Loading...
HomeMy WebLinkAboutLighting Plan Sheet ES2.2 4-9-2021 •F• . ELECTRICAL SPECIFICATIONS ELECTRICAL SPECIFICATIONS (CONY.) Scott T �00T r;0 3 ELECTRICAL NOTE: INTENT OF PLANS AND SPECIFICATIONS WIRE DEVICES AND COVERPLATES: C T _ N The plans and specifications contemplate the complete installation of the system described so that at Coordinate all device and plate colors/material with the existing equipment and architect/owner. ENS3 CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE CITY OF BOZEMAN'S STANDARD the conclusion of the construction, the systems will be turned over to the own complete and ready SPECIFICATIONS FOR LIGHTING MATERIALS AND INSTALLATION. PROVIDE AND INSTALL for safe, efficient operation. The plans and specifications cannot deal individually with the many minute Duplex Receptacles: ALL MATERIALS AND EQUIPMENT PER CITY'S REQUIREMENTS. items which may be required by the nature of the systems n The contractor shall be obliged to furnish Duplex receptacles shall be rated 125 volts, 20 amps, 2 pole, 3 wire, NEMA Type 5-20R, UL heavy and install all such items normally included o systems of this type, which while not mentioned directly duty, back and side wired, grounding type with nylon or lexan bodies. Approved manufacturers are herein, are obviously essential to the installation and operation of the system and which are normally Arrow-Hart, Bryant, Hubbell 5362, Leviton or Pass&Seymour 5362A. furnished on quality installations of this type. In re ving bids, it will be assumed that each bidder has made a thorough inspection of the conditions GFCI Duplex Receptacles: and se1familiar with all conditions affecting the extent o cost of this work. Claims for extra payments GFCI duplex rscsptaclW shall be rated 125 volts, 20 amps, 2 pole, 3 wire, NEMreceptacles Type s-20R, UL heovy e PROVIDE A PLUG AND RECEPTACLE HOUSED IN WATER-RESISTANT, SYNTHETIC RUBBER CAPABLE OF BURIAL IN THE as a result of failure to examine the conditions prior for submitting the bid will not be allowed. duty, back and de wired, grounding type with nylon Iexan bodies. GFCI hall trip when ground currents exceed 5mA, shall trip in 25milliseconds maximum and shall have a interrupting rating m GROUND OR INSTALLATION IN SUNLIGHT. THE HOUSING, CONSISTING OF 2 SECTIONS, PROVIDES A WATERTIGHT SEAL a Z of Toggle amps. Approved manufacturers are Arrow-Hart, Bryant, Hubbell, or Leviton. 0 AROUND THE CABLE AND A WATERTIGHT SEAL BETWEEN THE TWO SECTIONS AT THE POINT OF DISCONNECTION. Toggle Switches: SUPPLY EACH KIT WITH SUFFICIENT SILICONE COMPOUND TO LUBRICATE METAL PARTS AND THE RUBBER HOUSINGS CODES, ORDINANCES AND PERMITS Toggle switches shall be rated 120/277 volts, 20 amps, single-pole, double-pole, 3-way or 4-way as N ruscD In— FOR EASY ASSEMBLY. Comply with all state and local codes and ordinances applying to the work specified herein. shown, specification grade, extra-heavy duty, back and side wired.Approved manufacturers are LU > Make application for, obtain and pay for all required permits and certificates of inspection for the work. Arrow-Hart, Bryant, Hubbell , Leviton or Pass & Seymour. WHERE INDICATED, CRIMP A COPPER PIN AND A COPPER RECEPTACLE TO THE CABLE. THE RECEPTACLE IS TO Cover Plates: ESTABLISH CONTACT PRESSURE WITH THE PIN THROUGH THE USE OF A COPPER BERYLLIUM SPRING AND BE Type 302 Stainless Steel or non-breakable nylon. EQUIPPED WITH A DISPOSABLE MOUNTING PIN.THE PIN INSPECTION Re lar inspections shall be requested of duly authorized tors as d b codes and SUPPORTS AND HANGERS: IS TO BE CONSTRUCTED OF AT LEAST HALF-HARD MATERIAL.THE CRIMPING PORTION IS TO BE FULLY ANNEALED ordaances.spec reques y inspectors require y Supports and hangers shall be UL listed and approved by local inspectors. WHILE THE REST OF THE PIN IS MAINTAINED IN ITS ORIGINAL STATE OF HARDNESS.THE RECEPTACLE IS TO BE FULLY ANNEALED.THE PIN AND RECEPTACLE Conductors: FUSED eR—(END