excess of $100,000: to be announced in weekly e-mail from Interim
Accounting Technician, Levi Stewart.
Report compiled on: June 3, 2021
5
Memorandum
REPORT TO:City Commission
FROM:David Fine, Urban Renewal Program Manager
Brit Fontenot, Economic Development Director
SUBJECT:Approve the South Bozeman Technology District and Pole Yard Urban
Renewal District Work Plans and Budgets for Fiscal Year 2022 and Annual
Reports for Fiscal Year 2021
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Finance
RECOMMENDATION:Approve the South Bozeman Technology District and Pole Yard Urban
Renewal District Work Plans and Budgets for Fiscal Year 2022
STRATEGIC PLAN:2.2 Infrastructure Investments: Strategically invest in infrastructure as a
mechanism to encourage economic development.
BACKGROUND:South Bozeman Technology District and the Pole Yard Urban Renewal
District have no projected revenue and Staff is recommending no
appropriations, work plans or budgets for these Districts.
The South Bozeman Technology District has seen no new taxable value since
its creation although there are significant proposed developments in the
pipeline. The Pole Yard Urban Renewal District was created in 2020 and we
have no projections for anticipated revenue since the base year.
UNRESOLVED ISSUES:None at this time.
ALTERNATIVES:As recommended by the City Commission.
FISCAL EFFECTS:Staff is recommending no appropriation for these Districts.
Report compiled on: June 3, 2021
6
Memorandum
REPORT TO:City Commission
FROM:Karl Johnson, Engineer I
Scott Shirley, Interim Public Works Director
SUBJECT:Authorize the City Manager to sign a Conditional Irrevocable Offer of
Dedication with Gallatin Mall Group, LLC for the Gallatin Valley Mall
Redevelopment (20412)
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Agreement - Property
RECOMMENDATION:Authorize the City Manager to sign a Conditional Irrevocable Offer of
Dedication with Gallatin Mall Group, LLC for the Gallatin Valley Mall
Redevelopment (20412).
STRATEGIC PLAN:4.3 Strategic Infrastructure Choices: Prioritize long-term investment and
maintenance for existing and new infrastructure.
BACKGROUND:Attached is a copy (original to City Clerk) of the partially executed
agreement. Engineering staff reviewed the document and found it to be
acceptable.
UNRESOLVED ISSUES:None
ALTERNATIVES:As suggested by the City Commission.
FISCAL EFFECTS:N/A
Attachments:
Conditional Irrevocable Offer of Dedication
Report compiled on: June 3, 2021
7
8
9
10
Memorandum
REPORT TO:City Commission
FROM:Anna Rosenberry, Assistant City Manager
SUBJECT:Ratify the Signature of the City Manager on an Agreement for Professional
Employment Services with GOVTEMPSUSA, LLC.
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Agreement - Vendor/Contract
RECOMMENDATION:Ratify City Manager's Signature on Agreement for Professional Employment
Services with GOVTEMPSUSA, LLC.
STRATEGIC PLAN:7.2 Employee Excellence: Recruit, retain and value a diverse, well-trained,
qualified and motivated team capable of delivering superior performance.
Be accountable and expect accountability from others. Make demonstrated
use of good judgement a part of the evaluation process for promotions.
BACKGROUND:The City's Public Works Director resigned effective April 9, 2021. We have
filled the position with an Interim Director to assist the department and
community while we undertake a nation-wide recruitment for a permanent
Public Works Director. The Interim Director is an employee of
GOVTEMPSUSA, LLC, an employment agency that provides executive-level
temporary employees for municipal governments around the country. The
agreement covers the six-month period of May 24, 2021 through November
24, 2021 and can be extended beyond that time period, by mutual
agreement of the parties.
UNRESOLVED ISSUES:None.
ALTERNATIVES:Alternative included operating without an Interim Public Works Director,
which is not recommended.
FISCAL EFFECTS:The total cost of the agreement is $107,280 and will be paid for from the
Public Works Administration budget.
Attachments:
GovTemps Contract signed.pdf
Report compiled on: May 28, 2021
11
12
13
14
15
16
17
18
19
20
21
22
23
Memorandum
REPORT TO:City Commission
FROM:Scott McMahan, Information Technology Director
SUBJECT:Authorize the City Manager to Sign a Professional Services Agreement with
Comcate for Public Comment Software
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Agreement - Vendor/Contract
RECOMMENDATION:Authorize the City Manager to Sign a Professional Services Agreement with
Comcate for Public Comment Software
STRATEGIC PLAN:1.2 Community Engagement: Broaden and deepen engagement of the
community in city government, innovating methods for inviting input from
the community and stakeholders.
BACKGROUND:The City is looking for a way to more efficiently take in, route, and respond
to public comments that come to the City. This software will allow us to
route incoming comments to the most qualified staff member for action or
response. It will also allow high level reporting on topics for City
Management.
UNRESOLVED ISSUES:None.
ALTERNATIVES:Keep using our current process which is primarily a manual process that is
not efficient.
FISCAL EFFECTS:There will be a one time up front fee of $13,800 to purchase the system and
implement the system with a $9,500 yearly renewal with a COLA increase of
5% each year.
Attachments:
Comcate Final Contract
Report compiled on: June 2, 2021
24
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 1 of 19
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT is made and entered into this _____ day of ____________, 2021
(“Effective Date”), by and between the CITY OF BOZEMAN, MONTANA,a self-governing
municipal corporation organized and existing under its Charter and the laws of the State of Montana,
121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT
59771, hereinafter referred to as “City,” and, Comcate Software, Inc, a California Corporation,
hereinafter referred to as “Contractor.” The City and Contractor may be referred to individually as
“Party” and collectively as “Parties.”
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree as follows:
1.Purpose: City agrees to enter this Agreement with Contractor to perform for City
services described in the Scope of Services attached hereto as Exhibit A and by this reference made
a part hereof.
2.Term/Effective Date: This Agreement is effective upon the Effective Date and be
subject to the “Term: Right of Cancellation” terms in Exhibit A. unless earlier terminated in
accordance with this Agreement.
3.Scope of Services: Contractor will perform the work and provide the services in
accordance with the requirements of the Scope of Services attached as exhibit A. For conflicts
between this Agreement and the Scope of Services, unless specifically provided otherwise, the
Agreement governs.
4.Payment: City agrees to pay Contractor the amount specified in the Scope of
Services. Any alteration or deviation from the described services that involves additional costs above
the Agreement amount will be performed by Contractor after written request by the City, and will
become an additional charge over and above the amount listed in the Scope of Services. The City
must agree in writing upon any additional charges.
5. Contractor’s Representations: To induce City to enter into this Agreement,
25
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 2 of 19
Contractor makes the following representations:
a.Contractor has familiarized itself with the nature and extent of this Agreement, the
Scope of Services, and with all local conditions and federal, state and local laws, ordinances, rules,
and regulations that in any manner may affect cost, progress or performance of the Scope of Services.
b.Contractor represents and warrants to City that it has the experience and ability to
perform the services required by this Agreement; that it will perform the services in a professional,
competent and timely manner and with diligence and skill; that it has the power to enter into and
perform this Agreement and grant the rights granted in it; and that its performance of this Agreement
shall not infringe upon or violate the rights of any third party, whether rights of copyright, trademark,
privacy, publicity, libel, slander or any other rights of any nature whatsoever, or violate any federal,
state and municipal laws. The City will not determine or exercise control as to general procedures or
formats necessary to have these services meet this warranty.
6.Independent Contractor Status/Labor Relations: The parties agree that Contractor
is an independent contractor for purposes of this Agreement and is not to be considered an employee
of the City for any purpose. Contractor is not subject to the terms and provisions of the City’s
personnel policies handbook and may not be considered a City employee for workers’ compensation
or any other purpose. Contractor is not authorized to represent the City or otherwise bind the City in
any dealings between Contractor and any third parties.
Contractor shall comply with the applicable requirements of the Workers’ Compensation Act,
Title 39, Chapter 71, Montana Code Annotated (MCA), and the Occupational Disease Act of
Montana, Title 39, Chapter 71, MCA. Contractor shall maintain workers’ compensation coverage for
all members and employees of Contractor’s business, except for those members who are exempted
by law.
Contractor shall furnish the City with copies showing one of the following: (1) a binder for
workers’ compensation coverage by an insurer licensed and authorized to provide workers’
compensation insurance in the State of Montana; or (2) proof of exemption from workers’
compensation granted by law for independent contractors.
In the event that, during the term of this Agreement, any labor problems or disputes of any
type arise or materialize which in turn cause any services to cease for any period of time, Contractor
specifically agrees to take immediate steps, at its own expense and without expectation of
reimbursement from City, to alleviate or resolve all such labor problems or disputes. The specific
steps Contractor shall take shall be left to the discretion of Contractor; provided, however, that
26
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 3 of 19
Contractor shall bear all costs of any related legal action. Contractor shall provide immediate relief
to the City so as to permit the services to continue at no additional cost to City.
Contractor shall indemnify, defend, and hold the City harmless from any and all claims,
demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in
connection with any labor problems or disputes or any delays or stoppages of work associated with
such problems or disputes.
7.Indemnity/Waiver of Claims/Insurance:
Contractor agrees to indemnify, hold harmless and defend City, City Commission and each
member thereof, and every officer, employee and agent of City, from any liability or financial loss
(including, without limitation, attorney fees and costs) arising from any intentional, reckless,
negligent or otherwise wrongful acts, errors or omissions of Contractor, its employees, agents,
representatives, and/or subcontractors in the performance of this Agreement.
Contractor agrees to indemnify, hold harmless and defend City, the City Commission and
each member thereof, every officer, employee and agent of City, from any liability or financial loss
(including, without limitation, attorneys’ fees and costs) arising from or related to any claim that use
of the Technology provided by Contractor infringes upon any copyright, trade secret, trademark,
patent or other proprietary or intellectual property right of any third party. Contractor shall defend
and send Contractor prompt notice of such claim of which it learns. In all events, City shall have the
right, but not the obligation, to participate at its own expense in the defense of any such suit or
proceeding through counsel of its own choosing.
For the professional services rendered, to the fullest extent permitted by law, Contractor
agrees to indemnify and hold the City harmless against claims, demands, suits, damages, losses, and
expenses, including reasonable defense attorney fees, to the extent caused by the negligence or
intentional misconduct of the Contractor or Contractor’s agents or employees.
Such obligationsshall not be construed to negate, abridge, or reduce other rights or obligations
of indemnity that would otherwise exist. The indemnification obligations of this Section must not be
construed to negate, abridge, or reduce any common-law or statutory rights of the City as
indemnitee(s) which would otherwise exist as to such indemnitee(s).
Contractor’s indemnity under this Section shall be without regard to and without any right to
contribution from any insurance maintained by City.
27
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 4 of 19
Should the City be required to bring an action against the Contractor to assert its right to
defense or indemnification under this Agreement or under the Contractor’s applicable insurance
policies required below, the City shall be entitled to recover reasonable costs and attorney fees
incurred in asserting its right to indemnification or defense but only if a court of competent
jurisdiction determines the Contractor was obligated to defend the claim(s) or was obligated to
indemnify the City for a claim(s) or any portion(s) thereof.
In the event of an action filed against the City resulting from the City’s performance under
this Agreement, the City may elect to represent itself and incur all costs and expenses of suit.
Contractor also waives any and all claims and recourse against the City, including the right of
contribution for loss or damage to person or property arising from, growing out of, or in any way
connected with or incident to the performance of this Agreement except “responsibility for [City’s]
own fraud, for willful injury to the person or property of another, or for violation of law, whether
willful or negligent” as per 28-2-702, MCA.
These obligations shall survive termination of this Agreement and the services performed
hereunder.
In addition to and independent from the above, Contractorshall at Contractor’s expense secure
insurance coverage through an insurance company or companies duly licensed and authorized to
conduct insurance business in Montana which insures the liabilities and obligations specifically
assumed by the Contractor in this Section. The insurance coverage shall not contain any exclusion
for liabilities specifically assumed by the Contractor in this Section.
The insurance shall cover and apply to all claims, demands, suits, damages, losses, and
expenses that may be asserted or claimed against, recovered from, or suffered by the City without
limit and without regard to the cause therefore and which is acceptable to the City. Contractor shall
furnish to the City an accompanying certificate of insurance and accompanying endorsements in
amounts not less than as follows:
Workers’ Compensation – statutory;
Employers’ Liability - $1,000,000 per occurrence; $2,000,000 annual aggregate;
Commercial General Liability - $1,000,000 per occurrence; $2,000,000 annual
aggregate;
Automobile Liability - $1,000,000 property damage/bodily injury per accident; and
Professional Liability - $1,000,000 per claim; $2,000,000 annual aggregate.
Cyber and Technical Errors and Omissions: $1,000,000 in the aggregate
28
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 5 of 19
The above amounts shall be exclusive of defense costs. The City shall be endorsed as an
additional or named insured on a primary non-contributory basis on the Commercial General,
Employer’s Liability, and Automobile Liability policies. The insurance and required endorsements
must be in a form suitable to City and shall include no less than a thirty (30) day notice of cancellation
or non-renewal. Contractor shall notify City within two (2) business days of Contractor’s receipt of
notice that any required insurance coverage will be terminated or Contractor’s decision to terminate
any required insurance coverage for any reason.
The City must approve all insurance coverage and endorsements prior to the Contractor
commencing work.
8.Termination for Contractor’s Fault:
a.If Contractor refuses or fails to timely do the work, or any part thereof, or fails
to perform any of its obligations under this Agreement, or otherwise breaches any terms or
conditions of this Agreement, the City may, by written notice, terminate this Agreement and
the Contractor’s right to proceed with all or any part of the work (“Termination Notice Due
to Contractor’s Fault”). The City may then take over the work and complete it, either with its
own resources or by re-letting the contract to any other third party.
b.In the event of a termination pursuant to this Section 8, Contractor shall be
entitled to payment only for those services Contractor actually rendered.
c.Any termination provided for by this Section 8 shall be in addition to any other
remedies to which the City may be entitled under the law or at equity.
d.In the event of termination under this Section 8, Contractor shall, under no
circumstances, be entitled to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature arising, or claimed to have arisen, as a result of the termination.
9.Termination for City’s Convenience:
a.Should conditions arise which, in the sole opinion and discretion of the City,
make it advisable to the City to cease performance under this Agreement, the City may
terminate this Agreement by written notice to Contractor (“Notice of Termination for City’s
Convenience”). The termination shall be effective in the manner specified in the Notice of
29
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 6 of 19
Termination for City’s Convenience and shall be without prejudice to any claims that the City
may otherwise have against Contractor.
b.Upon receipt of the Notice of Termination for City’s Convenience, unless
otherwise directed in the Notice, the Contractor shall immediately cease performance under
this Agreement and make every reasonable effort to refrain from continuing work, incurring
additional expenses or costs under this Agreement and shall immediately cancel all existing
orders or contracts upon terms satisfactory to the City. Contractor shall do only such work as
may be necessary to preserve, protect, and maintain work already completed or immediately
in progress.
c.In the event of a termination pursuant to this Section 9, Contractor is entitled
to payment only for those services Contractor actually rendered on or before the receipt of the
Notice of Termination for City’s Convenience.
d.The compensation described in Section 9(c) is the sole compensation due to
Contractor for its performance of this Agreement. Contractor shall, under no circumstances,
be entitled to claim or recover consequential, special, punitive, lost business opportunity, lost
productivity, field office overhead, general conditions costs, or lost profits damages of any
nature arising, or claimed to have arisen, as a result of the termination.
10.Limitation on Contractor’s Damages; Time for Asserting Claim:
a.In the event of a claim for damages by Contractor under this Agreement,
Contractor’s damages shall be limited to contract damages and Contractor hereby expressly
waives any right to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature or kind.
b.In the event Contractor wants to assert a claim for damages of any kind or
nature, Contractor shall provide City with written notice of its claim, the facts and
circumstances surrounding and giving rise to the claim, and the total amount of damages
sought by the claim, within thirty (30) days of the facts and circumstances giving rise to the
claim. In the event Contractor fails to provide such notice, Contractor shall waive all rights
to assert such claim.
30
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 7 of 19
11.Representatives and Notices:
a.City’s Representative: The City’s Representative for the purpose of this
Agreement shall be Scott McMahanor such other individual as City shall designate in writing.
Whenever approval or authorization from or communication or submission to City is required
by this Agreement, such communication or submission shall be directed to the City’s
Representative and approvals or authorizations shall be issued only by such Representative;
provided, however, that in exigent circumstances when City’s Representative is not available,
Contractor may direct its communication or submission to other designated City personnel or
agents as designated by the City in writing and may receive approvals or authorization from
such persons.
b.Contractor’s Representative: The Contractor’s Representative for the
purpose of this Agreement shall be David Richmond or such other individual as Contractor
shall designate in writing. Whenever direction to or communication with Contractor is
required by this Agreement, such direction or communication shall be directed to Contractor’s
Representative; provided, however, that in exigent circumstances when Contractor’s
Representative is not available, City may direct its direction or communication to other
designated Contractor personnel or agents.
c.Notices: All notices required by this Agreement shall be in writing and shall
be provided to the Representatives named in this Section. Notices shall be deemed given
when delivered, if delivered by courier to Party’s address shown above during normal business
hours of the recipient; or when sent, if sent by email or fax (with a successful transmission
report) to the email address or fax number provided by the Party’s Representative; or on the
fifth business day following mailing, if mailed by ordinary mail to the address shown above,
postage prepaid.
12.Permits: Contractor shall provide all notices, comply with all applicable laws,
ordinances, rules, and regulations, obtain all necessary permits, licenses, including a City of Bozeman
business license, and inspections from applicable governmental authorities, and pay all fees and
charges in connection therewith.
31
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 8 of 19
13 Laws and Regulations: Contractor shall comply fully with all applicable state and
federal laws, regulations, and municipal ordinances including, but not limited to, all workers’
compensation laws, all environmental laws including, but not limited to, the generation and disposal
of hazardous waste, the Occupational Safety and Health Act (OSHA), the safety rules, codes, and
provisions of the Montana Safety Act in Title 50, Chapter 71, MCA, all applicable City, County, and
State building and electrical codes, the Americans with Disabilities Act, and all non-discrimination,
affirmative action, and utilization of minority and small business statutes and regulations.
14.Nondiscrimination and Equal Pay: The Contractor agrees that all hiring by
Contractor of persons performing this Agreement shall be on the basis of merit and qualifications.
The Contractor will have a policy to provide equal employment opportunity in accordance with all
applicable state and federal anti-discrimination laws, regulations, and contracts. The Contractor will
not refuse employment to a person, bar a person from employment, or discriminate against a person
in compensation or in a term, condition, or privilege of employment because of race, color, religion,
creed, political ideas, sex, age, marital status, national origin, actual or perceived sexual orientation,
gender identity, physical or mental disability, except when the reasonable demands of the position
require an age, physical or mental disability, marital status or sex distinction. The Contractor shall
be subject to and comply with Title VI of the Civil Rights Act of 1964; Section 140, Title 2, United
States Code, and all regulations promulgated thereunder.
Contractor represents it is, and for the term of this Agreement will be, in compliance with the
requirements of the Equal Pay Act of 1963 and Section 39-3-104, MCA (the Montana Equal Pay Act).
Contractor must report to the City any violations of the Montana Equal Pay Act that Contractor has
been found guilty of within 60 days of such finding for violations occurring during the term of this
Agreement.
Contractor shall require these nondiscrimination terms of its subcontractors providing services
under this Agreement.
15.Intoxicants; DOT Drug and Alcohol Regulations/Safety and Training: Contractor
shall not permit or suffer the introduction or use of any intoxicants, including alcohol or illegal drugs,
by any employee or agent engaged in services to the City under this Agreement while on City property
or in the performance of any activities under this Agreement. Contractor acknowledges it is aware of
and shall comply with its responsibilities and obligations under the U.S. Department of Transportation
(DOT) regulations governing anti-drug and alcohol misuse prevention plans and related testing. City
shall have the right to request proof of such compliance and Contractor shall be obligated to furnish
such proof.
32
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 9 of 19
The Contractor shall be responsible for instructing and training the Contractor's employees
and agents in proper and specified work methods and procedures. The Contractor shall provide
continuous inspection and supervision of the work performed. The Contractor is responsible for
instructing its employees and agents in safe work practices.
16.Modification and Assignability: This Agreement may not be enlarged, modified or
altered except by written agreement signed by both parties hereto. The Contractor may not
subcontract or assign Contractor’s rights, including the right to compensation or duties arising
hereunder, without the prior written consent of the City. Any subcontractor or assignee will be bound
by all of the terms and conditions of this Agreement.
17. Reports/Accountability/Public Information: Contractor agrees to develop and/or
provide documentation as requested by the City demonstrating Contractor’s compliance with the
requirements of this Agreement. Contractor shall allow the City, its auditors, and other persons
authorized by the City to inspect and copy its books and records for the purpose of verifying that the
reimbursement of monies distributed to Contractor pursuant to this Agreement was used in
compliance with this Agreement and all applicable provisions of federal, state, and local law. The
Contractor shall not issue any statements, releases or information for public dissemination without
prior approval of the City.
18.Non-Waiver: A waiver by either party of any default or breach by the other party of
any terms or conditions of this Agreement does not limit the other party’s right to enforce such term
or conditions or to pursue any available legal or equitable rights in the event of any subsequent default
or breach.
19.Attorney’s Fees and Costs: In the event it becomes necessary for either Party to
retain an attorney to enforce any of the terms or conditions of this Agreement or to give any notice
required herein, then the prevailing Party or the Party giving notice shall be entitled to reasonable
attorney's fees and costs, including fees, salary, and costs of in-house counsel including the City
Attorney’s Office staff.
20.Taxes: Contractor is obligated to pay all taxes of any kind or nature and make all
appropriate employee withholdings.
21.Dispute Resolution:
a.Any claim, controversy, or dispute between the parties, their agents,
employees, or representatives shall be resolved first by negotiation between senior-level
33
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 10 of 19
personnel from each party duly authorized to execute settlement agreements. Upon mutual
agreement of the parties, the parties may invite an independent, disinterested mediator to assist
in the negotiated settlement discussions.
b.If the parties are unable to resolve the dispute within thirty (30) days from the
date the dispute was first raised, then such dispute may only be resolved in a court of
competent jurisdiction in compliance with the Applicable Law provisions of this Agreement.
22.Survival: Contractor’s indemnification shall survive the termination or expiration of
this Agreement for the maximum period allowed under applicable law.
23.Headings: The headings used in this Agreement are for convenience only and are not
be construed as a part of the Agreement or as a limitation on the scope of the particular paragraphs to
which they refer.
24.Severability: If any portion of this Agreement is held to be void or unenforceable, the
balance thereof shall continue in effect.
25.Applicable Law: The parties agree that this Agreement is governed in all respects by
the laws of the State of Montana.
26.Binding Effect: This Agreement is binding upon and inures to the benefit of the heirs,
legal representatives, successors, and assigns of the parties.
27.No Third-Party Beneficiary: This Agreement is for the exclusive benefit of the
parties, does not constitute a third-party beneficiary agreement, and may not be relied upon or
enforced by a third party.
28.Counterparts: This Agreement may be executed in counterparts, which together
constitute one instrument.
29.Integration: This Agreement and all Exhibits attached hereto constitute the entire
agreement of the parties. Covenants or representations not contained herein or made a part thereof
by reference, are not binding upon the parties. There are no understandings between the parties other
than as set forth in this Agreement. All communications, either verbal or written, made prior to the
date of this Agreement are hereby abrogated and withdrawn unless specifically made a part of this
Agreement by reference.
34
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 11 of 19
30.Consent to Electronic Signatures: The Parties have consented to execute this
Agreement electronically in conformance with the Montana Uniform Electronic Transactions Act,
Title 30, Chapter 18, Part 1, MCA.
31.Extensions:See Exhibit A.
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
IN WITNESS WHEREOF,the parties hereto have executed this Agreement the day and
year first above written or as recorded in an electronic signature.
CITY OF BOZEMAN, MONTANA ____________________________________
CONTRACTOR (Type Name Above)
By________________________________By__________________________________
Jeff Mihelich, City Manager
Print Name: David Richmond
Print Title: President
APPROVED AS TO FORM:
By_______________________________
Greg Sullivan, Bozeman City Attorney
35
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 12 of 19
Exhibit A
June 2, 21
City of Bozeman, MT
Re: Business Agreement to Implement Technology
Dear City of Bozeman,
At Comcate, we believe in empowering public agencies.
We do this by creating solutions that are simple to use, easy to implement, configurable, accessible,
and affordable. Our philosophy, which guides every action we take, centers on helping public agencies
solve problems through technology.
Comcate was founded in 2000 with the help of retired City managers and Silicon Valley technologists.
With close access to the customer base, our team developed software exclusively for public agencies.
We have signed over 300 agreements with public agencies and have over 20,000 public agency staff
users across 34 states. Comcate has implemented more web CRM software in public agencies than any
other software provider of which we are aware. With over 10,000 Code Enforcement, Permit, Animal
Control & Inspection Officers across 32 states, Comcate is the leading provider of Code Enforcement,
Animal Control, and Permit/Building Safety Inspection software in the nation.
Focus
Comcate is entirely focused on improving the efficiency and effectiveness of public agencies with
affordable and easy to use web-based software. We are motivated to meet the specific needs of each of
our clients. Our client base will testify to our dedication, motivation and initiative to accommodate
each of their individual needs.
This City of Bozeman staff and citizens will enjoy 24/7 access to a highly configurable web application
specialized to accept and process public comments.
No Hardware or Software to Install
Comcate hosts all data at a secure facility with robust network and power redundancies and round-
the-clock system monitoring. The Agency does not have to purchase any new hardware or software.
Customer Support
We are prepared to dedicate the full support of our staff into the configuration of the application and
the tailoring of its implementation. You will have a dedicated Project Manager assigned to your
implementation to guide you through each step of the process, with direct phone and email access and
full-time customer support.
Simple to Use, Easy to Implement
We are dedicated to understanding your Agency’s workflow, and count the number of steps needed to
complete an action and tirelessly work to minimize them. We constantly incorporate user feedback
into our applications. As a result, Comcate has been recognized by users for its intuitive and easy to
36
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 13 of 19
use design.
To accept the Agreement, please sign below. As soon as we receive the signed Agreement we will
schedule the implementation kick-off phone call.
