Loading...
HomeMy WebLinkAboutAppendix F - Design Guidelines 4-9-2021 1 DRAFT AApprriill 22002211 Prepared For EASTLAKE PROFESSIONAL CENTER, LLC Prepared By EASTLAKE PROFESSIONAL CENTER Architectural Design Guidelines 2 Table of Contents Chapter 1: Purpose Chapter 2: Properties and Projects Subject to Design Manual Chapter 3: Relationship to other Documents 3.1 Local Land Use Regulations & Building Codes 3.2 The Declaration of Protective Covenants & Bylaws for Eastlake Professional Center Chapter 4: Architectural Review Committee 4.1 Function 4.2 Membership 4.3 Scope of Responsibilities 4.4 Enforcing Powers 4.5 Inspection Access 4.6 Limitation of Responsibilities Chapter 5: Design Review Process 5.1 Informal Advice 5.2 Form A: Sketch Design Review 5.3 Form B: Construction Design Review 5.5 Form C: Changes & Modifications 5.6 Inspections 5.7 Timing of Construction 5.8 Liability Chapter 6: Design Guidelines 6.1 Site Intent Fences & Screens Sidewalks 6.2 Architecture Character Massing & Articulation Walls & Façades Fenestration Entrance & Doors Roofs Lighting Specialty Features 3 Signage Prohibited Building Type Lot Specific Information 6.3 Parking 6.4 Landscape Street Trees & Boulevards Vegetation and Solar Gain Hardscape Irrigation Maintenance and Weed Control Vegetation Removal Lot Specific Information 6.5 Pedestrian & Common Spaces Paving Materials Furniture and Amenities 6.6 Service Areas & Mechanical Equipment Location Screening Dumpsters Chapter 7: Amendments EXHIBITS & APPENDICES Exhibit 1: Legal Description Exhibit 2: Lot Diagrams Appendix A: Planting List Appendix B: Shared Use Agreement – Stormwater Appendix C: Stormwater Management Plan Appendix D: Forms 4 Pursuant to the Declaration of Protective Covenants for Eastlake Professional Center (“Declaration”), on file with the Gallatin County Clerk and Recorder’s Office, the Declarant Eastlake Professional Center, LLC (“Declarant”), herein adopts the following the Eastlake Professional Center Design Manual (“Design Manual”): Chapter 1: Purpose This Design Manual is intended to promote sustainable patterns of development that will encourage people to connect and interact as part of the Eastlake Professional Center project and adjacent projects. The standards within this document provide a framework for design and construction that will allow each project to contribute to the neighborhood and to the long-term goal of complimenting and enhancing the overall Bozeman community. The architectural and landscape elements of site design are integral to the overall desired neighborhood patterns. Rather than dictate specific design styles, the standards are provided to ensure well designed and detailed, compatible buildings and sites with clear order and comprehensive composition. The goal is to strike a balance between project harmony and creativity. This document encourages design diversity and contemporary design while providing certain guidance to ensure quality design and longevity in property values. Each project should not simply be an exact copy of another building. The fact that a given style or feature of building already exists does not guarantee that it will be approved for construction again. Exceptions to this Design Manual may be granted only based on architectural merit as determined by the Eastlake Professional Center Design Review Panel (“DRP”) and outlined in Section 6.4. The DRP is not authorized to grant any exceptions to local land use regulations unless explicitly authorized by the appropriate review agency or agencies. It is the responsibility of the Owner to ensure that all proposed construction shall comply with all laws, rules, and regulations including, but not limited to local Land Use Regulations and the International Building Code as well as other applicable plumbing, electrical, or building codes in effect for the City of Bozeman. The Declaration and Bylaws, if any, also apply to all Lots within the Eastlake Professional Center Subdivision. Chapter 2: Properties and Projects Subject to Design Manual The Design Manual shall inure to and pass with each parcel, tract, lot, or division in Eastlake Professional Center Subdivision. Unless specifically excluded, this Design Manual shall apply to the entire Eastlake Professional Center Subdivision (as described in Exhibits 1, 2, 3 & 4), any property annexed to Eastlake Professional Center Subdivision, and all improvements. No improvements shall be made, erected, altered or permitted to remain upon any Lot until (1) the proper Form(s) is/are submitted, (2) any other information required or requested by the DRP is submitted, (3) all fees are fully paid, (4) all required Forms are approved in writing by the DRP, and (5) any applicable City of Bozeman review or permitting and/or fee payment(s) has been completed. 5 All plans submitted to the City of Bozeman must have the Eastlake Professional Center Design Review Panel Form B stamp of approval. “Improvement” shall be construed broadly and includes, but is not limited to, a residence, fence, wall, garage, outbuilding, other structure, or landscaping. Chapter 3: Relationship to other Documents 3.1 Local Land Use Regulations & Building Codes All improvements must comply with applicable building codes, land use regulations, and all other laws, rules and regulations of any government or agency under whose jurisdiction the land lies. Local land use regulations can be found online at www.bozeman.net. 3.2 The Declaration of Protective Covenants and Bylaws for Eastlake Professional Center All Lots in Eastlake Professional Center Subdivision are also subject to The Declaration of Protective Covenants for Eastlake Professional Center(“Declaration”), which are on file at the Gallatin County Clerk & Recorder’s Office, and Bylaws. Chapter 4: Eastlake Professional Center Design Review Panel A Panel is hereby established known as the Eastlake Professional Center Design Review Panel (“DRP”). 