Loading...
HomeMy WebLinkAboutSetback Table 12-31-2019The Bozeman Gateway Subdivision - Phase 4 Preliminary Plat Resubmittal Planned Unit Development Property Setbacks Lot Number Fronting Street Front Yard Setback (building/parking lot) Side Yard Setback (building/parking lot) Rear Yard Setback (building/parking lot) 26 Common Area 7 15’/na 0’/na* 0’/na* 27 Technology 12’/na 0’/na* 0’/na* 28 Technology 12’/na 0’/na* 15’/na* 30 Technology 12’/na 0’/na* 15’/na* 31 Technology 12’/na 0’/na* 0’/na* 32 Harmon Stream Blvd. 12’/na 12’/na* 0’/na* 33 Common Area 8 15’/na 12’/na* 0’/na* 34 Common Area 8 15’/na 0’/na* 0’/na* 35 Common Area 11 12’/na 10’/na* 12’/na* 36 Technology 12’/na 12’/na* 10’/na* 37 Technology 12’/na 0/na* 10’/na* 38 Technology 12’/na 0’/na* 10’/na* 40 Technology 12’/na 0’/na* 10’/na* 41 Technology 12’/na 0’/na* 0’/na* 42 Common Area 11 10’/na 10’/na* 0’/na* 43 West Garfield Street 17.5’/na 15’/na* 10’/na* 44 West Garfield Street 17.5’/na 15’/na* 10’/na* *Setback between building lots is 0’. Note: Setbacks shall be adjusted to include easements where applicable.