We look forward to hearing from you and are available to answer any questions to help facilitate this
process.
Very truly yours,
David W. Richmond, President
APPROVED:
Name in Print: ____________________________________________________________ Title: _____________________________
Signature: ________________________________________________________________ Date: ______________________________
Name in Print: ___________________________________________________________ Title: ______________________________
Signature: ________________________________________________________________ Date: ______________________________
37
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 14 of 19
Major Tasks Sub Tasks
Pre-project Needs Assessment - Meet with Agency to clarify and confirm integrations,
customizations and phases of the project
Execute Agreement - Receive signed agreement
Initial Call and Identification of Project Lead
with the Agency
-Review implementation process
-Identify project team
-Schedule kick-off meeting
Kick-Off Meeting -Comcate introduction
-Review project scope and timeline
-Demo application to implementation team
-Prepare for needs assessments
Needs Assessment -Review staff workflow
-Propose implementation configuration
Public comments portal configurations -Identification of citizen submission workflow
-Staff assignments and SLAs
-Customization of email templates
-Configuration of volume and SLA reports
Trainings for Public Comments Staff Portal - Role based training: power submitter, case managers,
agency heads, agency manager
- Role based training for department staff
Soft Launch!-Go Live!
Follow up Training -Separate follow up training sessions
Project Wrap Up -Debriefing with project lead, Agency manager and other
appropriate participants
Implementation Timeline and milestones for deliverables Comcate’s standard implementation
program is flexible.
* We can complete the implementation and go live with basic implementation within a few weeks
after signing the contract.
38
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 15 of 19
Ongoing Support and Services
We view everyclient relationship as a long term partnership. During implementation you will be
introduced to several members of our experiencedand capable in-house customer support staff.
We maintain hours necessary to support our clients. Currently, our customer service technicians
operate during normal businesshours from 8am to 5:00pm PST Monday through Friday. Our team is
available during businesshours via email and phone and we are committed to responding to all client
issues within 4-6 hours.
Comcate is required to uphold the following performance standards and response times in the Service
Level Table in order to be considered in compliance with its contract:
Comcate shall make arrangements for the technology to be accessible by the
Agency’s staff and public users 99.8% of the time, not counting scheduled
maintenance for users of Comcate’s ASP service.
Service Level Table
Level Description Response Time Means of Contact
First Software System
Inoperable
Response within 3
hours
Telephone, email,
pager/mobile phone
Second Significant operating
issues but application still
operating
Response with 6 hours Telephone, e-mail
Third Application not
functioning as designed
but still operating
successfully
Response with 18
hours
Telephone, e-mail
Third Non-critical problems for
which a solution is
available
These issues will be
addressed as part of
the product
development cycle
Telephone, e-mail
Support includes the following:
1) Trouble-shooting at Comcate’s facilities
2) Establishment of an FAQ for customers
3) On-line help windows
Example of on-line help windowscan be provided upon request.
39
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 16 of 19
40
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 17 of 19
Training
Comcate’s training goal is to have staff users up and running on the applicationduring their initial
training session.
Comcate has developed its role-based training program by continuing to learnfrom our hundredsof
existing client implementations. Training sessionsare organized to be completed in less than an hour,
as longer sessions often result in attendees 'attention span waning. The session is organized like a
story: we start with an introduction about Comcate, the application and project background, then
discuss the reason for the implementation,any internal breakdowns that have been identified, and
concerns of management.
This provides an opportunity to highlight how our software addressedsimilar concerns at other
agencies. After this discussion, we have provided a brief product demonstration, which provides
background to move into the primary, usage-basedpart of the training.
We found the best result is to have peoplestart usingthe application as soonas possible. During this
period we have staff log-in,create and manage cases, assign tasks and, as appropriate,perform
activities that are appropriate for their role. We makethis fun and develop stories about requests that
are relevant and humorous to those attendingthe training.
We provide each attendeewith a personalizeduser summary (cheat sheet) which they can take back
to their desk. This includes all the information theyneed to access the application, get answers to
common questions and contact Comcate’s customersupport if necessary. After the training your
Project Manager will monitor and track the cases to ensure that all staff members feel comfortable
with the applicationand that the Agency is ready to go live.
Post-implementation training sessions are also included in our proposal. Wehave found these are
valuable by providing staff an opportunity to ask specific questions after they have had a chance to
work with the application.
Additional Training (in-person or web-based) can be accommodated at theAgency’s request.
41
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 18 of 19
Investment Summary
The year-one investmentin Comcate’s software is comprised of two components: 1)the one-time
Implementation Fee which includesinitial configurations, customizations and web-based training,
and 2) the Annual License Fee which includeson-going support, upgrades and hosting. Starting in
the second year, the AnnualLicense Fee will be adjusted by a COLA increase not to exceed 5% per
year.
Product
Implementation
Fee (One-Time)
Annual License
Fee
Total Year One
Investment
eFM Limited (for public comments)$2,000.00 $6,100.00 $8,100.00
Modern Mobile Citizen Submission Web
solution (CMA)Included Included $0.00
GIS Lite $300.00 $400.00 $700.00
Unlimited Users and Usage for eFM Limited $2,000.00 $3,000.00 $5,000.00
Total $13,800.00
w Unlimited users and usage for eFeedback Limited Edition for collectionand processing of public
comments
w Unlimited use of GIS Lite (Case Mapping)
w Mobile optimizedcitizensubmission web app
w Unlimited customer support
w Software enhancements and maintenance
w Full implementationsupport including project management, training and configurations
*Advanced CRM/311 features can be activatedat a later date with written approval from both
parties. Highlights include:
w Integration with Active Directory
w Integration with CityWorks
w Social Media integrationsand texting
w GIS Enterprisefunctionality
w Enterprise workflows bydepartment
42
Professional Services Agreement for Comcate Software, Inc.
FY 2020 – FY 2021
Page 19 of 19
Acknowledgments.
(a)The Agency expressly acknowledges that the Agencyis solely responsible for any use of the
Technology, and such use will be entirely at Agency’s own risk. Agency agrees that the
Technologyshall not be used for or in connection with any illegal purpose (includingbut not
limited to intellectual propertyinfringement, fraudor defamation).
(b)Comcate acknowledges thatit will “host” the Technologyand agrees that it will backup data
and take appropriatemeasures to protect and store Agency’s Data.
(c)Comcate acknowledges thatit shall maintain access rights to the Agency’s Data and shall
secure such data.
Comcate acknowledgesand agrees it will store all Agency’s data in the UnitedStates.
Term: Right of Cancellation.
The Initial Use Term of the Agreement shall commence on the Effective date hereof and continue for
365 days. Thereafter, unless Agency notifies Comcate in writing at least 30 days in advance of each
scheduled expiration datethat Agency elects not to renew, the Agreement shall automatically renew
for a period of 365 days with an annual 5% COLA.
43
Memorandum
REPORT TO:City Commission
FROM:Jessica Ahlstrom, Water Conservation Program Manager
Scott Shirley, Interim Director of Public Works
Anna Rosenberry, Assistant City Manager
SUBJECT:Authorize the City Manager to Sign a Professional Services Agreement with
Water Systems Optimization, Inc. for the 2021 Water Distribution System
Audit
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Agreement - Vendor/Contract
RECOMMENDATION:
Authorize the City Manager to Sign a Professional Services Agreement with
Water Systems Optimization, Inc. for the 2021 Water Distribution System
Audit.
STRATEGIC PLAN:6.1 Clean Water Supplies: Ensure adequate supplies of clean water for today
and tomorrow.
BACKGROUND:
In 2013, the City adopted an Integrated Water Resources Plan which states
that ‘water conservation and water-use efficiency should be the bedrock of
the City’s water resource management,’ and ultimately calls for 50% of the
projected gap between water supply and demand to be filled through
conservation. An important component of reaching this goal is identifying
opportunities to increase efficiencies within the City’s water distribution
system infrastructure.
The City’s water distribution system services approximately 14,000 metered
connections through 295 miles of water mains. The City currently
implements an ongoing leak detection and pipe replacement program, as
well as a meter upgrade program to improve system efficiencies. By
conducting a water distribution system audit and level one validation, the
City will identify real and apparent losses within the distribution system. The
results of the water distribution system audit will guide the continued
development of the City’s water loss control program by identifying
opportunities to reduce real losses, optimize revenue recovery, and promote
equity among rate payers.
44
Water Systems Optimization, Inc. (WSO), was selected to provide
professional services for this project pursuant to formal procurement action
under Sec. 18-8-204 Montana Code Annotated. The professional services
agreement was negotiated in terms of scope of fee.
The water distribution system audit will utilize a data driven approach to
assess previous water loss management practices, identify the amount of
overall losses within the water distribution system, and make
recommendations to mitigate system water loss. This will be accomplished
by using the standard American Water Works Association (AWWA) Water
Audit Software as well as methods contained in the AWWA M36 manual on
Water Audits and Loss Control Programs. In addition to performing the audit
and data validation, WSO will provide information on audit procedures and
guidance to aid in developing an annual water loss audit program for the
City.
UNRESOLVED ISSUES:None.
ALTERNATIVES:As suggested by the Commission.
FISCAL EFFECTS:Total costs for this project are not to exceed $26,490.00 and will be paid for
out of the Water Conservation Division professional services fund.
Attachments:
PSA_Water Systems Optimization_Water Distribution System
Audit.pdf
Attachment A_Scope of Services_Water Systems
Optimization_Water Distribution System Audit.pdf
Report compiled on: June 3, 2021
45
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 1 of 11
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT is made and entered into this _____ day of ____________, 2021
(“Effective Date”), by and between the CITY OF BOZEMAN, MONTANA, a self-governing
municipal corporation organized and existing under its Charter and the laws of the State of Montana,
121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT
59771, hereinafter referred to as “City,” and, Water Systems Optimization Inc., 1330 26th Avenue,
San Francisco, CA, 94122 hereinafter referred to as “Contractor.” The City and Contractor may be
referred to individually as “Party” and collectively as “Parties.”
In consideration of the mutual covenants and agreements herein contained, the receipt and
sufficiency whereof being hereby acknowledged, the parties hereto agree as follows:
1. Purpose: City agrees to enter this Agreement with Contractor to perform for City
services described in the Scope of Services attached hereto as Exhibit A and by this reference made
a part hereof.
2. Term/Effective Date: This Agreement is effective upon the Effective Date and will
expire on the 15th day of June 2022, unless earlier terminated in accordance with this Agreement.
3. Scope of Services: Contractor will perform the work and provide the services in
accordance with the requirements of the Scope of Services. For conflicts between this Agreement
and the Scope of Services, unless specifically provided otherwise, the Agreement governs.
4. Payment: City agrees to pay Contractor the amount specified in the Scope of
Services. Any alteration or deviation from the described services that involves additional costs above
the Agreement amount will be performed by Contractor after written request by the City, and will
become an additional charge over and above the amount listed in the Scope of Services. The City
must agree in writing upon any additional charges.
5. Contractor’s Representations: To induce City to enter into this Agreement,
Contractor makes the following representations:
a. Contractor has familiarized itself with the nature and extent of this Agreement, the
46
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 2 of 11
Scope of Services, and with all local conditions and federal, state and local laws, ordinances, rules,
and regulations that in any manner may affect cost, progress or performance of the Scope of Services.
b. Contractor represents and warrants to City that it has the experience and ability to
perform the services required by this Agreement; that it will perform the services in a professional,
competent and timely manner and with diligence and skill; that it has the power to enter into and
perform this Agreement and grant the rights granted in it; and that its performance of this Agreement
shall not infringe upon or violate the rights of any third party, whether rights of copyright, trademark,
privacy, publicity, libel, slander or any other rights of any nature whatsoever, or violate any federal,
state and municipal laws. The City will not determine or exercise control as to general procedures or
formats necessary to have these services meet this warranty.
6. Independent Contractor Status/Labor Relations: The parties agree that Contractor
is an independent contractor for purposes of this Agreement and is not to be considered an employee
of the City for any purpose. Contractor is not subject to the terms and provisions of the City’s
personnel policies handbook and may not be considered a City employee for workers’ compensation
or any other purpose. Contractor is not authorized to represent the City or otherwise bind the City in
any dealings between Contractor and any third parties.
Contractor shall comply with the applicable requirements of the Workers’ Compensation Act,
Title 39, Chapter 71, Montana Code Annotated (MCA), and the Occupational Disease Act of
Montana, Title 39, Chapter 71, MCA. Contractor shall maintain workers’ compensation coverage for
all members and employees of Contractor’s business, except for those members who are exempted
by law.
Contractor shall furnish the City with copies showing one of the following: (1) a binder for
workers’ compensation coverage by an insurer licensed and authorized to provide workers’
compensation insurance in the State of Montana; or (2) proof of exemption from workers’
compensation granted by law for independent contractors.
In the event that, during the term of this Agreement, any labor problems or disputes of any
type arise or materialize which in turn cause any services to cease for any period of time, Contractor
specifically agrees to take immediate steps, at its own expense and without expectation of
reimbursement from City, to alleviate or resolve all such labor problems or disputes. The specific
steps Contractor shall take shall be left to the discretion of Contractor; provided, however, that
Contractor shall bear all costs of any related legal action. Contractor shall provide immediate relief
to the City so as to permit the services to continue at no additional cost to City.
47
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 3 of 11
Contractor shall indemnify, defend, and hold the City harmless from any and all claims,
demands, costs, expenses, damages, and liabilities arising out of, resulting from, or occurring in
connection with any labor problems or disputes or any delays or stoppages of work associated with
such problems or disputes.
7. Indemnity/Waiver of Claims/Insurance: For other than professional services
rendered, to the fullest extent permitted by law, Contractor agrees to release, defend, indemnify, and
hold harmless the City, its agents, representatives, employees, and officers (collectively referred to
for purposes of this Section as the City) from and against any and all claims, demands, actions, fees
and costs (including attorney’s fees and the costs and fees of expert witness and consultants), losses,
expenses, liabilities (including liability where activity is inherently or intrinsically dangerous) or
damages of whatever kind or nature connected therewith and without limit and without regard to the
cause or causes thereof or the negligence of any party or parties that may be asserted against,
recovered from or suffered by the City occasioned by, growing or arising out of or resulting from or
in any way related to: (i) the negligent, reckless, or intentional misconduct of the Contractor; or (ii)
any negligent, reckless, or intentional misconduct of any of the Contractor’s agents.
For the professional services rendered, to the fullest extent permitted by law, Contractor
agrees to indemnify and hold the City harmless against claims, demands, suits, damages, losses, and
expenses, including reasonable defense attorney fees, to the extent caused by the negligence or
intentional misconduct of the Contractor or Contractor’s agents or employees.
Such obligations shall not be construed to negate, abridge, or reduce other rights or obligations
of indemnity that would otherwise exist. The indemnification obligations of this Section must not be
construed to negate, abridge, or reduce any common-law or statutory rights of the City as
indemnitee(s) which would otherwise exist as to such indemnitee(s).
Contractor’s indemnity under this Section shall be without regard to and without any right to
contribution from any insurance maintained by City.
Should the City be required to bring an action against the Contractor to assert its right to
defense or indemnification under this Agreement or under the Contractor’s applicable insurance
policies required below, the City shall be entitled to recover reasonable costs and attorney fees
incurred in asserting its right to indemnification or defense but only if a court of competent
jurisdiction determines the Contractor was obligated to defend the claim(s) or was obligated to
indemnify the City for a claim(s) or any portion(s) thereof.
In the event of an action filed against the City resulting from the City’s performance under
48
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 4 of 11
this Agreement, the City may elect to represent itself and incur all costs and expenses of suit.
Contractor also waives any and all claims and recourse against the City, including the right of
contribution for loss or damage to person or property arising from, growing out of, or in any way
connected with or incident to the performance of this Agreement except “responsibility for [City’s]
own fraud, for willful injury to the person or property of another, or for violation of law, whether
willful or negligent” as per 28-2-702, MCA.
These obligations shall survive termination of this Agreement and the services performed
hereunder.
In addition to and independent from the above, Contractor shall at Contractor’s expense secure
insurance coverage through an insurance company or companies duly licensed and authorized to
conduct insurance business in Montana which insures the liabilities and obligations specifically
assumed by the Contractor in this Section. The insurance coverage shall not contain any exclusion
for liabilities specifically assumed by the Contractor in this Section.
The insurance shall cover and apply to all claims, demands, suits, damages, losses, and
expenses that may be asserted or claimed against, recovered from, or suffered by the City without
limit and without regard to the cause therefore and which is acceptable to the City. Contractor shall
furnish to the City an accompanying certificate of insurance and accompanying endorsements in
amounts not less than as follows:
Workers’ Compensation – statutory;
Employers’ Liability - $1,000,000 per occurrence; $2,000,000 annual aggregate;
Commercial General Liability - $1,000,000 per occurrence; $2,000,000 annual
aggregate;
Automobile Liability - $1,000,000 property damage/bodily injury per accident; and
Professional Liability - $1,000,000 per claim; $2,000,000 annual aggregate.
The above amounts shall be exclusive of defense costs. The City shall be endorsed as an
additional or named insured on a primary non-contributory basis on both the Commercial General
and Automobile Liability policies. The insurance and required endorsements must be in a form
suitable to City and shall include no less than a thirty (30) day notice of cancellation or non-renewal.
Contractor shall notify City within two (2) business days of Contractor’s receipt of notice that any
required insurance coverage will be terminated or Contractor’s decision to terminate any required
insurance coverage for any reason.
49
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 5 of 11
The City must approve all insurance coverage and endorsements prior to the Contractor
commencing work.
8. Termination for Contractor’s Fault:
a. If Contractor refuses or fails to timely do the work, or any part thereof, or fails
to perform any of its obligations under this Agreement, or otherwise breaches any terms or
conditions of this Agreement, the City may, by written notice, terminate this Agreement and
the Contractor’s right to proceed with all or any part of the work (“Termination Notice Due
to Contractor’s Fault”). The City may then take over the work and complete it, either with its
own resources or by re-letting the contract to any other third party.
b. In the event of a termination pursuant to this Section 8, Contractor shall be
entitled to payment only for those services Contractor actually rendered.
c. Any termination provided for by this Section 8 shall be in addition to any other
remedies to which the City may be entitled under the law or at equity.
d. In the event of termination under this Section 8, Contractor shall, under no
circumstances, be entitled to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature arising, or claimed to have arisen, as a result of the termination.
9. Termination for City’s Convenience:
a. Should conditions arise which, in the sole opinion and discretion of the City,
make it advisable to the City to cease performance under this Agreement, the City may
terminate this Agreement by written notice to Contractor (“Notice of Termination for City’s
Convenience”). The termination shall be effective in the manner specified in the Notice of
Termination for City’s Convenience and shall be without prejudice to any claims that the City
may otherwise have against Contractor.
b. Upon receipt of the Notice of Termination for City’s Convenience, unless
otherwise directed in the Notice, the Contractor shall immediately cease performance under
this Agreement and make every reasonable effort to refrain from continuing work, incurring
additional expenses or costs under this Agreement and shall immediately cancel all existing
orders or contracts upon terms satisfactory to the City. Contractor shall do only such work as
may be necessary to preserve, protect, and maintain work already completed or immediately
50
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 6 of 11
in progress.
c. In the event of a termination pursuant to this Section 9, Contractor is entitled
to payment only for those services Contractor actually rendered on or before the receipt of the
Notice of Termination for City’s Convenience.
d. The compensation described in Section 9(c) is the sole compensation due to
Contractor for its performance of this Agreement. Contractor shall, under no circumstances,
be entitled to claim or recover consequential, special, punitive, lost business opportunity, lost
productivity, field office overhead, general conditions costs, or lost profits damages of any
nature arising, or claimed to have arisen, as a result of the termination.
10. Limitation on Contractor’s Damages; Time for Asserting Claim:
a. In the event of a claim for damages by Contractor under this Agreement,
Contractor’s damages shall be limited to contract damages and Contractor hereby expressly
waives any right to claim or recover consequential, special, punitive, lost business
opportunity, lost productivity, field office overhead, general conditions costs, or lost profits
damages of any nature or kind.
b. In the event Contractor wants to assert a claim for damages of any kind or
nature, Contractor shall provide City with written notice of its claim, the facts and
circumstances surrounding and giving rise to the claim, and the total amount of damages
sought by the claim, within thirty (30) days of the facts and circumstances giving rise to the
claim. In the event Contractor fails to provide such notice, Contractor shall waive all rights
to assert such claim.
11. Representatives and Notices:
a. City’s Representative: The City’s Representative for the purpose of this
Agreement shall be Jessica Ahlstrom, Water Conservation Program Manager, or such other
individual as City shall designate in writing. Whenever approval or authorization from or
communication or submission to City is required by this Agreement, such communication or
submission shall be directed to the City’s Representative and approvals or authorizations shall
be issued only by such Representative; provided, however, that in exigent circumstances when
City’s Representative is not available, Contractor may direct its communication or submission
to other designated City personnel or agents as designated by the City in writing and may
receive approvals or authorization from such persons.
51
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 7 of 11
b. Contractor’s Representative: The Contractor’s Representative for the
purpose of this Agreement shall be Kate Gasner, Vice President, or such other individual as
Contractor shall designate in writing. Whenever direction to or communication with
Contractor is required by this Agreement, such direction or communication shall be directed
to Contractor’s Representative; provided, however, that in exigent circumstances when
Contractor’s Representative is not available, City may direct its direction or communication
to other designated Contractor personnel or agents.
c. Notices: All notices required by this Agreement shall be in writing and
shall be provided to the Representatives named in this Section. Notices shall be deemed given
when delivered, if delivered by courier to Party’s address shown above during normal business
hours of the recipient; or when sent, if sent by email or fax (with a successful transmission
report) to the email address or fax number provided by the Party’s Representative; or on the
fifth business day following mailing, if mailed by ordinary mail to the address shown above,
postage prepaid.
12. Permits: Contractor shall provide all notices, comply with all applicable laws,
ordinances, rules, and regulations, obtain all necessary permits, licenses, including a City of Bozeman
business license, and inspections from applicable governmental authorities, and pay all fees and
charges in connection therewith.
13 Laws and Regulations: Contractor shall comply fully with all applicable state and
federal laws, regulations, and municipal ordinances including, but not limited to, all workers’
compensation laws, all environmental laws including, but not limited to, the generation and disposal
of hazardous waste, the Occupational Safety and Health Act (OSHA), the safety rules, codes, and
provisions of the Montana Safety Act in Title 50, Chapter 71, MCA, all applicable City, County, and
State building and electrical codes, the Americans with Disabilities Act, and all non-discrimination,
affirmative action, and utilization of minority and small business statutes and regulations.
14. Nondiscrimination and Equal Pay: The Contractor agrees that all hiring by
Contractor of persons performing this Agreement shall be on the basis of merit and qualifications.
The Contractor will have a policy to provide equal employment opportunity in accordance with all
applicable state and federal anti-discrimination laws, regulations, and contracts. The Contractor will
not refuse employment to a person, bar a person from employment, or discriminate against a person
in compensation or in a term, condition, or privilege of employment because of race, color, religion,
creed, political ideas, sex, age, marital status, national origin, actual or perceived sexual orientation,
gender identity, physical or mental disability, except when the reasonable demands of the position
52
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 8 of 11
require an age, physical or mental disability, marital status or sex distinction. The Contractor shall
be subject to and comply with Title VI of the Civil Rights Act of 1964; Section 140, Title 2, United
States Code, and all regulations promulgated thereunder.
Contractor represents it is, and for the term of this Agreement will be, in compliance with the
requirements of the Equal Pay Act of 1963 and Section 39-3-104, MCA (the Montana Equal Pay Act).
Contractor must report to the City any violations of the Montana Equal Pay Act that Contractor has
been found guilty of within 60 days of such finding for violations occurring during the term of this
Agreement.
Contractor shall require these nondiscrimination terms of its subcontractors providing services
under this Agreement.
15. Intoxicants; DOT Drug and Alcohol Regulations/Safety and Training: Contractor
shall not permit or suffer the introduction or use of any intoxicants, including alcohol or illegal drugs,
by any employee or agent engaged in services to the City under this Agreement while on City property
or in the performance of any activities under this Agreement. Contractor acknowledges it is aware of
and shall comply with its responsibilities and obligations under the U.S. Department of Transportation
(DOT) regulations governing anti-drug and alcohol misuse prevention plans and related testing. City
shall have the right to request proof of such compliance and Contractor shall be obligated to furnish
such proof.
The Contractor shall be responsible for instructing and training the Contractor's employees
and agents in proper and specified work methods and procedures. The Contractor shall provide
continuous inspection and supervision of the work performed. The Contractor is responsible for
instructing its employees and agents in safe work practices.
16. Modification and Assignability: This Agreement may not be enlarged, modified or
altered except by written agreement signed by both parties hereto. The Contractor may not
subcontract or assign Contractor’s rights, including the right to compensation or duties arising
hereunder, without the prior written consent of the City. Any subcontractor or assignee will be bound
by all of the terms and conditions of this Agreement.
17. Reports/Accountability/Public Information: Contractor agrees to develop and/or
provide documentation as requested by the City demonstrating Contractor’s compliance with the
requirements of this Agreement. Contractor shall allow the City, its auditors, and other persons
authorized by the City to inspect and copy its books and records for the purpose of verifying that the
reimbursement of monies distributed to Contractor pursuant to this Agreement was used in
53
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 9 of 11
compliance with this Agreement and all applicable provisions of federal, state, and local law. The
Contractor shall not issue any statements, releases or information for public dissemination without
prior approval of the City.
18. Non-Waiver: A waiver by either party of any default or breach by the other party of
any terms or conditions of this Agreement does not limit the other party’s right to enforce such term
or conditions or to pursue any available legal or equitable rights in the event of any subsequent default
or breach.
19. Attorney’s Fees and Costs: In the event it becomes necessary for either Party to
retain an attorney to enforce any of the terms or conditions of this Agreement or to give any notice
required herein, then the prevailing Party or the Party giving notice shall be entitled to reasonable
attorney's fees and costs, including fees, salary, and costs of in-house counsel including the City
Attorney’s Office staff.
20. Taxes: Contractor is obligated to pay all taxes of any kind or nature and make all
appropriate employee withholdings.
