BOZEMAN GATEWAY SUBDIVISION
PHASE 4 - WATER SYSTEM
WATER MAIN EXTENSION BASIS OF DESIGN REPORT
September 2019
PREPARED BY:
MMI #: 3638.009
1
Table of Contents
1 EXECUTIVE SUMMARY ...................................................................................................................... 2
2 GENERAL INFORMATION (DEQ 1.1.1) .............................................................................................. 2
3 EXTENT OF WATER WORKS SYSTEM, INCLUDING (DEQ 1.1.2): ................................................. 3
4 ALTERNATE PLANS (1.1.3) ................................................................................................................ 3
5 SITE CONDITIONS (1.1.4) ................................................................................................................... 3
6 WATER USE DATA, INCLUDING (1.1.5): ........................................................................................... 3
7 FLOW REQUIREMENTS (1.1.6) .......................................................................................................... 4
8 SOURCES OF WATER SUPPLY (1.1.7) ............................................................................................. 5
9 PROPOSED TREATMENT PROCESSES (1.1.8) ................................................................................ 5
10 SEWAGE SYSTEM AVAILABLE (1.1.9) ......................................................................................... 5
11 WASTE DISPOSAL (1.1.10) ............................................................................................................ 5
12 AUTOMATION (1.1.11) .................................................................................................................... 5
13 PROJECT SITES (1.1.12) ................................................................................................................ 5
14 FINANCING (1.1.13) ......................................................................................................................... 5
15 FUTURE EXTENSIONS (1.1.14) ...................................................................................................... 5
APPENDICES
Appendix A Location Map
Appendix B WaterCAD Layout
Appendix C WaterCAD Results
Prepared by:
Morrison-Maierle, Inc.
2880 Technology Blvd. W.
Bozeman, Montana 59771
Phone: (406) 587-0721
Fax: (406) 922-6702
Written By: CMS Checked By: JAU
Approved By: JAU
PROJECT NO.: N:\3959\022\Design Docs\Reports\Water Report\Water Design Report.doc
2
Bozeman Gateway Subdivision – Phase 4
Water Distribution Design Report
This section is a response to the requirements of the City of Bozeman Unified Development
Ordinance, Section 38.220.060 and Section 38.410.090 relative to Water Supply and Fire
Protection.
1 EXECUTIVE SUMMARY
This report provides a basis for design of the proposed water distribution network for Phase 4 of
the Bozeman Gateway. The water distribution system serving Phase 4 of the Bozeman
Gateway development will be designed and installed in accordance with the Montana
Department of Environmental Quality (MDEQ) Circular No. 1; Montana Public Works Standard
Specifications (MPWSS); The City of Bozeman Modifications to MPWSS; City of Bozeman
Water Facility Plan; and the City of Bozeman Fire Service Line Standard.
The design report is to verify that there is adequate volume and pressure to supply domestic
and fire service for all the buildings in the Bozeman Gateway Phase 4 development. The
following design report follows the section numbering of Circular DEQ-1-Standards for Water
Works, August 8, 2014 Section 1.1, Engineer’s Report.
2 GENERAL INFORMATION (DEQ 1.1.1)
a. The Bozeman Gateway is located west of the existing Advanced Technology Park, with
College Street and Huffine Lane along the north, the extension of Garfield Street along
the South and Fowler Avenue along the west. This project is located within the City of
Bozeman, Montana. See the vicinity map for location details.
As a part of the original subdivision, an overall water plan was developed. The plan
included extending approximately 821 feet of new 8 -inch Class 51 DIP water pipe which
would connect the existing 8” water main lines between Phase 1 and Phase 3 along
Technology Blvd West. This water main extension would provide water services for
Phase 4. Each building will be serviced by a domestic water service and a fire service.
This phase would also include (2) two new fire hydrant assemblies.
b. The proposed water main infrastructure will be served by the City of Bozeman.
c. Mitchell Development Group, LLC
PO Box 738
Great Falls, MT
59718
d. System Owner
City of Bozeman
PO Box 1230
Bozeman, MT
3
3 EXTENT OF WATER WORKS SYSTEM, INCLUDING (DEQ 1.1.2):
The water main extension is proposed to serve Phase 4 of the Bozeman Gateway development
which includes 160 residential units with a commercial area of 4.57 acres in the B-2 zoning
district. This water main extension will serve the buildout of the property. Adjacent phases are
already served by existing water mains.
4 ALTERNATE PLANS (1.1.3)
The alignment of the proposed main was chosen to meet the layout of the proposed
development. Given the previously approved water main design, no alternate plans were
considered.
5 SITE CONDITIONS (1.1.4)
The proposed Bozeman Gateway Phase 4 is currently undeveloped agricultural land which
slopes from south to north at approximately 1.25%. A site specific geotechnical report has been
done for the Bozeman Gateway by NTL Engineering & Geoscience, Inc, January 16, 2003. The
soils underlying the Bozeman Gateway Subdivision are similar to those found throughout
Bozeman, typically dark colored loams underlain by gravel. Limitations to development are
primarily depth to groundwater, bearing capacity, frost heave potential, shrink-swell potential
and flooding. Engineering and common construction practices have proven that the limitations
can be overcome successfully.
6 WATER USE DATA, INCLUDING (1.1.5):
The water distribution system serving the proposed project will be designed and installed in
accordance with the Montana Department of Environmental Quality (MDEQ) Circular No. 1;
Montana Public Works Standard Specifications (MPWSS); the City of Bozeman Modifications to
MPWSS; City of Bozeman Water Facility Plan; and the City of Bozeman Design Standards and
Specifications Policy. The following section addresses the design capacity and flow
requirements discussed in Section 8 of DEQ – 1.
The capacity requirement for the water main extension is calculated as follows:
Residential Flows
160 dwelling units
2.11 Persons per dwelling units (Bozeman Design Standards May, 2017 p. 48)
170 GPD per person (Bozeman Design Standards May, 2017 P. 45)
Population = (2.11 persons/ DU)(160 DU) = 338 persons
ADF = 338 persons x 170gpd/person =57,392gpd = 39.9gpm
MDF = 2.3 x Avg. Day = 2.3 x 39.9gpm = 91.8gpm
MHF = 3.0 x Avg. Day = 3.0 x 39.9gpm= 119.7gpm
Commercial (B-2 zoning)
ADF = 4.57 acres x 2000 acres = 9,140 gpd = 6.35gpm
MDF = 2.3 x Avg. Day = 2.3 x 6.35gpm = 14.6gpm
Max hour Flow = 3.0 x Avg. Day = 3.0 x 6.35gpm = 19.1gpm
4
Irrigation Demands:
Based on the City of Bozeman’s Integrated Water Resources Plan September 2013, the 170
GPD per person includes all water use including irrigation.
