Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
16-2 Technology Blvd Section 04-05-2021
FABRIC, CONTECH C-200 MARAFI500X OR APPROVED EQUAL, ASREQUIRED BY ENGINEER18" OF 6"MINUS PITRUN6" OF 1.5"MINUS BASECOURSEC.O.B. STDCURB AND GUTTERC.O.B. STDCURB AND GUTTER3.00'13.00' PARKING (45°)15.00' SIDEWALK90.00'-2%BIKE LANE 5.50'DRIVING LANE 11.50'4' WIDE CONC VALLEYGUTTERDRIVING LANE 11.50'BIKE LANE 5.50'3" ASPHALT-3%-3%13.00' PARKING (45°)4' WIDE CONC VALLEYGUTTER3.00'-2%15.00' SIDEWALKGRADE CHANGE-2%-2%FIGURE NUMBER©PROJECT NO.DRAWN BY:DSGN. BY:APPR. BY:DATE:COPYRIGHT MORRISON-MAIERLE, INC.,2021N:\3638\009\ACAD\Preliminary Plat 4\Tech Blvd Section.dwg Plotted by celine saucier on Apr/5/2021engineers surveyors planners scientistsMorrisonMaierle2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.net6558.004FIG 1BOZEMAN GATEWAY PUD - PHASE 4 PRELIMINARY PLATBOZEMAN MONTANATECHNOLOGY BLVD.CROSS SECTION 120.510SCALE IN FEETTECHNOLOGY BLVD CROSS SECTIONSCALE: 1" = 5'1