4.1 Function The function and purpose of the DRP is to review applications, plans, specifications, materials, samples, and location to determine if the proposed construction conforms to the Declaration and the Design Manual. 4.2 Membership 4.2.1 Before the Transfer Date, the Declarant may appoint a Design Review Panel composed of up to three persons. The persons are not required to be Owners or Members of the Association. The persons may serve on the Design Review Panel until he or she resigns or is replaced by the Declarant, whichever occurs first. If no persons are on the Design Review Panel, then the Board of Directors shall act as the Design Review Panel. 4.2.2 After the Transfer Date, the Board of Directors may appoint a Design Review Panel composed of up to three persons. The persons are not required to be Owners or Members of the Association. The persons may serve on the Design Review Panel until he or she resigns or is replaced by the Board of Directors, whichever occurs first. If no persons are on the Design Review Panel, then the Board of Directors shall act as the Design Review Panel. 6 4.2.3 The Board of Directors may also engage engineers or other advisors or consultants in the design review process, as necessary. 4.3 Enforcement Powers Should any Owner violate or threaten to violate any part of this Design Manual, the DRP may attempt to work with the Owner to have the Owner cure the violation in a timely manner, and/or refer the violation or threatened violation to the Board of Directors. Among any other remedy set forth in the Declaration, the Board of Directors has the right to injunctive relief, which requires the Owner to stop, remove, and/or alter any improvements in a manner that complies with the standards established by the DRP. 4.4 Limitation of Responsibilities The primary goal of the DRP is to review the Review Applications and the plans, specifications, materials, samples, and location to determine if the proposed construction conforms to the Declaration and the Design Manual. The DRP does not assume responsibility for the following:  The structural adequacy, capacity, or safety features of the proposed construction or improvement.  Soil erosion, ground water levels, non-compatible or unstable soil conditions.  Compliance with any or all building codes, safety requirements, and governmental laws, regulation, or ordinances. Chapter 5: Design Review Process 5.1 General 5.1.1 Approval Required to Commence Construction. No improvements shall be made, erected, altered or permitted to remain upon on any Lot until the Owner submits the proper Form to the DRP and the Form is approved in writing by the DRP. 5.1.2 DRP Discretion. The DRP has complete discretion to approve, conditionally approve, or deny a Form. At the least, the construction, installation, or alteration shall comply with the Declaration and Design Manual; be in harmony with the external design, location, and topography of the surrounding Lots and Eastlake Professional Center Subdivision; and not be placed on or under any part of said Lot within the common areas and easements reserved as indicated on Exhibit “A,” or the common areas and easements reserved and created in the Declaration, except as approved by the DRP. 5.1.3 Information Required. No Form will be deemed submitted until all information required by the Design Manual and requested by the DRP, and all fees are provided. Incomplete applications may be returned and are subject to a re-submittal fee. 5.1.4 Submitting Forms. To submit for design review please email, or otherwise digitally transfer your application form and associated documents to the following address: Eastlake Professional Center Design Review Panel 7 c/o Intrinsik Architecture, Inc. 111 North Tracy Avenue Bozeman, Montana 59715 406.582.8988 studio@intrinsikarchitecture.com Submittals must be labeled with “Eastlake Professional Center Design Review Panel” and specific project title and address. Forms A, B, and C, as may be amended from time to time, may be requested from the DRP. Submittals must also be under 15 MBs or separated into individual files less than 15 MB. 5.1.5 After the Review. Following DRP review, the Owner will be notified as to whether the construction has been approved, conditionally approved, or denied. 5.1.6 Withdrawing Application. An Owner may withdraw an application without prejudice, provided the request for withdrawal is made in writing to the DRP. 5.1.7 Departures. Any request for any departure must be made in writing to the DRP. Any departure granted shall be considered unique and will not set any precedent for future decisions. Departure requests are subject to Section 6.4. 5.1.8 Request for Hearing. If an application is conditionally approved or denied, the Owner may request a hearing before the DRP to justify the Owner’s position. The DRP will consider the arguments and facts presented by the Owner and notify the Owner of its decision. 5.1.9 Event of Inaction. If the DRP does not act on or respond to a Form within forty-five (45) days after receiving the Form, the Form shall be deemed denied. 5.2 Informal Advice Prior to beginning the design process, it is recommended that Owners and their designated representatives (such as architects, contractors, etc.) contact the DRP to verify their interpretation of this Design Manual. Owners or their designated representatives may, at their option, request a meeting with the DRP to discuss the preliminary plans prior to a full Form A (Sketch Design Review) submittal. Fee* Required Documents Required Submittal Materials (1 digital PDF copy) Schematic Drawing Checklist None (except as noted below) None Conceptual plans appropriate for informal discussion N/A *Note: Additional meetings and/or reviews requested by the Owner and as determined by the DRP to be above and beyond the standard review process are subject to hourly fees in addition to the Design Review fee and must be paid prior to issuance of approval. 