Total Flows:
Average Daily Flow = 39.9 + 6.35 = 46.25gpm
Max Daily Flow = 91.8+14.6 = 106.4gpm
Max Hour Flow = 119.7+19.1 = 138.8gpm
Fire Flow
For the purpose of this report, we have conservatively assumed that 1,500gpm of fire flow will
be required. The total water demand for the system includes the Maximum Daily Flow and the
maximum required fire flow of 1,500gpm. The Maximum Daily Flow is calculated by multiplying
the Average Daily Demand by a peaking factor of 2.3 as described above. Therefore, the
following fire flow demand for Phase 4 is as follows:
Total Fire Flow = 106.4gpm + 1,500gpm = 1,606.4gpm
7 FLOW REQUIREMENTS (1.1.6)
Modeling Procedure
Water modeling using the proposed water main locations has been input into WaterCAD V8i
software to assess expected performance of the new distribution network. Water supply from
the existing City water system has been modeled by a reservoir and pump at the intersection of
Technology Blvd West and Harmon Stream Blvd and a reservoir and pump at the intersection of
along West Garfield Street. Use of fire hydrant flow data and a reservoir/pump supply is a
commonly used method to build a stand-alone model without reproducing the complete
distribution system. The nearest hydrant tests were done by City Water Department staff on
8/16/2019 on hydrants located in Bozeman Gateway to the west of Phase 4. The results are as
follows:
Flow/Test Hydrant #2266/#2267 – Pitot of 84psi @ 1540gpm on a 2.5” nozzle, Static of 106psi
and Residual of 100psi
Flow/Test Hydrant #1912/#1913 – Pitot of 84psi @ 1540gpm on a 2.5” nozzle, Static of 100psi
and Residual of 95psi
The total water demand for the system includes the maximum daily demand and the required
fire flow of 1,500 gpm as determined by the Insurance Services Office (ISO) criteria. The
maximum daily demand is calculated by multiplying the average daily demand by a peaking
factor of 2.3. The minimum pressure used for pipe main sizing was 35-psi during normal uses
and no less than 20-psi residual pressure during fire hydrant full flow condition at any supply
node. A “C” of 130 is used for the Hazen Williams pipe roughness factor.
Modeling Results
The model’s results indicate that 8-inch distribution main for Phase 4 of the Bozeman Gateway
development will supply the needed maximum daily flow with fire flow while maintaining the
5
required 20-psi residual pressure at all points within the modeled area. Pressure during peak
day ranges from 98psi to 105psi. Available fire flow ranges from 3,500gpm to 2,449gpm. (See
the WaterCAD model flow results located in the appendix at the end of this report for additional
information).
8 SOURCES OF WATER SUPPLY (1.1.7)
Water is supplied from City of Bozeman
9 PROPOSED TREATMENT PROCESSES (1.1.8)
Non-applicable
10 SEWAGE SYSTEM AVAILABLE (1.1.9)
The area is served by the City of Bozeman wastewater treatment facility
11 WASTE DISPOSAL (1.1.10)
Non-applicable
12 AUTOMATION (1.1.11)
Non-applicable
13 PROJECT SITES (1.1.12)
The development is bounded to the north and east by Phase 2 of the Bozeman Gateway PUD,
Garfield Street to the south and Harmon Stream Blvd to the east. The wastewater at the site
will be conveyed to the City of Bozeman wastewater treatment facility.
14 FINANCING (1.1.13)
Non-applicable
15 FUTURE EXTENSIONS (1.1.14)
No future extension will be needed.
Appendix A
11THSAVE19THNAVEDURSTON RD
W COLLEGE ST
MAIN STW 191
COTTONWOODINTERSTATE
90
PROJECT
LOCATION
HUFFINE
LN
W GARFIELD STSRDengineerssurveyorsplannersscientists
2880 Technology Boulevard West
Bozeman, MT 59718
Phone: (406) 587-0721
Fax: (406) 922-6702
VICINITY MAP
SCALE:1" = 3000'
Appendix B
B L O
C
K
6
B L O
C
K
2
B L O
C
K
5WWWW WW
W W
W
W
W
W
W
W
W
W
W W
W
W
W
W
WWWWWWWWW W WWWWW W W W WWWWWWWWWWWW
WWW
WWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W
W
W W W W W W W W W W W W W W W W W W W W W W W W
W
WWW
W
W
WWWJ-1
J-3
J-4
J-6
J-7
J-8
J-9
J-10
J-11
J-13
J-14
J-15
J-16
J-17
J-19
J-20 J-21
J-22
J-23
J-24
J-25
J-26
J-27
J-28
J-29
J-30
J-31
J-32
J-33J-34
J-35 J-36
J-38 J-39 J-40
J-41
J-42
J-43
J-44
J-45
J-46
J-47
J-48
J-49
J-50
J-51
P-1 P-2 P-4
P-5
P-6
P-7
P-8
P-10
P-11
P-12
P-14 P-15
P-17P-19P-20P-21P-22P-24P-25P-26P-28J-52
P-30P-31P-32P-33P-35P-36P-37P-38J-53P-39 P-40P-44P-45P-46
J-56
P-47P-48J-57
P-49
J-58
P-51J-59
J-62
P-55P-5
6
J-63
P-57
P-58R-1
PMP-1P-60P-61J-64P-62
P-63
J-67 P-66
J-68P-68J-69
P-69
P-70
J-70P-71P-72R-2 PMP-2
P-73 P-74
J-72
P-76P-77
P-80
J-76 J-77P-82
J-78P-83P-841 20.51 0
SCALE IN FEET
VERIFY SCALE!
THESE PRINTS MAY BE REDUCED.
LINE BELOW MEASURES ONE INCH
ON ORIGINAL DRAWING.
MODIFY SCALE ACCORDINGLY!
