BELOW-GRADE PARKING GARAGE
Two of the residential buildings, the office building, and a portion of the public open space are
constructed over a parking garage.
62 Parking spaces
Entry & exit to the parking garage is from Aspen Street in order to direct traffic to Wallace Avenue,
and reduce traffic impacts on Cottonwood Street and Ida Avenue.
EAST ASPEN STREET
The entire right-of-way adjacent to the property is currently undeveloped. The proposal is to construct
a roadway, with sidewalk and other street improvements along the north and south side of the right-
of-way. In addition to the parking garage entry, the street will accommodate several parallel parking
spaces, and a loading zone.
EAST COTTONWOOD STREET
The Northern half of the right-of-way adjacent to the project site will be improved. The intention is for the
proposed improvements to match the character of recent improvements directly across the street - with
sidewalk, street trees, and diagonal parking. NOTE: MAINTENANCE OF THE ANGLED ON-STREET PARKING
IS THE RESPONSIBLITY OF THE PROPERTY OWNERS ASSOCIATION.
NORTH IDA AVENUE
The right-of-way adjacent to the project site will be improved with sidewalk, street trees, curb,
and parallel parking. Improvements will continue East across the Ida right-of-way up to, but not
including, the opposite curb.
WOONERF
The site provieds an additional North / South access, contemplated as a “woonerf” for shared use of
vehicles and pedestrian alike. The vehicular access is primariliy to services the rowhouse garages (C,D &E)
and to provide access for solid waste pick-up points.
PEDESTRIAN ACCESS
The 20’ fire lane will serve as a through-block pedestrian connection between the active Cottonwood-
Wallace Intersection, and the open green space at Aspen Street.
PUBLIC OPEN SPACES
The main open space on the site takes advantage of the distinctive Misco Mill and the renovated
on-site building to create a plaza suitable for hosting food vendors, farmer’s markets, and similar
community events; as well as daily informal use by the office tenants, residents, and artisan
community. Public services, such as event storage and restrooms will be located in the renovated
building at the Southwest corner of the site.
SITE ACCESSIBILITY
INFRASTRUCTURE STRATEGIES & SUMMARIES
CONTINUED
COTTONWOOD + IDA
SP1 SUMITTAL || JANUARY 2021
page 78
PARKING
The parking demand will be met primarily by the 62 space parking garage located partially below-
grade across most of the site. The project more than doubles the current onstreet parking to 26.
The Rowhouse units in buildings C,D&E have individual 2 stall parking garages. Commercial uses
are provided parking through a off site lease of 83 spaces. With nearby bus stops, and downtown
within easy walking and biking distance, we are able to provide residents and tenants with a
community that is less reliant on their cars for daily commuting and errands. With ample on-site
bike parking facilities, the reduced demand for parking is crucial to creating a more attainable -
and more diverse - set of housing options.
RESIDENTIAL PARKING STUDIOS 1-BDRM 2-BDRM 3-BDRM UNITS DEMAND
COUNTS 22 30 18 3 73
CURRENT CODE RATIO 1.25 1.5 2 3
PROPOSED REDUCTION RATIO 1 1.25 2 3 105
PROVIDED IN MIX OF ON-SITE, ON-STREET
BIKE PARKING CODE 12
PROVIDED 82
NON-RESIDENTIAL PARKING NON-RESIDENTIAL AREA
AREA NET
SF
USE*RATIO DEMAND
BUILDING A 3,775 PRIMARILY OFFICE 250 15
BUILDING F 2,200 RESTAURANT (INDOOR)50 44
700 RESTAURANT (OUTDOOR)100 7
17054 PRIMARILY OFFICE 250 68
BUILDING G 2100 ASSUMED AS ARTISAN 1000 2
CURRENT CODE 136
REDUCTION PER PUD 40%82
BIKE PARKING REQ’D 14 PROVIDED 38
* USES FOR COMMERCIAL COULD VARY- MAX PARKING DEMAND OF 84 FOR TOTAL
PARKING PROVIDED
ON SITE PARKING GARAGE 62 PRIMARILY RESIDENTIAL
ON SITE -PRIVATE GARAGES 18 DEDICATED TO RESIDENTIAL BUILDINGS (C,D&E)
OFF SITE LEASE 83 FOR NON-RESIDENTIAL USE WITHIN 800 FEET OF
ENTRANCE(S)
ON STREET 26 COUNTED TOWARD RESIDENTIAL ONLY
COVERED BIKE PARKING 52
ON SITE BIKE PARKING 68
TOTAL BIKE PARKING 120
TOTAL VEHICLE PROVIDED 189
TOTAL PER PUD REQUESTS 187
COTTONWOOD + IDA
SP1 SUMITTAL || JANUARY 2021
page 79
FIRE PROTECTION
Buildings A and B will have floors and/or roof decks at least 30 feet above the adjacent road where fire
equipment will have access. We are proposing standpipe systems in the exit stairs at the North end of each of
these buildings.