21. Dispute Resolution:
a. Any claim, controversy, or dispute between the parties, their agents,
employees, or representatives shall be resolved first by negotiation between senior-level
personnel from each party duly authorized to execute settlement agreements. Upon mutual
agreement of the parties, the parties may invite an independent, disinterested mediator to assist
in the negotiated settlement discussions.
b. If the parties are unable to resolve the dispute within thirty (30) days from the
date the dispute was first raised, then such dispute may only be resolved in a court of
competent jurisdiction in compliance with the Applicable Law provisions of this Agreement.
22. Survival: Contractor’s indemnification shall survive the termination or expiration of
this Agreement for the maximum period allowed under applicable law.
23. Headings: The headings used in this Agreement are for convenience only and are not
be construed as a part of the Agreement or as a limitation on the scope of the particular paragraphs to
which they refer.
24. Severability: If any portion of this Agreement is held to be void or unenforceable, the
54
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 10 of 11
balance thereof shall continue in effect.
25. Applicable Law: The parties agree that this Agreement is governed in all respects by
the laws of the State of Montana.
26. Binding Effect: This Agreement is binding upon and inures to the benefit of the heirs,
legal representatives, successors, and assigns of the parties.
27. No Third-Party Beneficiary: This Agreement is for the exclusive benefit of the
parties, does not constitute a third-party beneficiary agreement, and may not be relied upon or
enforced by a third party.
28. Counterparts: This Agreement may be executed in counterparts, which together
constitute one instrument.
29. Integration: This Agreement and all Exhibits attached hereto constitute the entire
agreement of the parties. Covenants or representations not contained herein or made a part thereof
by reference, are not binding upon the parties. There are no understandings between the parties other
than as set forth in this Agreement. All communications, either verbal or written, made prior to the
date of this Agreement are hereby abrogated and withdrawn unless specifically made a part of this
Agreement by reference.
30. Consent to Electronic Signatures: The Parties have consented to execute this
Agreement electronically in conformance with the Montana Uniform Electronic Transactions Act,
Title 30, Chapter 18, Part 1, MCA.
31. Extensions: this Agreement may, upon mutual agreement, be extended for a period
of one year by written agreement of the Parties. In no case, however, may this Agreement run longer
than June 15th, 2024.
**** END OF AGREEMENT EXCEPT FOR SIGNATURES ****
55
Professional Services Agreement for 2021 Water Distribution System Audit
FY 2021 – FY 2022
Page 11 of 11
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and
year first above written or as recorded in an electronic signature.
CITY OF BOZEMAN, MONTANA WATER SYSTEMS OPTIMIZATION, INC.
By________________________________ By__________________________________
Jeff Mihelich, City Manager Kate Gasner, Vice President
Date ______________________________ Date ________________________________
APPROVED AS TO FORM:
By_______________________________
Greg Sullivan, Bozeman City Attorney
56
2021 Water Distribution System Audit
Attachment A: Scope of Services
Each section outlines sub-task descriptions that detail work to meet or exceed the RFP requests.
Note that all work is anticipated to occur remotely, via conference call considering the ongoing challenges posed
by COVID-19. WSO will gladly entertain conversations and weigh decisions around business travel to conduct in-
person meetings after WSO participants and City staff agree upon necessary precautions.
Task 0: Project Management
WSO will reserve time for regular check-in calls and progress reports to guarantee diligent progress on this project.
Regular communication will be a key part of WSO’s strategy in staying on timeline and within budget.
Subtasks:
0.1: Check In Calls – WSO will lead regular check in call, providing agendas and follow up communications as
necessary. The frequency of these calls will be scoped with the project team, depending on availability.
0.2: Progress Reports on Invoices – WSO will document progress on each task in our monthly invoices.
Task 1: Review of Current Water Loss Prevention Approach
WSO will be sure to study all water loss related activities pursued by the City to date. In this task, WSO will request
and review related reporting and/or data and conduct conference calls to learn about past water loss work.
Subtasks:
1.1: Review Past Water Loss Projects & Findings – WSO will pour over the City’s past interactions with water loss
data and water loss programming. Understanding what has worked – and not worked! – in the past will be key to
informing a best-fit strategy for effective water loss control programming going forward.
1.2: Conference Calls to Debrief Previous Water Loss Work – In addition to the summary reporting and/or data
we will review, WSO will conduct brief conference calls to debrief the City staff’s experience with these programs
to date. We’re interested in learning about both the outcomes (i.e. leaks found, meters replaced, etc.) and the
reflections on the process (i.e. who was involved, whether the process was documented, where improvement
potential was identified).
Task 2: Water Audit Data Collection, Analysis, & Compilation
WSO will compile a water audit in the American Water Works Association (AWWA) Free Water Audit Software.
Upon deciding on the appropriate timeframe for the audit period, WSO will request all relevant data, conduct all
quality control analysis, follow up regarding data clarifications and/or obstacles, and complete the AWWA Free
Water Audit Software.
Subtasks:
2.1: Data Requests – WSO will develop and distribute a data collection tracking sheet, where all data necessary
for the completion of the AWWA water audit software is identified. The tracking sheet will provide examples of
57
data sources used in previous years (if available from background research). To streamline our data requests, this
data request will also include the data needs related to Task 4.1.
2.2: Billing Data Analysis – WSO will validate billing data provided in a standard format (one row corresponds to
one bill), where available, including verification of data integrity using customized R-scripts and pro-rating of billed
volumes to reduce lag-time effects.
2.3: Supporting Documentation Preparation - As required for level 1 validation, WSO will summarize the inputs
for the water audit, capturing the data source, the derivation approach, and any estimation or uncertainty
qualifications.
2.4: Data Debriefs – In the process of reviewing and summarizing water audit data, WSO will inevitably encounter
questions (i.e. needing clarification about the source of the data or observing an anomaly). Periodic conversations
with City staff closest to the data collection will be a valuable process in the audit compilation.
Task 3: Level 1 Validation
WSO will conduct a Level 1 Validation session to verify all the data used in the water audit is appropriate and all
the Data Validity Grades are assigned correctly.
3.1: Validation Session – WSO will schedule and lead an interview with appropriate staff to confirm the inputs
and Data Validity Grades in the water audit.
3.2: Validation Documentation – WSO will provide documentation that formalizes the findings of the validation
session.
Note: The analysis in Task 2 goes beyond the scope of Level 1 Validation and guarantees an even more detailed
quality control review of the water audit than Level 1 Validation provides. There may be an opportunity to
combine Task 2 and 3 to avoid redundant conversations if that is a concern. However, if the City is interested in
practicing the workflow of Level 1 Validation (as it stands separately from compilation support), WSO supports
keeping this task.
Task 4: Water Loss Remediation & Prevention Recommendations
4.1: Component Analysis of Real Losses - WSO will perform a component analysis of real losses to establish the
City’s unique leakage profile and inform targeted and cost-effective leak management strategies.
WSO’s component analysis of real losses will entail background leakage modeling using infrastructure and
pressure data, quantification of reported leakage using repair records, assessment of unreported leakage
proactively discovered through leak detection, and estimation of hidden leakage ongoing in the system. In working
with City’s infrastructure, pressure, leak detection, and repair documentation, WSO will also identify and
recommend data collection and management improvements that provide more accurate insight into leakage.
WSO’s work on this task will provide:
Determination of the City’s component leakage volumes: background, unreported, reported, and hidden
leakage
Break frequency analysis and comparison to national datasets
Evaluation of documented leak response times
58
4.2: Real Loss Improvement Recommendations – Directly informed by the component analysis conducted in Task
4.1, WSO will develop a suite of recommendations for cost-effective leakage recovery investments. Depending on
the City’s component analysis results, these recommendations will feature a combination of the following:
Leak repair response improvement
Proactive leak detection frequency adjustment
Proactive pressure management
4.3: Apparent Loss Improvement Recommendations – Directly informed by the data collected for the compilation
of the water audit, WSO will develop a suite of recommendations for strategic apparent loss assessment and/or
recovery work. This may include recommendations regarding the following:
Small meter testing & replacement practices
Large meter testing & replacement practices
Estimation protocols for unauthorized consumption and/or systematic data handling errors
4.4 Communications Support – After the analysis featured in Task 2 and the program development outlined in
the earlier components of Task 4, WSO will support City staff with the summary and communication of this
project’s findings. This may include support, such as but not limited to the following:
Support developing slides and material that summarizes program findings
Support in preparation and attendance of internal meetings on water loss work and/or board meetings
Reporting: Detailed Documentation of Methodology & Process
WSO will document each piece of the water loss investigation and findings for future reference and stakeholder
communication. Each report will describe the task’s analysis, synthesize findings, and outline recommended next
steps. Given the currently outlined scope of work, WSO would develop the following detailed reports:
Water Audit Compilation Documentation (delivered in conjunction with task 2.3 Supporting
Documentation)
Billing Data Analysis – Detailed Report (delivered in conjunction with task 2.2 Billing Data Analysis)
Real Loss Component Analysis Report (delivered in conjunction with task 4.1 Component Analysis of Real
Losses)
Water Loss Program Recommendations (delivered in conjunction with tasks 4.2 and 4.3)
59
Timeline
The following figure outlines the general timeframe WSO aims to follow as we work on each of the above tasks.
Completion of any one task will be dependent on the transfer of relevant data and availability of relevant City staff for discussion.
60
Budget
The following table outlines the estimated budget for the Scope of Services as outlined above.
61
Memorandum
REPORT TO:City Commission
FROM:Mitch Overton, Parks and Recreation Director
SUBJECT:Resolution 5288 Update to the Policy and Fee Schedule for Facility Use and
Programs for Parks and Recreation
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Resolution
RECOMMENDATION:I hereby move to adopt Resolution 5288 updating the Parks and Recreation
Policy and Fee Schedule for Facility Use and Programs.
STRATEGIC PLAN:6.5 Parks, Trails & Open Space: Support the maintenance and expansion of
an interconnected system of parks, trails and open spaces.
BACKGROUND:The first comprehensive Policy and Fee Schedule was adopted by the City
Commission on April 16, 2018 by Resolution 4861 and became effective on
July 1, 2019. Resolution 4861 was adopted at a noticed public hearing
during the City Commission action calendar. Resolution 4861 included an
annual review of the policy and fee schedule by the Recreation and Parks
Advisory Board (RPAB) and for any recommended changes to be presented
to the City Commission on subsequent consent agenda calendars. The
purpose of the Policy and Fee Schedule is to outline reservation policies and
fees for Parks and Recreation facility use and programs in a format that is
straightforward, easily updateable and available to the public. An update for
fiscal year 2021 was postponed due to COVID. Further, tonight's amended
policy and fee schedule took financial impacts to residents and community
members into account as not to significantly increase fees during this time of
hardship for many. In short the amended fee schedule makes some
administrative changes, adds in pandemic appropriate protections, such as
professional cleaners for facility reservations, adds nominal increases where
appropriate to cover costs, but also includes some reductions in cost to more
accurately reflect the cost of the services provided.
As part of the annual review of this document, the RPAB reviewed these
changes at their March 11, 2021 and April 8, 2021 meetings. The RPAB
unanimously recommended commission adoption of the fee schedule as
proposed with Resolution 5288 at their April 8, 2021 meeting. This update
and the agenda item have been legally posted for public notice, opportunity
to review document, and make public comment in accordance with
Montana Code Annotated 7-6-4013.
UNRESOLVED ISSUES:None.
62
ALTERNATIVES:As suggested by the City Commission.
FISCAL EFFECTS:Resolution 5288 will slightly increase revenues and cost recovery while
honoring City Commission adopted subsidies of 50% for youth programs and
50% for senior programs.
Attachments:
FY21- Policy and Fee Schedule.pdf
Resolution 5288.docx
Report compiled on: June 2, 2021
63
POLICY AND FEE SCHEDULE
FOR FACILITY USE AND PROGRAMS
FY21 UPDATES 4/1/21
64
1
Table of Contents
Section 1: Park Reservation Policies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
Section 1.1: Park Pavilion Reservation Policies & Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
Section 1.2: Community Garden Plot Reservation Policies & Fees . . . . . . . . . . . . . . . . . . . . . . . . Page 4
Section 1.3: Park Open Space and Trails Reservation Policies . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 4
Section 1.4: Park Facilities Reservation Policies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 4
Section 1.5: User Group & Special Event Policies & Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 6
Section 2: Recreation Facilities Reservation Policies & Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 9
Section 2.1: Recreation Facilities-Extended Term Reservations Policies . . . . . . . . . . . . . . . . . . . Page 11
Section 3: Aquatic Facility Reservation Policies & Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 12
Section 4: Alcohol Policies & Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 15
Section 5: Vending Policies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 16
Section 6: Recreation and Aquatic Program Scholarship and Refund Policy & Fees. . . . . . . . . . Page 16
Section 7: Non-city of Bozeman Resident Fee Policy for Facilities and Programs . . . . . . . . . . . . Page 17
65
2
The purpose of this document is to outline reservation policies and fees for Parks and Recreation facility use and
programs in a format that is straightforward, easily updateable and available to the public. The Parks and
Recreation Advisory Board will review the schedule annually, and fee changes will be recommended to the City
Commission for approval.
A. Reservation Types:
1. Park Pavilion Reservations
2. Community Garden Plot Reservations
3. User Group Agreements
4. Special Event Permits
B. Priorities for use of Park Facilities:
1. City of Bozeman Parks and Recreation Department Programs
2. Long term user groups in good standing
3. Schools and nonprofit groups
4. General public
C. General Park Facilities Reservation Requirements:
1. Request for use applications are due to the Parks and Recreation Director or designee for review one month
prior to the event start date.
2. Fees are due at the time reservations are made.
3. Each group in the priority list is served on a first come, first served basis.
4. Good standing status is required to make a reservation.
5. A reservation entitles the user to exclusive use of an assigned area during reserved hours. All park policies
must be abided by and the park must remain open to the general public unless otherwise approved by the
Parks and Recreation Director.
6. Any costs due to damages caused by renter or any person(s) within their party are the responsibility of the
renter. This includes but is not limited to damage or destruction caused by abuse or misuse of the facility,
garbage left at the site, or equipment which was moved that is not replaced to its original location, such as
picnic tables, bases on ball fields, bleachers, etc.
7. Reservations are final with completion of the reservation form or agreement, the Recreation Manager or
designee has approved the form or agreement and entered it into the reservation system, and the deposit
and fees are received.
8. Any request for fee reduction must be submitted 60 days prior to the event and must be approved by the
Parks and Recreation Director or designee.
9. The use of public parks or facilities for personal or business profit is prohibited without first obtaining the
applicable agreement (Per BMC Sec. 26.02.070).
10. All reservation and usage requirements stated in this document apply unless otherwise approved by the
Director of Parks and Recreation.
Section 1: Park Reservation Policies
66
3
Eighteen pavilions in the city park system are available to rent April 1-September 30 and are offered in the
following time blocks: 8:00am-3:00pm, 3:30pm-10:00pm, or a full day from 8:00am-10:00pm. Pavilions may be
reserved six months in advance in the same calendar year. Between October 1 and March 31, pavilions are used
on a first come, first served basis. Each pavilion available to rent has a capacity. See chart below. Reservation
requests that exceed the capacity will be considered under a user group agreement (Section 1.5). A Public
Assembly Permit is required for any park reservation with a group size of 75 or more people. There is no
nonprofit discount available for pavilion reservations.
A. Pavilion Reservation Policies:
Section 26.02.030 of the City of Bozeman Municipal Code must be referred to for more details regarding
park prohibitions. A section of the code is included in all park pavilion applications that must be signed by
renters.
B. Pavilion Reservation Fees:
Tier IV Reservation Fee
Up to 200 person capacity $200.00 - Resident 1/2 Day
$280.00 - Non Resident 1/2 Day
$320.00 - Resident Full Day
$448.00 - Non Resident Full Day
Tier III Reservation Fee
Up to 100 person capacity $100.00 - Resident 1/2 Day
$140.00 - Non Resident 1/2 Day
$160.00 - Resident Full Day
$224.00 - Non Resident Full Day
Tier II Reservation Fee
Up to 50 person capacity $50.00 - Resident 1/2 Day
$70.00 - Non Resident 1/2 Day
$80.00 - Resident Full Day
$112.00 - Non Resident Full Day
Tier - Capacity Name Tier - Capacity Name
Tier IV - 200 Anderson Pavilion at
Bogert Park
Tier I - 15 Kirk Park Pavilion North
Tier III - 100 Bozeman Pond Pavilion - 15 Kirk Park Pavilion South
Tier II - 50 Glen Lake Rotary Park
Pavilion
- 20 Norton Ranch Park Pavilion
- 50 Lindley Park Pavilion - 20 Oak Springs Park Pavilion
-50 Rotary Centennial
Pavilion
- 20 Reunion Pavilion*
- 50 Shane Lalani Pavilion* - 20 Sandan Park Pavilion
Tier I - 20 Beall Park Pavilion - 20 The Lakes at Valley West-East
Pavilion
- 20 Creekwood Park Pavilion - 20 The Lakes at Valley West-West
Pavilion
- 20 Davis Pavilion* - 20 Valley West Park Pavilion
- 20 Dumke Pavilion*
*Located in Story Mill Community Park
Section 1.1: Park Pavilion Reservation Policies & Fees
67
4
Tier I Reservation Fee
Up to 20 person capacity $25.00 - Resident 1/2 Day
$35.00 - Non Resident 1/2 Day
$40.00 - Resident Full Day
$56.00 - Non Resident Full Day
D. Refund Policy
When a reservation is cancelled more than 15 days prior to the reservation date, a $25 processing fee will be
held from the paid fees. If the cancellation or change occurs 14 days or less, no refund will be issued.
Community garden plots are available to rent for a fee in three locations: 25 plots at Bozeman City Hall, 21 plots
in Westlake Park, and 42 plots in Langhor Park. Garden plot agreements are renewed every year for gardeners in
good standing. If not in good standing, an agreement will be terminated and deposit held.
A. Responsibilities of the gardener:
1. Use only organic fertilizers, pesticides, and herbicides.
2. Bear all liability incurred, including but not limited to, the use or misuse of pesticides, herbicides, or
other chemicals.
3. Remove all silage from the site by sundown on the last Sunday in October, or deposit will be forfeited.
4. Do not exceed the boundaries of the garden plot assigned.
5. Do not use motor vehicles in the park.
B. Garden Plot Fees
Garden Fee per plot annually Deposit
Langhor $60.00 $60.00
Westlake $50.00 $50.00
City Hall $40.00 $40.00
Some open space and trails in city parks may be available to rent through a User Group Agreement (Section 1.5).
A. Field Requirements and Reservation Information
1. The Bozeman Parks and Recreation Department makes every effort to have fields ready for play at the
beginning of each season, weather dependent. The Bozeman Parks and Recreation Department reserves
the right to change the starting date of field availability. During the month of March, turf is often wet
and not actively growing, and therefore susceptible to damage from use. Fields may not be available to
reserve until April 1, weather and turf conditions dependent. During any month, especially April and
May, it is important that use be cancelled when fields are too wet and may be damaged by play. Should
damage result from use, repair costs will be deducted from the security deposit. If repair costs exceed
the security deposit, the organization will be invoiced the difference. The organization will also be
Section 1.3: Park Open Space and Trails Reservation Policies
Section 1.2: Community Garden Plot Reservation Policies & Fees
Section 1.4: Park Facilities Reservation Policies
68
5
required to reinstate the amount necessary to bring the security deposit to the required amount during
seasonal play.
2. Misuse resulting in damage will result in the organizations loss of field use and will affect its ability to
reserve fields in the future.
3. The Parks and Recreation Director or Designee shall approve all field preparation vehicles and
equipment prior to use. (Section 1.5)
4. Regulation soccer goals must be secured to the ground for safety, using a weight system approved by
the Parks and Recreation Director or Designee.
B. Banners and Signs at Sports Facilities
Any signage intended to be affixed to fencing, structures, or to be staked in the ground must be approved by
the Parks and Recreation Director or Designee. Signs may not block the view of the public or cause a
distraction. All signage must be removed upon conclusion of the reservation. (per BMC Sec. 38.28.160.)
C. Accident Reporting
In the event of an accident or emergency, the organization/reservation holder is required to complete a
Bozeman Parks and Recreation Department accident report and submit to the Department within 24 hours
of the incident.
D. Refunds-Sports Facilities
For a full refund, cancellations must be submitted to the Parks and Recreation Department a minimum of 15
working days prior to the start of the reservation. Working days are considered Monday-Friday, 8:00am-
5:00pm. Holidays are not considered working days.
Security Deposits will be refunded if:
1. No damage has occurred to the facility or equipment
2. All fees were paid in full as stated in the user group agreement
3. All user group agreement requirements were met
4. If damage did occur, the deposit fee will not be released until the damages are fixed by the
organization and final inspection and approval by the Parks and Recreation Director or
designee is complete.
5. If damages have not been corrected or contracted to be corrected within 14 days of the event,
the full deposit will be forfeited.
E. Field Preparation
Field preparation and infield maintenance on all baseball and softball fields is the responsibility of the
renter. This includes weed pulling, dragging, base placement and striping. Only water based paint approved
by the Parks and Cemetery Superintendent is allowed on all fields. Chalk is prohibited.
Field and Court Types:
A. Athletic Fields-Diamond
The following are available to rent:
1. Christie Fields
2. Kirk Fields
3. North Grand Fields
4. Softball Complex
5. West Babcock Fields
B. Non Programmed Park Space
In order to support the demand for field space for a variety of organized field sports, certain non-
programmed park areas may be reserved for practices. The field areas are not meant to have official
69
6
league games or sports events. Non-programmed park space may also be reserved for camps and
fitness classes through a user group agreement.
C. Tennis and Pickeball Courts
Reservations for general public, single court use are not accepted. Use is on a first come, first served
basis. A 1 hour of play for singles and 1.5 hours for doubles rule is in place on all tennis and pickleball
courts when others are waiting. Court reservations are only available for special events and camps.
The following courts are available to rent for special events and camps:
1. Southside Tennis Courts (3 available)
2. Southside Pickleball Courts (6 available)
3. Bogert Pickleball Courts (7 available)
D. Sand Volleyball and Outdoor Basketball Courts
Reservations for general public, single court use are not accepted. Use is on a first come, first served
basis. Court reservations are only available for special events and camps.
The following sand volleyball courts are available:
1. Bozeman Pond
2. East Gallatin Recreation Area
The following outdoor basketball courts are available:
1. Beall
2. Bogert
3. Bozeman Pond
4. Valley Unit
Groups and individuals requesting use of a public park for the purpose of implementing fee or non-fee
based programs or events are required to obtain a user group agreement or special event permit. The
director may enter into agreements with various park user groups, with the fee for such agreements
established by the director. (Per BMC Sec. 26.02.040.6)
a. Admission fees may be charged for events held in conjunction with a park user group agreement or
special event permit if approved by the director and listed in the agreement or permit.
b. Articles, food, beverages or service may be sold for events held in conjunction with a park user
group agreement or special event permit, if so noted in the agreement or permit.
Types:
A. User Group Agreement
These agreements are available for providers to implement their programs for an agreed upon duration of
time. Examples include youth and adult athletic groups, camps, and outdoor fitness classes. User Group
Agreements can be submitted up to six months
B. Special Event Permit
A one-time (one day) event that requires exclusive use of a park, field, or facility will be subject to the
Special Event Permit. Examples include a race, concert, wedding, or festival will be subject to the Special
Event Permit. Special Event Permits can be submitted up to 12 months in advance. Any “pay to participate”
event, tournaments, and/or clinics and camps will be subject to the Special Event Permit, and all obligations
and responsibilities that go with it. Special Event Permits do not grant exclusive use of the park without
written approval from the Parks and Recreation Director or designee. An admission fee to a permitted event
cannot be charged without written approval from the director. Exclusions to this policy include special
events covered in an existing user group agreement. No refunds are issued if a special
event permit is cancelled.
Section 1.5: User Group & Special Event Policies & Fees
70
7
Fees [A 3% increase may be added annually due to inflation.]
A. User Group:
a. Assessed according to the facility type (Section 1.4) or as established by the Director in the User Group
Agreement.
b. Diamond Athletic Field fees, non-programmed park space and court use fees: $15 per hour per field,
space or court
d. Deposit determined per contract
e. Requires a $25 processing fee
B. Special Event:
a. See Pavilion Reservation Fee chart (Section 1.1) on page 3 of this document for fee information.
b. When an event exceeds 200 people, the fee is $1 per person.
c. No deposit required
d. A 50% discount applies to non-profit groups for park use fees.
e. Requires a $25 processing fee
f. Public Assembly Permit, if applicable
Required Information:
A. User Group:
a. A User Group application is required along with a $25 processing fee. Please allow 2 weeks for review.
Upon approval of a User Group Agreement, the following must be provided by the group:
1. Signed Park User Group Agreement
2. Public assembly permit application (if over 75 people)
3. Pre-season walk-though meeting with Parks and Recreation Department staff
4. Portable toilets when applicable, along with rental receipt
5. Security deposit (refundable) when applicable
6. Key deposit (refundable) when applicable
7. Park use fee
8. Liability Insurance and endorsement statement (if group size is 75 or more people)
I. Group shall maintain $1,500,000 liability insurance, $750,000 per occurrence, additionally insuring
the City of Bozeman, its officers, and agents as well as the group against loss and liability for
damages including, but not limited to, personal injury, death, or property damage arising out of,
or in connection with the use of the facility and/or park.
II. The insurance must be in place and the group shall provide proof of insurance satisfactory to the
City of Bozeman prior to the commencement of the use covered by this agreement or the use will
not commence as scheduled.
9. Alcohol waiver, if applicable
A Special Event Permit application is required. Please allow 2 weeks for review.
B. Special Event:
a. A Special Event Permit application is required along with a $25 processing fee. Please allow 2 weeks for
review.
Upon approval of a Special Event Permit, the following must be provided by the group:
1. Signed Special Event Permit
2. Public assembly permit application (if over 75 people)
3. Portable toilets when applicable, along with rental receipt
4. Security deposit (refundable) when applicable
5. Park use fee
6. Liability Insurance and endorsement statement (if group size is 75 or more people)
71
8
I. Group shall maintain $1,500,000 liability insurance, $750,000 per occurrence, additionally insuring
the City of Bozeman, its officers, and agents as well as the group against loss and liability for
damages including, but not limited to, personal injury, death, or property damage arising out of, or
in connection with the use of the facility and/or park.