2019COPYRIGHT MORRISON-MAIERLE, INC.,
SHEET NUMBER
PROJECT NUMBER
DRAWING NUMBER
DATEDESCRIPTIONNO.BY
N:\3638\009\ACAD\PRELIMINARY PLAT\WATERCAD.DWG PLOTTED BY:CELINE SAUCIER ON Sep/20/2019
REVISIONS DRAWN BY:
DSGN. BY:
APPR. BY:
DATE:
Q.C. REVIEW
DATE:
BY:
1 Engineering Place
Helena, MT 59602
406.442.3050
www.m-m.net
engineers surveyors planners scientists
MorrisonMaierle
BOZEMAN GATEWAY PUD - PHASE 4
PRELIMINARY PLAT
3638.009
MONTANA
WATER CAD MODEL EX1
CMS
CMS
JAU
9/2019
BOZEMAN
Appendix C
Scenario Summary ReportScenario: Average DayScenario Summary1IDAverage DayLabelNotesBase Active TopologyActive TopologyBase PhysicalPhysicalBase DemandDemandBase Initial SettingsInitial SettingsBase OperationalOperationalBase AgeAgeBase ConstituentConstituentBase TraceTraceBase Fire FlowFire FlowBase Energy CostEnergy CostBase TransientTransientBase Pressure Dependent DemandPressure Dependent DemandBase Failure HistoryFailure HistoryBase SCADASCADABase User Data ExtensionsUser Data ExtensionsBase Calculation OptionsSteady State/EPS Solver Calculation OptionsBase Calculation OptionsTransient Solver Calculation OptionsHydraulic SummarySteady StateTime Analysis TypeTrueUse simple controls during steady state?Hazen-WilliamsFriction MethodFalseIs EPS Snapshot?0.001Accuracy12:00:00 AMStart Time40TrialsHydraulics OnlyCalculation TypePage 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-16669/17/2019Bentley WaterCAD CONNECT Edition[10.00.00.55]Bentley Systems, Inc. Haestad Methods Solution CenterWaterCAD.wtg
ID Label Demand
(gpm)
Hydraulic Grade
(ft)
39 J-1 0 5,086.32
40 J-3 0 5,086.76
41 J-4 0 5,086.77
43 J-6 0 5,086.77
44 J-7 0 5,086.78
45 J-8 0 5,086.78
46 J-9 0 5,086.78
47 J-10 0 5,086.78
48 J-11 0 5,086.81
50 J-13 0 5,086.82
51 J-14 0 5,086.82
52 J-15 0 5,086.84
53 J-16 0 5,086.84
54 J-17 1 5,086.84
56 J-19 0 5,086.79
57 J-20 0 5,086.86
58 J-21 0 5,086.86
59 J-22 0 5,086.88
60 J-23 0 5,086.89
61 J-24 1 5,086.88
62 J-25 1 5,086.89
63 J-26 0 5,086.92
64 J-27 1 5,086.92
65 J-28 0 5,086.93
66 J-29 0 5,086.93
67 J-30 0 5,086.94
68 J-31 0 5,086.94
69 J-32 0 5,086.97
70 J-33 0 5,086.94
71 J-34 0 5,087.14
72 J-35 20 5,087.47
73 J-36 20 5,087.39
75 J-38 0 5,087.47
76 J-39 0 5,087.39
77 J-40 0 5,087.21
78 J-41 0 5,087.06
79 J-42 0 5,087.00
80 J-43 0 5,086.88
81 J-44 0 5,087.14
82 J-45 0 5,087.23
83 J-46 0 5,087.35
84 J-47 0 5,087.47
85 J-48 0 5,087.60
86 J-49 0 5,086.35
87 J-50 0 5,086.32
88 J-51 0 5,086.27
118 J-52 1 5,086.81
129 J-53 0 5,086.94
133 J-55 0 5,086.94
140 J-56 0 5,087.28
143 J-57 0 5,087.28
146 J-58 0 5,086.53
149 J-59 0 5,086.27
153 J-62 0 5,086.35
157 J-63 0 5,086.27
165 J-64 0 5,086.86
172 J-67 0 5,087.31
175 J-68 0 5,087.31
177 J-69 0 5,087.05
180 J-70 0 5,087.05
191 J-72 0 5,087.34
198 J-75 0 5,086.94
201 J-76 0 5,086.94
202 J-77 0 5,086.94
204 J-78 0 5,086.94
Bozeman Gateway - Phase 4
Average Daily: Junction Table
99
100
102
102
99
101
102
103
104
104
103
103
104
105
104
101
101
101
102
101
101
100
100
105
99
98
100
102
101
103
101
100
102
102
100
100
102
103
103
103
102
100
104
103
103
103
103
104
104
104
103
103
103
104
Pressure
(psi)
104
103
103
104
104
104
104
103
4,859.61
4,853.13
4,848.00
4,851.63
4,854.76
103
102
100
4,847.79
4,848.54
4,859.00
4,856.83
4,852.00
4,852.41
4,852.82
4,853.45
4,852.14
4,847.46
4,846.63
4,846.90
4,856.95
4,844.35
4,846.73
4,844.45
4,846.25
4,852.34
4,854.51
4,849.41
4,852.04
4,852.82
4,854.04
4,855.29
4,856.06
4,856.06
4,858.56
4,859.89
4,857.09
4,852.05
4,851.34
4,855.32
4,853.17
4,855.27
4,852.07
4,851.28
4,849.44
4,846.40
4,851.34
4,849.56
4,848.45
4,849.66
4,849.69
4,846.22
4,846.80
4,848.48
4,848.35
4,849.29
4,847.39
4,849.17
4,846.93
4,847.30
4,848.95
4,847.97
Elevation
(ft)
4,846.80
4,848.34
4,848.11
4,846.34
4,847.43
4,845.52
ID Label Start Node Diameter
(in)
Material Hazen-
Williams C
Velocity
(ft/s)
89 P-1 J-3 8.0 Ductile Iron 140.0 0.66
90 P-2 J-4 8.0 Ductile Iron 140.0 0.66
91 P-3 J-7 8.0 Ductile Iron 140.0 0.66
92 P-4 J-9 8.0 Ductile Iron 140.0 0.66
93 P-5 J-19 8.0 Ductile Iron 140.0 0.66
94 P-6 J-11 8.0 Ductile Iron 140.0 0.67
95 P-7 J-13 8.0 Ductile Iron 140.0 0.67