RUry TIER TicuT CONNEcnarv) ARE TO LOCK TOGETHER SO THE CONNECTION IS MAINTAINED WHEN A MINIMUM FORCE OF 20 POUNDS TENSION IS SUBSTITUTING All conductors shall be copper with THHN/THWN type insulation within raceway.Aluminum conductors may W APPLIED TO THE ATTACHED CABLES. Requests for approval shall be submitted to the owner at least 10 days prior to the bid date. only be used as feeders. MC cable may be utilized for branch circuits. Provide conductors with NEC F approved color coding. All wire Shall have an insulation voltage rating of 600 volts; and an insulation Q yN�p_ PROVIDE FUSED CONNECTOR KITS CONTAINING A PAIR OF SPRING LOADED 90% CONDUCTIVITY CONTACTS FOR temperature rating of 75 degrees C. SHOP DRAWINGS Wire colors: Black, Red for circuits at 240/12OV, single phase. GRIPPING A STANDARD MIDGET FERRULE TYPE FUSE.THE CONTACTS MUST BE FULLY ANNEALED AND ADAPTED TO The contractor shall submit to the owner for I, to the Iacin of orders for t, W BE CRIMPED TO THE CABLE. n approve prior, p g any equipment, complete schedule of mechanical wequipment and light fixtures to be installed. The schedule shall ANCHORS: � cconsist of at least three (3) sets each of catalogs, cuts, diagrams, shop drawings, performance curves Hollow Masonry - Toggle Bolt E any other descriptive material nec ssary to fully describe the equipment proposed and its operating Solid Masonry - Expansion Anchor z0U0H WATERTIGHT CONNECTION DETAIL(FOR STREET LIGHTING FIXTURES) 2cracteraccs. The ecneawee shall eret the operating conditions of he equipment at the conditions Metal = Machine screws, Bolts, or Welding F�oO $2, NO SCALE listed on the Schedules. Z- Wood Wood Screws .O- ❑ The determination of quantities of material and equipment required shall be made by the contractor T 2y EE from the drawings. Schedules on the drawings and in the specification are completed as an aid to the ��� - o contractor, but where discrepancies arise, it shall not release the contractor from providing the proper GROUNDING: umber to complete this work. Grounding shall be provided in strict accordance with the NEC and Utility Company t Providing PHOTOCELL n rig provi y pony regulations.ions. g m a copper equipment grounding conductor in all raceways. INSTALLATION OF THE WORK w The Contractor shall examine all the drawings before proceeding with the layout and installation of his NAMEPLATES: \ J TO TYPE A TO TYPE A work. General mechanical and plumbing contract drawings will be made available to this Contractor. a TO A FIXTURE AT Should discre affectin the work be found, the contractor shall immediate) report same to the Provide nameplates on all disconnects and equipment. Nameulates shall have 3/16" high letters engraved = N FIXTURE FIXTURE panties g y repo p engraving I 9 9 END OF CIRCUIT with contrastingcolor fill. Device late shall be 1 8"hi h letters with contrasting color fill. CONNECT TO CONNECT TO owner for instructions. Subsequent changes made necessary by the neglect of any Contractor to CIRCUITING CIRCUITING discover and report such discrepancies shall be mode by Band at the expense of the Contractor, under •L 12-POLE WATER TIGHT IN POLE BASE WATER TIGHT IN POLE BASE WATER TIGHT the direction of the owner. L— orvracroP CONNECTOR_ AS REQUIRED CONNECTOR AS REQUIRED CONNECTOR DISCONNECTS: � 2 (TYPICAL) (TYPICAL) (TYPICAL) CONNECT TO Furnish, provide, and/or install shall be considered a requiring the Contractor to both furnish the N CIRCUITING equipment and install it unless specific reference iss made to the furnishing or installing of the Provide disconnect switches where required by NEC. Disconnect switches shall be, heavy-duty, NEMA_ A POLE BASE equipment by others. rated and UL listed. '- AS REQUIRED tiT U Z CONNECT TO �¢ ❑ u wOrc CIRCUITING CLEANING LIGHT FIXTURES: W r in CONNECT TO �_u. A POLE BASE Labels, stickers, etc., shall be removed and the entire installation left in a clean, usable