8 5.3 FORM A (Required) Sketch Design Review The Sketch Design Review checks designs for general interpretations of the overall Declaration and Design Manual. Form A includes a statement of Acknowledgement. The Lot Owner and/or its designated representative shall take all necessary steps to ensure that they and their employees, subcontractors, agents, suppliers, and others involved in the development of the Lot are familiar with and agree to abide by the Declaration, Design Manual, and approved plans. Note that Form A review must be completed before Form B review can begin. If a Form B application is not submitted within nine (9) months of Form A review (based on the date of the letter from the DRP approving or conditionally approving the plans) or if the design changes considerably (as determined by the DRP in the DRP’s sole discretion), a new full Form A submittal will be required. Fee* Required Documents (1 digital PDF copy) Required Submittal Materials (1 digital PDF copy) Schematic Drawing Checklist $1,250 - All Buildings Form A (must be signed) Site Plan (1/16” or 1/8” scale) North Arrow Property/Setback Lines Easements Sidewalks; Building Footprints; Patios, Stairs, etc; Overhangs (as dashed lines) Landscape Plan (1/16” or 1/8” scale) Schematic Site & Boulevard Landscaping Floor Plans (1/8” scale or larger) Room Use Windows & Doors Overhangs Dimensions Gross SF Elevations (1/8” scale or larger) Balconies Doors, windows Materials specified Overall Height (from average grade) Roof Pitches *Notes: 1) Fee covers Form A & B; if project does not progress past Form A, a $250 refund will be provided upon request of the owner. 2) Additional meetings and/or reviews requested by the Owner and as determined by the DRP to be above and beyond the standard review process are subject to hourly fees in addition to the Design Review fee and must be paid prior to issuance of approval. 3) Incomplete applications may be returned and are subject to a $100 penalty. 9 5.4 Form B (Required) Construction Design Review: The Construction Design Review checks the construction documents for general compliance with the Declaration and Design Manual and verifies that the previous DRP recommendations have been addressed. Conformity to applicable local regulations and building codes, as well as obtaining appropriate permits is the responsibility of the Owner and/or the Owner’s architect and/or builder. If a Form B application is not submitted within nine (9) months of Form A review (based on the date of the letter from the DRP) or if the design changes considerably (as determined by the DRP in its sole discretion), a new full Form A submittal will be required. Fee* Required Documents (1 digital PDF copy) Required Submittal Materials (1 digital PDF copy) Drawing Checklist N/A (Fee paid in Form A) Form B (must be signed) Site Plan (1/16” or 1/8” scale) All dimensions must be noted. North Arrow; Property Lines; Setback Lines; Easements; Sidewalk & Street Location; Location, Dimensions, Materials for Patios, Walks & Drives; Building Footprints; Stairs, etc.; Overhangs (as dashed lines); Grading Plan; Location and screening details of dumpsters, equipment and meters; Limits of construction activity Landscape Plan (1/16” or 1/8” scale) Site landscaping Boulevard Landscaping Floor Plans (1/8” scale or larger) All dimensions must be noted. Room Use Windows & Doors Overhangs Gross square footage for building Elevations (1/4” scale or larger) All dimensions must be noted. Balconies Doors, windows Materials specified Overall Height (from average grade) Roof Pitches Lights and light fixture details Color Rendering Color rendering of the front elevation and color chips Material Samples As requested by DRP 10 Foundation Letter from Engineer Each project is required to submit a letter from a civil engineer identifying existing ground water elevations, and recommendations for foundation design, footing and first floor elevations. *Notes: 1) Fees paid with Form A cover both Form A & Form B. 2) Form A & Form B may be submitted concurrently. 3) Additional meetings and/or reviews requested by the Owner and as determined by the DRP to be above and beyond the standard review process are subject to hourly fees in addition to the Design Review fee and must be paid prior to issuance of approval. 4) Incomplete applications may be returned and are subject to a $100 penalty. 5.5 Form C Changes & Modifications: Owners may wish to make improvements or modifications to their improvements or property during the initial construction or at a future date. A change may only be executed after DRP approval of Form C. Note that any changes or modifications that are made before Form C is submitted, reviewed, and approved will be subject to an increased fee, a fee to be decided by the Board of Directors or the DRP. Fee* Required Documents (1 digital PDF copy) Required Submittal Materials (1 digital PDF copy) Drawing Checklist $200 (for proposed modifications) $500 (for “after the fact” modifications, per infraction as determined by the DRP) Form C Any relevant drawings related to proposed change(s) Any details related to the proposed changes. *Notes: 1) Additional meetings and/or reviews requested by the Owner and as determined by the DRP to be above and beyond the standard review process are subject to hourly fees in addition to the Design Review fee and must be paid prior to issuance of approval. 2) Incomplete applications may be returned and are subject to a $100 penalty. 