HomeMy WebLinkAboutEastlake Professional Center PP RC#1 Narrative 21-016 04-09-2021EASTLAKE PROFESSIONAL CENTER
File # 21-016
Preliminary Plat
RC#1 Narrative
April 2021
2 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
Table of Contents
1. Application Forms & Checklists
(Applications included - A1 Development Review, PP Subdivision Preliminary Plat, & N1 Noticing Checklist)
2. Project Team
3. Narrative
I. Project Overview
II. Project Details
III. Phasing Timelines
IV. Preliminary Plat Supplements
V. Response to City Comments
VI. Variances and Waivers
VII. Response to Preliminary Plat Review Criteria
4. Appendices
Appendix A: Preliminary Plat
Appendix B: Phasing Plan
Appendix C: Exhibits
Exhibit A: Vicinity Map 1/2 Mile Conditions
Exhibit B: Current Zoning Map
Exhibit C: Future Land Use Map
Exhibit D: FEMA Floodplain Map
Exhibit E: Green Plan
Appendix D: Articles of Incorporation
Appendix E: Covenants, Conditions and Restrictions
Appendix F: Design Regulations
Appendix G: Noxious Weed Management Plan and Approval
Appendix H: Engineering Design Report
Appendix I: Traffic Impact Study
3 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
Appendix J: Ground Water Monitoring Data
Appendix K: Preliminary Platting Certificate
Appendix L: NorthWestern Energy Will Serve Letter
Appendix M: City of Bozeman Address Assignment
5. Plan Set
Civil
Preliminary Plat
Master Utility Plan
Weed Management Plan
Site Survey
Lighting
Sheet ES1.1
Sheet ES2.1
Sheet ES2.2
4 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
1. Application Forms & Fees
The required A1, PP, & N1 forms for the Eastlake Professional Center Subdivision
Preliminary Plat Application have been included in the application materials. The
calculated fee total is outlined below.
COMPONENT FEE QUANTITY TOTAL
PP Base Fee (Minor Subdivision) $2,049 1 $2,049.00
Additional fee per lot subject to Site
Plan Review
$35 4 $140.00
Additional fee per lot physically
contiguous
$6.50 5 $32.50
TOTAL $ 2,221.50
5 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
2. Project Team
OWNER Eastlake Professional Center LLC
Attn: Randy Scully
randy@scullywestproperties.com
5073 Patterson Road
Bozeman, MT 59718
p. 914.450.8803
APPLICANT ScullyWest Properties, LLC
Attn: Randy Scully
randy@scullywestproperties.com
5073 Patterson Road
Bozeman, MT 59718
p. 914.450.8803
PROJECT CONSULTANTS
Planning Intrinsik Architecture, Inc.
Attn: Ryan Krueger
rkrueger@intrinsikarchitecture.com
111 North Tracy Avenue,
Bozeman, MT 59715
p. 406.582.8988
Civil Engineering TD&H Engineering
Attn: Alex Edwards
Alex.Edwards@tdhengineering.com
234 East Babcock Street, Suite 3
Bozeman, MT 59715
p. 406.586.0277
Landscape Architect Design 5
Attn: Nate Beck
Nate@Design5la.com
37 East Main Street, Suite 10
Bozeman, MT 59715
p. 406.587.4873
6 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
3. Narrative
0. Executive Summary
The Eastlake Professional Center commercial subdivision represents a thoughtful
commercial hub adjacent to existing transit corridors, residential neighborhoods, and
commercial areas. Once approved and the infrastructure is complete, the 4 -lot
subdivision will be able offer a variety of future development options to ensure
commercial needs of the community are met.
I. Project Overview
This Subdivision Preliminary Plat is for a project to subdivide 7.65 acres (333,321 SF) of
undeveloped land into four (4) commercial lots. The property is designated as
Community Commercial Mixed Use in the Community Plan ’s Future Land Use Map, and
the property is zoned B-2M - Community Business District-Mixed. The property is
located southeast of the intersection of East Valley Center Road, a principle arterial,
and North 27th Avenue, a collector. This intersection is designated as a high visibility
street corner, and as such has two associated block frontages: Mixed (North 27th
Avenue) and Gateway (East Valley Center Road).