96 P-8 J-15 8.0 Ductile Iron 140.0 0.67
98 P-10 J-22 8.0 Ductile Iron 140.0 0.68
99 P-11 J-23 8.0 Ductile Iron 140.0 0.68
100 P-12 J-26 8.0 Ductile Iron 140.0 0.68
102 P-14 J-31 8.0 Ductile Iron 140.0 0.69
103 P-15 J-32 8.0 Ductile Iron 140.0 0.69
105 P-17 J-41 8.0 Ductile Iron 140.0 0.69
107 P-19 J-39 8.0 Ductile Iron 140.0 0.82
108 P-20 J-38 8.0 Ductile Iron 140.0 0.95
109 P-21 J-48 8.0 Ductile Iron 140.0 1.51
110 P-22 J-47 8.0 Ductile Iron 140.0 1.51
112 P-24 J-45 8.0 Ductile Iron 140.0 1.51
113 P-25 J-44 8.0 Ductile Iron 140.0 1.50
114 P-26 J-43 8.0 Ductile Iron 140.0 1.50
116 P-27 J-4 6.0 Ductile Iron 140.0 0.00
117 P-28 J-8 6.0 Ductile Iron 140.0 0.01
120 P-30 J-10 6.0 Ductile Iron 140.0 0.00
121 P-31 J-14 6.0 Ductile Iron 140.0 0.00
122 P-32 J-17 6.0 Ductile Iron 140.0 0.01
123 P-33 J-16 6.0 Ductile Iron 140.0 0.00
124 P-34 J-20 6.0 Ductile Iron 140.0 0.00
125 P-35 J-24 6.0 Ductile Iron 140.0 0.01
126 P-36 J-25 6.0 Ductile Iron 140.0 0.01
127 P-37 J-26 6.0 Ductile Iron 140.0 0.01
128 P-38 J-29 6.0 Ductile Iron 140.0 0.00
130 P-39 J-33 6.0 Ductile Iron 140.0 0.00
131 P-40 J-53 6.0 Ductile Iron 140.0 0.00
135 P-42 J-55 8.0 Ductile Iron 140.0 0.69
136 P-43 J-30 6.0 Ductile Iron 140.0 0.00
137 P-44 J-35 6.0 Ductile Iron 140.0 0.23
138 P-45 J-36 6.0 Ductile Iron 140.0 0.23
139 P-46 J-34 6.0 Ductile Iron 140.0 0.00
141 P-47 J-46 8.0 Ductile Iron 140.0 1.51
142 P-48 J-56 8.0 Ductile Iron 140.0 1.51
144 P-49 J-57 6.0 Ductile Iron 140.0 0.00
145 P-50 J-1 6.0 Ductile Iron 140.0 0.00
147 P-51 J-3 8.0 Ductile Iron 140.0 2.16
150 P-53 J-1 8.0 Ductile Iron 140.0 2.16
154 P-54 J-1 8.0 Ductile Iron 140.0 2.16
155 P-55 J-62 8.0 Ductile Iron 140.0 2.16
156 P-56 J-62 6.0 Ductile Iron 140.0 0.00
158 P-57 J-59 6.0 Ductile Iron 140.0 0.00
159 P-58 J-63 6.0 Ductile Iron 140.0 0.00
163 P-60 PMP-1 8.0 Ductile Iron 140.0 2.16
164 P-61 J-52 6.0 Ductile Iron 130.0 0.01
166 P-62 J-21 8.0 Ductile Iron 140.0 0.67
167 P-63 J-64 8.0 Ductile Iron 140.0 0.67
173 P-66 J-40 8.0 Ductile Iron 140.0 0.69
176 P-68 J-68 6.0 Ductile Iron 140.0 0.00
178 P-69 J-42 8.0 Ductile Iron 140.0 0.69
179 P-70 J-69 8.0 Ductile Iron 140.0 0.69
181 P-71 J-70 6.0 Ductile Iron 140.0 0.00
183 P-72 PMP-1 6.0 Ductile Iron 130.0 3.84
186 P-73 R-2 6.0 Ductile Iron 130.0 4.36
187 P-74 PMP-2 6.0 Ductile Iron 130.0 4.36
192 P-76 J-67 8.0 Ductile Iron 140.0 0.69
193 P-77 J-72 8.0 Ductile Iron 140.0 0.69
199 P-80 J-28 8.0 Ductile Iron 140.0 0.69
200 P-81 J-75 8.0 Ductile Iron 140.0 0.69
203 P-82 J-76 6.0 Ductile Iron 130.0 0.00
205 P-83 J-77 6.0 Ductile Iron 130.0 0.00
206 P-84 J-78 6.0 Ductile Iron 130.0 0.00
Bozeman Gateway - Phase 4
Average Day: Pipe Table
J-77
J-78
J-75
PMP-2
J-48
J-72
J-39
J-75
J-55
J-67
J-67
J-69
J-41
J-69
J-59
J-63
J-51
R-1
J-11
J-64
J-22
J-50
J-58
J-59
J-62
J-58
J-49
J-38
J-39
J-44
J-56
J-45
J-56
J-27
J-28
J-53
J-31
J-31
J-55
J-13
J-15
J-15
J-21
J-22
J-23
J-44
J-43
J-3
J-6
J-7
J-9
J-42
J-40
J-38
J-48
J-47
J-46
J-15
J-21
J-23
J-26
J-28
J-32
0
Stop Node
J-4
J-7
J-9
J-19
J-11
J-13
-108
-108
-108
-108
0
0
-108
-108
0
-338
384
384
338
-1
-106
-106
-108
0
338
-338
-339
0
0
0
0
236
236
0
0
339
0
0
-108
0
-20
-20
0
0
-1
-1
1
0
236
0
0
0
0
-1
-128
-148
236
236
236
236
-106
-107
-107
-108
-108
-108
-103
-104
-104
-104
-105
-106
22
118
53
Flow
(gpm)
-103
-103
45
50
123
195
46
9
388
11
221
29
9
25
176
39
21
88
18
78
32
104
25
10
88
101
142
141
86
65
46
29
73
117
50
151
5
14
124
110
125
15
120
121
76
240
111
10
81
98
105
566
232
267
118
109
91
63
52
90
49
106
Length (Scaled)
(ft)
50
43
19
41
63
38
Pump Definition Detailed Report: Pump Definition - 1
Element Details
182ID Notes
Pump
Definition - 1Label
Pump Definition Type
Standard (3
Point)Pump Definition Type ft237.93Design Head
gpm0Shutoff Flow gpm1,540Maximum Operating Flow
ft244.86Shutoff Head ft231.00Maximum Operating Head
gpm1,059Design Flow
Pump Efficiency Type
Best
Efficiency
Point
Pump Efficiency Type
%100.0Motor Efficiency
%100.0BEP Efficiency FalseIs Variable Speed Drive?
gpm0BEP Flow
Transient (Physical)
lb·ft²0.000Inertia (Pump and Motor)SI=25,
US=1280Specific Speed
rpm0Speed (Full)TrueReverse Spin Allowed?