5.6 Site Plan Review & Building Permits All construction projects require a building permit and some projects may require additional review from the City of Bozeman. Any plans submitted to the City of Bozeman must include the Eastlake Professional Center Design Review Panel stamp and/or letter of approval. This is a requirement of the Eastlake Professional Center Homeowners’ Association and not the City of Bozeman. Approval by the DRP does not ensure approval by the City of Bozeman. Construction may not commence without obtaining necessary approvals/permits from the City of Bozeman and the Eastlake Professional Center Homeowners’ Association. Eastlake Professional 11 Center Homeowners’ Association Eastlake Professional Center Homeowners’ Association will assess significant fines for beginning construction prior to obtaining all required approvals. 5.7 Timing of Construction An Owner has one (1) year from the date of Form B approval to start construction. If construction of a structure is not started within one (1) year of Form B approval, new approval must be obtained. If there are delays due to the City of Bozeman review process, or other reasons an extension can be granted by the DRP. An Owner has eighteen (18) months from the date construction commences to complete construction unless an extension is granted by the DRP. If construction is commenced and is not completed in eighteen (18) months or is not completed in strict compliance with what was approved, then in addition to any other remedy allowed in the Declaration or this Design Manual, or at law or in equity, the Board of Directors, may, in its sole discretion, take any action that in its judgment is necessary to improve the appearance of the construction or to bring it into compliance with the Declaration, the Design Manual, or the approved plans, including completing the exterior, or removing the uncompleted structure, or any other action. Consideration will be given to remaining landscaping based on seasonal constraints; however, such landscaping must be completed during the beginning of the next planting season. The amount of any expenditure incurred in so doing shall be the Owner’s obligation. In addition, a lien on the Lot may be recorded and enforced by an action at law. The Association may also take such action as is available in the Declaration and by law or in equity, including an injunction and/or action for damages. 5.8 Inspections The DRP reserves the right to inspect the property during any stage of construction. If the DRP determines, in its sole discretion, that discrepancies exist between the construction and approved plans, the Declaration, or the Design Manual, the Owner shall immediately correct the discrepancies or submit a Form C (after the fact changes) for review and approval. Inspections are required to ensure that construction proceeds in compliance with these covenants, regulations, and approved drawings. Inspection fees are included in the design review application fees. The inspections will generally take place when framing is nearing completion, when siding has neared completion and when landscaping has been completed. Owners are responsible for notifying the DRP when a project is ready for review at each stage noted above. The DRP reserves the right to enter the property and inspect the exterior of the project for compliance during any stage of construction. The DRP is empowered to enforce its policy as set forth in the Design Manual, in law or equity, to ensure compliance. The inspection shall determine general compliance with the Declaration, Design Manual, and approved plans. If the DRP finds the improvements were not completed in strict compliance with the Declaration, Design Manual, and approved plans, the DRP shall notify the Owner of the noncompliance, and shall require remedy of the same. The Owner shall have seven (7) days from the notification to remedy the noncompliance or to submit a work plan delineating the time frame when the noncompliance will be remedied, although in no instance shall the timeframe exceed forty-five (45) days. The DRP may allow up to forty-five (45) days for the noncompliance to be remedied if the Form C and corresponding work plan provides adequate justification for the requested time. 12 If the noncompliance is not remedied, the Board of Directors may, in its sole discretion, remedy the noncompliance. The amount of any expenditure incurred in so doing shall be the Owner’s obligation. In addition, a lien on the Lot may be recorded and enforced by an action at law. The Association may also take such action as is available in the Declaration and by law or in equity, including an injunction and/or action for damages. The owner shall reimburse the DRP for any time spent on an inspection that is above and beyond the average inspection (including multiple phases and buildings staggered construction). the payment shall be based on the hourly fee (approximately $100/hour). No occupancy of the project shall take place prior to the completion of all required inspections or as otherwise specified by the DRP. 5.9 Liability Neither the Eastlake Professional Center Homeowners’ Association, the Declarant, the Board of Directors, the DRP, nor the individual member's thereof, may be held liable to any person for any damages for any action taken pursuant to this Design Manual, including but not limited to, damages which may result from review, correction, amendment, changes or rejection of plans and specifications, observations or inspections, the issuance of approvals, or any delays associated with such action on the part of the Design Review Panel or Board of Directors. 13 Chapter 6: Design Guidelines The City of Bozeman approved and adopted changes to Chapter 38 of the Bozeman Municipal Code (BMC). All development must review and adhere to the current design guidelines outlined in BMC Chapter 38. These regulations and requirements may be found at www.bozeman.net. In addition to the BMC regulations and Eastlake Professional Center Subdivision, additional requirements are described in the following sections. Any photos are included reference only. Note that some provisions of this Design Manual may be more-or-less restrictive than local land use regulations as part of the overall Eastlake Professional Center Subdivision. See Section 6.4 for allowable variations from these design guidelines. Please also refer to Exhibit 2 for lot diagrams and specific lot by lot requirements. 