The Eastlake Professional Center project site has been previously reviewed by the City
7 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
of Bozeman as a Concept Plan in 2016 and 2018 (File No. 16-462 & File No. 18-345),
and as a now expired Subdivision Pre-Application in 2017 (File No. 17-081). In August
2020 a new Pre-application was submitted for City review (File No. 20 -274), and the
City provided comprehensive comments in response to this submittal on October 15,
2020. In 2020 the City also reviewed and provided comments on a Concept application
submitted for Lot 4 (File No. 20-380). To the west of this proposed subdivision, the
Billings Clinic project team has submitted a informal review application for Phase 1 of
the Clinic Campus.
This Preliminary Plat
application is submitted as
the next step for the
creation of the Eastlake
Professional Center
commercial subdivision.
This narrative contains or
directs the reviewer to the
appropriate Preliminary
Plat application
documents. If additional
clarifying, non-substantive
revisions are needed to
documents or plans
included herein, the
Applicant Team requests
that these amendments be
conditioned for submission
with the Final Plat
materials.
II. Project Details
The Eastlake Professional
Center commercial
subdivision is proposed for
the parcel that lies to east
of the intersection of East
Valley Center Road and
North 27th Avenue. The
subject parcel is bounded
to the north by Interstate 90, to the west by the future Billings Clinic Campus site, to
the south by future commercial development and the existing school system bus barn,
and to the east of the Catron Crossing Commercial Subdivision.
8 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
The subdivision design is intended to foster a unified node of thoughtful commercial
activity that additionally enhances connectivity to current and future development in
proximity to this site. This proposed four lot commercial subdivision will include
improvements to several roadways and the PROST shared use path located parallel to
East Valley Center Road. The intersection of East Valley Center Road and North 27th
Avenue has been designated as a high visibility intersection, and the site’s adjacency to
the interstate further highlights the significance of this property ’s location. Honor Lane
is proposed to be constructed to the south the subject parcel, and the applicant has
been in discussions with adjacent property owners regarding shared costs for the
installation of this local street.
The site layout is limited by the unavailability of permitted accesses to East Valley
Center Road, and therefore all internal circulation through the subdivision and
between abutting properties will be through access easements connected rights -of-way
to shared parking areas. The Preliminary Plat (Civil Sheet 3.0) displays these necessary
access easements for shared driveways and parking areas to ensure adequate access to
all lots. Future development of the subdivision will also look to include the
construction of parking facilities to be shared between Lots 1 - 3 (see Exhibit E - Green
Plan). Both surface and parking structures are under consideration for construction on
Lot 3, and future Concept and Site Plans will explore this possibility in further detail.
LAND USE
The subdivision is intended to be entirely commercial in nature, with offices and
medical offices predominantly envisioned for this site. The subdivision development
may included a structured parking facility within the subdivision, which can allow for
shared parking based on future site development needs. The Master Site Plan
submitted concurrent with the Preliminary Plat explores several possible site parking
design and use configuration options. Please refer to the Master Site Plan Narrative for
additional details.
Initial land use assumptions for the Eastlake Professional Center subdivision have been
Table 1: Eastlake Professional Center - Land Use Table
Use Proposed Lots Proposed Land Area (square feet)
Single Household - -
Multi-Household - -
Commercial 4 6.004 Acres (261,566 sf)
Parkland - -
Open Space - -
ROW/Streets - 1.648 Acres (71,755 sf)
TOTAL 4 7.652 Acres (333,321 sf)
9 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
outlined in the Table 1 (below). It is not known at this time if commercial condominiums
are to be developed. Should condo units be proposed, additional Site Plan and
Condominium review applications will be submitted as necessary. No Planned Unit
Developments are anticipated, and no manufactured homes nor RV parks are to be
developed within this neighborhood.