Page 1 of 227 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
9/19/2019
Bentley WaterCAD CONNECT Edition
[10.00.00.55]
Bentley Systems, Inc. Haestad Methods Solution
CenterWaterCAD.wtg
Pump Definition Detailed Report: Pump Definition - 1
Graph
Head (ft)250.00
225.00
200.00
175.00
150.00
125.00
100.00
75.00
50.00
25.00
0.00 Pump Efficiency (%)125.0
112.5
100.0
87.5
75.0
62.5
50.0
37.5
25.0
12.5
0.0
Flow (gpm)
7,0006,0005,0004,0003,0002,0001,0000
Page 2 of 227 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
9/19/2019
Bentley WaterCAD CONNECT Edition
[10.00.00.55]
Bentley Systems, Inc. Haestad Methods Solution
CenterWaterCAD.wtg
Pump Definition Detailed Report: Pump Definition - 2Element Details188IDNotesPump Definition - 2LabelPump Definition TypeStandard (3 Point)Pump Definition Typeft226.38Design Headgpm0Shutoff Flowgpm1,540Maximum Operating Flowft231.00Shutoff Headft219.45Maximum Operating Headgpm939Design FlowPump Efficiency TypeBest Efficiency PointPump Efficiency Type%100.0Motor Efficiency%100.0BEP EfficiencyFalseIs Variable Speed Drive?gpm0BEP FlowTransient (Physical)lb·ft²0.000Inertia (Pump and Motor)SI=25, US=1280Specific Speedrpm0Speed (Full)TrueReverse Spin Allowed?Page 1 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-16669/19/2019Bentley WaterCAD CONNECT Edition[10.00.00.55]Bentley Systems, Inc. Haestad Methods Solution CenterWaterCAD.wtg
Pump Definition Detailed Report: Pump Definition - 2GraphHead (ft)250.00225.00200.00175.00150.00125.00100.0075.0050.0025.000.00Pump Efficiency (%)120.0100.080.060.040.020.00.0Flow (gpm)7,0006,0005,0004,0003,0002,0001,0000Page 2 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-16669/19/2019Bentley WaterCAD CONNECT Edition[10.00.00.55]Bentley Systems, Inc. Haestad Methods Solution CenterWaterCAD.wtg
Scenario Summary ReportScenario: Max Day (Average*2.3)Scenario Summary32IDMax Day (Average*2.3)LabelNotes<I> Base Active TopologyActive Topology<I> Base PhysicalPhysicalMax DayDemand<I> Base Initial SettingsInitial Settings<I> Base OperationalOperational<I> Base AgeAge<I> Base ConstituentConstituent<I> Base TraceTraceFire Flow Max DayFire Flow<I> Base Energy CostEnergy Cost<I> Base TransientTransient<I> Base Pressure Dependent DemandPressure Dependent Demand<I> Base Failure HistoryFailure History<I> Base SCADASCADA<I> Base User Data ExtensionsUser Data ExtensionsMax DaySteady State/EPS Solver Calculation Options<I> Base Calculation OptionsTransient Solver Calculation OptionsHydraulic SummarySteady StateTime Analysis TypeTrueUse simple controls during steady state?Hazen-WilliamsFriction MethodFalseIs EPS Snapshot?0.001Accuracy12:00:00 AMStart Time40TrialsFire FlowCalculation TypePage 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-16669/19/2019Bentley WaterCAD CONNECT Edition[10.00.00.55]Bentley Systems, Inc. Haestad Methods Solution CenterWaterCAD.wtg
ID Label Demand
(gpm)
Hydraulic Grade
(ft)
39 J-1 0 5,086.13
40 J-3 0 5,086.49
41 J-4 0 5,086.50
43 J-6 0 5,086.50
44 J-7 0 5,086.51
45 J-8 1 5,086.51
46 J-9 0 5,086.51
47 J-10 1 5,086.51
48 J-11 0 5,086.53
50 J-13 0 5,086.54
51 J-14 1 5,086.54
52 J-15 0 5,086.55
53 J-16 1 5,086.55
54 J-17 1 5,086.55
56 J-19 0 5,086.52
57 J-20 0 5,086.56
58 J-21 0 5,086.56
59 J-22 0 5,086.58
60 J-23 0 5,086.59
61 J-24 2 5,086.58
62 J-25 1 5,086.59
63 J-26 0 5,086.61
64 J-27 1 5,086.61
65 J-28 0 5,086.62
66 J-29 1 5,086.62
67 J-30 0 5,086.63
68 J-31 0 5,086.63
69 J-32 0 5,086.65
70 J-33 1 5,086.63
71 J-34 1 5,086.85
72 J-35 46 5,087.05
73 J-36 46 5,086.95
75 J-38 0 5,087.08
76 J-39 0 5,086.98
77 J-40 0 5,086.84
78 J-41 0 5,086.72
79 J-42 0 5,086.67
80 J-43 0 5,086.61
81 J-44 0 5,086.85
82 J-45 0 5,086.93
83 J-46 0 5,087.04
84 J-47 0 5,087.15
85 J-48 0 5,087.27
86 J-49 1 5,086.15
87 J-50 0 5,086.13
88 J-51 1 5,086.09
118 J-52 1 5,086.53
129 J-53 0 5,086.63
133 J-55 0 5,086.63
140 J-56 0 5,086.97
143 J-57 0 5,086.97
146 J-58 0 5,086.31
149 J-59 0 5,086.09
153 J-62 0 5,086.15
157 J-63 0 5,086.09
165 J-64 0 5,086.57
172 J-67 0 5,086.92
175 J-68 0 5,086.92
177 J-69 0 5,086.72
180 J-70 0 5,086.72
191 J-72 0 5,086.94
198 J-75 0 5,086.63
201 J-76 1 5,086.63
202 J-77 0 5,086.63
204 J-78 0 5,086.63
Bozeman Gateway - Phase 4
Max Day: Junction Table
99
100
102
101
98
101
102