6.1 Site & Block Frontage Standards The following site design guidelines are intended to provide a framework for site layouts within Eastlake Professional Center and meet the site and block frontage standards outlined in the Bozeman Municipal Code (BMC Sec. 38.510 and 38.520.) Block Frontages  All lots fronting on North 27th and Honor Lane will conform to the “Landscaped Block Frontage” standards (BMC Sec.38.510.030.C).  Criteria: The intent of the landscaped block frontage designation emphasizes landscaped frontages and clear pedestrian connections between buildings and the sidewalk  Lots Fronting on East Valley Center Road will conform to the “Gateway Block Frontage” standards (BMC 38.510.030.E).  Criteria: The gateway block frontage designation serves strategic areas fronted by highways or other high visibility arterials that feature heavy vehicular traffic, but there is a desire to provide attractive landscaped frontages, limit the extent of visible surface parking, and accommodate the needs of pedestrians.  Landscape Material permitted: Property owners may select plant materials to meet their landscape installation requirements and points from a list provided in Appendix A. Fences & Screens  No fences are allowed.  Landscape material such as screen walls are required to meet all setbacks and must be aesthetically connected to and appear as an extension of a building wall. Pathway Design  All pathways and circulation of the Subdivision will conform to BMC Sec 38.520.040. C 14  Any existing sidewalks in the right-of-way or open spaces that are damaged during construction must be repaired or replaced at the lot owner’s expense.  Crosswalks are required where the pedestrian walkways cross the parking areas of Lot 2 (a common lot for all property owners). Crosswalks must be concrete or other approved surface.  The pedestrian walkways will be differentiated from asphalt and drive surfaces.  Pathways must be separated from structures by at least three feet of landscaping where buildings exceed 100 feet in length, per the Bozeman Municipal Code. Departures are permitted for other landscaping and/or façade design treatments to provide attractive pathways will be considered. Examples include sculptural, mosaic, bas-relief artwork, or other decorative treatments that meet the intent of the code, see 38.520.040.D.3 of the BMC for an example.  Bicycle racks are provided throughout the campus. Each lot owner is responsible for the installation and maintenance of the bicycle racks designated for their lot in the Master Site Plan. For a list of all site amenities, refer to Appendix B. 6.2 Building The following building design guidelines are intended to promote both building diversity and compatibility with the neighborhood business node. All building heights, encroachments, etc. are governed by the BMC and Eastlake Professional Center Subdivision. Bozeman regulations in Sec. 38.530.404 of the BMC should be consulted to ensure adherence to applicable codes and regulations. Note that the Design Manual guidelines may be more restrictive than the city ordinances including but not limited to the building requirements listed below. Building Character  To promote appropriate architectural elements that create a cohesive look and feel to the Eastlake Professional Center Subdivision. A focus is placed on human scaled design details, high-quality materials and sustainable design measures. The desired building character will enhance and respond to the site’s unique context and Eastlake Professional Center’s design intent. Massing & Articulation  All facades of the main building shall be made of similar materials and be similarly detailed. See lot diagrams for additional requirements. Walls & Facades  A minimum 60% of overall wall composition must me made of masonry unless approved otherwise for design merit. Façades must have overall comprehensive composition and address and compliment all adjacent site conditions. 15 Fenestration Design  Windows and doors must be commercial quality aluminum storefront materials unless approved otherwise for design merit and must have overall comprehensive composition. Entrances  All egress points must be articulated and be part of the overall comprehensive composition. Roofs  A minimum of 60% of each building roof composition must be flat unless otherwise approved for design merit. Lighting  Common space and common element lighting will be Kim Lighting fixtures, per the Eastlake Professional Center Subdivision and will be installed by the developer. Maintenance of common light elements will fall under the Property Owner’s Association responsibility. Sheet PM 1.0 contains a list of fixtures and locations for common lighting elements.  All exterior building lighting must be dark-sky compliant.  The following lighting is prohibited: obtrusive flood lighting, mercury vapor or high-pressure sodium lights, metal halide lights, and clear glass or exposed bulb (non-cutoff) fixtures. Specialty Features  Buildings featuring food preparation and/or commercial kitchens are required to incorporate an approved grease interceptor. Signage  All property owners and businesses will be required to conform to the Bozeman Municipal Code sign ordinances (38.560), have signage that is high quality, compliments the building design and overall project, and receives prior approval before installation. Prohibited Building Type  Prefabricated, modular, mobile, factory built and/or kit buildings are prohibited. Lot Specific Information:  General, lot specific regulations are outlined below. In addition to the general Lot layouts and building configurations, pedestrian plazas are addressed in Section 6.4, Landscape. Each Lot owner is responsible for achieving