III. Phasing Timelines
This project is proposed to be constructed in five (5) phases. Phase 1 is to be the first
phase constructed. While Phases 2 - 5 are numbered numerically, and subsequently to
Phase 1, phases are not necessarily intended to be constructed in their numerical order.
It is the applicants intention that Phases 1 - 5 may be constructed concurrently or
independently of one another.
Please see Appendix B for additional details on the extent of each proposed phase. The
applicant may seek to financially guarantee onsite improvements in Phase 1 as is
necessary. The construction staging limits for the construction of all phases may be
relocated to an alternative location depending on project need. The Phasing
expectations will be further developed in the subsequent Final Plat submittal.
IV. Preliminary Plat Supplements
38.220.060.A.1 - Surface water.
Response: The Eastlake site is approximately 4,650 feet above sea level, encompassing 6
acres that slopes gradually from south to north. The historic land use for this site is
agriculture and there is no surface water in the vicinity of the site.
38.220.060.A.2 - Floodplains.
The site is in FEMA Zone X which is an area outside of the special flood hazard area. The
site is higher than the elevation of the 0.2-percent annual chance flood. See included
Exhibit E for the FEMA FIRMette map.
38.220.060.A.3 - Ground Water.
Response: Groundwater was encountered during Geotechnical investigation on the site.
The minimum depth was found at 67 inches on May 19, 2020. The maximum depth
encountered was 112 inches on August 4, 2020. The test pit locations and results can
are included as Appendix J.
38.220.060.A.4 - Geology, Soils and Slopes.
Response: The proposed subdivision does not have any geological hazards that will
require any protective measures.
10 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
38.220.060.A.5 - Vegetation.
Response: The proposed subdivision does not contain any major vegetation types such
as march, grassland, shrub, coniferous forest or deciduous forest. There are no critical
plant communities identified onsite.
38.220.060.A.6 - Wildlife.
Response: The proposed subdivision does not contain any known critical, significant or
key wildlife areas.
38.220.060.A.7 - Historical Features.
Response: The proposed subdivision does not contain any known historic,
paleontological, archaeological or cultural sites.
38.220.060.A.8 - Agriculture.
Response: The site is currently covered in native grasses and there is no production on
the land. The surrounding sites are currently under development and there will be no
agricultural operations near the proposed subdivision.
38.220.060.A.9 - Agricultural Water User Facilities.
Response: The proposed subdivision does not contain any agricultural water user
facilities.
38.220.060.A.10 - Water and Sewer.
Response: Please refer to Appendix H - Preliminary Engineering Design Report . Water
and wastewater system improvements will be designed to meet City of Bozeman
Standards and State Department of Environmental Quality Standards and Regulations.
38.220.060.A.11 - Stormwater Management.
Response: Stormwater will be managed on an individual lot basis. A stormwater
management plan meeting the requirements of section 40.04.700 will be submitted with
the individual Site Plan submittals.
38.220.060.A.12 - Streets, Roads and Alleys.
Response: The subdivision will have several new streets and improvements of existing
public streets. As part of the proposed subdivision public street improvements, North
27th Avenue from Honor Lane to East Valley Center Road will be constructed to the
applicable City of Bozeman cross-section standards. Honor Lane will be built from the
south-east corner of the subdivision and connected to North 27th Avenue. The
proposed subdivision will have internal drives to provide access to each lot. Additional
information included in Appendix I - Traffic Impact Study, and below regarding access
to the property from North 27th Avenue.
38.220.060.A.13 - Utilities.
Response: A copy of the subdivision preliminary plat has been submitted to
Northwestern Energy for review. NorthWestern Energy will be providing gas and
11 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
electrical services to the subdivision. The utilities will be installed along East Valley
Center road prior to construction on the proposed subdivision to provide the necessary
utilities to Billings Clinic on the west side of the subdivision. A written statement from
Northwestern Energy has been included as Appendix L.