All of the buildings and the below-grade parking garage will be fully-sprinklered per NFPA-13, with the exception
of the single-story existing building (building G), and only the three story units in C,D&E will be sprinkled.
The site is surrounded by public right of way on the North, South and East sides. The West side of the site will be
maintained as a 20 feet wide fire equipment access route. There is a 20’ wide access North / South behind buildings
C,D & E that will provide further access to buildings B,C,D,E & F. Each side of the project will have at least one direct
and readily accessible access point from the street or on-site fire access route onto the top of the parking garage,
INFRASTRUCTURE STRATEGIES & SUMMARIES
CONTINUED
SOLID WASTE COLLECTION
Unit owners are responsible for placing the trash, compost and recycling recepticals in designated locations on
pick-up day and returning them to the enclosed locations at the end of the same day.
A Trash room in building A serves the 3 one-bedroom, 12 two-bedroom residential units as well as the
3,775 SF of commercial (office) space and general common areas located in the building. studio and
one-bedroom apartments and the general common areas in the building.
The trash room is 168 sf (14 feet x 12 feet), and can accommodate up to two 4-yard dumpsters, roughly
6 feet x 4 feet each and five 1 yard totes. Building staff will use a pallet jack to move the dumpsters from
the trash room to Aspen Street for pick-up, and will place them back in the trash room once they’ve been
emptied.
B Trash room in building B serves the 49 studio and one-bedroom apartments and the general common
areas in the building.
The trash room is 300 sf (18 feet x 17 feet), and can accommodate up to five 4-yard dumpsters, roughly
6 feet x 4 feet each. Building staff will use a pallet jack to move the dumpsters from the trash room to
Aspen Street for pick-up, and will place them back in the trash room once they’ve been emptied.
C,D &E
Trash for the indiviual units will be handled with totes for each unit separateley and stored in the garages
. Pick-up will occur along the woonerf / drive access behind the units
F&G Trash room located in Building F will serve both F and G. The uses in these buildings may vary but it is
expected to have a 2,200 SF restruant, and 18,000 SF of commercial space combined. Janitorial staff will
collect trash and recycling from the offices, and place it in dumpsters and/or curbside bins. The dumpsters
and/or bins will be put out and retreived by building staff.
The trash room is 440 sf (22 feet x 20 feet), and able to accommodate up to four 4-yard dumpsters, roughly
6 feet x 4 feet each and six 1-yard totes. This area will also accomodate the needs of the resturant grease
recepticals.
COTTONWOOD + IDA
SP1 SUMITTAL || JANUARY 2021
page 80
WATER RIGHTS
WATER WELL PROPOSED FOR IRRIGATION
An existing well, located approximately in the Northwest corner of the project area, is proposed to be used for
landscaping irrigation. We have provided letters (email form) from the department of natural resources and
conservation that have indicated that our conumption and usage meets the threshold of an exempt well status.
See Appendix G for letters and communications with DNRC in Well Water Right Usuage Appendix. Addtionally
refer to L4.00 -02 & L9.00 for the design, layout and specifications for the proposed irrigation system.
USE USE AREA SF RESIDENTIAL
UNITS
UNIT WATER
DEMAND GAL/
YR/1,000 SF
UNIT WATER
DEMAND AF/
RESIDENTIAL
UNIT
ESTIMATED WATER
VOLUMN
GAL / YR AF / YR
RESIDENTIAL --73 --0.124 2,949,603 9.05
RESTAURANT 2,200 --165,000 --363,000 1.11
ARTISAN MANUFACTURING
(ASSUMED OFFICE 2100 --10,000 --21,000 0.06
OFFICE 20829 --10,000 --208,290 0.64
IRRIGATION N/A (EXEMPT WELL FOR
IRRIGATION WATER)
TOTAL 10.87
LESS CILWR CREDIT FROM 0.00
LESS HISTORICAL ANNUAL AVG METERED USE -0.07
NET VOLUME FOR CILWR 10.87
FINAL CILWR FEE ESTIMATE- 18516 COTTONWOOD + IDA PUD @ $6,000 / AF $ 65,220
CASH-IN-LIEU TABLE