condition. Provide new light fixtures; complete with trims, lamps, fuses, gaskets, ballast, options, accessories, etc. END RUN CIRCUITING END RUN AS REQUIRED ire in m as scheduled. rc°,a WATER TIGHT A POLE BASE WATER TIGHT Dust, w insulation pieces, bugs, and finger prints shall le removed from exterior and interior of all Oh�3 CONNECTOR AS REQUIRED CONNECTOR light fixtures and the entire installation left in a clean, usable condition. Support light fixtures independent of ceiling framing. Connect light fixtures to branch circuits, as indicated. Install specified lamps in each fixture. DRAWN BY: STE (TYPICAL) TO A FIXTURE AT (TYPICAL) TO A FIXTURE AT END OF CIRCUIT END OF CIRCUIT DESIGNED BY: STE PAINTING QUALITY CHECK: STE ALL ELECTRICAL EQUIPMENT FURNISHED UNDER THE PROJECT: Finishes of all electrical equipment shall be protected during storage, installation and until final At a time set by the contractor and agreed to by the own arrange to place equipment in operation ceptance.Any damage or imperfections shall be "touched up"or if extensive,the entire unit shall be and have available at that time, if required, representatives owner, the m nufacturer of equipment to assist DATE: 11/2020 �epainted as directed by the owner. in starting and/or programing equipment,to make necessary adjustments to equipment, and to prove JOB NO. B16-089 SITE LIGHTING WIRING DIAGRAM satisfactory operation prior to turning facility over to the owner. FIELDBOOK S2, NO SCALE SLEEVES Any irregularities,faulty equipment, etc., shall be repaired or replaced as required prior to acceptance. The Electrical Contractor shall set and maintain all sleeves. Run operating test for 30 hour periods and submit data for approval. All equipment shall be labeled and installation completely finished prior to acceptance. OPENINGS Properly balance all electrical panels and provide new type-written panel schedules as needed. All openings required for the passage of cable tray, multiple conduits and electrical equipment in the construction shall be provided by the Electrical Contractor. The Electrical Contractor shall be responsible OPERATION AND MAINTENANCE MANUALS for determining the correct location for all openings. Prepare two portfolios with two complete sets of shop drawings of the equipment used in the erection EXISTING SERVICES of the mechanical systems and equipment testin g s, cleaning and maintenance instructions,operation and The Contractor shall verify the e act location of all existing building s extended and/or relocated drs saof manuals,need list of materials for the maintenance, parts list, wiring diagrams, and name and for this project. The Contractor x shall also verify the exact location and stoke proper precautions to address of authorized service organization. PANEL A protect all services which may be encountered during construction. Include the following close-out documents in the manuals: W ACCESS TO EQUIPMENT 1. Final Test reports. 1 200 AMPS MLO 2081120V VOLT 1 PHASE 3 WIRE SURFACE MOUNTING NEMA'SIR 22,000AIC Access shall be provided to all equipment for maintenance purposes. 2. Asbestos letter. 14 BREAKER DESCRIPTION CIRCUIT PHASELCA CIRCUIT DESCRIPTION BREAKER 3. Warranty letter. AMPS POLES VA # A B # VA AMPS POLES PROTECTIVE DEVICES 4. Equipment start-up and functional test reports. LL All panel covers, belts, drives, couplings, and moving parts shall be protected by approved permanent W (--� 20 2 LTS:CIRCUIT#1 414 1 821 2 207 LTS:CIRCUIT#2 20 2 covers guards, shields, or railings, which shall be in place whenever the equipment is in operation and PROJECT CLOSE OUT W _ She be in accordance with applicable safety standards. The electrical contractor shall arrange for an inspection of all items installed in the ceiling before the QUALITY ASSURANCE PROVISION 5 0 8 SPARE 20 2 ceiling or ceiling file is installed. The o ner shall be informed at least one week before the planned Z