38.220.060.A.14 - Educational Facilities.
Response: The proposed subdivision is commercial use and will not increase enrollment
or have any impact to the existing school bus system.
38.220.060.A.15 - Land Use.
Response: The proposed subdivision has four proposed lots that will all be commercial
use, and additional details on the proposed subdivision land use have been included in
the preceding narrative sections.
38.220.060.A.16 - Parks and recreation Facilities.
Response: Please see Exhibit A, which shows all the locations of parks and open space
areas within a one-half mile radius. This is a Commercial Subdivision that will not
require parkland dedication. All future commercial development will demonstrate UDC
compliance with commercial open space standards through individual Site Plan review.
38.220.060.A.17 - Neighborhood Center.
Response: The neighborhood is proposed is a commercial subdivision, therefore a
neighborhood center is not required.
38.220.060.A.18 - Lighting Plan.
Response: A lighting plan has been included with this submittal.
38.220.060.A.19 - Miscellaneous.
Response: The proposed subdivision is not located within 200 feet of any public land
access. The subdivision has powerlines that travel north-south along the east side of the
site. A Northwestern Energy representative will be onsite while any construction is
taking place within 25’ of the overhead powerlines to ensure all hazards are avoided.
The proposed subdivision is not located within a delineated Wildland Urban Interface
area.
38.220.060.A.20 - Affordable Housing.
Response: The proposed subdivision will not include any housing as this is to be a
commercial subdivision.
V. Response to Previous Comments
The City of Bozeman provided comments in response to the Subdivision Preliminary Plat
(File No. 21-016). Responses to these comments are included below.
Planning Condition of Approval #1: BMC 38.270.030.1. – The applicant is advised
12 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
that unmet code provisions, or code provisions that are not specifically listed as
conditions of approval, does not, in any way, create a waiver or other relaxation of
the lawful requirements of the Bozeman Municipal Code or state law.
Response: Noted.
Planning Condition of Approval #1: The final plat must conform to all requirements
of the Bozeman Municipal Code and the Uniform Standards for Monumentation,
Certificates of Survey, and Final Subdivision Plats (24.183.1101 ARM, 24.183.1104
ARM, 24.183.1107 ARM) and must be accompanied by all required documents,
including certification from the City Engineer that record drawings for public
improvements were received, a platting certificate, and all required and corrected
certificates.
Response: Noted.
Planning Condition of Approval #3: The final plat must contain the following
notation on the conditions of approval sheet in the final plat: “The responsibility of
maintenance for the stormwater facilities, common areas, pedestrian access
easement areas, and street frontage landscaping for the perimeter streets must be
that of the property owners’ association. Maintenance responsibility must include,
all vegetative ground cover, boulevard trees and irrigation systems in the public right
-of-way boulevard strips along all external perimeter development streets. The
property owners’ association must be responsible for levying annual assessments to
provide for the maintenance, repair, and upkeep of all perimeter street frontage
landscaping and stormwater facilities and all open space landscaping.”
Response: Noted.
Planning Condition of Approval #4: The final plat must provide all necessary utility
easements and they must be described, dimensioned and shown on each subdivision
block of the final plat in their true and correct location.
Response: Noted.
Planning Condition of Approval #5: All stormwater facilities not on property
dedicated to the City of Bozeman require public utility easements for storm water
facility maintenance.
Response: Noted.
Planning Comment #1: BMC Sec. 38.220.310. - Property owners' association. The
Property Owners’ Association (POA) documents must be finalized and recorded with
the final plat. The POA documents must include the requirements of Section
38.220.300 and 320.
Response: Noted.
Planning Comment #2: BMC. 38.220.070. - Final plat. Please include all certificates
on sheet 1, the plat on sheet 2, and conditions of approval on sheet 3.
13 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
Response: Noted.
Planning Comment #3: BMC 38.240.150. - Final plat application. Transfer of
ownership of public land, off -site land, private land, personal property,
improvements and water rights; documents required.
