Loading...
HomeMy WebLinkAboutL100 Overall Landscape Plan-Bozeman Gateway-Ph 4_12-31-2019SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWSS SSSSSSSSSSWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSD SDSDSDEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSDSD SD SD SDWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSOPEN SPACE 3OPEN SPACE 4LOT 5OPEN SPACE 5LOT 45COMMON AREA 7COMMON AREA 6ALOT 24ALOT 35LOT 36LOT 37LOT 38COMMON AREA 10LOT 40LOT 41LOT 42COMMON AREA 11COMMON AREA 14COMMON AREA 13LOT 44LOT 43B L O C K 6COMMON AREA 8SHEET L101SHEET L101SHEET L101SHEET L101SHEET L102SHEET L102SHEET L103SHEET L103SHEET L103SHEET L103SHEET L104SHEET L104SHEET L104SHEET L104SHEET L105SHEET L105SHEET L106SHEET L106SHEET L107SHEET L107SHEET L107SHEET L107GENERAL NOTES1.ALL LANDSCAPED AREAS SHALL HAVE PERMANENT UNDERGROUND IRRIGATION INSTALLED TO ENSURE A HEALTHY LANDSCAPE.2.ALL AREAS DISTURBED BY CONSTRUCTION TO BE SEEDED OR PLANTED ANDMAINTAINED.3.ALL EDGING SHALL BE METAL (PRO EDGE-STEEL/ALUMINUM)4.ALL SHRUB BEDS SHALL BE LINED WITH PROFESSIONAL GRADE TYPAR WEEDFABRIC, AND COVERED WITH 3-4" OF 1 12" WASHED ROCK MATERIAL5.ALL TREES SHALL BE STAKED WITH WOOD STAKES (MIN OF 2 PER TREE) ANYTREE OR SHRUB PLANTED THAT IS NOT IN A SHRUB BED SHALL HAVE A 3' DIA. 4" DEPTH ORGANIC MULCH RING AT THE BASE.6.CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES PRIOR TO INSTALLATION,EXCAVATION, OR PLANTING.7.NO TREE SHALL BE PLANTED WITHIN 10' OF ANY FIRE HYDRANT, SEWER ORWATER LINE.8.ALL STREET TREES SHALL BE APPROVED BY CITY FORESTER AND PLANTEDSLIGHTLY HIGHER THAN GRADE AND WITH THE TREE COLLAR EXPOSED. THE HOLEEXCAVATED SHALL BE TWICE THE SIZE OF THE POT OR ROOTBALL OF THE TREE.9.ALL PLANTS SHALL BE GUARANTEED FOR ONE YEAR AFTER PROJECT COMPLETION.10.ALL LAWN AREAS SHALL BE LOCALLY GROWN SOD11.ALL OTHER DISTURBED AREAS ON SITE SHALL BE RE-GRADED ROCK HOUNDEDAND SEEDED TO MATCH DISTURBED AREA EXISTING LANDSCAPE12.NO PLANT SUBSTITUTIONS WITHOUT WRITTEN APPROVAL FROM THE OWNER ANDLANDSCAPE DESIGNER11.CONTRACTOR TO VERIFY ALL PLANT QUANTITIES. IF THERE IS A DISCREPANCYBETWEEN PLANT TABLE AND PLAN, THE PLAN SHALL DICTATE QUANTITY.BOZEMAN U.D.O. REQUIREMENTSOPEN SPACE 7: 24,664 SF3 PLANT ELEMENTS REQUIRED PER 5,000 SF= 5 GROUPS OF 3 PLANTELEMENTS REQUIRED; 5 GROUPS SHOWN.OPEN SPACE 8: 18,594 SF3 PLANT ELEMENTS REQUIRED PER 5,000 SF= 4 GROUPS OF 3 PLANTELEMENTS REQUIRED; 4 GROUPS SHOWN.OPEN SPACE 9: 31,380 SF3 PLANT ELEMENTS REQUIRED PER 10,000 SF= 3 GROUPS OF 3 PLANTELEMENTS REQUIRED; 3 GROUPS SHOWN.PARKING LOT LANDSCAPINGTOTAL PARKING STALLS: 130LANDSCAPE AREA REQUIRED: 2600 SF; 10,527 SF SHOWN14 PARKING LOT TREES REQUIRED, 26 SHOWNBOULEVARD TREES:1 LARGE CANOPY TREE PROVIDED FOR EACH 50' OF STREET FRONTAGE~ADDITIONAL LANDSCAPE SHOWN TO ENHANCE THE VISUAL APPEAL OF THEPROJECTOWNERMITCHELL DEVELOPMENT GROUP, LLC.PO BOX 738GREAT FALLS, MT 59403406-761-4400LEGAL DESCRIPTIONPHASE 4, SITUATED IN TRACT 2A OF THE AMENDED PLAT OF WEST COLLEGEMINOR SUBDIVISION NO. 195A SITUATED IN THE NW14 SECTION 14 AND THENE14 SECTION 15, T2S, R5E, P.M.M., CITY OF BOZEMAN, GALLATIN COUNTY,MONTANA IRRIGATION GENERAL NOTES1.IRRIGATION POC WILL BE WELLS LOCATED IN OPEN SPACES 7, 8 AND 9.2.IRRIGATION DESIGN ASSUMES 25-28GPM FROM WATER SOURCE3.CARE SHALL BE TAKEN TO ENSURE IRRIGATION SYSTEM IS INSTALLEDPROPERLY TO MINIMIZE/ELIMINATE WATER WASTE DUE TO OVER SPRAY ONTOWALKS AND PARKING LOTS.4.IRRIGATION CONTRACTOR SHALL INSTALL A RAINBIRD (OR SIMILAR) RAINSENSOR THAT WILL AUTOMATICALLY TURN OFF THE SYSTEM DURING RAINEVENTS5.POWER SOURCE TO BE PROVIDED FOR IRRIGATION CONTROLLER ANDCOORDINATED WITH ELECTRICAL.7.ALL TURF AREAS ARE TO BE SPRAY OR ROTOR IRRIGATED. MPR NOZZLES ORSIMILAR SHALL BE INSTALLED IN LAWN AREAS WHERE FEASIBLE TO MAXIMIZEEFFICIENCY. IRRIGATION SYSTEM TO BE INSTALLED WITH HEAD TO HEADCOVERAGE FOR ALL ROTOR AND SPRAY ZONES.8.ALL LANDSCAPE BEDS TO RECEIVE DRIP IRRIGATION. HIGH EFFICIENCYIRRIGATION DRIP ZONES SHALL HAVE 5 GALLON EMITTERS TO TREES, 2GALLON EMITTERS TO ALL SHRUBS, AND 1 GALLON EMITTERS TO ALLPERENNIALS AND GRASSES. ANY TREES OR SHRUBS OUTSIDE BEDS ORLAWN AREAS (IN NATIVE GRASS) ARE TO RECEIVE DRIP IRRIGATION.9.ON THE NORTH SIDES OF STRUCTURES OR HEAVY CLAY SOILS, CARE SHALLBE TAKEN TO MINIMIZE OVER WATERING DEPENDING ON SOIL CONDITIONS AND THE SIZE OF EMITTER MAY BE REDUCEDNProject For: Bozeman Gateway-Ph. 4 Bozeman, MTOverallLandscapePlanL100SCALE: 1"=50'-0"12/31/19City SubmittalDate Issue3084 Thorpe RoadBelgrade, Montana 59714Ph 406.924.8038alyssa@redbarnmontana.comWest Garfield Street