all requirements of their Lot and the intent of the Master Site Plan. 16 6.3 Parking Eastlake Professional Center has a common, shared space and is available to support parking for the all the lots in the subdivision. The oversight, management and sharing of the common parking lot is detailed in the Declaration of Covenants, Conditions and Restrictions for Eastlake Professional Center. Maintenance of the shared commons parking area and replacement and upkeep of all associated elements will fall under the Property Owner’s Association responsibilities. This includes: • Parking lot surfacing • Parking lot landscaping, plant materials, surfacing and related irrigation. • All internal parking lot painting, striping and traffic regulation measures • Snow removal • Cross-walk maintenance • Parking lot lighting 6.4 Landscape Section 38.550 of the BMC details local regulations with respect to landscaping. The proper use of plant materials adds to a sense of permanence and consistency for the neighborhood commercial node and adjacent residential areas while connecting the built and natural environments. Landscape plans submitted with Form B should outline hardscape elements, and planting areas with species and quantities listed. Each Owner will be required to meet minimum landscape specifications related to three general categories: Landscaped frontages, pedestrian-oriented spaces and site landscaping. Street Trees & Boulevards  Individual lot owners shall be responsible for landscaping the boulevard area directly adjacent to their property prior to occupancy and for the maintenance of the boulevard area thereafter, unless arranged otherwise.  All boulevard plantings must follow City of Bozeman requirements for street tree permits. See landscaping plans for approved installation locations and Appendix A for species selection.  It is the responsibility of the Owner to contact the appropriate utility companies before digging and installing species. Vegetation & Solar Gain  Special consideration should be given to areas of sun exposure and shade for the planting of trees and large shrubs. Landscaping should allow southern exposures necessary for solar gain in the winter.  Alternative water-conserving designs may be considered based on overall design merit and composition. Hardscapes  All plazas will consist of concrete walkways or as otherwise approved. 17 Irrigation Systems & Water Use  Irrigation of common area will be maintained and operated by the Property Owner’s Association. Maintenance and Weed control  As further specified in the covenants, all maintenance of landscaping, weed control will be the responsibility of the Property Owner’s Association. Vegetation Removal  No landscaping in the right-of-way, and common areas may be removed without prior permission from the ARC. 6.5 Pedestrian Oriented and Commercial Open Space To create usable and vibrant outdoor spaces for employees and visitors, Eastlake Professional Center Subdivision will adhere to the design criteria outlined in Sec 38.520.060.D for pedestrian oriented open space. This section applies to all plazas and shared spaces in Eastlake Professional Center Subdivision, see sheet L 0.0 for approximate locations of amenities and Appendix B for images of site amenities. Paving Materials:  Plazas and circulation will be poured concrete. Lot owners may request to use other paving elements that must be approved by the ARC, meet the intent of the Master Site Plan and create a cohesive transition between common space and plaza areas. Furniture and Amenities:  All site amenities will be installed and maintained by the property owner’s association. For specific locations please see master site plan drawings. These amenities are intended to serve the Subdivision and create site cohesion. 6.6 Service Areas and Mechanical Equipment To reduce visual impact of mechanical and utility needs, as well as maintain accessible service areas, the requirements of BMC Sec. 38.520.070 apply to all service areas, dumpsters, electrical panels and mechanical equipment associated with buildings and activities at the Subdivision. In addition to these requirements, the Subdivision shall adhere to the following stipulations: Location:  Electrical panels, service areas and mechanical equipment shall not be located adjacent to North 27th Avenue or East Valley Center Road Street facing building facades. All required screening mechanisms shall be detailed on site plans and development applications. When possible, these areas should be located within landscaped areas and away from pedestrian access routes. 18 Screening Materials:  Plant materials used for screening must be chosen from the planting palette approved for the Eastlake Professional Center Subdivision. Substitutions may be granted based on design merit and cohesion with other landscape materials. Dumpster enclosures:  Enclosures are sited in the parking area and are screened with landscape material and fence material. The dumpster enclosures also have a horizontal trellis component for screening the top of the trash enclosure, see sheet C 3.0 for full details. They are considered common elements and will be maintained through the property owner’s association. No other dumpster or trash receptacles are allowed. 19 Chapter 7: Amendments Amendments to Design Manual may be made as set forth in the Declaration. A submittal shall be processed consistent with the Design Manual in effect 30 days prior to ARC receipt of a complete Form A submittal. No improvements that were constructed and approved in accordance with the Design Manual shall be required to be changed because such standards are thereafter amended. 