103
104
104
103
103
104
105
104
101
101
101
102
101
101
100
100
105
99
98
99
102
100
103
101
100
101
102
100
100
102
103
103
103
102
100
104
103
103
103
103
104
104
104
103
103
102
104
Pressure
(psi)
104
103
103
104
103
104
103
103
4,859.61
4,853.13
4,848.00
4,851.63
4,854.76
103
102
100
4,847.79
4,848.54
4,859.00
4,856.83
4,852.00
4,852.41
4,852.82
4,853.45
4,852.14
4,847.46
4,846.63
4,846.90
4,856.95
4,844.35
4,846.73
4,844.45
4,846.25
4,852.34
4,854.51
4,849.41
4,852.04
4,852.82
4,854.04
4,855.29
4,856.06
4,856.06
4,858.56
4,859.89
4,857.09
4,852.05
4,851.34
4,855.32
4,853.17
4,855.27
4,852.07
4,851.28
4,849.44
4,846.40
4,851.34
4,849.56
4,848.45
4,849.66
4,849.69
4,846.22
4,846.80
4,848.48
4,848.35
4,849.29
4,847.39
4,849.17
4,846.93
4,847.30
4,848.95
4,847.97
Elevation
(ft)
4,846.80
4,848.34
4,848.11
4,846.34
4,847.43
4,845.52
ID Label Start Node Diameter
(in)
Material Hazen-
Williams C
Velocity
(ft/s)
89 P-1 J-3 8.0 Ductile Iron 140.0 0.53
90 P-2 J-4 8.0 Ductile Iron 140.0 0.53
91 P-3 J-7 8.0 Ductile Iron 140.0 0.53
92 P-4 J-9 8.0 Ductile Iron 140.0 0.54
93 P-5 J-19 8.0 Ductile Iron 140.0 0.54
94 P-6 J-11 8.0 Ductile Iron 140.0 0.55
95 P-7 J-13 8.0 Ductile Iron 140.0 0.55
96 P-8 J-15 8.0 Ductile Iron 140.0 0.57
98 P-10 J-22 8.0 Ductile Iron 140.0 0.58
99 P-11 J-23 8.0 Ductile Iron 140.0 0.59
100 P-12 J-26 8.0 Ductile Iron 140.0 0.59
102 P-14 J-31 8.0 Ductile Iron 140.0 0.61
103 P-15 J-32 8.0 Ductile Iron 140.0 0.61
105 P-17 J-41 8.0 Ductile Iron 140.0 0.61
107 P-19 J-39 8.0 Ductile Iron 140.0 0.90
108 P-20 J-38 8.0 Ductile Iron 140.0 1.19
109 P-21 J-48 8.0 Ductile Iron 140.0 1.45
110 P-22 J-47 8.0 Ductile Iron 140.0 1.45
112 P-24 J-45 8.0 Ductile Iron 140.0 1.45
113 P-25 J-44 8.0 Ductile Iron 140.0 1.44
114 P-26 J-43 8.0 Ductile Iron 140.0 1.44
116 P-27 J-4 6.0 Ductile Iron 140.0 0.00
117 P-28 J-8 6.0 Ductile Iron 140.0 0.01
120 P-30 J-10 6.0 Ductile Iron 140.0 0.01
121 P-31 J-14 6.0 Ductile Iron 140.0 0.01
122 P-32 J-17 6.0 Ductile Iron 140.0 0.02
123 P-33 J-16 6.0 Ductile Iron 140.0 0.01
124 P-34 J-20 6.0 Ductile Iron 140.0 0.00
125 P-35 J-24 6.0 Ductile Iron 140.0 0.02
126 P-36 J-25 6.0 Ductile Iron 140.0 0.01
127 P-37 J-26 6.0 Ductile Iron 140.0 0.01
128 P-38 J-29 6.0 Ductile Iron 140.0 0.01
130 P-39 J-33 6.0 Ductile Iron 140.0 0.01
131 P-40 J-53 6.0 Ductile Iron 140.0 0.01
135 P-42 J-55 8.0 Ductile Iron 140.0 0.60
136 P-43 J-30 6.0 Ductile Iron 140.0 0.00
137 P-44 J-35 6.0 Ductile Iron 140.0 0.52
138 P-45 J-36 6.0 Ductile Iron 140.0 0.52
139 P-46 J-34 6.0 Ductile Iron 140.0 0.01
141 P-47 J-46 8.0 Ductile Iron 140.0 1.45
142 P-48 J-56 8.0 Ductile Iron 140.0 1.45
144 P-49 J-57 6.0 Ductile Iron 140.0 0.00
145 P-50 J-1 6.0 Ductile Iron 140.0 0.00
147 P-51 J-3 8.0 Ductile Iron 140.0 1.97
150 P-53 J-1 8.0 Ductile Iron 140.0 1.96
154 P-54 J-1 8.0 Ductile Iron 140.0 1.96
155 P-55 J-62 8.0 Ductile Iron 140.0 1.97
156 P-56 J-62 6.0 Ductile Iron 140.0 0.01
158 P-57 J-59 6.0 Ductile Iron 140.0 0.01
159 P-58 J-63 6.0 Ductile Iron 140.0 0.01
163 P-60 PMP-1 8.0 Ductile Iron 140.0 1.96
164 P-61 J-52 6.0 Ductile Iron 130.0 0.02
166 P-62 J-21 8.0 Ductile Iron 140.0 0.57
167 P-63 J-64 8.0 Ductile Iron 140.0 0.57
173 P-66 J-40 8.0 Ductile Iron 140.0 0.61
176 P-68 J-68 6.0 Ductile Iron 140.0 0.00
178 P-69 J-42 8.0 Ductile Iron 140.0 0.61
179 P-70 J-69 8.0 Ductile Iron 140.0 0.61
181 P-71 J-70 6.0 Ductile Iron 140.0 0.00
183 P-72 PMP-1 6.0 Ductile Iron 130.0 3.48
186 P-73 R-2 6.0 Ductile Iron 130.0 4.69
187 P-74 PMP-2 6.0 Ductile Iron 130.0 4.69
192 P-76 J-67 8.0 Ductile Iron 140.0 0.61
193 P-77 J-72 8.0 Ductile Iron 140.0 0.61
199 P-80 J-28 8.0 Ductile Iron 140.0 0.60
200 P-81 J-75 8.0 Ductile Iron 140.0 0.60
203 P-82 J-76 6.0 Ductile Iron 130.0 0.01
205 P-83 J-77 6.0 Ductile Iron 130.0 0.01
206 P-84 J-78 6.0 Ductile Iron 130.0 0.01
Bozeman Gateway - Phase 4
Max Day: Pipe Table
J-77
J-78
J-75
PMP-2
J-48
J-72
J-39
J-75
J-55
J-67
J-67
J-69
J-41
J-69
J-59
J-63
J-51
R-1
J-11
J-64
J-22
J-50
J-58
J-59
J-62
J-58
J-49
J-38
J-39
J-44
J-56
J-45
J-56
J-27
J-28
J-53
J-31
J-31
J-55
J-13
J-15
J-15
J-21
J-22
J-23
J-44
J-43
J-3
J-6
J-7
J-9
J-42
J-40
J-38
J-48
J-47
J-46
J-15
J-21
J-23
J-26
J-28
J-32
-1
Stop Node
J-4
J-7
J-9
J-19
J-11
J-13
-95
-95
-94
-94
-1
-1
-95
-95
0
-307
413
413
307
-1