II. The insurance must be in place and the group shall provide proof of insurance satisfactory to the
City of Bozeman prior to the commencement of the use covered by this agreement or the use will
not commence as scheduled.
7. Alcohol waiver, if applicable
8. Proof of nonprofit status, if applicable
9. A run map, if applicable
10. Approval of a Waiver to Sell Goods, if applicable
11. Approval of any tens, canopies, shade structures prior to assembly, if applicable
Park Use Policies:
A. Condition of Premises
It is expressly understood and agreed upon that renter agrees to maintain and leave all facilities clean, safe,
and in a sanitary condition. Failure to do so will result in the renter paying all costs incurred by the City of
Bozeman to return the premises to its original condition at a rate of $50 per hour. The City may apply any
security deposit received from the user group toward such costs.
B. Reservations
There shall be no SUBLICENSING of fields, parks or facilities. Sublicensing of a field, park or facility shall be
cause for forfeiture of any security deposit and termination of the user group agreement or special event
permit. Periods not identified as exclusive in the user group agreement or special event permit will be open
to the public or may be reserved by another user group.
C. Contacts
The renter will be responsible for designating an individual who will be the sole contact for the group. A
backup contact shall also be provided. They will be responsible for the initial walk-through, final walk-
through, keys checked out, and any assessment charged to the user group pursuant to the agreement or
permit. In addition, the renter will provide a list of numbers and email addresses of all officers.
D. Schedule
The renter shall submit, through their appointed designee, a schedule of events the renter plans to hold on
the premises during the term of the agreement or permit.
E. Field Preparation
It is the sole responsibility of the renter to prepare the fields for game play and practice. On all turf areas,
approved athletic field water based paint will be applied. Chalk is prohibited. Maintenance and care of the
infield/skinned area is the responsibility of the user group. The Parks and Recreation Director or designee
shall approve all field preparation vehicles and equipment prior to use.
F. Field Lights
The field lights (if applicable) are the sole responsibility of the renter. This includes maintenance and paying
the utility bill. The City of Bozeman will contact the user group designee with the amount owed upon
receiving the utility bill. It is the renter’s responsibility to pay the bill before the due date.
G. Restrooms/Litter
Renters will be responsible for policing grounds, dugouts, and fields for litter and equipment left out, on, or
near the fields. This includes but is not limited to infield drags, painting machines, hoses, and tarps. The
garbage collected will be deposited into the trash receptacles located throughout the park. If there are no
garbage receptacles it is up to the user group to provide them. Tarps shall be placed in proper areas. Other
equipment shall be returned to buildings or dugouts.
72
9
H. Snow Removal
Snow removal by user groups is not allowed on any fields. If snow is plowed off, there will be a charge for
damage to irrigation heads, turf, fencing, and other related items.
I. Rain
Games shall be postponed in the event of wet, saturated turf. Excessive wear due to play on wet fields will
be the responsibility of the user group. Renovation and mitigation will be charged to the renter.
J. Improvements
Any changes, modifications, or improvements to the park shall require a plan and must be approved by the
Parks and Recreation Director or designee prior to work being done. At a minimum the plan shall include:
schedule of work, timeline, design details, notice of start and completion. City staff shall be consulted
regarding guidelines on planning a project and any pre-conferences before the commencement of a project.
K. Inflatable Structures
Renter agrees to indemnify, protect, defend, save and hold harmless the City, its officers, employees,
agents, and volunteers from and against any and all liability, claims, suits, and causes of action for death or
injury to persons, or damage to property, resulting from intentional or negligent acts, errors, or omissions of
renter arising out of the setup, use or operation of inflatable bounce houses or other similar inflatable
apparatus (the “Inflatable Structure”), or resulting from any violation of any federal, state, or municipal law
or ordinance, the extent caused, in whole or in part, by the willful misconduct, negligent acts, or omissions
of renter, which occurs related to the setup, use or operation of the Inflatable Structure.
L. Park Prohibitions
Section 26.02.030 of the City of Bozeman Municipal Code must be referred to for more details regarding
park prohibitions.
The Recreation Division manages four community buildings that are home to Parks and Recreation Department
programs and are available to the public to rent for private events. Facilities may be reserved 1 year in advance.
A. Recreation facilities available to reserve:
Name and Location Building Capacity
Beall Park Recreation Center, 415 N. Bozeman Ave. 74 people
Lindley Center, 1102 E. Curtiss Ave. 150 people
Story Mansion, 811 S. Willson Ave. 83 people (with tables and chairs)
181 people (chairs only)
230 people (no tables and chairs)
Story Mill Community Center - Gymnasium,
600 Bridger Dr.
140 people (with tables and chairs)
470 people (no tables or chairs)
B. Recreation Facility Reservation Policies:
1. You must be 18 years of age or older to reserve a recreation facility. You must be at a minimum 21 years
of age to have alcohol at your event (see #5 below).
2. The time block you’ve paid for is the only time you may be in the building, including your guests, your
caterer and rental companies. All rental equipment must be picked up before your reservation end time
listed above. An additional reservation time may be needed.
Section 2: Recreation Facilities Reservation Policies & Fees
73
10
3. A) A cleaning/damage deposit is required for all facility reservations. Once the cleaning and damage
facility check has been completed after your event by our staff, we will process your refund. Any
damage to the facility, loss of key, or failure to clean the facility to the standards set by the Parks and
Recreation Department will result in a deduction of the cleaning/damage deposit. If the cost of cleaning
and/or damage exceeds the deposit amount, the renter will be sent an itemized statement for the
remaining cost of cleaning/damage repair. The statement must be paid within 30 days of the date of
issue.
B) Anyone who rents an indoor recreation facility (regardless of group size) will be required to hire a
professional, licensed, insured cleaner to clean the building immediately following their event and
provide proof of the hire. Proof of hire must be submitted BEFORE your reservation takes place. The
cleaner has to be done no later than two hours after your reservation time ends.
4. All items must be removed from the facility by the end of the reservation time listed on the agreement.
After returning the key, the deposit (or remainder thereof) will be mailed to the renter by the City of
Bozeman Finance Department within three weeks.
5. Public drinking or display or exhibition of open alcoholic beverages (open containers) is prohibited in
public parks and recreational facilities. (per BMC 4.04.030) A waiver of this requirement may be
granted. (per BMC 4.04.050) A separate application and fee are required.
6. A ‘safety supervisor’ is required for events with 75 or more adults (minimum 18 years of age) where
alcohol is served.
7. Selling of goods, alcoholic beverages, or charging admission to attend a function is prohibited without
approval of the Parks and Recreation Director. (per BMC 26.02.070)
8. Smoking is prohibited in all recreation facilities. If there is evidence of smoking in the facility, all of the
deposit will be withheld.
9. The renter is responsible for the conduct and actions of the individuals attending the function.
Attendees shall not mark, deface, or remove any tables, chairs, benches, refrigerators, railings,
equipment, signs, or other city property.
10. Recreation facilities are located in residential areas. Strobe lights, loud noise, indoors or outdoors, are
prohibited. Music may be played inside the facility with the volume adjusted so it cannot be heard
outside and shall end by 10:00pm. If we receive a complaint from the neighbors after 10:00pm or police
are called, renter will lose their deposit. BMC Noise Ordinance applies to all rental facilities.
11. Animals are not permitted in the recreation facilities except service animals authorized under the
Americans with Disabilities Act.
12. Vehicles shall park in designated parking areas only.
13. Roller blade or skateboard use is prohibited inside facilities and on porches.
14. Overnight stay and camping is prohibited.
15. Renter is responsible for shoveling sidewalks and stairs. A shovel and ice remover are provided.
16. All functions in Recreation facilities must end by 11:00pm. Renter is responsible to clean the facility
immediately after the function according to the clean-up list and remove all personal effects. Cleaning
must be completed by 6pm or 1am, depending on reservation time.
17. Renter shall pick up all glass and litter in and around the facility and deposit in the dumpster.
18. Renter shall report all damages to the Parks and Recreation Department. All non-reported damage or
violations of these policies may result in the loss of privilege to rent this facility.
19. No tape, staples, nails or tacks on the walls or ceiling. Nothing adhered to walls or doors.
74
11
20. The entire deposit will be forfeited if excessive cleaning is required or unsanitary conditions exist (i.e.,
vomit) upon inspection.
21. Any police officer shall have full authority to void facility rental permits should the activity hereby
approved become disruptive or abusive to disrupt the peace of the area or involve any violations of park
or building rules and regulations. Violation of rules, regulations, or laws may result in denial of future
reservation requests.
22. It will take 2-3 weeks for your deposit to be returned to you via a check in the mail.
C. Facility Rental Refund Policy
When a reservation is cancelled or a change is requested (i.e. date or location) more than 15 days prior to
the reservation date, a $25 processing fee will be held from the paid deposit. If the cancellation or change
occurs 14 days or less, the full deposit will be held back.
D. Recreation Facilities Rental Fees:
Beall Park Recreation Center Story Mansion
Deposit Amount $200 Deposit Amount $500
Friday HALF DAY (5pm-11pm) Monday-Thursday (9am-4pm or 5pm-11pm)
City of Bozeman Resident $130 City of Bozeman Resident $250/half day
Non-city of Bozeman Resident $156 Non-city of Bozeman Resident $300/half day
Saturday or Sunday (9am-4pm or 5pm-11pm) Monday-Thursday FULL DAY (9am-11pm)
City of Bozeman Resident $130/half day City of Bozeman Resident $500
Non-city of Bozeman Resident $156/half day Non-city of Bozeman Resident $600
Saturday or Sunday FULL DAY (9am-11pm) Friday-Sunday (9am-4pm or 5pm-11pm)
City of Bozeman Resident $260 City of Bozeman Resident $500/half day
Non-city of Bozeman Resident $312 Non-city of Bozeman Resident $600/half day
Lindley Center Friday-Sunday FULL DAY (9am-11pm)
Deposit Amount $200 City of Bozeman Resident $1,000
Monday-Thursday (9am-4pm or 5pm-11pm) Non-city of Bozeman Resident $1,200
City of Bozeman Resident $65/half day Non-city of Bozeman Resident $78/half day
Monday-Thursday FULL DAY (9am-11pm)
City of Bozeman Resident $130 Non-city of Bozeman Resident $156
Friday-Sunday (9am-4pm or 5pm-11pm) Story Mill Community Center Gym
City of Bozeman Resident $130/half day City of Bozeman Resident $35 per hour
Non-city of Bozeman Resident $156/half day Non-city Bozeman Resident $50 per hour
*Deposit amount equals rent amount and a three
Friday-Sunday FULL DAY (9am-11pm) hour minimum is required for gym reservations
City of Bozeman Resident $260 Non-city of Bozeman Resident $312
75
12
E. For all City-sponsored functions, there will be no deposit, processing fee, or reservation fee. Hiring of a
janitorial service will be required.
F. Non-Profit rates are 50% off, require tax documentation, and apply to Beall, Lindley Center, and Story
Mansion fees only.
Extended term facility reservations are available for individuals or organizations interested in implementing a
fee or non-fee based program over an extended period, not to exceed three months. Reservations must be
made at least 30 days prior to the reservation date.
Upon approval by the Parks and Recreation Director or designee the following must be provided:
1. Facility reservation application and fees
2. Cleaning/Damage deposit as determined per contract
3. Fee as determined per contract
4. Liability Insurance and endorsement statement
1) Group shall maintain $1,500,000 liability insurance, $750,000 per occurrence, additionally insuring
the City of Bozeman, its officers, and agents as well as the group against loss and liability for
damages including, but not limited to, personal injury, death, or property damage arising out of, or
in connection with the use of the facility and/or park.
2) The insurance must be in place and the group shall provide proof of insurance satisfactory to the
City of Bozeman prior to the commencement of the use covered by this agreement or the use will
not commence as scheduled.
5. Alcohol waiver application, if applicable. (See Section 4: Alcohol Policies for details.)
City of Bozeman Aquatic Facilities
1. Bozeman Swim Center, 1211 W. Main Street
2. Bogert Pool, 325 S. Church Ave.
The Bozeman Swim Center is a 50 meter, 8-lane indoor aquatic facility which is divided into a 25 yard pool and a
25 meter pool from the end of August to the middle of March utilizing a removable bulkhead. Bogert Pool is an
outdoor pool and has two swimming areas: a 25-yard pool ranging from 3.5 feet to 9 feet and a shallow pool
with depths from 1 foot to 3 feet. Children age 13 and under require supervision from an adult who is at least
18 years old at all times per Montana Health Code.
A. Aquatic Facilities available to rent
1. Bozeman Swim Center
a. Entire Pool
b. 50 meter lanes
c. 20 yard lanes
d. 25 meter lanes
e. 25 yard lanes
B. Priority for use of aquatic facilities
1. City of Bozeman Parks and Recreation Department Programs
2. Long-term User Groups in good standing
3. Schools and Nonprofit Groups
Section 2.1: Recreation Facilities-Extended Term Reservations Policies
Section 3: Aquatic Facility Reservation Policies & Fees
76
13
4. General Public
NOTE: Hours of availability depend on the type of event and the number of people in the group. All group
rentals must be approved by the Parks and Recreation Director or designee.
C. Aquatic Facility Rental Policies
1. Groups (teams) shall put in and take out the lane lines.
2. All swimmers must exit the water by contracted times.
3. Swimmers must wait to put in lane lines until a coach is on deck.
4. Swimmers are not allowed in the water until a coach and lifeguards are on deck.
5. Liability Insurance and endorsement statement is required, naming the City of Bozeman, Its Officers and
Agents as additionally insured for $1,500,000 and $750,000 per occurrence.
6. Groups need to abide by all pool rules and etiquette.
D. Pool Rules: MT HEALTH CODE ARM 37.115.1402
1. The main drains must be clearly visible and sharply defined from any point on the side of the pool.
Anything else requires the management to close the pool.
2. Take a cleansing shower before using the pool.
3. Please do not use the pool if you have had diarrhea or any other disease transmittable by the water in
the past two weeks.
4. Swimmers who are not toilet trained must wear a swim diaper with waterproof pants and elastic
openings for the legs and waist.
5. Do not change diapers near or on the deck.
6. Do not bring food, drink, gum or tobacco into the pool or onto the deck area.
7. No animals in the pool or deck area except as required under the American with Disabilities Act.
8. Offensive or unsanitary behavior is prohibited.
9. Non-swimmers and children under the age of 13 shall not use the pool without a responsible adult in
attendance. Adults must be 18 or older.
E. City of Bozeman Pool Rules
1. Don’t flip the float mats
2. Don’t step onto the mats from the side of the pool
3. No hitting with the noodles (people or the water)
4. Lifeguards may ask kids to take swim test/put on a lifejacket
5. Jump in feet first, no spins or backward jumps
6. Diving allowed only in the deep end (past tall, white guard chair)
7. No flips or back dives
8. Kids may not use the lap swim or water fitness equipment
9. We do not lend out goggles
10. No rough play
11. No food or drinks on the pool deck
12. No glass in the facility
13. No running on the pool deck
14. Groups must provide one adult, 18-years or older, for every 10 kids under 14
15. Patrons must be respectful of lifeguards, fellow patrons, the facility and its rules
16. Patrons may not distract the lifeguards from their surveillance duties
17. Failure to comply with the pool rules and codes may result in suspension from the facility
18. Passes and Punch cards have a 10-day grace period, which during this time, there is a $25 processing fee
for reimbursement. No refunds will be issued after ten days.
F. Dry Land Practice Guidelines
1. All dry land practice times must be approved by management.
77
14
2. The area directly adjacent to the Swim Center on the west side of the building may be used for dry land
practice.
3. Deck space may be used for dry land practice. When deck space is used, exercises that keep swimmers
feet in contact with the deck may be performed. Exercises that increase the odds of slipping such as
jumping jacks and burpees are prohibited.
G. Lap Swimming Etiquette
1. Entering the water
Always use a feet-first entry into shallow water. If the lane is crowded, always ease in, using a feet-first
entry. You may dive into the pool from the deep end, but only if the pool is completely clear in front of
you.
2. Circle Swimming
Follow the arrows on the bottom of the pool for proper lap swimming directions. Do not swim on the
blue lines. If you are not sure, ask a lifeguard for assistance.
3. Passing
The best place to pass someone is at the wall. A light touch of the foot of the person in front of you will
indicate to them to stop at the wall and let you pass. If you pass in the middle of the pool, it should be
between the backstroke flags, and you should pass in the inside or middle of the lane. Make sure the
way is clear. You can also lightly touch the person’s foot to indicate you will be passing them and they
should “hug the lane.”
4. Number of People in a Lane
Several people (as many as 6 or more) can fit in a lane if proper etiquette is observed and swimmers of
like speed are together.
5. Lane Speed
The lanes are designated Fast, Medium, and Slow. These terms are relative, so the best way to find the
lane that is best for you is to watch those that are swimming. If you are the first one in the lane, abide
by the circle swimming rules so others may join you. If you aren’t sure what lane, ask a lifeguard for
assistance. Swimming in the same lane with people at your same pace could help you swim better and
have a better workout.
6. Stopping/Resting
If you are resting on the wall, stay to the right side of the lane to stay away from swimmers coming in.
Stopping in the middle of the pool should be avoided. If the lane is crowded and one person stops, all
will have to stop. Be aware of the swimmers around you at all times. Do not start if a swimmer is inside
the backstroke flags.
7. Water Jogging/Walking
Water jogging and walking can take place in lane one, following the direction and rules of circle
swimming.
8. The Diplomacy of Shared Space
If someone makes a suggestion concerning any of mentioned etiquette topics, try to make adjustments
in the spirit of cooperation. If you make a suggestion to another swimmer, try to do it as diplomatically
as possible. Lifeguards will intercede only if there is a problem that cannot be resolved or if there
appears to be a safety concern. If you are not sure, ask a lifeguard for assistance.
H. Private Swim Lesson Policy
1. Lessons must be one on one. Group lessons are prohibited.
2. Instructor and participant must pay the entrance fee.
78
15
3. Private lessons are allowed during recreation swim times in the recreation swim area. A roped off space
is not provided.
I. Aquatic Fees:
1. Locker rental fees: $10/month, limited lockers available for rent.
2. Swim Meet Fee: $178.32/hour the building is occupied.
3. Coaching certificate: $50
Daily Admission
Age Resident Fee Non-Resident Fee
Infants age 2 and under FREE FREE
Youth (3-18 years) $3.00 $4.00
Adult (19-59 years) $4.00 $5.00
Senior (60+ years) $3.00 $4.00
Family Swim (Fridays) $10.00 per family $10.00 per family
Membership Passes
Pass Type 1 Month 3 Months 6 Months 12 Months
Youth
(3-18 years) $30 City/$42 Non $72 City/$101 Non $108 City/$151 Non $161 City/$225 Non
Adult
(19-59 years) $40 City/$56 Non $96 City/$134 Non $144 City/$201 Non $214 City/$300 Non
Senior
(60+ years) $30 City/$42 Non $72 City/$101 Non $108 City/$151 Non $161 City/$225 Non
Family $192 City/$268 Non $288 City/ $403 Non $428 City/$600 Non
Punch Cards
Age Resident Fee Non-Resident Fee
Youth (3-18 years) $40.00 $50.00
Adult (19-59 years) $50.00 $60.00
Senior (60+ years) $40.00 $50.00
Aquatic Facility Rental Fees
50 Meter Lane $12.73 per lane per hour
25 Meter or Yard Lane $6.37 per lane per hour
20 Yard Lane $4.24
City of Bozeman (Ord. No. 1616, § 1(9.70.040), 7-12-2004) All forms and documents must be submitted at least
two weeks in advance. All alcohol waivers must be attached to a reservation, whether it be for a facility, park
pavilion, special event, or user group. Alcohol waivers will not be approved without a reservation.
A. FOR AN EVENT WITH LESS THAN 75 PEOPLE
(Adults age 18 and up)
Section 4: Alcohol Policies & Fees
79
16
1. Complete Alcohol Waiver form for under 75 adults
B. FOR AN EVENT WITH 75 OR MORE PEOPLE
(Adults age 18 and up)
1. Complete Alcohol Waiver form for over 75 adults
2. Responsible Beverage Server Certificate:
Someone who has attended the Responsible Beverage Service Training must serve and be responsible
for the alcoholic beverages during the duration of the event. A copy of their certification of training
must be provided to the Parks and Recreation Department.
3. Certificate of Insurance and Insurance Endorsement Statement:
Provide a Certificate that names the "City of Bozeman, its officers, agents, and employees" as
additionally insured on a primary non-contributory basis for $1.5 million per occurrence & $750,000 for
each claim and host liquor liability of not less than $1 million. Policy must be acceptable by the City of
Bozeman.
4. Safety Plan that addresses:
a) Identify Safety Plan Supervisor that must be present for duration of event and ensures that plan is
adhered to.
b) How admission of those who are under the legal age to drink will be handled & consequences when
underage drinking occurs.
c) How those under the influence of alcohol will be handled – will alternate transportation be offered?
d) Action to be taken in the event of a disturbance or medical or other type of emergency any other
measures to be taken to maintain a safe environment for those in attendance.
C. Alcohol Waiver Fees:
Type Fee
City of Bozeman Resident $25 per waiver
Non-City Resident $35 per waiver
Vending of any kind in public parks and in recreation facilities is prohibited without Parks and Recreation
Director Approval. With Director Approval, vending is only allowed when attached to a user group agreement,
special event, pavilion reservation or facility reservation. A Waiver to Sell Goods form must be submitted a
minimum of one month prior to the event.
A. Youth Scholarship Program
Any child (0-18 years old) who is a resident of the City of Bozeman, who wishes to participate in a Bozeman
Parks and Recreation Department program and is in need of financial assistance, may apply for a scholarship.
Proof of residency is required. Contracted classes and job training classes (Water Safety Instructor or
Lifeguarding) are not included in the scholarship program.
Individuals that are eligible for scholarships may apply for 20% to 100% of programs costs for a maximum of
$200.00 per year (first come first served until the scholarship funds are exhausted). Current poverty guidelines
and a sliding scale are used to determine eligibility. Applications are reviewed by a committee and strict
confidentiality is maintained.
Section 6: Recreation and Aquatic Program Scholarship and Refund Policy & Fees
Section 5: Vending Policies
80
17
B. Recreation and Aquatic Program and Pass Refund Policies
Payment is due at registration and participants must be of the required age on the first day of the program to be
eligible to participate.
Refunds for program and pass cancellations will not be given unless injury or illness prevents participation. If a
participant must be cancelled out of a program, a request must be made 10 working days (Monday-Friday)
before the start of the program to receive a Parks and Recreation Department credit. Credits may be used for
future programs.
If the Parks and Recreation Department cancels a program due to low registration, weather, or any unforeseen
reason, a full refund for the cancelled program will be issued. If a swim lesson is cancelled due to weather or
unforeseen circumstances, a courtesy swim pass will be issued at the completion of the session.
Passes and punch cards have a 10 day grace period, which during this time there is a $25 processing fee for
reimbursement. No refunds will be issued after 10 days.
C. Recreation and Aquatic Program Fees Determined By:
Youth Active Aging (ages 60+)
50% of program costs, city subsidizes 50% 50% of program costs, city subsidizes 50%
Adult
100% program cost recovery
Fees for facility use and programs for non-city of Bozeman residents may be up to 40% more than the fees for
residents residing inside the City of Bozeman limits. City of Bozeman resident’s taxes support the general fund
that provides a subsidy for Parks and Recreation Department facilities and programs, therefore resident fees for
use are lower. In order to receive city rates, your primary residence must be inside the physical boundaries of
the City of Bozeman.
Section 7: Non-city of Bozeman Resident Fee Policy for Facilities and Programs
81
1
COMMISSION RESOLUTION NO.5288
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, UPDATING THE FEE SCHEDULE FOR PARKS AND RECREATION
FACILITY USE AND PROGRAMS.
WHEREAS,Resolution 4861 established or amended fee schedules for Park and
Recreation Department facility use and programs,and
WHEREAS, the City Commission approved Resolution 4861 on April 16, 2018 which
included a noticed public hearing, held during the April 16, 2018 City Commission Action Item
Agenda; and
WHEREAS, the adopted fee schedule for parks and recreation facility use and programs
included an annual review by the Recreation and Parks Advisory Board and for any recommended
amendments to be presented to the City Commission on subsequent Commission Consent
Calendars and;
WHEREAS,the Recreation and Parks Advisory Board reviewed the Parks and
Recreation Fee Schedule for Facility Use and Programs at their March 11, 2021 and April 8, 2021
meetings and;
82
2
WHEREAS, The Recreation and Parks Advisory Board voted unanimously at their
April 8, 2021 meeting to recommend that the City Commission adopt the Parks and Recreation
Policy and Fee Schedule for Facility Use and Programs fee updates, and
WHEREAS, public notice was provided in conformance with Montana Code Annotated
7-1-4127 regarding this resolution to address updating the Parks and Recreation Fee Schedule for
Facility Use and Programs; and
WHEREAS, the Bozeman City Commission conducted such public hearing on
updatingthe Parks and Recreation Fee Schedule for Facility Use and Programs, in accordance with
Montana Code Annotated 7-6-4013, on June 15, 2021, and
WHEREAS, The Parks and Recreation Department Director has submitted a
recommendation for an update of Parks and Recreation Fee Schedules, and
WHEREAS, The City Commission finds value in the update, and the Recreation and
Parks Advisory Board annual review and recommendation of the Parks and Recreation Fee
Schedule for Facility Use and Programs;
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana:
Section 1
That the Policy and Fee Schedule, attached hereto as Exhibit “A”, be updated for parks
and recreation facility use and programs;
Section 2
83
3
The updated Policy and Fee Schedule for Facility Use Programs shall be effective
July 1, 2021
PASSED AND APPROVED by the City Commission of the City of Bozeman,
Montana, at a regular session thereof held on the 15th day of June 2021.
___________________________________
Cynthia Andrus
Mayor
ATTEST:
________________________________________
Mike Maas
City Clerk
APPROVED AS TO FORM:
___________________________________
GREG SULLIVAN
City Attorney
84
Memorandum
REPORT TO:City Commission
FROM:Emily Cope, District Manager Downtown Bozeman Partnership
Ellie Staley, Executive Director Downtown Bozeman Partnership
SUBJECT:Downtown Business Improvement District Fiscal Year 2021 Annual Report
and Fiscal Year 2022 Budget and Work Plan
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Finance
RECOMMENDATION:Approve Downtown Business Improvement District Fiscal Year 2021 Annual
Report and Fiscal Year 2022 Budget and Work Plan
STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant
Downtown, Midtown, and other commercial districts and neighborhood
centers – including higher densities and intensification of use in these key
areas.