(1) For the transfer of real property in satisfaction of required or offered dedications
to the city, and required or offered donations or grants to the property owners'
association (POA), the subdivider or owner of the property must submit with the
application for final plat a warranty deed or other instrument acceptable to the city
attorney transferring fee simple ownership to the city or the POA.
(3) The subdivider or owner of the property must record the deed or instrument
transferring ownership or interests at the time of recording of the final plat with the
original of such deed or instrument returned to the city or POA as applicable.
(4) For the transfer of ownership interest in water, the subdivider or owner of the
property must submit with the application for final plat a deed or other instrument
acceptable to the city attorney transferring ownership to the city or POA, along with
all required state department of natural resources and conservation documentation,
certification and authorization.
Response: Noted.
Planning Comment #4: BMC Sec. 38.240.410. - Dedication or consent. The
certificate of dedication or consent must contain a notary block.
Response: Noted.
Planning Comment #5: BMC Sec. 38.240.520. - Certificate of completion of non-
public improvements. Where non-public improvements are to be installed prior to
final plat approval, the final plat of subdivision must contain a certificate of
completion of non-public improvements. A certificate for all improvements related
to the perimeter street landscaping and irrigation, stormwater improvements and
open space lot landscaping and irrigation must be provided on the final plat.
Response: Noted.
Planning Comment #6: BMC Sec. 38.240.530. - Certificate of completion of water -
related improvements. When irrigation of public facilities are to be installed prior to
final plat approval, the final plat of subdivision must contain a certificate of
completion of water-related improvements. The certificate must list all completed
and accepted improvements, including but not limited to all irrigation system record
drawings. The subdivision proposes irrigation of public street frontage and city
parkland. This certificate must be provided on the final plat.
Response: Noted.
Planning Comment #7: BMC Sec. 38.410.060. - Easements. The existing easement
that is labeled “to be abandoned” must either be abandoned and the language and
easement linework omitted from the plat or the language must read “easement
14 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
abandoned with this plat.”
Response: Noted. This will be addressed with final plat.
Planning Comment #8: BMC Sec. 38.550.070. - Landscaping of public lands. In
accordance with the requirements of this section, installation by the developer of
vegetative ground cover, boulevard trees, and irrigation system in the public right -of
-way boulevard strips on perimeter streets and in and adjacent to City park lots and
all open space lots is required prior to final plat approval.
Response: Noted.
Engineering Comment #1: Stormwater BMC 38.410.080 - Stormwater facilities may
not encroach into the required 10 utility easement unless written approval is
obtained from all impacted utilities.
Response: Acknowledged, stormwater facilities no longer fall within 10’ utility
easements.
Engineering Comment #2: Transportation - BMC 38.400.090.D.2 : Access -
a) Proposed Access for the Billings Clinic must be shown on the plat.
b) The proposed deviation for access on to N 27th Ave is not acceptable as proposed.
Response: a) Noted. b) The deviation request for the south access was discussed
with COB personnel in a comment response meeting that occurred on 3/11/21. The
deviation was granted in the meeting given that right in, right out only movements
would be permitted, and the appropriate traffic devices would be added to the
plans. The MSP plans have been updated and signage and striping has been added to
direct traffic for right-in, right-out movements.
Engineering Comment #3: Transportation BMC 38.400.010 - North 27th Ave must be
constructed to the City’s Collector standard including curb gutter and sidewalk from
the southern edge of the property line to the intersection of Valley Center Drive.
a) The engineering department recommends a street section of 38 feet from back of
curb to back of curb with no on street bike lanes.
b) The engineering department recommends a 10 foot wide asphalt multi use path in
lieu of the proposed 5 foot wide concrete sidewalk along 27 th Ave.
Response: a) Acknowledged, N27th has been revised per COB Comment. b)
Acknowledged, the path has been added per COB Comment.