-89
-89
-95
0
308
-308
-308
1
1
1
-1
226
226
0
0
308
-1
-1
-94
0
-46
-46
-1
0
-2
-1
1
-1
226
0
-1
-1
-1
-1
-141
-187
226
226
226
226
-91
-92
-93
-95
-95
-95
-84
-85
-85
-86
-87
-89
22
118
53
Flow
(gpm)
-83
-83
45
50
123
195
46
9
388
11
221
29
9
25
176
39
21
88
18
78
32
104
25
10
88
101
142
141
86
65
46
29
73
117
50
151
5
14
124
110
125
15
120
121
76
240
111
10
81
98
105
566
232
267
118
109
91
63
52
90
49
106
Length (Scaled)
(ft)
50
43
19
41
63
38
ID Label Pump Definition Hydraulic Grade
(Suction)
(ft)
Hydraulic
Grade
(Discharge)
Flow (Total)
(gpm)
161 PMP-1 Pump Definition - 1 5,086.02 5,330.04 338
185 PMP-2 Pump Definition - 1 4,844.43 5,088.23 384
Bozeman Gateway - Phase 4
Average Day: Pump Table
27 Siemon Company Drive Suite 200 W
Watertown, CT 06795 USA +1-203-755-1666
Pump Status
On
On
Bentley WaterCAD CONNECT Edition
[10.00.00.55]
Page 1 of 1
WaterCAD.wtg
9/19/2019
Elevation
(ft)
4,846.29
4,856.71
Pump Head
(ft)
244.02
243.80
Bentley Systems, Inc. Haestad Methods Solution
Center
Scenario Summary ReportScenario: Peak Hour (Average*3)Scenario Summary34IDPeak Hour (Average*3)LabelNotes<I> Base Active TopologyActive Topology<I> Base PhysicalPhysicalPeak HourDemand<I> Base Initial SettingsInitial Settings<I> Base OperationalOperational<I> Base AgeAge<I> Base ConstituentConstituent<I> Base TraceTrace<I> Base Fire FlowFire Flow<I> Base Energy CostEnergy Cost<I> Base TransientTransient<I> Base Pressure Dependent DemandPressure Dependent Demand<I> Base Failure HistoryFailure History<I> Base SCADASCADA<I> Base User Data ExtensionsUser Data ExtensionsPeak HourSteady State/EPS Solver Calculation Options<I> Base Calculation OptionsTransient Solver Calculation OptionsHydraulic SummarySteady StateTime Analysis TypeTrueUse simple controls during steady state?Hazen-WilliamsFriction MethodFalseIs EPS Snapshot?0.001Accuracy12:00:00 AMStart Time40TrialsHydraulics OnlyCalculation TypePage 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-16669/19/2019Bentley WaterCAD CONNECT Edition[10.00.00.55]Bentley Systems, Inc. Haestad Methods Solution CenterWaterCAD.wtg
ID Label Demand
(gpm)
Hydraulic Grade
(ft)
39 J-1 0 5,086.03
40 J-3 0 5,086.35
41 J-4 0 5,086.36
43 J-6 0 5,086.36
44 J-7 0 5,086.37
45 J-8 1 5,086.37
46 J-9 0 5,086.37
47 J-10 1 5,086.37
48 J-11 0 5,086.38
50 J-13 0 5,086.39
51 J-14 1 5,086.39
52 J-15 0 5,086.40
53 J-16 1 5,086.40
54 J-17 2 5,086.40
56 J-19 0 5,086.37
57 J-20 0 5,086.41
58 J-21 0 5,086.41
59 J-22 0 5,086.42
60 J-23 0 5,086.43
61 J-24 2 5,086.42
62 J-25 2 5,086.43
63 J-26 0 5,086.44
64 J-27 2 5,086.44
65 J-28 0 5,086.45
66 J-29 1 5,086.45
67 J-30 0 5,086.46
68 J-31 0 5,086.46
69 J-32 0 5,086.48
70 J-33 1 5,086.46
71 J-34 1 5,086.69
72 J-35 60 5,086.82
73 J-36 60 5,086.71
75 J-38 0 5,086.87
76 J-39 0 5,086.76
77 J-40 0 5,086.64
78 J-41 0 5,086.54
79 J-42 0 5,086.50
80 J-43 0 5,086.46
81 J-44 0 5,086.69
82 J-45 0 5,086.77
83 J-46 0 5,086.88
84 J-47 0 5,086.98
85 J-48 0 5,087.10
86 J-49 1 5,086.04
87 J-50 0 5,086.03
88 J-51 1 5,085.99
118 J-52 2 5,086.38
129 J-53 0 5,086.46
133 J-55 0 5,086.46
140 J-56 0 5,086.81
143 J-57 0 5,086.81
146 J-58 0 5,086.19
149 J-59 0 5,085.99
153 J-62 0 5,086.04
157 J-63 0 5,085.99
165 J-64 0 5,086.41
172 J-67 0 5,086.71
175 J-68 0 5,086.71
177 J-69 0 5,086.54
180 J-70 0 5,086.54
191 J-72 0 5,086.73
198 J-75 0 5,086.46
201 J-76 1 5,086.46
202 J-77 0 5,086.46
204 J-78 0 5,086.46
Bozeman Gateway - Phase 4
Peak Hour: Junction Table
99
99
101
101
98
101
102
103
104
103
103
103
104
105
104
101
101
101
102
101
101
100
100
105
99
98
99
101
100
103
101
100
101
102
100
100
102
102
103
102
102
100
104
103
103
103
103
104
104
103
103
103
102
104
Pressure
(psi)
104
103
103
104
103
104
103
103
4,859.61
4,853.13
4,848.00
4,851.63
4,854.76
103
102
100
4,847.79
4,848.54
4,859.00
4,856.83
4,852.00
4,852.41
4,852.82
4,853.45
4,852.14
4,847.46
4,846.63
4,846.90
4,856.95
4,844.35
4,846.73
4,844.45
4,846.25
4,852.34
4,854.51
4,849.41
4,852.04
4,852.82
4,854.04
4,855.29
4,856.06
4,856.06
4,858.56
4,859.89
4,857.09
4,852.05
4,851.34
4,855.32
4,853.17
4,855.27
4,852.07
4,851.28
4,849.44
4,846.40
4,851.34
4,849.56
4,848.45
4,849.66
4,849.69
4,846.22
4,846.80
4,848.48
4,848.35
4,849.29
4,847.39
4,849.17
4,846.93
4,847.30
4,848.95
4,847.97
Elevation