BACKGROUND:The Downtown Bozeman Partnership administers the Downtown Business
Improvement District (BID) on behalf of the City of Bozeman. The Downtown
BID Board, as appointed by the City Commission, directs the programs,
projects and initiatives of
the Downtown BID. MCA 7-12-1131 guides the programs, projects and
initiatives of the Downtown BID.
The Downtown BID Board took formal action to approve the FY2022 work
plan and budget at their monthly public board meeting on May 19, 2021.
The Downtown BID presents an annual report and proposes a work plan and
budget for approval by the City Commission during public hearings on the
proposed City budget on an annual basis as required by statute.
UNRESOLVED ISSUES:None identified
ALTERNATIVES:None identified
FISCAL EFFECTS:The Downtown BID is funded by the special assessments collected from
property owners within the district. The BID assessment for FY2022 will be
$185,000 as approved by the board at the May 19, 2021 board meeting. The
BID will also receive approximately $41,600 in additional revenue from
sponsorships and contracts.
Total FY21 revenues are budgeted as approximately $226,600.
The FY21 budget expenses are estimated to be $224,450.
The BID has approximately $136,810 in capital and operation reserves.
85
Attachments:
FY2022 BID Work Plan Budget Packet.pdf
Report compiled on: June 2, 2021
86
CITY COMMISSION MEMORANDUM
TO: Mayor Andrus and City Commission
FROM: Emily Cope, District Manager
Downtown Bozeman Partnership
SUBJECT: Downtown Business Improvement District Fiscal Year 2021 Annual Report
and Fiscal Year 2022 Budget and Work Plan
MEETING DATE: June 15, 2021
AGENDA ITEM TYPE: Action
RECOMMENDATION:
Approve the Downtown Business Improvement District Fiscal Year 2022 Work Plan and
Budget as submitted.
BACKGROUND:
The Downtown Bozeman Partnership administers the Downtown Business
Improvement District (BID) on behalf of the City of Bozeman. The Downtown BID Board,
as appointed by the City Commission, directs the programs, projects and initiatives of
the Downtown BID. MCA 7-12-1131 guides the programs, projects and initiatives of the
Downtown BID.
The Downtown BID Board took formal action to approve the FY2022 work plan and
budget at their monthly public board meeting on May 19, 2021.
The Downtown BID presents an annual report and proposes a work plan and budget for
approval by the City Commission during public hearings on the proposed City budget on
an annual basis as required by statute.
FISCAL EFFECTS:
The Downtown BID is funded by the special assessments collected from property
owners within the district. The BID assessment for FY2022 will be $185,000 as
approved by the board at the May 19, 2021 board meeting. The BID will also receive
approximately $41,600 in additional revenue from sponsorships and contracts.
Total FY21 revenues are budgeted as approximately $226,600.
The FY21 budget expenses are estimated to be $224,450.
The BID has approximately $136,810 in capital and operation reserves.
87
ATTACHMENTS:
The following documentation is included as a single attachment:
• FY21 Downtown BID Annual Report
• FY22 Downtown BID Work Plan
• FY22 Downtown BID Budget
88
The BID Misson: Keeping Downtown Beautiful and Vibrant
The downtown Bozeman Business Improvement District (BID) is an organization of downtown
property owners who through thoughtful, pro-active collaboration and partnership with local
government, business owners, residents and citizens strive to create a shared vision and voice for
the community of downtown Bozeman. The BID will commit resources, identify, plan and act on
short-term and long-term initiatives otherwise unavailable to individual owners. The BID has a
goal of ensuring the long-term preservation and vitality of the city’s underlying economic, cultur-
al, social and environmental assets and the BID will work together to keep our downtown a safe,
beautiful and vibrant place.
Downtown Business Improvement District
FY2021 BID ANNUAL REPORT
Eric Bowman-Chair
Eric Sutherland-VC
Jolee Barry
Mike Basile
Ileana Indreland
Erik Nelson
Susan Neubauer
BID Board
Below are some interesting “statistics” demonstrating the quantity of
work accomplished by the BID in FY2021.
BID by the Numbers: They All Add Up to Success
3500 Number of hours worked by BID maintenance staff
3640 Number of trash and recycling receptacles emptied
525 Number of graffiti tags removed
270 Number of flower baskets purchased and installed
118 Number of consecutive days flowers watered
108 Number of holiday decorations installed
1180 Number of streetlamp banners installed
BID Graffiti Removal Program: Winning the Battle Against Vandalism
The rising level of graffiti vandalism in our downtown is an eyesore that threatens the well-being of downtown and is an affront
to our entire community. Graffiti contributes to lost revenue associated with reduced retail sales and declines in property value.
In addition, graffiti generates the perception of blight and a sense that a place is in a state of decline and may even be unsafe. A
survey conducted in 2008 documented over 300 separate tags in the downtown district. That same year, the BID Board commit-
ted funds to launch the Graffiti Removal Program to tackle this growing problem.
Case studies have repeatedly proven that the number one deterrent to graffiti is prompt removal of new tags. Therefore, the
BID maintenance program strives to remove all new tags within 48 hours. In FY2021, BID maintenance staff removed 525 graffiti
tags bringing the total number removed over the life of the program to 4,072.
Below are “before-and-after” photos showing the BID Graffiti Removal Program in action.
89
Over the years the BID maintenance program has grown to include two full
-time employees and two part-time employees. The maintenance staff
work 7 days a week during the summer and 5 days a week in winter doing a
variety of projects to keep downtown clean, appealing and inviting.
On a daily and weekly basis, maintenance staff: empty the trash receptacles;
pick up garbage from storefronts, doorways and sidewalks; water the flow-
er baskets; clean up Soroptomist Park; remove stickers and posters; re-
move graffiti tags; snow removal from crosswalks.
Year round the BID maintenance staff maintain the light pole banners, assist
with DBA events, and install holiday decorations. The BID maintenance
team utilizes the ever-present Mule ATV and pick-up truck to perform
many of their day-to-day tasks.
BID Maintenance Program: Keeping Downtown Bozeman Attractive
BID Flower Basket Program: A Downtown Summer Tradition
Perhaps the most beloved BID initiative is the Flower Basket Program that adorns
the street lamps downtown with over 270 baskets of color every summer. Not
only does the BID purchase the planted baskets of Super Petunias, but the
maintenance staff waters them seven days a week for over 115 consecutive days
to ensure they remain vibrant throughout the summer.
To make this program a reality, the BID orders the baskets to be planted in Feb-
ruary. The flowers are cultivated until early June when they can be hung down-
town after the last hard frost. Then the work begins for the staff to water them
each and every day. The BID utilizes a pick-up truck complete with a 535 gallon
water tank, pump and hose to complete the watering.
BID Holiday Decoration Program: Celebrating the Winter Season
The BID installs the holiday decorations that make downtown fes-
tive from Thanksgiving through New Years. Year after year, the BID
relies the commitment of the many community partners that make
“lighting up the town” possible.
For over 30 years, the BID has installed the intersection decora-
tions known as the “Christmas Spiders.” The BID relies on the
following groups to make all the holiday decoration an annual tradi-
tion: Bozeman Fire Department, City Forestry Division, Streets and
Sign Departments, Bozeman Arborcare, Montana Crane Service.
The other holiday decorations that adorn downtown include 80 lit
strands of garland that the BID maintenance staff wrap around each
historic street lamp up and down Main Street. A total of 16 large
wreaths and bows are hung from the traffic light standards. The
BID also lights the large trees in Soroptomist Park.
Prepared by: Emily Cope—District Manager
406-586-4008 www.downtownbozeman.org emily@downtownbozeman.org
BID New Program: Street Outreach in Downtown
This year the BID allocated $12,000 towards a new pilot program partnered with COB and HRDC that will run
throughout the summer of 2021. This program is managed by HRDC. The pilot program proposes a two em-
ployee approach, one for street outreach (time spent visiting with people physically downtown and using a
housing first approach while connecting persons to existing resources) and one for business relations (time
spent talking to business community to understand current concerns and time spent training for employers
and employers).
90
Downtown Business Improvement District
FY2022 BID Work Plan and Budget
BID Mission Statement
The BID is an organization of downtown property owners who through thoughtful, pro-active collaboration and
partnership with local government, business owners, residents and citizens strive to create a shared vision and
voice for the community of downtown Bozeman. The BID will commit resources, identify, plan and act on short-
term and long-term initiatives otherwise unavailable to individual owners. The BID has a goal of ensuring the
long-term preservation and vitality of the city’s underlying economic, cultural, social and environmental assets
and the BID will work together to keep our downtown a safe, beautiful and vibrant place.
BID Assessment Programs
The following programs are funded by the special assessments collected from property owners within
the Business Improvement District. The BID assessment for FY2022 will be $185,000 as approved by the
board at the May 19, 2021 board meeting The BID will also receive approximately $41,600 in additional
revenue from sponsorships and maintenance contracts.
Downtown Bozeman Partnership ($58,750)
The BID is a member of the Downtown Bozeman Partnership. The BID contributes to the
administration of the Downtown Partnership office located at 222 East Main Street.
Downtown Bozeman Association ($26,150)
The BID contributes to the DBA to support its events, staff and marketing efforts to promote
downtown. The DBA hosts events downtown that include Art Walks, Christmas Stroll, Music on
Main, Crazy Days, Cruisin’ on Main Car Show, Bridal Walk and more.
New Program ($15,000)
The BID funded a pilot program during summer of 2021 for street outreach. The board will
discuss and vote on funding of a new program in FY22. The
new program could be street outreach, sidewalk pressure
washing, district wide wireless internet, or another as needs
arise for the district.
Summer Flowers ($25,000)
The BID purchases, installs and maintains (which includes
watering 7 days a week) 270 hanging baskets of Super-
Petunias. These flower baskets are hung throughout
downtown from June through September on the historic lamp
posts. This program grows each year as additional historic
street lamps are installed downtown.
91
Holiday Lighting ($4,900)
The BID installs the following holiday lighting downtown: 1)
lighted garland on each historic lamp post along Main
Street; 2) lights on the large conifer trees in Soroptomist
Park; 3) garland wreaths at the Rouse, Church, Wallace,
and Grand intersections; and 4) the infamous holiday
“spider” decoration above the downtown intersections.
Maintenance Program ($66,600)
The BID hires two full-time maintenance employees in addition
to two part-time maintenance employees for the summer
months. Primary tasks performed by the BID maintenance staff
includes garbage collection, flower watering, tree watering,
Soroptomist Park upkeep, installation of the light pole banners,
maintenance of pedestrian benches, graffiti removal, and
limited snow removal. The BID maintenance staff removed over
3640 bags of garbage and recycling during the past year.
Graffiti Removal Program ($5,625)
The BID comprehensive graffiti removal program is
in its third year of operation. Since 2009, this
program has removed 3500 graffiti tags. The BID
maintenance staff removes tags from public
property and works with property owners to clean
private buildings of graffiti. The BID will continue to
actively remove new tags as quickly as possible
considering immediate removal has proven to be
the most effective deterrent.
92
Downtown Banners ($3,000)
The BID purchases, installs and maintains the downtown light
pole banners. Seasonally the BID installs banners for MSU,
Bozeman Farmers Market, Bridger Bowl, Big Sky Resort, Sweet
Pea, Yellowstone Forever, Bridgercare and Greater
Yellowstone Coalition.
Tree Replacement ($2,000)
The BID replaces trees that have died in the
downtown district. In coordination with the City
Forestry Division, dead trees are removed and then
replaced by a local nursery. Smaller newly planted
trees are susceptible due to physical damage and
insufficient water. The BID replaces between two and
six trees a year.
Downtown Marketing ($2,500)
The BID contributes to the general marketing of downtown Bozeman. These funds are made
available to the Downtown Partnership which places advertisements in ten to twelve local,
regional and state-wide publications.
Vehicle Maintenance ($7,550)
The BID owns and maintains a maintenance truck and ATV.
Maintenance Supplies ($6,125)
The BID purchases a wide variety of maintenance supplies for various programs.
The FY2022 Downtown BID Assessment Budget and corresponding Work Plan was approved by
the BID Board on May 19, 2021.
Please refer to the FY2021 BID Annual Report attached for more program details.
93
Downtown Business Improvement District FY2022 Assessment Budget
Income
BID Assessment 185,000$
BID Assessment--residual
Contract Income 17,500$
Interest Income 100$
Mobile Vending Fees 2,000$
Flower Sponsorships 8,500$
Christmas Light Sponsorships 3,500$
Streetlamp Banners 10,000$
Total Income 226,600$
Expenses
Management Fee 58,750$
Total Expenses 58,750$
Payroll Expenses
Maintenance Staff 45,000$
Taxes 3,950$
Work Comp 2,700$
Maintenance Staff--Garage 13,000$
Taxes 975$
Work Comp 975$
Total Payroll Expenses 66,600$
Programs
New Program 15,000$
Downtown Bozeman Association (DBA) Support 26,150$
Christmas Lights 2,000$
Christmas Light Spider Repair 1,500$
Christmas Lights Storage 1,400$
New Banners 3,000$
Flower Expenses 25,000$
Flower Water 250$
Tree Purchases 2,000$
Marketing 2,500$
Maintenance Supplies 3,500$
Garbage Bags 2,625$
Graffiti Supplies 1,125$
Graffiti Contracted Removal 4,500$
Mule Service & Fuel 1,500$
Truck Service & Fuel 2,200$
Vehicle Insurance 3,850$
Program Contingency 1,000$
Total Program Expenses 99,100$
Total BID Expenses 224,450$
NET ASSESSMENT INCOME 2,150$
94
Memorandum
REPORT TO:City Commission
FROM:Emily Cope, District Manager Downtown Bozeman Partnership
Ellie Staley, Executive Director Downtown Bozeman Partnership
SUBJECT:Downtown Urban Renewal District Fiscal Year 2021 Annual Report and Fiscal
Year 2022 Budget and Work Plan
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Finance
RECOMMENDATION:Approve the Downtown Urban Renewal District Fiscal Year 2022 Work Plan
and Budget as submitted.
STRATEGIC PLAN:1.4 Business and Institutional Partnerships: Explore opportunities for
partnerships with key business groups and non-profit organizations.
BACKGROUND:The Downtown Bozeman Partnership administers the Downtown Urban
Renewal District on behalf of the City of Bozeman. The Downtown Urban
Renewal District Board, as appointed by the Mayor and City Commission,
directs the programs, projects and initiatives of the Downtown URD. The
1995 Downtown Urban Renewal Plan and 2019 Downtown Bozeman
Improvement Plan, as adopted by the City Commission, guides the programs,
projects and initiatives of the Downtown URD.
The Downtown URD Board took formal action to approve the FY2022 work
plan and budget at their public board meeting on May 18, 2021.
The Downtown URD presents an annual report for last year and proposes
the next year’s work plan and budget for approval by the City Commission
during public hearings as required by statute.
UNRESOLVED ISSUES:None identified
ALTERNATIVES:None identified.
FISCAL EFFECTS:The Downtown URD anticipates a FY21 year-end balance of $3.29 million
and FY22 revenues are projected to be $1.87 million which totals $5.16
million of funding available for FY22.
The proposed FY22 expenditures total $3.45 million with an estimated FY22
year-end balance of $1.71 million.
95
Attachments:
DTN URD FY2022 Budget Commission Packet.pdf
Report compiled on: June 3, 2021
96
CITY COMMISSION MEMORANDUM
TO: Mayor Andrus and City Commission
FROM: Emily Cope, District Manager Downtown Bozeman Partnership SUBJECT: Downtown Urban Renewal District Fiscal Year 2021 Annual Report and Fiscal Year 2022 Budget and Work Plan
MEETING DATE: June 15, 2021 AGENDA ITEM TYPE: Action
RECOMMENDATION: Approve the Downtown Urban Renewal District Fiscal Year 2022 Work Plan and Budget as submitted.
BACKGROUND: The Downtown Bozeman Partnership administers the Downtown Urban Renewal District on behalf of the City of Bozeman. The Downtown Urban Renewal District Board, as appointed by the Mayor and City Commission, directs the programs, projects and
initiatives of the Downtown URD. The 1995 Downtown Urban Renewal Plan and 2019 Downtown Bozeman Improvement Plan, as adopted by the City Commission, guides the programs, projects and initiatives of the Downtown URD. The Downtown URD Board took formal action to approve the FY2022 work plan and
budget at their public board meeting on May 18, 2021. The Downtown URD presents an annual report for last year and proposes the next year’s work plan and budget for approval by the City Commission during public hearings as required by statute.
FISCAL EFFECTS: The Downtown URD anticipates a FY21 year-end balance of $3.29 million and FY22 revenues are projected to be $1.87 million which totals $5.16 million of funding available
for FY22. The proposed FY22 expenditures total $3.45 million with an estimated FY22 year-end balance of $1.71 million.
97
ATTACHMENTS: The following documentation is included as a single attachment:
• FY21 Downtown URD Annual Report
• FY22 Downtown URD Work Plan
• FY22 Downtown URD Budget
98
Downtown Urban Renewal District
FY2021 Annual Report and
FY2022 Work Plan and Budget
In 1995, the City Commission adopted the Urban Renewal Plan for downtown Bozeman which was subsequently amended in 2015. The intent and purpose of the Urban Renewal Plan emphasizes:
1.Bozeman’s historical character as a “working” downtown shall be maintained.2.Traffic movement and access shall be designed with the emphasis on the downtown as a designationrather than improving the flow of through traffic.
3.The facilitation of private/public partnerships is encouraged in the implementation of the Plan.4.Objectives shall be accomplished by incentives whenever possible.5.Private property rights will be respected.6.Administrative practices shall be conducted in a constructive manner which fosters cooperation.7.This Plan is further detailed, refined, prioritized and implemented by the “Downtown Improvement Plan”which outlines specific programs and projects consistent with the Urban Renewal Plan.
The Urban Renewal Plan established nine “Guiding Principles” to provide direction for improving Bozeman’s
historic downtown. The Urban Renewal Study Committee considered the first three principles more important than the next three with the last three the least important. However, the Committee deemed all nine principles to be vital to achieving the vision for downtown. Key implementation actions were identified for each principle
(may apply to multiple principles but are only listed once below). 1.Strengthen downtown’s economic vitality
•Provide more, better managed parking; retain public offices and anchor businesses; facilitatecommercial development; eliminate unnecessary regulatory barriers to reinvestment; enable highdensity housing; eliminate through truck traffic and restore Main Street as pedestrian-friendly
2.Improve the safety, security and health of the district
•Improve traffic flow emphasizing downtown as a destination; improve public works; improve night-
time lighting; improve sidewalks; increase police presence; improve alley and parking lotappearance and safety3.The image of downtown shall be continuously improved
•Improve streetscape aesthetics and amenities; enhance appearance of and accessibility toBozeman Creek; improve trash removal
4.Downtown’s accessibility shall be improved
•Provide effective public transportation; better accommodate bicycles; reduce reliance on privateautomobiles5.“Community Partnership” is fundamental to downtown’s success
•Encourage growth of cultural activities; preserve historic character6.Downtown’s diversity shall be facilitated7.The cost of projects and programs shall be weighed against their benefits
8.Downtown shall become more user friendly9.Cultural activities shall be nurtured and expanded downtown
Downtown URD Mission Statement The Downtown Bozeman Urban Renewal District board (URD) will foster an economically thriving district that: 1) attracts investment; 2) stabilizes and strengthens the tax base; and 3) supports the vitality and diversity of the Gallatin Valley as its social and cultural center.
99
Downtown Urban Renewal District (URD)
FY2021 Annual Report (July 1, 2020 to June 30, 2021)
Structured Parking Informal, Site Plan, Bids $ 750,000 budgeted $ 0 invested Since a location for a second parking garage has not been found, this $750k will roll into FY22 and fund the informal (schematic) and site plan design work for a specific second parking garage. As noted below this is just a portion of the “soft costs” associated with constructing a new garage.
Downtown Parking Garage $ 335,000 budgeted $ 335,000 invested The URD made the annual bond payment contribution for Bridger Park, the downtown parking garage. Downtown Streetlamp Power Reconfiguration $ 250,000 budgeted $ 0 invested This project was not completed this year due to staffing constraints at the city. North Rouse Streetscape Project $ 225,000 budgeted $ 35,483 invested
The URD has been working with the Montana Department of Transportation since 2018 to incorporate the elements of the downtown streetscape into the reconstruction of Rouse Avenue. A portion of this project was completed in FY21, the remaining funds will carry on to FY22. Downtown Residential Incentive Program $ 200,000 budgeted $ 0 invested The purpose of the Downtown Residential Incentive Grant Program is to encourage the creation of more attainable housing units downtown. The Program will reimburse a portion of housing-related impact fees for qualifying residential projects. No applications have been received for this program. Downtown Partnership Management Fee $ 175,000 budgeted $ 175,000 invested The URD is a member of the Downtown Bozeman Partnership, LLC which serves as the incorporated management agency for all the downtown organizations (BID, DBA, URD). This management fee pays for a portion of the operating costs of the downtown office in addition to most of the payroll costs
of the Executive Director and District Manager positions. Downtown Plan Transportation Projects $ 122,300 budgeted $ 31,392 invested The URD board approved Part 1 of a scope of work prepared by Sanderson Stewart which will
included: 3-lane Main Street configuration with diagonal parking options; bicycle facility improvements on Mendenhall and Babcock; possible new traffic signals on Mendenhall and Babcock; and
Schematic Design (17.5%) = $306,250 306,250$
Design Development (25%) = $437,500 437,500$ 743,750$
Construction Documents (33%) = $577,500 577,500$
Bidding & Negotiation (2%) = $35,000 35,000$
Construction Administration (22.5%) = $393,750 393,750$
Total (100%) = $1,750,000 1,750,000$ Complete design, permitting and construction administration services for a second structured parking facility in Downtown Bozeman,
including architectural, MEP, structural, civil, survey and geotechnical services. Permitting includes the City of Bozeman site plan
application and building permit processes.
100
pedestrian crosswalk improvements. MDT and COB provided comments to the initial work prepared by Sanderson Stewart. The URD Board will be reviewing this work and make a decision to move forward with Part 2 in FY22.
Part 2 will include traffic data collection and analysis of the affected intersections and corridors for the
extent of the improvements. The scope of work for Part 2 may need to be reconsidered based on the findings from Part 1 prior to the separate authorization to proceed. Part 2, as currently scoped, has a not-to-exceed cost of $90,590.
Fiber Infrastructure Project $ 110,000 budgeted $ 3,125 invested The URD continues to invest in upgrades to downtown’s open-source fiber broadband infrastructure and provide grants to defray the costs to connect downtown buildings/businesses to the fiber network. A total of $3,125 was invested in grants to property owners for fiber installation.
Armory Hotel Incentive $ 100,000 encumbered $ 100,000 invested In 2013 the URD awarded up to $100,000 to the Armory Hotel project and those funds remain encumbered until the completion of the hotel. The purpose of the Downtown Hotel Incentive Grant
Program was to encourage the construction of a quality hotel within the district.
The Armory Hotel project was completed and awarded the full grant amount of $100,000 on September 15, 2020. Downtown Improvement Plan Implementation $ 100,000 budgeted
$ 14,755 invested
This funding is intended to be available for smaller investments in the implementation of the 2019 Downtown Improvement Plan objectives. In FY21 funding was used to complete the infrastructure at the North Black Pocket Park as well as an update to the 3D SketchUp model for downtown.
South Wallace Asbestos Project $ 75,000 encumbered $ 75,000 invested The URD pledged these funds to be invested in the remediation of the asbestos contamination under the South Wallace roadway. The remediation was performed in conjunction with the sewer and water line upgrade along South Wallace between Main Street and Babcock Streets.
This project was completed and the full amount of $75,000 was paid out on October 19, 2020.
North Willson Streetscape Project $ 75,000 budgeted $ 0 invested This funding is to construct new streetscape (sidewalk, trees, and lamps) along North Willson
adjacent to the South Willson public parking lot and connect to new streetscape along East
Mendenhall adjacent to the Armory Hotel. Professional Services Term Contract $ 75,000 budgeted $ 528 invested
The intent of this funding is to allow the URD to nimbly respond to needs for professional services in
response to unanticipated issues. The professional services will include but not be limited to engineering, architecture, urban planning, parking and fiber consulting. Technical Assistance Grant Program $ 50,000 budgeted
$ 15,000 encumbered $ 15,536 invested This program supports current or potential developers, owners, and tenants with technical assistance during the preliminary phases of possible redevelopment projects in the downtown tax increment
101
district. This year the URD awarded four grants to a variety of proposed downtown redevelopment projects. Two grants that were previously awarded were given this year to property owners.
Streetscape Assistance Program $ 50,000 budgeted $ 0 invested This URD program will provide property owners with partial reimbursement for the installation of streetlamps in accordance with the Downtown Streetscape Plan. The program is designed to support private investment, redevelopment of property and the improvement of public areas in downtown.
Life-Safety Grant Program $ 50,000 budgeted $ 5,464 invested This URD program provides property owners with partial reimbursement for life-safety code compliance upgrades. The program is specific to the installation of dedicated fire lines connecting a
building’s sprinkler system to the municipal water main. The program has a one-to-one match
required of the property owner and a per-project dollar cap of $10,000. A total of $5,464 was invested to grant recipients. Streetscape Element Purchases and Maintenance $ 45,000 budgeted
$ 22,487 invested
The URD continues to supplement the existing streetscape inventory by purchasing additional historic streetlamps, trash receptacles, pedestrian benches, tree guards and bike racks. Funding was also used for the ongoing maintenance of the streetlamps, Soroptomist Park, and the North Black Pocket Park. Additional funding is expected to be used before the end of FY21.
SILD and Streetscape Engineering $ 50,000 budgeted $ 0 invested This year’s work will focus on finalizing a new comprehensive Special Improvement Lighting District and conducting preliminary streetscape engineering on North Willson and West Main.