Engineering Comment #4: Water and Wastewater - BMC 38.270.030 Completion of
Improvements - Required water and sewer improvements:
a) A 12” water main must be constructed in North 27th Ave from the existing main to
East Valley Center, as per the City’s Water Master Plan.
b) A 16” water main must be constructed in East Valley Center from the intersection
of North 27th Ave to connect with th e main installed with the Catron Crossing
15 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
Subdivision to the east.
c) The property is reliant upon the construction of the Davis Lane Lift Station
(scheduled for FY19) and an 8” main extension down East Valley Center as out line in
the City of Bozeman Wastewater Facility Master Plan (unscheduled, developer
driven).
d) The project is reliant on completion of offsite water and sewer infrastructure and
is not eligible for final plat approval until these improvements are completed and
accepted by the city.
Response: a) The 12” water main is included in the infrastructure plans for the
neighboring property (Billings Clinic). b) The utility master plan was discussed with
COB personnel in a comment response meeting that occurred on 3/11/21. The
proposed 16” line through the Eastlake Development will accomplish the
requirements of the City Utility Master Plan, and the alternative route was
acknowledged by the DRC during the meeting. The alternate route has been
coordinated with the neighboring property (Billings Clinic). c) Acknowledged.
Alterations to utility master plan requirements have been coordinated with COB
personnel, Eastlake, and the neighboring property (Billings Clinic). d) Acknowledged.
Engineering Condition #1: The existing 10 foot utility easement must be released
prior to final plat and cannot be shown on the plat.
Response: Understood.
Engineering Condition #2: If not already filed for the subject site, the applicant must
provide and file with the County Clerk and Recorder's office executed Waivers of
Right to Protest Creation of Special Improvement Districts (SID’s) for the following:
a) Street improvements to North 27th Avenue including paving, curb/gutter,
sidewalk, and storm drainage
b) Street improvements to Catamount Street including paving, curb/gutter, sidewalk,
and storm drainage
c) Street improvements to East Valley Center Road including paving, curb/gutter,
sidewalk, and storm drainage
d) Intersection improvements to North 27th Avenue and Catamount Street
e) Intersection improvements to East Valley Center Road and Catamount Street
f) Intersection improvements to North 27th Avenue and East Valley Center Road
g) Intersection improvements to North 19th Avenue and East Valley Center Road
The document filed must specify that in the event an SID is not utilized for the
completion of these improvements, the developer agrees to participate in an
alternate financing method for the completion of said improvements on a fair share,
proportionate basis as determined by square footage of property, taxable valuation
of the property, traffic contribution from the development, or a combination
16 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
thereof. The applicant must provide a copy of the filed SID waiver prior any future
development.
Response: Understood.
Engineering Condition #3: The final plat must provide all necessary utility easements
and they must be described, dimensioned and shown on each subdivision block of
the final plat in their true and correct location.
Response: Understood.
Engineering Condition #4: Show all recorded easement numbers on the final plat for
respective easements.
Response: Understood.
Engineering Condition #5: The subject property is located in an area with high
groundwater with potentially corrosive soils, which can increase the likelihood of
water main failure over the lifespan of the asset. The applicant must perform a
corrosivity analysis to determine if cathodic protection is required for the proposed
distribution mains.
Response: Acknowledged, in lieu of corrosivity testing, mainlines will be zinc coated
and wrapped in approved plastic wrap.
Engineering Condition #6: The applicant must contact the Gallatin County
Conservation District, Montana Department of Environmental Quality, and U.S. Army
Corps of Engineers regarding the proposed project and any required permits (i.e.,
310, 404, Turbidity exemption, etc.) must be obtained by the applicant.
Response: Understood.
Engineering Condition #7: 1 foot no access strip shall be placed along all lots
fronting East Valley Center.
Response: Acknowledged, the no access strip has been added.
Engineering Condition #8: The proposed project falls within the Bozeman Solvent
Site boundary. The property is underlain by an aquifer contaminated with
perchloroethylene (PCE). No irrigation wells may be installed on this property and
any excavation and dewatering will require additional construction oversite. Please
contact the Montana Department of Environmental Quality for additional
information on construction requirements within the solvent site.
