HomeMy WebLinkAboutSetbacks 03-11-2020The Bozeman Gateway Subdivision - Phase 1
Planned Unit Development
Property Setbacks
Lot
Number
Fronting Street Front Yard
Setback
(building/parking
lot)
Side Yard
Setback
(building/parking
lot)
Rear Yard
Setback
(building/parking
lot)
BLOCK 2
1A Fowler 30’/20’0’/0’*10’/na
4 Technology 20’/0’0’/0’0’/0’
5 Technology 20’/0’0’/0’0’/0’
6 Huffine 10’/0’0’/0’0’/0’
7 Huffine 10’/0’0’/0’0’/0’
BLOCK 5
1A Common Area
1A
10’/na 5’/na**50’/25’
2A Common Area
1A
10’/na 5’/na**50’/25’
3A Common Area
2A
10’/na 5’/na**50’/25’
4A Common Area
2A
10’/na 5’/na**50’/25’
5 Technology 20’/15’10’/na 10’/na
6 Common Area
1A to West
10’/na 5/na 0’/na
7 Common Area
2A to West
10’/na 5’/na 0’/na
*Front/Side Yard Setbacks along Fowler Avenue shall be 30’ to the building and 0’ to the
Parking Lot
**Setback between building lots is 0’.
Note: Setbacks shall be adjusted to include easements where applicable.
The Bozeman Gateway Subdivision - Phase 2
Planned Unit Development
Property Setbacks
Lot
Number
Fronting Street Front Yard
Setback
(building/parking
lot)
Side Yard
Setback
(building/parking
lot)
Rear Yard
Setback
(building/parking
lot)
BLOCK 3
14A Huffine Lane 0’/na 10’/na 25’/na
16A Huffine Lane 0’/na 10’/na 25’/na
17A Huffine Lane 0’/na 10’/na 20’/na
19A Huffine Lane 0’/na 5’ W 30’ E/15’ E 25’/na
22B Technology 15’/na 15’/na**0’/na**
23A Technology 15’/na 0’/na**0’/na**
24A Technology 15’/na 0’/na**0’/na**
25A Common Area 6 10’/na 0’ W 15’ E/na 0’/na**
BLOCK 6
45 Technology 15’/na 10’/na 10’/na
46 Technology 15’/na 10’/na 10’/na
47 Garfield 20’/na 5’/na**15’/na**
48 Garfield 20’/na 10’/na**15’/na**
**Setback between building lots is 0’.
Note: Setbacks shall be adjusted to include easements where applicable.
The Bozeman Gateway Subdivision - Phase 3
Planned Unit Development
Property Setbacks
Lot
Number
Fronting Street Front Yard
Setback
(building/parking
lot)
Side Yard
Setback
(building/parking
lot)
Rear Yard
Setback
(building/parking
lot)
BLOCK 4
1 S. 29th Avenue 15’/15’15’/20’ N na S**20’/na
2 S. 29th Avenue 15’/15’10’ N 15’ S/na**20’/na**
3 Technology 15’/10’30’ E 20’ W/na**10’/na**
4 Lot 1 20’/na**10’/na**30’/na
BLOCK 7
1A Technology 15’/15’15’/15’30’/na
3 Garfield 20’/na 10’ E 15’ W/na 30’/na
4 Garfield 20’/na 30’ E 10’ W/na 30’/na
5 Lot 6 10’/na**30’ E 10’ W/na 10’/na**
6 Technology 15’/15’30’ E 10’ W/na*10’/na**
**Setback between building lots is 0’.
Note: Setbacks shall be adjusted to include easements where applicable.
The Bozeman Gateway Subdivision - Phase 4
Planned Unit Development
Property Setbacks
Lot
Number
Fronting Street Front Yard
Setback
(building/parking
lot)
Side Yard
Setback
(building/parking
lot)
Rear Yard
Setback
(building/parking
lot)
BLOCK 3
26 Common Area 7 15’/na 10’/na**10’/na**
27 Technology 15’/na 10’/na**10’/na**
28 Technology 15’/na 0’/na**15’/na**
30 Technology 15’/na 0’/na**15’/na**
31 Technology 15’/na 0’/na**10’/na**
32 Harmon Stream
Blvd.
15’/na 15’/na**0’/na**
33 Common Area 8 15’/na 15’/na**0’/na**
34 Common Area 8 15’/na 10’/na**0’/na**
BLOCK 6
35 Common Area
11
15’/na 10’/na 10’/na
36 Technology 15’/na 15’/na**0’/na
37 Technology 15’/na 0/na**15’/na
38 Technology 15’/na 0’/na**15’/na
40 Technology 15’/na 0’/na**15’/na
41 Technology 15’/na 10’/na**15’/na**
42 Common Area
11
15’/na 10’/na**10’/na**
43 West Garfield
Street
15’/na 0’/na 0’/na
44 West Garfield
Street
15’/na 0’/na 0’/na
**Setback between building lots is 0’.
Note: Setbacks shall be adjusted to include easements where applicable.
The Bozeman Gateway Subdivision - Phase 5
Planned Unit Development
Property Setbacks
Lot
Number
Fronting Street Front Yard
Setback
(building/parking
lot)
Side Yard
Setback
(building/parking
lot)
Rear Yard
Setback
(building/parking
lot)
BLOCK 1
1 Fowler
(OPEN SPACE)
10’/5’20’/0’ N 20’ S***20’/20’
2 Technology 20’/20’10’/na 10’/na
**Setback between building lots is 0’.
***Lot 1 Setback along Huffine Lane is 10’/0’
Note: Setbacks shall be adjusted to include easements where applicable.