Downtown Plan Historic Inventory Updates $ 38,750 budgeted $ 38,750 invested These are matching funds assisted the Community Development Department to update the historic inventories for over 150 downtown buildings. This was the first step of developing a set of downtown
design guidelines per the 2019 Downtown Plan and 2019 NCOD Report. In 2015 the URD provided
$30,000 of matching funds for updating the historic inventories for over 100 buildings. This project is underway and the full amount of $38,750 was transferred to the Community Development Department.
DBIP: Alley Enhancement Project $ 19,000 encumbered (planning) $ 50,000 budgeted (implementation) $ 25,000 budgeted (planning) $ 10,521 invested The URD funded $10,521 towards planning to complete preliminary design of alley improvements in
north alley between Tracy and Black—the parking garage alley—that includes a combination of public
art, seasonal planters, pavement treatments, lighting, seating, and landscaping. This project was put on hold while the DBP hired a new Executive Director. DBIP: Bozeman Creek Project $ 30,000 budgeted (planning)
$ 50,000 budgeted (implementation) $ 15,000 invested
102
The URD invested $15,000 towards planning for a variety of enhancements to Bozeman Creek as suggested in the 2019 Downtown Improvement Plan. This project was put on hold while the DBP hired a new Executive Director.
Alternative Transportation Project $ 25,000 budgeted $ 0 invested This URD funding is to be invested in the planning, design, and implementation of alternative transportation infrastructure potentially including EV charging, car share, and multi-modal
transportation systems as recommended in the 2019 Downtown Improvement Plan. Structured Parking Feasibility Analysis $ 25,000 budgeted $ 20,763 invested The URD worked with the term contract team to continue studies on potential sites for a second
parking garage and parking deck alternatives on surface lots. City Economic Development Technician $ 21,740 budgeted $ 20,000 invested The URD is committed to partially fund the City Economic Development Department Specialist FTE.
This employee will work on a variety of tasks directly related to the downtown URD including parking
and tax increment financing. The URD began contributing funding for this position in FY20 URD. Library Pedestrian Safety Improvements $ 15,000 budgeted $ 15,000 invested
The URD board approved a $15,000 request from Bozeman Public Library director and board for the
Library’s parking lot pedestrian safety improvement plan. This project was allocated in FY19 URD budget but was then postponed. This project was completed and the full amount of $15,000 was transferred to the Public Library.
Main Street Truck Traffic Study $ 15,000 encumbered $ 6,155 invested The Western Transportation Institute completed the Main Street Truck Traffic Study, as an update to the same study conducted back in 2015.
Expenditures compiled on May 31, 2021.
Prepared and submitted by:
Emily Cope
Downtown Bozeman Partnership 222 East Main Street #302 Bozeman MT 59715 emily@downtownbozeman.org
406-586-4008
103
Downtown Urban Renewal District (URD)
FY2022 Work Plan (July 1, 2021 to June 30, 2022)
All budgeted investments over $15,000 are documented Structured Parking Informal, Site Plan, Bids $ 750,000 budgeted The URD will continue to invest in planning for additional structured parking downtown. This $750k would fund the informal (schematic) and site plan design work for a specific second parking garage.
As noted below this is just a portion of the “soft costs” associated with constructing a new garage.
Downtown Parking Garage $ 335,000 budgeted The URD will make the annual bond payment contribution for Bridger Park, the downtown parking garage. Downtown Utility Infrastructure Improvements $ 250,000 budgeted
This funding will support utility infrastructure improvements such as repairs to poles, pipes, cables, wires, conduits, etc. The URD Board will be discussing further how to allocate funding to projects. Downtown Residential Incentive Program $ 200,000 budgeted The purpose of the Downtown Residential Incentive Grant Program is to encourage the creation of
more attainable housing units downtown. The Program will reimburse a portion of housing-related impact fees for qualifying residential projects. Last year the program was revised to encourage the creation of new smaller studio and one-bedroom residential units as well as residential units that have long-term affordability controls. Downtown Partnership Management Fee $ 190,0000 budgeted The URD is a member of the Downtown Bozeman Partnership, LLC which serves as the incorporated management agency for all the downtown organizations (BID, DBA, URD). This management fee pays for a portion of the operating costs of the downtown office in addition to most of the payroll costs of the Executive Director and District Manager positions.
North Rouse Streetscape Project $ 182,000 encumbered The URD has been working with the Montana Department of Transportation since 2018 to incorporate the elements of the downtown streetscape into the reconstruction of Rouse Avenue. The current scope includes purchasing the streetlamps ($85,000), final engineering for streetlamp
installation ($17,000 remaining from FY21), and a separate contract to install the streetlamps ($80,000).
Schematic Design (17.5%) = $306,250 306,250$
Design Development (25%) = $437,500 437,500$ 743,750$
Construction Documents (33%) = $577,500 577,500$
Bidding & Negotiation (2%) = $35,000 35,000$
Construction Administration (22.5%) = $393,750 393,750$
Total (100%) = $1,750,000 1,750,000$ Complete design, permitting and construction administration services for a second structured parking facility in Downtown Bozeman,
including architectural, MEP, structural, civil, survey and geotechnical services. Permitting includes the City of Bozeman site plan
application and building permit processes.
104
Downtown Plan Transportation Projects $ 25,000 budgeted $ 91,000 encumbered This funding of $25,000 is intended for the study of the transportation concepts in 2019 Downtown
Improvement Plan not completed in Part 1 of a scope of work completed by Sanderson Stewart in
FY21. In FY21, The URD board approved Part 1 of a scope of work prepared by Sanderson Stewart which will included: 3-lane Main Street configuration with diagonal parking options; bicycle facility improvements on Mendenhall and Babcock; possible new traffic signals on Mendenhall and Babcock;
and pedestrian crosswalk improvements. MDT and COB provided comments to the initial work
prepared by Sanderson Stewart. The URD Board will be reviewing this work and make a decision to move forward with Part 2 in FY22. Part 2 (encumbered funds) will include traffic data collection and analysis of the affected intersections and corridors for the extent of the improvements. The scope of work for Part 2 may need to be
reconsidered based on the findings from Part 1 prior to the separate authorization to proceed. Part 2,
as currently scoped, has a not-to-exceed cost of $90,590. DBIP: Alley Enhancement Project $19,000 encumbered(implementation) $ 50,000 budgeted (implementation)
$ 45,000 budgeted (planning)
The $19,000 of encumbered funds (from FY20) as well the $50,000 budgeted funds are to complete alley improvements in north alley between Tracy and Black—the parking garage alley—that includes a combination of public art, seasonal planters, pavement treatments, lighting, seating, and landscaping.
The $45,000 is for planning improvements to a new section of alley (TBD) and planning for utility and
stormwater management. Fiber Infrastructure Project $ 110,000 budgeted The URD continues to invest in upgrades to downtown’s open-source fiber broadband infrastructure
and provide grants to defray the costs to connect downtown buildings/businesses to the fiber network. Downtown Infrastructure and Public Realm Plan $ 100,000 budgeted This URD funding will used to develop an infrastructure and public realm plan with the COB as recommended in the 2019 Downtown Improvement Plan. This plan will Establish a framework for
making near term strategic infrastructure investments that incrementally build to the long term vision,
align development and provide a stable path for private investment, while leveraging limited public resources, enhance Downtown’s identity and ensure that public realm improvements create a visually consistent and sustainable environment, coordinate with city-wide infrastructure plans and projects, and lay out potential state and federal funding.
Downtown Improvement Plan Implementation $ 100,000 budgeted This funding is intended to be available for smaller investments in the implementation of the 2019 Downtown Improvement Plan objectives.
Technical Assistance Grant Program $ 50,000 budgeted $ 45,000 encumbered This program supports current or potential developers, owners, and tenants with technical assistance during the preliminary phases of possible redevelopment projects in the district. This program facilitates navigating code requirements, preparing for the planning application and approval process,
and evaluating historic preservation considerations.
105
Downtown Design Guidelines $ 85,000 budgeted In FY21 the URD provided $38,750 to City Community Development Department to contract updating
historic inventories for downtown buildings. This was the first step of developing a set of downtown
design guidelines per the 2019 Downtown Plan and 2019 Neighborhood Conservation Overlay District Report. DBIP: Bozeman Creek Project $ 30,000 budgeted (planning)
$ 50,000 budgeted (implementation)
The URD intends to continue planning for a variety of enhancements to Bozeman Creek as suggested in the 2019 Downtown Improvement Plan with $30,000 of funding. The $50,000 is for creek improvements that could include a combination of public art, education elements, culvert improvements, furniture (benches, picnic tables), stream restoration, and bank
stabilization. North Willson Streetscape Project $ 75,000 budgeted This funding is to construct new streetscape (sidewalk, trees, and lamps) along North Willson adjacent to the South Willson public parking lot and connect to new streetscape along East
Mendenhall adjacent to the Armory Hotel.
Professional Services Term Contract $ 75,000 budgeted The intent of this funding is to allow the URD to nimbly respond to needs for professional services in response to unanticipated issues. The professional services will include but not be limited to
engineering, architecture, urban planning, parking and fiber consulting.
Alternative Transportation Project $ 75,000 budgeted This URD funding is to be invested in the planning, design, and implementation of alternative transportation infrastructure potentially including EV charging, car share, bike share, and multi-modal
transportation systems as recommended in the 2019 Downtown Improvement Plan.
Streetscape Element Purchases and Maintenance $ 55,000 budgeted The URD will continue to supplement the existing streetscape inventory by purchasing additional historic streetlamps, trash receptacles, pedestrian benches, tree guards and bike racks. Funding is
also available for the ongoing maintenance of the streetlamps, Soroptomist Park, and the North Black
Pocket Park. Streetscape Assistance Program $ 50,000 budgeted This URD program will provide property owners with partial reimbursement for the installation of
streetlamps in accordance with the Downtown Streetscape Plan. The program is designed to support
private investment, redevelopment of property and the improvement of public areas in downtown. Parklet $ 50,000 budgeted A parklet is a sidewalk extension into a parking lane that is used to create additional seating,
greenspace and art opportunities. This is cost-effective tool to provide community space in the
downtown core. This funding will be used to research, design and purchase a parklet for use in downtown. Life-Safety Grant Program $ 50,000 budgeted
This URD program provides property owners with partial reimbursement for life-safety code
compliance upgrades. The program is specific to the installation of dedicated fire lines connecting a building’s sprinkler system to the municipal water main. The program has a one-to-one match required of the property owner and a per-project dollar cap of $10,000.
106
Downtown Bozeman Association (DBA) Event Stage $ 50,000 budgeted
On March 10, 2020, the URD board approved a DBA request for $50,000 as matching funds to purchase a portable event stage. Because of a variety of factors, not the least being COVID, the DBA did not purchase a stage in 2020. Subsequently, it should be noted that the previously approved funding was not in the FY2021 URD Budget.
Streetscape Preliminary Engineering $ 50,000 budgeted This will provide preliminary streetscape engineering on North Willson, West Main, and updates to side streets as needed.
Soroptomist Park Planning $ 50,000 budgeted In FY21, the URD partnered with MSU and the CATS Program to develop initial design ideas to transform Soroptomist Park. The next step is to hire a professional firm or team to further the design concepts for the park.
Structured Parking Feasibility Analysis $ 35,000 budgeted This funding will provide further feasibility site analysis of potential locations for the construction of structured parking in the downtown district.
City Economic Development Specialists $ 33,000 budgeted
The URD is committed to partially fund City Economic Development Department Specialists FTE. These employees will work on a variety of tasks directly related to the downtown URD including parking and tax increment financing.
Intersection Cable Anchor Repairs $ 30,000 budgeted
The URD will continue to invest in the repair of the intersection cable and anchor system as they have in the past. The last engineering assessment was completed in 2017. The intersection cables hold the holiday decorations and over street banners.
Wayfinding and Parking Signage Project $ 10,000 budgeted (planning) $ 15,000 budgeted (implementation) This URD funding will assist with developing and to broaden installation of downtown parking signage as recommended in the 2019 Downtown Improvement Plan.
Code Amendments $ 20,000 budgeted This funding assists with code consulting on categories such as maximum height in the “core area”, code flexibility Downtown for new and existing buildings (departures, deviations, relaxations) as recommended in the 2019 Downtown Improvement Plan.
Employee Paid Parking Permit System $ 20,000 budgeted This funding will be used for planning the potential to update parking on-street policies around pricing, time limits and permits to promote use of on-street parking for visitors and customers. Also to collaborate with business owners on employee policies and incentives for alternative transportation use or off-street parking use as recommended in the 2019 Downtown Improvement Plan.
107
The FY2022 Downtown Urban Renewal District Work Plan and Budget was unanimously approved by the URD Board on May 18, 2021. Prepared and submitted by: Emily Cope
Downtown Bozeman Partnership
222 East Main Street #302 Bozeman MT 59715 emily@downtownbozeman.org 406-586-4008
108
Downtown Urban Renewal District FY2022 Budget
Category
Approved
Budget
Income
Starting Cash Balance 3,295,598
Income from TIF 335,000
COB Interlocal Share 1,456,000 Entitlement Share State of Montana 57,050
Interest Income 20,000 Other Income Total Income 5,163,648
Expenses OperationsDBP Management Fee 190,000
Total Operations 190,000
Infrastructure Improvements
Street Furniture and Park Maintenance 25,000 Streetscape--new purchases 30,000
North Rouse Streetscape Project FY21 Encumbered- Streetlamps (26 qty)85,000
FY21 Encumbered- Phase 1 Construction: Conduit 17,000 FY21 Encumbered-Phase 2 Construction: Lamps 80,000
North Willson Streetscape Project 75,000 Streetscape Assistance Grant Program 50,000
Streetlamp Power Reconfiguration Project -
Alley Improvements 50,000
FY20 Encumbered 19,000
DBIP: Bozeman Creek Improvements 50,000 DBIP: Wayfinding & Parking Singage 15,000
Library Pedestrian Safety Improvements -Life-Safety Grant Program 50,000
Fiber Infrastructure 100,000 Fiber-Broadband Infrastructure--Grants 10,000
Intersection Cable Anchor Repairs 30,000 DBA Event Stage 50,000
Parklet 50,000 Alternative Transportation Projects 75,000 Total Improvements 861,000
Planning
City Economic Development Specialist 33,000 Technical Assistance Grants 50,000
FY20 & FY21 Encumbered Funds 45,000 Residential Incentive Program 200,000
Armory Hotel Incentive Encumbered Funds -DBIP: Transportation Planning 25,000
FY20 Encumbered Part One--ConceptsY21 Encumbered- Part Two--Data, Analysis, Cost Est 91,000
DBIP: Alley Planning 45,000 DBIP: Bozeman Creek Planning 30,000
DBIP: Soroptomist Park Planning 50,000
DBIP: Code Amendments 20,000
DBIP: Design Guidelines-Historic Inventories -
DBIP: Design Guidelines 85,000 DBIP: Downtown Infrastruction & Public Realm Pla 100,000
DBIP: General Implementation 100,000 FY20 Encumbered Main Street Truck Study
DBIP: Employee Paid Parking Permit System 20,000 DBIP: Wayfinding Plan & Parking Singage 10,000
Utility Infrastructure Improvements 250,000 SILD & Streetscape Engineering -
Structured Parking Feasibility Analysis 35,000 Structured Parking Informal, Site Plan, Bids 750,000
South Wallace Asbestos Project -
Professional Services Term Contract 75,000
Streetscape Preliminary Engineering 50,000
Total Planning 2,064,000
Parking Structure
Garage Bond Payment 335,000 Total Parking Garage Payments 335,000
Total Expenses 3,450,000
Balance 1,713,648
109
Memorandum
REPORT TO:City Commission
FROM:David Fine, Urban Renewal Program Manager
Brit Fontenot, Economic Development Director
SUBJECT:Midtown Urban Renewal District Fiscal Year 2022 Work Plan and Budget and
Fiscal Year 2021 Annual Report
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Finance
RECOMMENDATION:I move to approve the Midtown Urban Renewal District Fiscal Year 2022
Work Plan and Budget
STRATEGIC PLAN:2.2 Infrastructure Investments: Strategically invest in infrastructure as a
mechanism to encourage economic development.
BACKGROUND:The Midtown Urban Renewal Board unanimously voted to recommend the
attached Work Plan and Budget for Fiscal Year 2022. Fiscal Year 2022, as
proposed, is year of making final payments related to Development
Agreements already approved by the City Commission. The Board
recommends three infrastructure projects for the year, including
improvements at Westlake Park, standards changes to perpetuate the look
and feel of streetscape elements already installed on N. 7th Ave. and a
manual for operating and maintain the streetscape elements. Funding for
standard programs and administration remains similar to last year, with the
exception that the urban renewal program manager position is now funded
exclusively with urban renewal funds.
Please see the attached Midtown Urban Renewal District Fiscal Year 2022
Work Plan and Budget and Fiscal Year 2021 Annual Report for details.
UNRESOLVED ISSUES:None at this time.
ALTERNATIVES:As recommended by the City Commission.
FISCAL EFFECTS:The proposed Work Plan and Budget for Fiscal Year 2022 appropriates
$3,461,551 from $3,515,417 in expected revenues and reserves.
Attachments:
Fiscal Year 2022 Midtown Work Plan and Budget and FY21
Annual Report packet.pdf
110
Report compiled on: June 3, 2021
111
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2022 Page 1 of 8
MIDTOWN URBAN RENEWAL BOARD
FY2021 ANNUAL REPORT
and
FY2022 WORK PLAN AND BUDGET
The City Commission passed Ordinance No. 1685, “Adopting an Urban Renewal
Plan for the North Seventh Avenue Corridor and Adjacent Properties”, on November 27,
2006. On December 16, 2015, the City Commission passed Ordinance No. 1925, which
adopted a new urban renewal plan, expanded the boundaries of the original district, and
renamed the North Seventh Urban Renewal District the Bozeman Midtown Urban Renewal
District.
The 2015 Midtown Urban Renewal Plan provides for the remediation of blighted
conditions within the urban renewal area by advancing five broad goals through a series of
implementing activities and strategies. The five goals include the following items:
1. Promote Economic Development
Rationale: Economic vitality strengthens the community, provides for physical
needs of the citizens, opens reinvestment opportunities, and helps to
eliminate the conditions that contribute to blight.
2. Improve Multimodal Transportation
Rationale: Increasing travel options supports public health, reduces resource
demand, increases efficiency and reduces costs, improving the quality of life
and making the community a better place to live and work, helping to
eliminate conditions that contribute to blight.
3. Improve, Maintain and Support Innovation Infrastructure
Rationale: Infrastructure is the backbone of the community. Private
development typically requires a corresponding public investment in
infrastructure. Therefore, capital improvements in the district will help achieve
economic vitality and address conditions that contribute to blight.
4. Promote Unified, Human Scale Urban Design
Rationale: Protecting and building upon existing physical assets increases
vitality, desirability and leverages economic development, strengthening
community values and mutual support helping to eliminate the conditions that
contribute to blight.
5. Support Compatible Urban Density Mixed Land Uses
Rationale: A sense of place is strengthened by a strong core identity.
Increasing live-work opportunities and community interaction, ensures that
the North 7th Avenue area remains a great place to live, work, operate a
business, and play, and helps to eliminate conditions that contribute to blight.
112
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2022 Page 2 of 8
The City Commission approved the Midtown Action Plan in 2017, which charted a
new direction in pairing infrastructure spending and blight remediation with proposed private
investment. The intent of the Action Plan is to, “attract targeted private investment by
leveraging the market potential of the Midtown District and removing barriers to
redevelopment through strategic infrastructure investments and incentives.” The Annual
Report for Fiscal Year 2020 and the Work Plan and Budget for FY 2021 reflects this specific
strategy and approach to using private investment to propel blight remediation and urban
renewal.
The Midtown Action Plan proposes targeting future development that includes the
following elements:
Infill. The intent of urban renewal is to remove blight to improve an area for the
entire community benefit. Remodeling of existing structures or infill of
underutilized lots is the priority of this Plan. As discussed, infill development is
more challenging than vacant greenfield development and warrants focused
investment of staff time and resources.
Increased building density. Increased building density increases the number
of people in the District, which helps create the desired active pedestrian
environment. More density of buildings grouped together in districts is
especially desired to encourage pedestrians to explore adjacent buildings.
Buildings that are separated by large parking area or vacant lots will impede
pedestrian movement.
Encourages multimodal transportation. New projects should provide
amenities such as adequate bike parking or bus schedule real time monitors in
lobbies. At the same time, the Urban Renewal District should invest in
infrastructure projects such as bike lanes and signals or covered bus stops to
make alternative transportation options visible, safe, and desirable.
Retail that serves surrounding residents. To achieve a more vibrant
pedestrian-oriented environment the District must consist of uses that are a
frequent destination by residents. Retail amenities that are experience based
such as restaurants or ice creams shops are desired because they generate
activity and are more resilient to emerging ecommerce trends. Such amenities
will also attract more housing investment.
Housing. Bozeman is in significant need of all types of housing, therefore it is
called out as a specific use that is desired. The Midtown District zoning is
intended to accommodate more dense housing projects with potential access
to retail amenities nearby.
The City Commission funded a package of several major infrastructure improvements
in the District through the approval of $6,500,000 in bonds with a 25 year term on July 6,
2020. The infrastructure improvements include the streetscape infrastructure on N. 7th Ave.
that enhances the walkability, aesthetics, and investment potential of the District as a whole,
along with improvements to Aspen St. and N. 5th Ave. that will accelerate ongoing private
investment in this emerging node of commercial activity.
The District is also focused on investing in public infrastructure that removes barriers
to specific private investments. These incentives primarily pay for the costs of public
113
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2022 Page 3 of 8
infrastructure associated with the private projects, as well as demolition costs and the cost of
various system development charges, such as impact fees. These early investments in
projects will create new incremental taxable value that will allow for greater blight remediation
throughout the District in the coming years. Over time, these increases in taxable value will
benefit the broader community by increasing the overall tax base through productive infill
development.
The remediation of blighted conditions in the District and its ongoing redevelopment
will take many years. The July issuance of revenue bonds means, Bozeman has 24 more
years to focus on redevelopment of the Midtown area. As instructed by Commission adopted
policy documents, the District will continue to focus on remediating blight, by attracting
targeted private investment and growing the tax base.
114
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2022 Page 4 of 8
Midtown Urban Renewal District (MURB)
FY2020 Annual Report (July 1, 2020 to June 30, 2021)
Highlights of investments over $15,000 are documented below.
Series 2020 Bond Payment $410,000
The City Commission approved the first series of bonds for the district for $6,500,000.
The proceeds of the bonds were to pay for the N. 7th Ave. Streetscape Project and the Aspen
and 5th Improvements Project. The term of the bonds is 25 years.
Midtown Infrastructure Improvements Urban Renewal Project $6,997,645
The Midtown Infrastructure Improvements Project includes several sets of public
infrastructure improvements throughout the District:
North 7th Avenue Streetscape between Mendenhall Street and Durston Road
Aspen Street Festival Street Streetscape Enhancements and new Water Line
Westlake BMX Park Parking on N. 5th Ave.
North 5th Avenue Sewer Line between Aspen and Oak Street
North 5th Avenue Multi-Use Path between Tamarack and Oak Street
Extension of the City of Bozeman Fiber Optic Conduit System along N. 5th Ave.
Professional Services - Engineering $26,799
The District spent $26,799 on engineering services, $22,020 of which was for third
party materials testing by Morrison Maierle for the Aspen and 5th Improvements Project.
PDI Investments Grant (Access Fitness/ Nu2u) $ 50,000
The Board provided a TIF Assistance Grant to the owner of the Nu2u building, which
is being converted into an Access Fitness with a new façade. The grant reimbursement paid
for new water and fire lines to the building that were oversized to allow for future
redevelopment of the property as a multistory mixed-use building.
The Monarch Grant $ 149,346
The Monarch mixed-use project at Peach and 6th was the first ever TIF Assistance
Program Grant Agreement. The project was also connected to the City fiber optic conduit
system through a separate line item.
Expenditures Compiled May 27, 2021
115
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2022 Page 5 of 8
Midtown Urban Renewal District (MURB)
FY2022 Work Plan (July 1, 2021 to June 30, 2022)
Midtown Infrastructure Improvements
Westlake Park Improvements $358,000
The District paid to add back-in angle parking to serve as parking for Westlake Park
as part of last year’s improvements to N. 5th Ave. The project significantly impacted the
mountain bike facilities manage by Southwest Montana Mountain Bike Association
(SWMMBA). A recently update park master plan calls for relocating the mountain bike
facilities and building an entrance plaza near the intersection of N. 5th Ave. and the recently
complete Aspen Festival Street. The improvements would also include a new, quiet electric
start gate for the BMX course, which will allow for much quieter operations and an improved
racing experience.
Codify Design Standards for N. 7th Ave. Streetscape $50,000
Recent improvements to the N. 7th Ave. streetscape are not currently required for
redevelopment projects on the corridor. In order to protect the public investments already
made and to ensure design continuity for the corridor, codifying the streetscape design is
necessary for the future development of the corridor.
Streetscape Operations and Maintenance Manual $8,000
The new streetscape will require regular maintenance. This item would allow the
designer to create a manual to make sure long-term care and maintenance of the recently
installed facilities is properly documented.
Bond Repayment
Series 2020 $ 410,000
The City Commission approved the Series 2020 bonds for a 25 year term that ends
2045. $410,000 is the annual payment on the $6,500,000 in debt issued to finance the cost
of the N. 7th Ave. Streetscape Project, and the Aspen and N. 5th Ave. Improvements Project.
Professional Services and Outside Legal Counsel
Contracted Professional Services $ 50,000
To assist with district management and implementation of the work plan and budget,
as well as responding to new opportunities, Staff will contract for services on an as-needed
basis.
Outside Legal Counsel $ 60,000
The Midtown Urban Renewal District continues to see strong interest in redevelopment. This
interest will necessitate work on development agreements under the Midtown TIF Assistance
Program, and depending on the scope of the projects, the need to issue additional bonds.
116
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2022 Page 6 of 8
Redevelopment Incentive Programs
The Midtown Urban Renewal District’s redevelopment incentive programs are based on
criteria included in the 2015 Midtown Urban Renewal District Plan and the 2017 Midtown
Action Plan.