20 Exhibit 1: The Eastlake Professional Center Subdivision, Legal Description A tract of land, said tract being Lot 1A of Minor Subdivision Number 221E, and the adjoining portion of East Valley Center Road, said tract being located in the Southwest Quarter of Section 26, Township 1 South, Range 5 East, Principal Meridian Montana, City of Bozeman, Gallatin County, Montana and being further described as follows: Beginning at northeast corner of Lot 1A of Minor Subdivision Number 221E; thence South 00°55'05" West, on the east line of said lot, a distance of 608.81 feet; thence South 89°50'55" West, on the south line of said lot, a distance of 462.52 feet; the following three courses are on westerly line of Lot 1A: thence North 00°54'39" East, a distance of 486.42 feet; thence on a non-tangent curve to the right with a radius of 430.00 feet, a central angle of 35°39'21", an arc length of 267.59 feet, having a chord which bears North 18°44'59" East, 263.30 feet; thence North 36°34'58" East, a distance of 125.33 feet to the northerly corner of said lot; thence North 36°34’58” East, on the northeasterly extension of the said westerly line, a distance of 75.00 feet to the centerline of East Valley Center Road; thence South 53°26’10” East, on said centerline, a distance of 326.19 feet, thence South 00°55'05" East, on the northerly extension of the east line of said Lot 1A, a distance of 92.29 feet to the Point of Beginning. The described tract has an area of 8.26 acres, more or less. The described tract is as shown on the accompanying exhibit and is along with and subject to any existing easements. 21 Exhibit 2: The Eastlake Professional Center Subdivision Lot Diagrams 22 Appendix A: Planting List Listed below are the acceptable plant species for Eastlake Professional Center. Lot owners are responsible for achieving the landscape points allocated to their lot on the landscape plan and as detailed in section 6.4 of the Architectural Design Guidelines. The tables below detail which species may be selected for each category of landscape plant and to achieve a cohesive landscape plan throughout Eastlake Professional Center. Species were chosen for drought tolerance, aesthetics and to achieve the design intent of the subdivision. All species denoted *** are drought tolerant. Design Recommendations for Planting Style: In small rectangular courtyard planters, a ‘monoculture’ planting of low maintenance Ornamental Grasses or hardy shrubs is preferred. Vigorous shrubs such as Rhus aromatica ‘Gro-lo’, Spirea befuligolia ‘Tor’ and Juniperous sabina ‘Buffalo’ are especially good shrubs for this application as they tend to fill in spaces and out compete weeds. They will work well planted with smaller ornamental trees as they grow lower and provide a good groundcover for the trees. Large grids of ornamental grasses are also preferred as they only require a Fall/Spring trim and provide nice impact and screening in Summer-Fall. Each Lot in Eastlake Professional Center shall have street-side perennial and ornamental grass plantings covering a minimum of 300 square feet per building. These plantings shall be designed with the required shrub and tree numbers for each lot. Plants should be clustered in groups as opposed to being scattered singly around building foundations. Bold plantings of similar material and or/ matrix plantings are encouraged. See photographs (below) for planting styles. Ornamental grasses and perennials are preferable to thick foundation plantings so as not to cover windows and obscure sightlines from the street and within the building. Hatches indicating locations for these plantings are located on the Landscape Plan as a general guideline. I. Large Trees: Species are noted as canopy and non-canopy to correspond to trees on landscape plan, and for meeting landscape requirements detailed on the landscape plan. Large Canopy Trees: Acceptable for Street tree plantings and parking lot islands Scientific Name Common Name Acer freemanii ‘Jeffersred’ Acer platanoides ‘ Helena’ Ulmus Davidiana Gleditsia triacanthos Quercus Macrocarpa Tilia Americana Ulmus Americana Acer Platanoides Ulmus Americana ‘brandon’ Autumn Blaze Maple*** Helena Maple *** Accolade elm *** Honey Locust *** Bur Oak *** American Linden ‘Dropmore’ *** American Elm *** Norway Maple *** Brandon Elm *** 23 Large Non-Canopy Trees: Scientific Name Common Name Acer tartaricum Betula papyrifera Betula platyphylla Sorbus decora Prunus ussuriensis Prunus virginiana Prunus Mackii Tilia Cordata Tartarian Maple *** Paper Birch *** Asian White Birch ‘Dakota pinnacle’*** Showy Mountain Ash*** Ussarian Pear*** Chokecherry *** Amur Chokecherry *** Littleaf Linden ‘Greenspire’ *** II. Small Ornamental Trees – For siting near buildings and planters. The small ornamental trees are ideally multi-stemmed and well branched, these plants are suitable in small planter strips, in planted beds near buildings and in courtyard spaces. It is encouraged that small ornamental trees are grouped together, see landscape plan for notes and quantities required. Small Ornamental Trees: Scientific Name Common Name Acer Ginnala Maackia amurensis Sorbus spp Syringa reticulata Amelanchier x alnifolia ‘Autumn brilliance’ Prunus padus var. commutate Amur Maple *** Amur Maackia ‘summertime’ *** Hawthorn ‘snowbird’ ‘toba’, ‘Thornless cockspur’ *** Japanese tree lilac *** Serviceberry *** Mayday Tree *** III. Shrubs, perennials and grasses – for use in planters, planting strips and landscape beds Shrubs: Scientific Name Common Name Amelanchier alnifolia Caragana aborescens Caragana pygmaea Rhus aromatica Aronia melanocarpa Berberis repans Cotoneaster apiculatus Berberis thunberfii Euonymous elatus Lonicera involucrate Spirea betulifolia Serviceberr Peashrub Siberian Pygmy Peashrub Sumac ‘grow low’ Iroqois Beauty Oregon Grape Cranberry Cotoneaster Barberry ‘crimson pygmy’ Dwarf Burning bush Twinberry honeysuckle Birchleaf spirea ‘Tor’ 24 Spirea Fritschiana Spirea x bumalda Prunus besseyi Ribes alpinum Syringa patula Viburnum trilobum Cornus alba Fritsch spirea Spirea ‘Froebel’ Sandcherry ‘Pawnee butte’ Alpine currant ‘greenmoung’ Dwarf Lilac ‘Ms. Kim’ Dwarf American