Response: Acknowledged, has informed the design team that the site is not a
concern and will be permitted to move forward with a dewatering general
construction permit.
Engineering Condition #9: All dedicated public easements must be recorded the
City’s standard template easement documents separate from the plat and the
recorded document number must be listed on the final plat.
17 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
Response: Understood.
Engineering Condition #10: The discrepancy in the master site plan and preliminary
plat application for the termination of the 16 inch water main must be resolved and
shown on the plat as it is in the master site plan.
Response: Acknowledged, the plat and master site plan match.
Engineering Condition #11: The final plat must contain the following notation on the
Conditions of Approval sheet in the final plat: The responsibility of maintenance for
the stormwater facilities, stormwater open space lots, pedestrian open space lots
and street frontage landscaping for the perimeter streets must be that of the
property owners’ association. Maintenance responsibility must include, all
vegetative ground cover, boulevard trees and irrigation systems in the public right -of
-way boulevard strips along all external perimeter development streets. The property
owners’ association must be responsible for levying annual assessments to provide
for the maintenance, repair, and upkeep of all perimeter street frontage landscaping
and stormwater facilities and all open space landscaping.
Response: Understood.
Engineering Condition #12: The final plat must contain the following notation on the
Conditions of Approval sheet in the final plat: No crawl spaces or basements may be
constructed. Sump pumps are not allowed to be connected to the sanitary sewer
system. Sump pumps are also not allowed to be connected to the drainage system
unless capacity is designed into the drainage system to accept the pumped water.
Water from sump pumps may not be discharged onto streets, such as into the curb
and gutters where they may create a safety hazard for pedestrians and vehicles. This
note must appear on the final plat.
Response: Understood.
Engineering Condition #13: The final plat must contain the following notation on the
Conditions of Approval sheet in the final plat: All downstream water user facilities
will not be impacted by this Subdivision.
Response: Understood.
Engineering Condition #14: The final plat must contain the following notation on the
Conditions of Approval sheet in the final plat: All lots are subject to a 10-foot wide
front yard utility easement.
Response: Understood.
Engineering Condition #15: The final plat must contain the following notation on the
Conditions of Approval sheet in the final plat: All Open Space and Public Access areas
to be owned and maintained by the property owners association.
Response: Understood.
Engineering Condition #16: The final plat must contain the following notation on the
18 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
Conditions of Approval sheet in the final plat: Lot access must be constructed to the
standard set forth by the City of Bozeman Design Standards and Specifications Policy,
and the City of Bozeman Modifications to the State Public Works Standard
Specifications per Bozeman Municipal Code requirements
Response: Understood.
VI. Variances and Waivers
No variances or waivers are proposed nor required for this project.
VII. Response to Subdivision Review Criteria
The application demonstrates compliance with the applicable Subdivision Review
Criteria, found in BMC Section 38.240.130, as described below:
1) Compliance with the survey requirements of Part 4 of the Montana Subdivision and
Platting Act.
Response: The Preliminary Plat (Civil Sheet 3.0) demonstrates compliance with the
survey requirements of Part 4 of the Montana Subdivision and Platting Act and has been
prepared by a Professional Engineer registered in the State of Montana. The subsequent
Final Plat will comply with State statute, Administrative Rules of Montana, and the
Bozeman Municipal Code.
2) Compliance with the local subdivision regulations provided for in Part 5 of the
Montana Subdivision and Platting Act.
Response: This application is in compliance with the local subdivision regulations
provided for in Part 5 of the Montana Subdivision and Platting Act. The final plat shall
comply with the standards identified and referenced in the Bozeman Municipal Code
(BMC).
3) Compliance with the local subdivision review procedures provided for in Part 6 of
the Montana Subdivision and Platting Act.
Response: This Preliminary Plat is undergoing review according to the procedures
provided for in UDC Section 38.240.130 and Part 6 of the Montana Subdivision and
Platting Act.