Technical Assistance Grants (TAG) $ 15,000
This program is to provide technical assistance funding to encourage developers to
build on parcels along the N. 7th Avenue corridor, or rehabilitate existing structures. It
recognizes the complexities of redeveloping parcels which have existing substandard
buildings and infrastructure; it was created to offset the costs of those complexities with grants
for those proposing work which eliminates blight and advances the implementation of the
District Plan. The program was approved by Resolution 4777 and is administered by the
MURB. The maximum grant amount for the program is $7,500 and requires a 1:1 match.
Midtown Tax Increment Finance Assistance Program –
Direct Incentives $ 100,000
The City Commission approved an incentive program, the Midtown TIF Assistance
Program pursuant to Resolution 4770 in 2017. Resolution 5087 reauthorized and updated
the Program in 2019. Awards will be based on the quality of projects and their support of the
Midtown Urban Renewal Plan. Projects of a larger magnitude may require the issuance of tax
increment revenue bonds. Projects $50,000 and under may be awarded by the Board and
sent to the City Commission as Consent Items. Projects over $50,000 require the approval of
the City Commission.
Fiber Conduit Connection Incentive Program $ 20,000
The District has made significant investments in facilitating competitive
telecommunications options through the provision of public conduit. This program, modeled
on a program created by the Downtown URD provides matching grants of up to $2,500 to
connect buildings to the City conduit system. The program facilitates connections to
infrastructure and the utilization of the existing conduit investment.
District Operations
Outreach and Mailing $ 10,000
The Board has requested money for public noticing and outreach activities in the
District. The purpose of these outreach activities is to inform and engage property owners
and the public in the implementation of the Midtown Urban Renewal Plan.
Midtown Marketing and Recruitment $ 10,000
This item includes maintenance of the new website midtownbozeman.org as well as
programs like the banner program to drive traffic to the website. The District website,
117
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2022 Page 7 of 8
midtownbozeman.org to communicate effectively with property owners, developers, and the
public and “to disseminate blight clearance and urban renewal information.” In addition, the
board and staff continue to actively recruit development projects in the district that are in
support of the urban renewal plan.
Payroll $ 89,000
The City’s Economic Development Department manages the Bozeman Urban
Renewal District in response to City Commission and the Midtown Urban Renewal Board
work plans and policy guidance. 1.5 FTE are dedicated to staffing the Bozeman Urban
Renewal Program as a whole, of which the Midtown URD contributes a proportionate share
of funding. The urban renewal district move to cover 100% of the urban renewal program
manager’s salary, which was previously 30% funded by the general fund.
Training $ 6,000
Strong professional development drives the success of the urban renewal program.
Staff plans to participate in the National Development Council’s Economic Development
Finance Professional (EDFP) Certification Program and the International Economic
Development Council’s (IEDC) certified economic developer course series over a number of
years
Midtown Tax Increment Finance Assistance Program
Approved Grants and Direct Incentives
Five projects were approved by the City Commission as Urban Renewal Projects
under the Midtown TIF Assistance Program and are expected to be complete in FY 2021.
Taken together, these five projects are expected to generate $30,154,499 in private
investment for $2,048,159 in public incentives, which represents a private to public
investment ratio of 14.72:1.
West Peach Condos (encumbered from FY21) $ 256,355
The West Peach Condos project is comprised of 17 two bedroom, one office, three
bathroom, and two car garage, townhouse-style condominium units. The project is located at
the northwest corner of N. 3rd Ave. and W. Peach St. The City Commission approved the
project as an urban renewal project pursuant to Resolution 5046 following a public hearing at
its May 20, 2019 meeting. The project represents a $7,656,246 investment in the District.
The Ruh Building (encumbered from FY21) $ 747,500
The Ruh Building is proposed as a 34,066 SF, 3-story, mixed-use building with
restaurant/retail uses on the ground floor and 16 residential units on the upper floors. The
project is located at the northwest corner of N. 7th Ave. and Durston Rd. The City Commission
approved the project as an urban renewal project pursuant to Resolution 4991 following a
public hearing at its February 11, 2019 meeting. The project represents a $6,676,667
investment in the District.
118
Bozeman Midtown Urban Renewal District
An Urban Renewal District with a Tax Increment Financing (TIF) Program
Midtown Urban Renewal Board Annual Work Plan and Budget FY2022 Page 8 of 8
The Ruh Building Streetscape $ 103,737
The Board recommends approval of a forthcoming amendment to the existing grant
agreement for The Ruh Building. At staff’s urging, the Developer modified their site plan to
make sure the streetscape elements matched those on the remainder of the corridor. In
addition the Montana Department of Transportation (MDT) is widening the intersection of N.
7th Ave and Durston Rd. and the new design is configured to be able to remain in place with
the widening project.
Aspen Crossing (encumbered from FY21) $ 849,959
The Ruh Building is proposed as a 10,000 SF, 2-story, retail and commercial building.
The project is located at the southwest corner of N. 5th Ave. and Tamarack St. The Midtown
Urban Renewal Board approved the project at its April 30, 2020 meeting. The project
represents a $16,147,097 investment in the District.
Zambon Building (encumbered from FY21) $ 45,000
The Zambon Building is proposed as a 65,000 SF, 3-story, mixed-use building with
restaurant/retail uses on the ground floor and 25 residential units on the upper floors. The
project is located at the northwest corner of N. 5th Ave. and Aspen St. The City Commission
approved the project as an urban renewal project pursuant to Resolution 4992 following a
public hearing at its March 25, 2019 meeting. The project represents a $2,941,000 investment
in the District.
119
Bozeman Midtown Urban Renewal Board Fiscal Year 2022 Work Plan and Budget
FY2022
Revenue and Reserves
Estimated FY21 Ending Balance $2,350,642
Estimated FY22 Revenue $1,164,775.00
Total Cash and Reserves $3,515,417
Infrastructure Investments
Westlake BMX Park Improvements $358,000
Codify Design Standards for N. 7th Avenue Streetscape $50,000
Streetscape Operations and Maintenance Manual $8,000
Bond Repayment
Series 2020 $410,000
Professional Services and Outside Legal Counsel
Outside Legal Counsel for Bonding and Redevelopment Agreements $60,000
Contracted Professional Services $50,000
Redevelopment Incentive Programs
Technical Assistance Grants 1:1 match [2 grants]$15,000
Direct Incentives - Midtown TIF Assistance Program $100,000
City Fiber Conduit Connection Incentive Program $20,000
District Operations
Outreach Engagement and Mailing $10,000
Midtown Marketing and Recruitment $10,000
Payroll $89,000
Training $6,000
Approved Grants and Direct Incentives
West Peach Condos (encumbered from FY21)$256,355
Zambon Building (encumbered from FY21)$45,000
Aspen Crossing (encumbered from FY21)$849,959
The Ruh Building (encumbered from FY21)$747,500
The Ruh Building Streetscape $103,737
The Elm Grant $233,000
El Mercadito $40,000
Total New Expenditures for FY 2022
New Expenditures $3,461,551
TOTAL EXPENDITURES FY 2021 $3,461,551
Year End Balance $53,866
*Items in green have been updated since the Midtown Urban Renewal Board recommended this budget.
120
Memorandum
REPORT TO:City Commission
FROM:David Fine, Urban Renewal Manger
SUBJECT:North Park Urban Renewal District Fiscal Year 2022 Work Plan and Budget
and Fiscal Year 2021 Annual Report
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Finance
RECOMMENDATION:
I move to approve the North Park Urban Renewal District Fiscal Year 2022
Work Plan and Budget.
STRATEGIC PLAN:2.2 Infrastructure Investments: Strategically invest in infrastructure as a
mechanism to encourage economic development.
BACKGROUND:The North Park Urban Renewal District was created in 2006 as an Industrial
Tax Increment Finance District. In 2017, by Ordinance No. 1979 the
Mandeville Farms Tax Increment Financing Industrial District Created by
Ordinance No. 1684, was terminated and the North Park Urban Renewal
District was created.
Until now there has been limited activity in the North Park URD. We are
aware of a significant development vision within the North Park URD and
staff recommends appropriating the entirety of the North Park URD
increment in FY 22. The District accumulated $45,764 in actual revenue in
FY20 and maintains a total fund balance of $111,444 for planning and
projects in the District.
UNRESOLVED ISSUES:None at this time.
ALTERNATIVES:As suggested by the City Commission.
FISCAL EFFECTS:Fiscal effects are undetermined at this time. Staff recommends
appropriating the entirity of the North Park URD increment, $45,764 as actual
revenue in FY20 and a total fund balance of $111,444 for future planning and
projects in the District.
Report compiled on: June 3, 2021
121
Memorandum
REPORT TO:City Commission
FROM:David Fine, Urban Renewal Program Manager
Brit Fontenot, Economic Development Director
SUBJECT:Northeast Urban Renewal District Fiscal Year 2022 Work Plan and Budget
and Fiscal Year 2021 Annual Report
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Finance
RECOMMENDATION:I move to approve the Northeast Urban Renewal District Fiscal Year 2022
Work Plan and Budget.
STRATEGIC PLAN:2.2 Infrastructure Investments: Strategically invest in infrastructure as a
mechanism to encourage economic development.
BACKGROUND:The Northeast Urban Renewal Board voted to recommend the attached
Work Plan and Budget for Fiscal Year 2022. The Board selected
reconstruction of a section of Front St. between Tamarack and Ida that
coordinates with construction of the intersection of Ida and Front St. that is
being completed this fall by the privately led Cottonwood and Ida Project.
The Board also prioritized funding for doing due diligence related to a
proposed public private partnership for structured parking in the District.
Funding for standard programs and administration remains similar to last
year, with the exception that the urban renewal program manager position
is now funded exclusively with urban renewal funds.
Please see the attached Northeast Urban Renewal District Fiscal Year 2022
Work Plan and Budget and Fiscal Year 2021 Annual Report for details.
UNRESOLVED ISSUES:None at this time.
ALTERNATIVES:As recommended by the City Commission.
FISCAL EFFECTS:The proposed budget appropriates $641,000 on $641,000 in expected
revenues and reserves, while designating $117,400 for future projects.
Attachments:
FY22 NEURD Work Plan and Budget Packet 20210615.pdf
Report compiled on: June 3, 2021
122
Northeast Urban Renewal Board Annual Work Plan and Budget FY2022 – 041521 draft 1
NORTHEAST URBAN RENEWAL BOARD
FY2021 ANNUAL REPORT
and
FY2022 WORK PLAN AND BUDGET
On November 28, 2005, the Bozeman City Commission finally adopted Ordinance No. 1655 which
formally enacted the Northeast Urban Renewal Plan and became effective December 28, 2005. The
stated mission of the plan and general goals are as follows:
DISTRICT PLAN MISSION/VISION
“This Plan is the City’s response to remedy the conditions of blight found in the August 2005 [Blight]
Report. The Plan also addresses other issues important to the District. The Plan’s purpose is to
ensure the vitality of the Northeast Urban Renewal District (NURD) the vitality of the NURD for
generations to come, and to make the NURD an area in which its citizens can take exceptional pride.
The Plan envisions a mixed use neighborhood that is user friendly, safe, secure and healthy. While
this Plan envisions a District with diversity of housing, businesses and amenities, it intends to maintain
the unique ambiance and historic character of the District”.
Nine principles were developed for the plan. Each of the principles has one or more goals associated
with the plan, some of which specifically relate to this work plan while others represent general
objectives and directives. The Northeast Urban Renewal Board (NURB) goals are as follows:
GENERAL GOALS:
Outdated or insufficient infrastructure should be repaired, replaced, or otherwise improved.
Provide public utilities to the area efficiently in ways that are not visually or physically obtrusive.
Encourage a land use pattern that facilitates all modes of transportation – vehicular, bicycle,
pedestrian, mass transit, and commercial – for safe, efficient and convenient access for
residential, commercial, and industrial uses.
Harmonize commercial and industrial development with residential quality of life.
New structures should be designed and built keeping in mind the public values of durability,
flexibility, and simplicity. Thoughtful consideration of design, materials, and massing in the
construction of new private buildings will add strength and character to the built environment. To
the degree that the private sector can be influenced by a public partner in development, the
community ought to strongly encourage excellence in urban design as a basis of partnership.
Promote sustainable building practices and design within the district.
Procure new land for park and open space.
Improve landscaping in existing public spaces.
Neither the City of Bozeman nor any of its subdivisions shall use eminent domain to take private
property for private use in the implementation of an urban renewal project or similar
redevelopment plan.
Encourage the City to help ensure the success of the Northeast Urban Renewal Plan by giving a
high priority to the Northeast District in its capital improvements plan.
Work with neighborhoods and businesses to ensure actions taken in the district are compatible
with adjacent developed areas.
Work with the City to ensure actions taken outside of the District are compatible with projects
inside of the District.
123
Northeast Urban Renewal Board Annual Work Plan and Budget FY2022 – 041521 draft 2
In 2010, the Northeast Urban Renewal Board began implementing plans and projects reflecting their
three funding priorities: 1) Parks, Trails and Greenspace; 2) Infrastructure and 3) Neighborhood
Development Plan.
Northeast Urban Renewal District (NURB)
FY2021 Annual Report (July 1, 2020 to June 30, 2021)
Front Street – Tamarack to Ida Engineering $ 30,000
East Tamarack Street has been improved to the west edge of the depot site; and North Ida
Avenue, East Aspen Street and that portion of Front Street adjacent to the boulder site are to be
improved by the developer of the TinWorks Project. This leaves that section of Front Street
between the terminus of the East Tamarack Street and North Ida Avenue projects unimproved.
These improvements are now engineered so that they can be made when the opportunity arises,
likely when the off-site street improvements for the TinWorks Project are done.
Pedestrian Bridge/East Aspen Street $ 30,000
This project has been included in this district’s work plan and budget since Fiscal Year 2011. It
was also the fifth project listed in the bond resolution adopted in 2017; however, those bond
proceeds funded only the top two projects. With the completion of other major infrastructure
projects in the district and the increased increment resulting from the 2019 reappraisal, monies
were available for final engineering of this project, which includes sidewalk along one side of East
Aspen Street between the creek and North Rouse Avenue. Also, the Montana Department of
Transportation has completed its improvements to North Rouse Avenue.
Since engineering for this project was last completed in FY2017 and since the floodplain map has
recently been updated, it was important to update the engineering for this project to determine
whether the bridge has adequate length and to update the estimated construction costs. Once
those cost estimates have been identified, monies for construction can be appropriately
budgeted.
Front Street Connector Trail $ 15,000
In Fiscal Year 2016, the Board donated $20,000 to the Gallatin Valley Land Trust for the Front
Street connector trail, which extends from North Rouse Avenue to North Wallace Avenue. Due to
a variety of issues, construction of the trail improvements has been delayed. The bridge has
been engineered to reflect the new floodplain and cost estimates updated. Also, for some of
those projects previously listed as “future”, now is the future. The Gallatin Valley Land Trust
requested an additional $15,000 to help cover the increased costs. To date, the project has not
begun and the monies have not been expended in this fiscal year.
Quiet Zone Feasibility Study $ 11,500
The Board recognized a quiet zone will reduce the noise from trains rolling through; however, all
three crossings (North Wallace Avenue, North Rouse Avenue and Griffin Drive) must be
considered at the same time to pursue quiet zone options. It acknowledged that only one
crossing lies within the district and, therefore, is the only one that can be funded through TIF
funds. The quiet zone feasibility study is nearing completion and the engineering firm has
identified the improvements needed to create a quiet zone. The amount budgeted for this project
covered the costs of the North Wallace Avenue crossing only; monies from other sources funded
124
Northeast Urban Renewal Board Annual Work Plan and Budget FY2022 – 041521 draft 3
the other two crossings.
Parking Structure $ 25,000
The TinWorks Planned Unit Development project has revised its plans to include a parking
structure on the Brewery site. Within the proposed project is a parking structure that will be
wrapped by buildings so it is not readily visible from the adjacent streets. The developer is
proposing that a portion of the spaces in that structure be made available to the public through
some type of public/private partnership. These monies cover the costs of retaining the needed
consultants to do due diligence to determine that this proposal is in the City’s best interests.
Trails Maintenance $ 5,700
The Northeast Urban Renewal District completed improvements to the depot trail, depot park,
Aspen Street trail and North Church Avenue trail several years ago and continues to pay annual
costs for maintenance of those amenities. Also included is the planting of seven boulevard trees
along East Tamarack Street and the weekly watering of those newly planted trees to ensure their
survival.
Administrative Services $ 23,100
Costs covered under this item include staff support ($3,000), administrative services ($10,100)
and professional services ($10,000).
Bond Costs $ 213,900
Costs covered under this item include bond repayment ($93,000) and the designated bond
reserve ($120,900).
Northeast Urban Renewal District (NURB)
FY2022 Work Plan (July 1, 2021 to June 30, 2022)
Front Street – Ida to East Aspen Street Engineering $ 18,000
The off-site street improvements required for the TinWorks Project include only one-half of the
Front Street improvements from North Ida Avenue eastward to East Aspen Street. Completion of
the full street improvements would improve traffic flow in the District and would be most efficiently
designed and constructed in conjunction with the larger scale improvements that will come with
this large-scale development project.
Front Street – Tamarack to Ida Construction $ 190,000
It would be financially beneficial to construct this improvement in conjunction with the
improvements being made by the developer of the TinWorks Project. Also, it will result in more
cohesive completion of infrastructure improvement within the district and will benefit the
community as a whole. Included in the project will be extension of the fiber conduit installed with
the East Tamarack Street improvements.
Front Street connector trail $ 15,000
In Fiscal Year 2016, the Board donated $20,000 to the Gallatin Valley Land Trust for the Front
Street connector trail, which extends from North Rouse Avenue to North Wallace Avenue. Due to
a variety of issues, construction of the trail improvements has been delayed. The monies were
included in the FY2021 budget and work plan but were not expended and are, therefore, being
125
Northeast Urban Renewal Board Annual Work Plan and Budget FY2022 – 041521 draft 4
carried forward in this budget.
Parking Structure due diligence $ 50,000
The TinWorks Planned Unit Development project has revised its plans to include a parking
structure on the Brewery site. Within the proposed project is a parking structure that will be
wrapped by buildings so it is not readily visible from the adjacent streets. These monies cover
the costs of retaining consultants to do any additional due diligence needed to determine that this
proposal is in the district’s best interests, particularly since the proposal is to issue tax increment
financing bonds to reimburse the developer for the costs of the parking structure and to operate it
as a public facility. It is currently anticipated that this could occur in Fiscal Year 2024.
Trails Maintenance $ 5,700
The Northeast Urban Renewal District completed improvements to the depot trail, depot park,
Aspen Street trail and North Church Avenue trail several years ago and continues to pay annual
costs for maintenance of those amenities. Also included is the planting of seven boulevard trees
along East Tamarack Street and the weekly watering of those newly planted trees to ensure their
survival.
Administrative Services $ 31,000
Costs covered under this item include staff support ($18,000), administrative services ($3,000)
and professional services ($10,000).
Bond Costs $ 213,900
Costs covered under this item include bond repayment ($93,000) and designated bond reserve
($120,900). These are static costs for the bonds that were issued in 2017 and must be budgeted
through Fiscal Year 2042.
Designated Reserve - Projects $ 117,400
At this time, it does not appear there will be adequate monies to fund construction of any
additional large scale projects. If the opportunity arises, one of the projects listed below may be
moved forward and funded through this designated reserve, particularly if such a move results in
significant cost savings.
Northeast Urban Renewal District (NURB)
Future Projects
North Ida Avenue – Peach to Cottonwood Engineering $ 50,000
Infrastructure improvements to be made in conjunction with the TinWorks Project include North
Ida Avenue between East Cottonwood Street and Front Street. Those improvements will leave
the one-block segment between East Peach Street and East Cottonwood Street without
improvement. It is important to undertake engineering of this block so that construction of the
improvements can be completed when the opportunity arises.
North Ida Avenue – Peach to Cottonwood Construction $ 280,000
While it is anticipated the off-site infrastructure improvements for the TinWorks Project will be
constructed before this project is ready, this will be the last block of street improvements needed
to meet the district plan’s goal of improving connectivity and pedestrian safety within the District
(assuming the Front Street improvements have been completed). Currently, the use/reuse of the
126
Northeast Urban Renewal Board Annual Work Plan and Budget FY2022 – 041521 draft 5
properties along this block are not known, so undertaking construction of these street
improvements (which will include water and sewer improvements) could result in the need for
immediate tear up to relocate water and sewer stubs or drive accesses.
Front Street – Ida to Aspen Construction $ 100,000
The off-site street improvements required for the TinWorks Project include only one-half of the
Front Street improvements from North Ida Avenue eastward to East Aspen Street. This project
will provide completion of the full street improvements. It be most efficiently constructed in
conjunction with the larger scale improvements that will come with the TinWorks Project
improvements.
Pedestrian Bridge/East Aspen Street Construction $ 170,000
This project will provide for pedestrian connectivity through a trail extension and a non-vehicular
crossing of Bozeman Creek. The project also includes sidewalk along one side of East Aspen
Street between the creek and North Rouse Avenue. This will result in improvement to yet another
street within the district and will tie into the new improvements to North Rouse Avenue.
Quiet Zone Construction $ 168,500
The quiet zone study has identified the improvements required for quiet railroad crossings. It is
anticipated that the improvements for the North Wallace Avenue/L Street crossing will include an
arm for the pedestrian crossing as well as raised medians on both sides of the railroad tracks to
preclude vehicles from driving around down arms. It is anticipated that improvements to Griffin
Drive, including upgrades at the railroad crossing, could be completed in Fiscal Year 2022. Since
improvements will be required for all three crossings at essentially the same time, it is important
to have monies set aside when those improvements are triggered.
Connector trail – Depot trail to Audubon site $ 25,000
The Audubon Society has acquired 32 acres of wetlands and sensitive lands lying east of this
district and is purchasing an additional 8 acres. The subject site lies outside the boundaries of
the district; however, a portion of the trail extension lies within the district. Monies may be used
for extensions to a specific location outside the district; however, these monies are for only that
portion lying within the district. This trail extension would provide a safe access for pedestrians
moving through the district to the enhanced wetlands area.
127
FY22 Budget Future Projects
Revenues:
Estimated Beginning Balance $370,000.00
FY21 Tax Increment $270,000.00
Delinquent Increment
State Shared/Entitlement
Interest $1,000.00
Total Estimated Revenues $641,000.00
Expenditures:
Infrastructure
Front Street - Ida to East Aspen Street Engineering $18,000.00
Front Street - Tamarack to Ida Construction $190,000.00
North Ida Avenue - Peach to Cottonwood Engineering $50,000.00
North Ida Avenue - Peach to Cottonwood Construction $280,000.00
Front Street - Ida to East Aspen Street Construction $100,000.00
Pedestrian Bridge/East Aspen Street Construction $170,000.00
Front Street connector trail $15,000.00
Quiet Zone Construction $168,500.00
Connector trail - Depot trail to Audubon site $25,000.00
Parking Structure $50,000.00
Subtotal - Infrastructure $273,000.00 $793,500.00
Maintenance
Trails/Boulevards Maintenance $5,700.00
Subtotal - Maintenance $5,700.00
Administration
Staff Support $3,000.00
Administrative Services $18,000.00
Professional Services $10,000.00
Bond Repayment $93,000.00
Subtotal Administration $124,000.00
Reserves
Designated Reserve - Bond $120,900.00
Designated Reserve - Projects $117,400.00
Subtotal Reserves $238,300.00
Total Expenditures $641,000.00
Northeast Urban Renewal District
2021-2022 Budget
128
Memorandum
REPORT TO:City Commission
FROM:Kristin Donald, Finance Director
Mitch Overton, Parks & Recreation Director
SUBJECT:Resolution 5289 Setting Cemetery Fees and Perpetual Care Fund Deposits
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Resolution
RECOMMENDATION:Move to approve resolution 5289 setting Cemetery fess and Perpetual Care
Fund deposits.
STRATEGIC PLAN:7.5. Funding and Delivery of City Services: Use equitable and sustainable
sources of funding for appropriate City services, and deliver them in a lean
and efficient manner.
BACKGROUND:
The 73+acre Sunset Hills Cemetery, the only City owned and maintained cemetery, is
a virtual arboretum of stately pine, fir, spruce, ash, maple, cedar and various
ornamental trees, which are maintained by the Forestry Division with assistance from
the Cemetery Division. The cemetery currently contains over 16,000 burial sites,
three columbariums, nine dedicated affiliation areas and ample room for expansion.
To make the Cemetery operations rely less on taxes and more on charges for services,
while still contributing to the Perpetual Care Fund, we are recommending increasing
Cemetery fees and reducing the revenue being deposited into the Perpetual Care
Fund.
The Cemetery Advisory Board met on May 27, 2021 and is recommending the
changes to the Commission.
Please see attached memo for the complete analysis and the resolution for the
specific fee changes.
UNRESOLVED ISSUES:None
ALTERNATIVES:As suggested by the Commission.
FISCAL EFFECTS:Increase fees for FY22 by 4% and 3% thereafter along with rounding to the
nearest dollar. For FY22 this would be an estimated increase of revenue of
$6,000 - $8,000 depending on the type of sales during the year.
Instead of 35% of all revenues going to the Perpetual Care Fund, have 25% of
129
all lot sales go to the fund. This would change the amount of the revenue
going to the fund by $20,000 and that $20,000 would go to current operations.
Plot sales vary each year so the deposit to the perpetual care fund would now
range from $12,000 to $20,000. The fund will continue to earn interest as
well, and the interest is averaging around $20,000 a year and will continue to
grow.
Attachments:
Cemetery Memo For Fee Changes .docx
Resolution 5289 Cemetery Fees.docx
Report compiled on: June 2, 2021
130
Cemetery Fee Changes
Background:
During FY2018 we reviewed Cemetery fees for the first time since 2011. As part of this review we looked
at the fees and the amount of the fees going towards the Perpetual Care Fund. Before 2011 the Perpetual
Care Fund had a small balance and needed to be built up and preserved for the future care of the
cemetery. In 2011 all lot sale revenue went to the Perpetual Care Fund.
With recommendation from the Cemetery Board, the Commission approved 35% of all revenues. In
addition, with a long space between fee change fees in the past, fees were increased by 25% in 2011 and
2% for the year’s following.
Now that the Perpetual Care Fund is in a good funding place and Cemetery Costs have increased we need
to look at the fee rates and the Perpetual Care fund deposit.