installation of the ceiling to a range the winspection. If the ceiling tile is installed before the inspection, PROVISION 7 0 8 ---- - - Electrical work shall be formed b licensed Journeyman or b n Electrical kite in direct the electrical contractor shall remove all the ceiling tiles i W per y ymm y a m war o g prior to the inspection. ,+ PROVISION 9 0 10 PROVISION supervision. Perform work in accordance with good commercial practice. Perform work in accordance Closeout Equipment/Programming: Program lighting control systems per the schedules provided on the V Con PROVISION 11 0 12 PROVISION with all applicable state and local standards.The quality appearance of the finished work shall be of drawings. Operate each relay and light switch with the owner's operating personnel present to equal importance with its electrical efficiency.The owner may reject work if workmanship and J a a 821 821 re not Subs artery. Install t and materials in accordance with the manufacturers' daemonstrate sustained, satisfactory performance. Adjust and correct operations as needed for proper appearance a fi equipment Aeration. r71 endations. Unless specifically indicated otherwise, or where local codes and regulations take Q Z ^ TOTAL LOADS: 1242 VA precedence. Operating Instructions: Con duet at least a half day walk ethrough instruction seminar for the Owner's Z �j personnel to be involved in the operation and maintenance of the electrical equipment and systems. If O /--1 O DEMAND more time is needed the contractor shall continue instruction until the owner's personal are familiar with ELECTRICAL MATERIALS AND METHODS the operation of the system. Explain the identification system, operational diagrams, emergency and — O Conduit Requirements: alarm provisions, programming requirements, seasonal provisions, security, safety, efficiency and similar (0 f..y 6 AMPS Conduits indoors in general areas shall be EMT with steel set screw fittings. features of the system. ♦w C Conduit outdoors and above ground shall be either IMC or RMC with threaded fittings and bushings. Guarantee: All equipment and work shall be fully guaranteed, parts and labor for one year from the v/ G T Conduit underground under parking lots and roadways(s) shall be Schedule 80 PVC. date of substantial completion, unless noted otherwise. The contractor has the full responsibility to W l U Where conduit transfers from underground to above ground the conduit r shall be provide with an IMC guarantee all equipment and work and shall assume full responsibility to repair any equipment at his LL Z 1�"'I 4-1 or RMC elbow and an IMC or RMC riser to the electrical r associated t. cost which the manufacturer refuses to guarantee. The Owner has the right to order repairs to any 1�1 1 q up pane o u equipment. O Q PANEL'A'-PANEL SCHEDULE equpment o work provided eereon and to enlarge the contractor for tee e me if repot are net made ���III NO SCALE ELECTRICAL BOXES: during a re sonable period of time not to exceed 24 hours during an emergency or 72 hours on a Ll Boxes for fixtures, receptacles, switches, equipment connections and wire pulling shall be: non critical oitem. a IV ^ Cast or formed from carbon steel sheets of commercial grade steel not less than 14 GA.c W O F�1 One-piece construction, zinc, or cadmium plated. W Tapped for mounting plates and covers as required. �/ m Pull and junction boxes shall be: Fabricated from galvanized or pointed code gauge cold rolled carbon steel sheets. J Welded construction with flat removable c Mere fastened to the box with machine s L r 1 Seams and joints shall be closed and reinforced with flanges formed of the some material from which L ��/ the box is constructed or by continuous welding which will provide equivalent strength to flange construction. a Preferably not provided with 'knockouts'. Q Be,covers shall be fastened in place by machine screws or hinges and latches. W r l F� W SHEET ES2.2