4) Compliance with Chapter 38, BMC and other relevant regulations.
Response: The application is in compliance with Chapter 38, BMC and all other relevant
regulations, or, as stipulated in any unmet code provisions, will be in substantial
compliance prior to Preliminary Plat approval.
5) The provision of easements to and within the subdivision for the location and
installation of any necessary utilities.
19 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
Response: All necessary utility easements have been provided for, both to and within
the subdivision, as shown on the Preliminary Plat (Civil Sheet 3.0).
6) The provision of legal and physical access to each parcel within the subdivision and
the notation of that access on the applicable plat and any instrument transferring the
parcel.
Response: All subdivision parcels have been provided with legal and physical, as shown
on the Preliminary Plat (Civil Sheet 3.0), which includes the relevant instrument
numbers as required.
Primary Subdivision Review Criteria, Section 76 -3-608
1) The effect on agriculture.
Response: The project site is not currently used for agricultural production and the
proposed subdivision will not have adverse effects on agriculture.
2) The effect on Agricultural water user facilities.
Response: There are no agricultural water facilities found at this site.
3) The effect on Local services.
Response:
Water/Sewer – Municipal water and sewer mains exist in the adjacent street rights of
way of to serve the development. The subdivider proposes to extend water and sewer
mains throughout the development and to the individual lots within the subdivision.
These internal water and sewer mains will be installed or guaranteed prior to final plat
approval. The applicant understands that completion of the Davis Lane lift station will
be necessary for service to this site, and as those improvements are currently
underway, the proposed subdivision will have sufficient sewer capacity for service once
that connection is complete.
Streets – The Growth Policy and subdivision standards require adequate connectivity of
the street grid to ensure sufficient infrastructure to serve the needs of the public and
alleviate congestion. The preliminary plat layout utilized East Valley Center Road
(Arterial), North 27th Avenue (Collector), and Honor Lane (Local street) to provide
primary site connectivity. Other internal drives provide circulation to all lots. The
project is well connected and meets block length requirements with the proposed
streets and pedestrian midblock crossings.
Police/Fire – The area of the subdivision is within the service area of both these
departments. No concerns on service availability have been identified. The necessary
addresses will be provided to enable 911 response to individual homes prior to
recording of the final plat.
Stormwater - The subdivision will construct storm water control facilities to conform to
municipal code. Inspection of installed facilities prior to final plat will verify that
20 April 2021
Preliminary Plat RC#1: Eastlake Professional Center
standards have been met. Maintenance of the storm water facilities is an obligation of
the property owners’ association. This responsibility is addressed in the covenants
proposed with the subdivision.
Parklands - As the project does not include residential uses, no Parkland is required.
Misc. - Provision of maintenance of all drives (including emergency accesses), common
areas and elements, and other required improvements not dedicated to the public are
to be maintained as described in Appendix E.
4) The effect on the Natural environment.
Response: The subdivision will not negatively impact the natural environment. The
project will also look to include passive solar opportunities and multimodal transit
options to and from the site, actions in line with the Bozeman Climate Plan.
5) The effect on Wildlife and wildlife habitat.
Response: The subdivision will not significantly impact wildlife and wildlife habitat at
this property. There are no known endangered or threatened species on the property.
6) The effect on Public health and safety.
Response: The project will be further reviewed through future Final Plats and Site Plans
to ensure the intent of the regulations in Chapter 38 of the Bozeman Municipal Code is
met. Chapter 38 includes the protection of public health, safety and general welfare as
a foundational tenet, therefore the subdivision continues to be reviewed with this
expectation in mind. DRC review has shown that this submittal is in general compliance
with the Chapter 38, and conditions of approval are expected in response to this
submittal where additional information is required to ensure approval. All subdivisions
must be reviewed against the criteria listed in 76 -3-608.3.b-d, Mont Code Annotated,
and this narrative demonstrates compliance with the requirements as shown herein.