Currently, taxes are heavily supplementing Cemetery Operations and it is our recommendation that
reliance on taxes should decrease. We recommend that tax support move closer to 50% from its current
level of nearly 80%:
Since the changes made in 2011 and in 2018, the Perpetual Care Fund is healthier and no spending has
occurred in the fund. As of the FY20 the Perpetual Care Fund has a balance of over $1.5 million and is
earning interest.
13%15%13%17%11%21%
87%85%87%83%89%79%
0%
20%
40%
60%
80%
100%
120%
FY16 FY17 FY18 FY19 FY20 FY21 Budget
Funding Breakdown for Cemetery Operations
% Funded by General Fund Taxes
% Funded by Charges for Services
131
Recommendation
To make the Cemetery operations rely less on taxes and more on charges for services, while still
contributing to the Perpetual Care Fund we are recommending:
Increase fees for FY22 by 4% and 3% thereafter along with rounding to the nearest dollar. For
FY22 this would be an estimated increase of revenue of $6,000 -$8,000 depending on the type of
sales during the year.
Instead of 35% of all revenues going to the Perpetual Care Fund, have 25% of all lot sales go to
the fund. This would change the amount of the revenue going to the fund by $20,000 and that
$20,000 would go to current operations. Plot sales vary each year so the deposit to the perpetual
care fund would now range from $12,000 to $20,000. The fund will continue to earn interest as
well, and the interest is averaging around $20,000 a year and will continue to grow.
These two changes will still keep investing for the long term care of the cemetery and not rely has heavily
on taxes for operations. We will monitor and continue to evaluate fees and the Perpetual Care fund.
2010, $544,209
2014, $880,682
2018, $1,311,442
2020, $1,522,049
$-
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Perpetual Care Fund Balance
132
RESOLUTION NO. 5289
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN,
MONTANA, SETTING CEMERTY FEES AND PERPETUAL CARE FUND DEPOSITS.
WHEREAS,on April 2, 2018 the City Commission passed Resolution 4865 amending
the fees for Sunset Hills Cemetery; and
WHEREAS,the City Commission has requested that Sunset Hills Cemetery fees be
periodically assessed for updating; and
WHEREAS, public notice was provided in conformance with Montana Code Annotated
7-1-4127 regarding the public hearing to address amending the Sunset Hills Cemetery fee
schedule; and
NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of
Bozeman, Montana, to wit:
Section 1 – Fee Schedule
That the following schedule of fees shall be effective for the sale of cemetery lots and other
cemetery services, on July 1, 2021 as described:
133
Section 2 – Perpetual Care Fund Deposits
Change the current percentage of revenues to the Perpetual Care Fund from 35% of all revenues
to 25% of all lot sales starting July 1, 2021.
4%3%3%
Fee 2022 2023 2024
Adult Lots 1,560.60$ 1,623$ 1,672$ 1,722$
Ashes Lots 1,170.45$ 1,217$ 1,254$ 1,291$
Infant Lots 118.02$ 123$ 126$ 130$
Columbarium 934.33$ 972$ 1,001$ 1,031$
Second Urn 295.06$ 307$ 316$ 326$
Opening and Closing Adult 786.80$ 818$ 843$ 868$
Opening and Closing Ahses 393.40$ 409$ 421$ 434$
Opening and Closing Infant 157.36$ 164$ 169$ 174$
Opening and Closing Conty/MSU 393.40$ 409$ 421$ 434$
Opening and Closing Columbarium 196.70$ 205$ 211$ 217$
Weekend/Holiday Opening and Closing Adult 1,131.03$ 1,176$ 1,212$ 1,248$
Weekend/Holiday Opening and Closing Ahses 560.59$ 583$ 601$ 619$
Weekend/Holiday Opening and Closing Infant 226.21$ 235$ 242$ 250$
Weekend/Holiday Opening and Closing Conty/MSU 560.59$ 583$ 601$ 619$
Weekend/Holiday Opening and Closing Columbarium 295.06$ 307$ 316$ 326$
Disinterment Triple Opening and Closing Adult 2,360.41$ 2,455$ 2,528$ 2,604$
Disinterment Triple Opening and Closing Ahses 1,180.20$ 1,227$ 1,264$ 1,302$
Disinterment Triple Opening and Closing Infant 472.08$ 491$ 506$ 521$
Disinterment Triple Opening and Closing Conty/MSU 1,180.20$ 1,227$ 1,264$ 1,302$
Disinterment Triple Opening and Closing Columbarium 590.10$ 614$ 632$ 651$
Extra depth operation hours 1,573.61$ 1,637$ 1,686$ 1,736$
Extra depth after hours 2,262.06$ 2,353$ 2,423$ 2,496$
Monument Setting Permit 29.51$ 31$ 32$ 33$
Admin fee for Reconveyance to City 49.17$ 51$ 53$ 54$
Lowering device Rental 59.02$ 61$ 63$ 65$
Disinterment/Reinternment within one week 688.46$ 716$ 737$ 760$
County interment for infant or ashes 98.36$ 102$ 105$ 109$
Payment in Lieu of Vault 688.46$ 716$ 737$ 760$
Memorial Garden Plaque 318.36$ 331$ 341$ 351$
Current
Rate
134
PASSED, ADOPTED, AND APPROVED by the City Commission of the City of
Bozeman, Montana, at a regular session thereof held on the 15 day of June, 2021.
___________________________________
CYNDY ANDRUS
Mayor
ATTEST:
___________________________________
MIKE MAAS
City Clerk
APPROVED AS TO FORM:
___________________________________
GREG SULLIVAN
City Attorney
135
Memorandum
REPORT TO:City Commission
FROM:Kristin Donald, Finance Director
SUBJECT:FY22 City Manager Recommended Budget- Special Revenue Funds
Presentation
MEETING DATE:June 15, 2021
AGENDA ITEM TYPE:Finance
RECOMMENDATION:Listen to staff presentations, ask questions, give direction as you see fit.
STRATEGIC PLAN:7.5. Funding and Delivery of City Services: Use equitable and sustainable
sources of funding for appropriate City services, and deliver them in a lean
and efficient manner.
BACKGROUND:Special Revenue Funds are used to account for the proceeds of specific
revenue sources that are legally restricted to expenditure for specific
purposes. The revenue is generated in different ways; some have
assessments on properties, property taxes, charges for services, and some
are funded through grants or donations.
The FY22 City Manager Recommended Budget can be found online at: FY22
City Manager Recommended Budget. We will be highlighting the financial of
the found found on pages 36-47 as well as the divisions funded in full or in
part by the fund. Division details begin on page 63.
We will present the following groupings for the Special Revenue funds and
funded division information, then pause for questions after each grouping:
Street Maintenance Fund and Arterial and Collector District Fund
Parks & Trails District Fund and Tree Maintenance (Forestry) Fund
Community Development- Planning Fund, Building Inspection Fund
and Workforce Housing Fund (CAHAB Recommendation letter
attached)
American Rescue Plan fund and wrap-up (Summary of the American
Rescue Plan is attached along with the guidance it references)
The budget is a plan that could need to shift due to the
constants changing of guidance. As we prepare to spend we will
confirm current guidance and calculations prior to using the
funds. In addition, we will not receive half of the funding until
136
the last month of FY22 so some larger projects will not begin
until the funds are received due to the cash flow. We have
focused our plan on capacity infrastructure, specifically sewer
capacity to make more areas developable sooner to help with
housing supply. We have also focused on the funding to recover
revenues lost that otherwise the City would have to reduce
services until funding was recovered such as recreation
programming and keeping up of our rental facilities.
For the American Rescue Plan funding properly accounting for
and spending based on regulations is our highest priority.
UNRESOLVED ISSUES:None
ALTERNATIVES:As suggested by the Commission.
FISCAL EFFECTS:Although the Final Budget adoption has far-reaching fiscal effects, there are
no immediate fiscal effects as a result of this work session. The funds
discussed tonight have proposed budgets with changes in rates and fees that
will affect all property owners and system users.
Attachments:
7 mills memorandum.pdf
American Rescue Plan Overview.docx
Report compiled on: May 14, 2021
137
To: Jeff Mihelich, City Manager
Subject: Community Affordable Housing Advisory Board FY22 Funding Recommendation
From: City of Bozeman Community Affordable Housing Advisory Board
Date: March 10, 2021
This memorandum summarizes the results of CAHAB meetings held in December of 2020 and
January of 2021 with regards to discussion of the members’ preliminary thoughts on funding
the Community Housing Fund. Based on these discussions, CAHAB recommends that the
Community Housing Fund receive the equivalent of 7 mills, or approximately $900,000 in FY22.
2020 Community Housing Action Plan
Understanding that the City of Bozeman has identified affordable housing as a strategic priority,
there is general agreement that the Community Housing Fund is lacking finances to support the
requests CAHAB receives for housing related projects in our community.
Focus & Measurable Objectives
This past year we were particularly short on funds due to the increased demand from HRDC for
their Boulevards, Darlington Manor and Warming Center projects. As a result of funding those
community needs, the Bridger View Subdivision targeting the “Missing Middle” we were unable
to lend any support to this development even though it catered directly to our Affordable
Housing Action Plan by several of the parties that helped develop the plan.
Economics and Issues
The current housing situation in Bozeman has moved from an affordable housing crisis to a
housing crisis in general with Median sales prices increasing close to $90,000 this past year (the
greatest increase on record and much greater than wages increased) and record low inventory.
If it is truly a priority for the city and commissioners and our community to make an impact on
affordable housing in Bozeman, we respectfully ask that you provide us the funds to continue
to say “yes” to these requests rather than turn them down due to lack of funding.
Summary
From the CAHAB meeting of January 13th: 00:54:50 Vote on the Motion to approve Suggested
Motion Language:
Having reviewed the packet materials and considered today's discussion, I move to recommend
that the City Manager's proposed budget funds the Community Housing Fund at 7 mills for fiscal
year 2022. The Motion carried 6 – 0
We appreciate your consideration of this important topic and including the request for 7 mils in
the City Manager’s FY 22 recommended budget.
138
American Rescue Plan Overview
Background
On March 10, 2021, the House of Representatives approved a Senate-amended version of President Biden's $1.9 trillion
COVID-19 relief package - the American Rescue Plan. The package includes $350 billion in aid for state and local
governments, along with additional funding for other areas like education, rental assistance and transit. Per the United
States Department of Treasury the objectives of this funding is to provide relief to1:
Support urgent COVID-19 response efforts to continue to decrease spread of the virus and bring the pandemic
under control
Replace lost revenue for eligible state, local, territorial, and Tribal governments to strengthen support for vital
public services and help retain jobs
Support immediate economic stabilization for households and businesses
Address systemic public health and economic challenges that have contributed to the inequal impact of the
pandemic
The Coronavirus State and Local Fiscal Recovery Funds provide substantial flexibility for each government to meet
local needs—including support for households, small businesses, impacted industries, essential workers, and the
communities hardest hit by the crisis. These funds can also be used to make necessary investments in water, sewer,
and broadband infrastructure.
The Treasury issued the Interim Final Rule, which implements the provisions of the program.2 The following are the
program areas3:
1 https://home.treasury.gov/policy-issues/coronavirus/assistance-for-state-local-and-tribal-governments/state-and-local-fiscal-
recovery-funds
2 https://www.govinfo.gov/content/pkg/FR-2021-05-17/pdf/2021-10283.pdf
3 https://www.gfoa.org/flc-analysis-of-current-proposed-covid-19-relief-measures
Issue Area/ Program City Application Guidance Date Updated
Coronavirus State and Local
Fiscal Recovery Fund
This is our funding source and being a non-
entitlement City we have special guidance
because our funding will com from the
State half this June and half the following
year.
https://home.treasury.gov/system/files/136/NEU_G
uidance.pdf
5/25/2021
Emergency paid sick and
family leave credits
N/A- Tax credits are not available to
government entities
https://gfoaorg.cdn.prismic.io/gfoaorg/e7498a6f-
0108-4a44-b053-f18dfaec644b_Paid-Leave-Credit-
Snapshot.pdf
4/21/2021
Emergency Rental Assistance
Program
STATE- Funding sent to State for
administration
https://home.treasury.gov/system/files/136/ERA2FA
Qs%205-6-21.pdf
5/7/2021
Homeowner Assistance Fund STATE- Funding sent to State for
administration
https://home.treasury.gov/system/files/136/HAF-
Guidance.pdf
4/14/2021
Low-Income Household
Water Assistance Program
STATE- Funding sent to State for
administration
https://www.acf.hhs.gov/ocs/policy-
guidance/lihwap-2021-05-state-territories-initial-
requirements-fy2021
4/19/2021
139
Allowable Spending and Guidance for City Funding
Funding Process
Coronavirus State and Local Fiscal Recovery (CSLFR) provides $350 billion in funding. Specifically for local governments
based on this formula:
Cities = $65.1B [Pop. > 50k ($44.7B, allocation based on modified CDBG formula); Pop. < 50k ($19.53B, non-CDBG
Eligible, money flows through state, allocation capped based on budget but cannot exceed 75 percent of budget
as of 1/27/20)]
Counties = $65.1B, allocation based on population
The funding for CSLFR for entitlement cities are distributed directly. For Non-entitlement units, defined in section 603(g)
(5) of the Social Security Act, as added by the American Rescue Plan Act, are generally local governments with populations
of less than 50,000. Non-entitlement units will receive Coronavirus State and Local Fiscal Recovery Funds through their
state governments. State governments will receive a specific allocation of these funds from Treasury for this purpose and
will be responsible for disbursing these funds to non-entitlement units within their state. Award amounts are based on
the population of the non-entitlement unit.Paymentsto local governments will be made in two tranches, first half 60 days
after enactment, second half one year later.
Eligible use of the funding is broader than CRF funding. Specifically, eligible uses include (updated 5/25/21 to add
Stormwater)4:
Support public health expenditures, by funding COVID-19 mitigation efforts, medical expenses, behavioral
healthcare, and certain public health and safety staff;
Address negative economic impacts caused by the public health emergency, including economic harms to
workers, households, small businesses, impacted industries, and the public sector;
Replace lost public sector revenue, using this funding to provide government services to the extent of the
reduction in revenue experienced due to the pandemic;
Provide premium pay for essential workers, offering additional support to those who have borne and will bear
the greatest health risks because of their service in critical infrastructure sectors; and,
Invest in water, sewer, and broadband infrastructure, making necessary investments to improve access to clean
drinking water, support vital wastewater and Stormwater infrastructure, and to expand access to broadband
internet.
Implementation
Broad definition of allowable uses, including lost revenue (limited to revenue loss due to pandemic relative to fiscal year
prior to the emergency), negative economic impact of the pandemic, and necessary investments in water, sewer, or
broadband infrastructure. Funds cannot be used to offset tax cuts or delay a tax; funds cannot be deposited into a pension
fund. Funds available and use completed by December 31, 2024.
Each eligible use categories have guidance and restrictions which we have highlighted in brief. This information us updated
by the U.S. Treasury Department May 25, 2021 and our plan for spending started in April with the Recommended Budget
was published 5/6/2021. We will ensure prior to any spending or transfers for revenue shortfalls that we will revisit the
most recent guidance to make sure it conforms and is eligible. Compliance is key since these are Federal Funding it will be
subject to Federal Guidelines and audit regulations.
The following table breaks down the areas with eligible expenditures and restrictions provided by the Government
Finance Officers Association5:
4 https://home.treasury.gov/system/files/136/SLFRP-Fact-Sheet-FINAL1-508A.pdf
5 https://www.gfoa.org/flc-analysis-of-current-proposed-covid-19-relief-measures
140
Area Eligible Restrictions
Support public health expenditures- A broad range of services are needed to contain COVID-19 and are
eligible uses, including vaccination programs; medical care;
testing; contact tracing; support for isolation or quarantine;
supports for vulnerable populations to access medical or public
health services; public health surveillance; enforcement of public
health orders; public communication efforts; enhancement to
health care capacity, including through alternative care facilities;
purchases of personal protective equipment; support for
prevention, mitigation, or other services in congregate living
facilities and other key settings like schools; ventilation
improvements in congregate settings, health care settings, or
other key locations.
The Interim Final Rule contains a non-
exclusive list of programs or services
that may be funded as responding to
COVID-19 or the negative economic
impacts of the COVID-19 public health
emergency, along with considerations
for evaluating other potential uses of
Fiscal Recovery Funds not explicitly
listed.
Address negative economic impacts
caused by the public health emergency
Eligible uses in this category include assistance to households;
small businesses and non-profits; and aid to impacted industries.
Assistance to households includes, but is not limited to: food
assistance; rent, mortgage, or utility assistance; counseling and
legal aid to prevent eviction or homelessness; cash assistance;
emergency assistance for burials, home repairs, weatherization, or
other needs; internet access or digital literacy assistance; or job
training to address negative economic or public health impacts
experienced due to a worker’s occupation or level of training.
May not use funds for general economic
development or workforce
develoipment. Recipients must
demonstrate that funding uses directly
address a negative economic impact of
the COVID-19 public health emergency,
including funds used for economic or
workforce development. For example,
job training for unemployed workers
may be used to address negative
economic impacts of the public health
emergency and be eligible.
Replace lost public sector revenue General Revenue includes revenue from taxes, current charges,
and miscellaneous general revenue.
Recipients should classify revenue sources as they would if
responding to the U.S. Census Bureau’s Annual Survey of State
and Local Government Finances. An example of current charges
that would be included in a state or local government’s general
revenue from own sources: “Gross revenue of facilities operated
by a government (swimming pools, recreational marinas and piers,
golf courses, skating rinks, museums, zoos, etc.); auxiliary facilities
in public recreation areas (camping areas, refreshment stands, gift
shops, etc.); lease or use fees from stadiums, auditoriums, and
community and convention centers; and rentals from concessions
at such facilities.” Recipients are permitted to calculate the extent
of reduction in revenue as of four points in time: December 31,
2020; December 31, 2021; December 31, 2022; and December 31,
2023.
It excludes refunds and other correcting
transactions, proceeds from issuance of
debt or the sale of investments, agency
or private trust transactions, and
revenue generated by utilities and
insurance trusts. General revenue also
includes intergovernmental transfers
between state and local governments,
but excludes intergovernmental
transfers from the Federal government,
including Federal transfers made via a
state to a locality pursuant to the CRF or
the Fiscal Recovery Funds.
Provide premium pay for essential
workers
Essential workers are those in critical infrastructure sectors who
regularly perform in-person work, interact with others at work, or
physically handle items handled by others.
The Interim Final Rule emphasizes the need for recipients to
prioritize premium pay for lower income workers. Premium pay
that would increase a worker’s total pay above 150% of the
greater of the state or county average annual wage requires
specific justification for how it responds to the needs of these
workers.
141
Specifically in regards to affordable housing we searched all guidance for “affordable housing”, “workforce housing” and
“community Housing” and there is funding. For our specific funding it does come up in the fact sheet dated 5/10/21 under
Address negative economic impacts caused by the public health emergency as:
“Investments in housing and neighborhoods, such as services to address individuals experiencing homelessness,
affordable housing development, housing vouchers, and residential counseling and housing navigation assistance
to facilitate moves to neighborhoods with high economic opportunity;”
Further in the 5/25/21 guidance further clarifies that you must prove a COVID-19 impact and who can be served with the
funding:
“In recognition of the disproportionate impacts of the COVID-19 virus on health and economic outcomes in low-
income and Native American communities, the Interim Final Rule identifies a broader range of services and
programs that are considered to be in response to the public health emergency when provided in these
communities. Specifically, Treasury will presume that certain types of services are eligible uses when provided in
a Qualified Census Tract (QCT), to families living in QCTs, or when these services are provided by Tribal
governments.
Recipients may also provide these services to other populations, households, or geographic areas
disproportionately impacted by the pandemic. In identifying these disproportionately-impacted communities,
recipients should be able to support their determination for how the pandemic disproportionately impacted the
populations, households, or geographic areas to be served.”
Therefore under the current guidance, we would have a lot to establish to justify the spending and would need to create
specific programs to distribute funding and comply with Federal regulations. Further, we would have demonstrate there
was an impact to housing due to COVID-19 impacts as part of reporting and we do not have data to support this. The City
can explore other housing funding directly from Federal programs and State programs to see if we can qualify prior to
being made an entitlement City. The Cityneeds to stay within requirements and regulations to ensure we will not have to
return the funding and find a way to cover the costs incurred for any expenditures determined to be unallowable.
Area Eligible Restrictions
Invest in water, sewer, and broadband
infrastructure
As mentioned in the Interim Final Rule, eligible projects under the
DWSRF and CWSRF support efforts to address climate change, as
well as to meet cybersecurity needs to protect water and sewer
infrastructure. Given the lifelong impacts of lead exposure for
children, and the widespread nature of lead service lines, Treasury
also encourages recipients to consider projects to replace lead
service lines. Under the DWSRF, categories of eligible projects
include: treatment, transmission and distribution (including lead
service line replacement), source rehabilitation and
decontamination, storage, consolidation, and new systems
development.
Under the CWSRF, categories of eligible projects include:
construction of publicly-owned treatment works, nonpoint source
pollution management, national estuary program projects,
decentralized wastewater treatment systems, stormwater
systems, water conservation, efficiency, and reuse measures,
watershed pilot projects, energy efficiency measures for publicly-
owned treatment works, water reuse projects, security measures
at publicly-owned treatment works, and technical assistance to
ensure compliance with the Clean Water Act.
Recipients may not use funds as a state
match for the CWSRF and DWSRF due to
prohibitions in utilizing federal funds as
a state match in the authorizing statutes
and regulations of the CWSRF and
DWSRF.
142
Reporting and Auditfor City Funds
As provided for in the award terms, payments from the Fiscal Recovery Funds as a general matter will be subject to the
provisions of the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (2
CFR 200) (the Uniform Guidance), including the cost principles and restrictions on general provisions for selected items of
cost.6
Recipients of Fiscal Recovery Funds will be required to submit one interim report and thereafter quarterly Project and
Expenditure reports until the end of the award period. Recipients must submit interim reports to Treasury by August 31,
2021. The quarterly Project and Expenditure reports will include financial data, information on contracts and subawards
over $50,000, types of projects funded, and other information regarding a recipient’s utilization of the award funds.
Non-entitlement unit recipients will be required to submit annual Project and Expenditure reports until the end of the
award period. The initial annual Project and Expenditure report for Non-entitlement unit recipients must be submitted to
Treasury by October 31, 2021. The subsequent annual reports must be submitted to Treasury by October 31 each year.7
As part of the annual financial audit the City under goes a Single Audit, and Federal funding is reported on the City’s
schedule of federal awards. Any other American Rescue Plan funding received from the State and the City’s direct funding
will be reported on the schedule. The City will have to demonstrate they had proper internal controls in place, ensured
all costs were allowable under federal guidance and reporting was done accurately and timely. These audits can aid or
hinder the City in receiving and competing for Federal funding in the future.
Other ARP Funding
As part of the American Rescue Plan there is funding going to federal programs and to the states. Specifically, the State of
Montana has set their spending with House Bill 632. Many of the programs are through existing funding mechanisms and
there is a larger portion for infrastructure. The funding is split between two funding areasone based on a City population
and requires a match, the City will apply and could receive up to $6 million for water and sewer infrastructure depending
on our match abilities and projects readiness to be spent by 2024. The other funding area is a competitive process. A
summary of HB0632 is below and highlighted in green is the funding, as of right now, available to Cities to apply for
8:
Applications are due July 15 and we are looking into what we can apply for and accomplish in the time and match
constraints.
Water and Sewer infrastructure-A recipient may only use funds to cover costs incurred during the period beginning March
3, 2021 through December 31, 2026. Funds must be obligated by December 31, 2024. Any funds not obligated by
December 31, 2024 must be returned to the Treasury. We are getting an allocation from the minimum allocation grant
then we can apply for competitive grants. The max for competitive grants is $25 Million.
Broadband –The State Department of Commerce is currently gathering mapping information in coordination with the
State Library and other providers. Working with the Commission and the Governor's Office, Commerce will develop the
open process for submission of proposals for funding required in SB297. Eligible providers may be awarded funding for
projects in unserved, underserved or frontier areas. The Department is also in the process of hiring broadband deployment
experts to staff the Broadband Task Force within Commerce. Please check back for more information as those jobs are
posted on the State's recruitment website.
Economic - Recovery and work force development. Programs developed by the State Department of Commerce and
recommended to the Governor by the Advisory Commission by the Commission may include grant and other programs
for businesses, workforce development, and employee training. By law, the proposals recommended for funding by
Commerce must be reviewed by the Commission, which will then recommend grants and programs to the Governor.
6 https://gfoaorg.cdn.prismic.io/gfoaorg/6a9dcc45-6811-46e6-be79-91c5432b057f_2021-10283.pdf (page 86)
7 https://gfoaorg.cdn.prismic.io/gfoaorg/6a9dcc45-6811-46e6-be79-91c5432b057f_2021-10283.pdf (pages 98-100)
8 https://leg.mt.gov/bills/2021/billpdf/HB0632.pdf
143
Commerce and other agencies are in the process of developing recommended grant programs that will be submitted to
be recommended by the Advisory Commission. Once programs are recommended by the Advisory Commission,
Commerce and other agencies will provide more information on the grants available and process for applying and
awarding the grants.
Health and Human Services - Mainly State and County programs adding funding to programs such as Supplemental
Nutrition Assistance Program, Commodity Supplemental Food Program, Family Violence Prevention, Vaccine Distribution
and Supply, Testing and Contact Tracing, Child care Block Grants, Mental Health Block grant, and WIC.
Housing - Mortgage assistance program.
Education – Elementary & Secondary School Emergency Relief (ESSR) funding and funding for home & private school
COVID impacts.
FY22 Budget Plan
The budget is a plan that could need to shift due to the constants changing of guidance. As we prepare to spend we will
confirm current guidance and calculations prior to using the funds. In addition, we will not receive half of the funding
until the last month of FY22 so some larger projects will not begin until the funds are received due to the cash flow. We
have focused our plan on capacity infrastructure, specifically sewer capacity to make more areas developable sooner to
help with housing supply. We have also focused on the funding to recover revenues lost that otherwise the City would
have to reduce services until funding was recovered such as recreation programming and keeping upof our rental facilities.
For the American Rescue Plan funding properly accounting for and spending based on regulations is our highest priority.
We plan to include in the Financial Quarterly Updates the application and spending of this fundingto keep the Commission
informed.
144