Cranberrybush ‘Bailey compact’ Dogwood ‘ Ivory Halo’ ‘ Elegantissima’ Evergreen Shrubs: Scientific Name Common Name Juniperus Sabina Juniperus scopulorum Picea abies Picea pungens Pinus mugo Taxus x media Savin juniper ‘broadmoor’ ‘buffalo’ Rocky mountain juniper Dwarf spruce – ‘little gem’ ‘birds nest’ Dwarf Blue Spruce ‘Globosa’ Mugo Pine ‘Tannenbaum’ ‘Valley Cushion’ ‘Slow mound’ Spreading Yew ‘Taunton’*** Ornamental Grasses Scientific Name Common Name Calamagrostis x acutiflora Festuca Glauca Helectotrichon semperviviens Panicum virgatum Sporobulus heterolepsis Selseria autumnalis Feather reed grass ‘karl forester’ ‘Avalanche’ ‘El Dorado’ ‘ Blue Fescue ‘Blue select’ Blue oat grass Switchgrass ‘Northwind’ ‘Shenandoah’ Prairie dropseed Autumn moor grass 25 Flowering Perennials: Scientific Name Common Name Artemisia versicolor Centranthys ruber ‘coccineus’ Geum triflorum Nepeta Fasenii Penstemon strictus Perovskia atriplicifolia Salvia x sylvestris ‘snow hill’ Salvia x nermerosa ‘caradonna’, may night’ Veronica liwensis Sedum spp Amsonia hybrid Aster hybrid Cerastium tomentosum Echinacea purpurea Hemerocallus sp Heuchera Iris Siberica Penstemon spp Rudbeckia fulgida Stachys monieri Veronica spicata Sage ‘seafoam’ Jupiter’s beard Prairie smoke Catmint ‘dropmore’, ‘walkers low’ Rocky Mountain Penstemon Russian Sage Snow hill meadow sage meadow sage Turkish Veronica Sedum Amsonia ‘blue ice’ Aster ‘tiny theo’ ‘woods purple’ snow in summer Echinacea ‘magnus’ ‘sunrise’ ‘white swan’ ‘vintage wine’ Daylily coral bells Siberina Iris Penstemon Black Eyed Susan ‘little goldstar’ ‘Goldstrum’ Betony ‘Hummelo’ Veronica IV. SAMPLE IMAGES The above images are examples of “bold plantings of similar materials” to achieve large swaths of color and texture while filling landscape areas. 26 Additional examples of massing and mixing perennials and flowering plants. Trees mixed with perennial/grasses as ground cover Low growing, hearty shrub, Rhus aromatica ‘Gro-lo’, as a monoculture shrub installed around a tree. 27 28 Appendix B: The Eastlake Professional Center Subdivision– Executed Shared Use Agreement for Stormwater access DRAFT INCLUDED IN MSP APPLICATION, FINAL SIGNED COPY TO BE INSERTED INTO DESIGN REGS 29 Appendix C: Stormwater Maintenance Plan DRAFT INCLUDED IN MSP APPLICATION, FINAL SIGNED COPY TO BE INSERTED INTO DESIGN REGS 30 Eastlake Professional Center Design Review Indicate Form being submitted by checking appropriate box(s): Form A: Sketch Design Review Form B: Construction Design Review Form C: Application for Change(s) Submittal Date: __________________ Property Information: Street Address: ______________________________________________ Lot __________ All design review correspondence will go to primary contact. Indicate primary contact by checking the appropriate box: Owner Information: Name: __________________________________________________________ Mailing Address: __________________________________________________ Telephone: ________________ Email: ________________________________ Architect Information: Name: __________________________________________________________ Mailing Address: __________________________________________________ Telephone: ________________ Email: ________________________________ Builder Information: Name: __________________________________________________________ Mailing Address: __________________________________________________ Telephone: ________________ Email: ________________________________ Landscape Designer Information: Name: __________________________________________________________ Mailing Address: __________________________________________________ Telephone: ________________ Email: ________________________________ 31 Departures: 1. Are any departures from the Eastlake Professional Center Design Manual being requested under this application?  Yes  No If yes, please describe the departure: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 2. Items submitted (please check):  Review Fee(s) $_______  Colored Elevations  Site Plan Including grading  Floor Plans  Roof Plan  Building Sections  Landscape Plan  Garage Door Cut Sheet (If Applicable) Request for Changes (Form C): 1. Type of Modification  Proposed Modification (C1)  Modification already constructed (C2) 2. Change description and reason for Change (Attach specific drawings of proposed changes.) ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Project Timelines: Please List anticipated completions dates for each Phase. Design Review Approval ____________ Foundation _______________ City Approval _____________________ Framing __________________ Break ground _____________________ Siding ___________________ Landscaping _____________ 32 Acknowledgement Statement: The Lot Owner acknowledges that he/she has received, read and will abide by the Design Manual for Eastlake Professional Center. As stated in the both the Covenants and Design Manual, violations will be remedied by the Eastlake Professional Center Homeowners’ Association whereupon the Lot Owner will be responsible for the cost of the remedy. I (We) ______________________________________________ am/are the owner(s) of record of Lot ____, of Eastlake Professional Center. I/We have read these requirements and understand their implications. Furthermore, I (we) have been given sufficient opportunity to discuss any questions we may have regarding these requirements with a member of the Eastlake Professional Center Design Review Panel. My (Our) signature(s) below is/are evidence of my/our intent to comply with these requirements. Property Owner Signature: ___________________________ Date: _________ Printed Name:____________________________________________________ Applicant Signature: ________________________________ Date: _________ Printed Name: ___________________________________________________ *FOR OFFICE USE ONLY* DATE RECEIVED ____________ CHECK NUMBER ____________CHECK AMOUNT ____________