(ft)
4,846.80
4,848.34
4,848.11
4,846.34
4,847.43
4,845.52
ID Label Start Node Diameter
(in)
Material Hazen-
Williams C
Velocity
(ft/s)
89 P-1 J-3 8.0 Ductile Iron 140.0 0.45
90 P-2 J-4 8.0 Ductile Iron 140.0 0.45
91 P-3 J-7 8.0 Ductile Iron 140.0 0.46
92 P-4 J-9 8.0 Ductile Iron 140.0 0.47
93 P-5 J-19 8.0 Ductile Iron 140.0 0.47
94 P-6 J-11 8.0 Ductile Iron 140.0 0.48
95 P-7 J-13 8.0 Ductile Iron 140.0 0.49
96 P-8 J-15 8.0 Ductile Iron 140.0 0.50
98 P-10 J-22 8.0 Ductile Iron 140.0 0.52
99 P-11 J-23 8.0 Ductile Iron 140.0 0.53
100 P-12 J-26 8.0 Ductile Iron 140.0 0.54
102 P-14 J-31 8.0 Ductile Iron 140.0 0.56
103 P-15 J-32 8.0 Ductile Iron 140.0 0.56
105 P-17 J-41 8.0 Ductile Iron 140.0 0.56
107 P-19 J-39 8.0 Ductile Iron 140.0 0.94
108 P-20 J-38 8.0 Ductile Iron 140.0 1.32
109 P-21 J-48 8.0 Ductile Iron 140.0 1.41
110 P-22 J-47 8.0 Ductile Iron 140.0 1.41
112 P-24 J-45 8.0 Ductile Iron 140.0 1.41
113 P-25 J-44 8.0 Ductile Iron 140.0 1.41
114 P-26 J-43 8.0 Ductile Iron 140.0 1.41
116 P-27 J-4 6.0 Ductile Iron 140.0 0.00
117 P-28 J-8 6.0 Ductile Iron 140.0 0.01
120 P-30 J-10 6.0 Ductile Iron 140.0 0.01
121 P-31 J-14 6.0 Ductile Iron 140.0 0.01
122 P-32 J-17 6.0 Ductile Iron 140.0 0.02
123 P-33 J-16 6.0 Ductile Iron 140.0 0.01
124 P-34 J-20 6.0 Ductile Iron 140.0 0.00
125 P-35 J-24 6.0 Ductile Iron 140.0 0.02
126 P-36 J-25 6.0 Ductile Iron 140.0 0.02
127 P-37 J-26 6.0 Ductile Iron 140.0 0.02
128 P-38 J-29 6.0 Ductile Iron 140.0 0.01
130 P-39 J-33 6.0 Ductile Iron 140.0 0.01
131 P-40 J-53 6.0 Ductile Iron 140.0 0.01
135 P-42 J-55 8.0 Ductile Iron 140.0 0.55
136 P-43 J-30 6.0 Ductile Iron 140.0 0.00
137 P-44 J-35 6.0 Ductile Iron 140.0 0.68
138 P-45 J-36 6.0 Ductile Iron 140.0 0.68
139 P-46 J-34 6.0 Ductile Iron 140.0 0.01
141 P-47 J-46 8.0 Ductile Iron 140.0 1.41
142 P-48 J-56 8.0 Ductile Iron 140.0 1.41
144 P-49 J-57 6.0 Ductile Iron 140.0 0.00
145 P-50 J-1 6.0 Ductile Iron 140.0 0.00
147 P-51 J-3 8.0 Ductile Iron 140.0 1.86
150 P-53 J-1 8.0 Ductile Iron 140.0 1.85
154 P-54 J-1 8.0 Ductile Iron 140.0 1.85
155 P-55 J-62 8.0 Ductile Iron 140.0 1.86
156 P-56 J-62 6.0 Ductile Iron 140.0 0.01
158 P-57 J-59 6.0 Ductile Iron 140.0 0.01
159 P-58 J-63 6.0 Ductile Iron 140.0 0.01
163 P-60 PMP-1 8.0 Ductile Iron 140.0 1.85
164 P-61 J-52 6.0 Ductile Iron 130.0 0.02
166 P-62 J-21 8.0 Ductile Iron 140.0 0.50
167 P-63 J-64 8.0 Ductile Iron 140.0 0.50
173 P-66 J-40 8.0 Ductile Iron 140.0 0.56
176 P-68 J-68 6.0 Ductile Iron 140.0 0.00
178 P-69 J-42 8.0 Ductile Iron 140.0 0.56
179 P-70 J-69 8.0 Ductile Iron 140.0 0.56
181 P-71 J-70 6.0 Ductile Iron 140.0 0.00
183 P-72 PMP-1 6.0 Ductile Iron 130.0 3.28
186 P-73 R-2 6.0 Ductile Iron 130.0 4.86
187 P-74 PMP-2 6.0 Ductile Iron 130.0 4.86
192 P-76 J-67 8.0 Ductile Iron 140.0 0.56
193 P-77 J-72 8.0 Ductile Iron 140.0 0.56
199 P-80 J-28 8.0 Ductile Iron 140.0 0.54
200 P-81 J-75 8.0 Ductile Iron 140.0 0.55
203 P-82 J-76 6.0 Ductile Iron 130.0 0.01
205 P-83 J-77 6.0 Ductile Iron 130.0 0.01
206 P-84 J-78 6.0 Ductile Iron 130.0 0.01
Bozeman Gateway - Phase 4
Peak Hour: Pipe Table
J-77
J-78
J-75
PMP-2
J-48
J-72
J-39
J-75
J-55
J-67
J-67
J-69
J-41
J-69
J-59
J-63
J-51
R-1
J-11
J-64
J-22
J-50
J-58
J-59
J-62
J-58
J-49
J-38
J-39
J-44
J-56
J-45
J-56
J-27
J-28
J-53
J-31
J-31
J-55
J-13
J-15
J-15
J-21
J-22
J-23
J-44
J-43
J-3
J-6
J-7
J-9
J-42
J-40
J-38
J-48
J-47
J-46
J-15
J-21
J-23
J-26
J-28
J-32
-1
Stop Node
J-4
J-7
J-9
J-19
J-11
J-13
-87
-87
-85
-86
-1
-1
-87
-87
0
-289
428
428
289
-2
-79
-79
-87
0
290
-290
-291
1
1
1
-1
221
221
0
0
291
-1
-1
-86
0
-60
-60
-1
0
-2
-2
2
-1
220
0
-1
-1
-1
-2
-147
-207
221
221
221
220
-81
-83
-84
-87
-87
-87
-72
-73
-73
-75
-76
-79
22
118
53
Flow
(gpm)
-71
-71
45
50
123
195
46
9
388
11
221
29
9
25
176
39
21
88
18
78
32
104
25
10
88
101
142
141
86
65
46
29
73
117
50
151
5
14
124
110
125
15
120
121
76
240
111
10
81
98
105
566
232
267
118
109
91
63
52
90
49
106
Length (Scaled)
(ft)
50
43
19
41
63
38
ID Label Pump Definition Hydraulic Grade
(Suction)
(ft)
Hydraulic
Grade
(Discharge)
Flow (Total)
(gpm)
161 PMP-1 Pump Definition - 1 5,085.80 5,330.03 289
185 PMP-2 Pump Definition - 1 4,844.31 5,087.88 428
Bozeman Gateway - PUD
Peark Hour: Pump Table
Pump Status
On
On
Elevation
(ft)
4,846.29
4,856.71
Pump Head
(ft)
244.23
243.57